City Council
January 27, 2026 · 7 recorded decisions · 18,057 words of debate
Decisions
- 3. Report 2026 Chief Administrative Officer Performance Review – Proposed Objectives dated January 20, 2026, be approved.Carried (8 to 0)
- 6.1 Approve the Corporate Climate Action Plan, with implementation of the Corporate Climate Action Plan subject to the pace of capital investment.Carried (11 to 0)
- 6.2 Now hold a meeting that is closed to the public, pursuant to the Municipal Act…Carried (11 to 0)
- 6.2 City Council, per Section 32(j) of Parkland Dedication By-law (2022) – 20717 as amended…Carried (6 to 5)
- 7. By-laws (2026) – 21199 through by-law (2026) - 21202, (2026) - 21204 and (2026) - 21205…Carried (11 to 0)
Routine business (2)adopting minutes, adjourning and similar
The whole meeting, as text
Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.
Read the full transcript (18,057 words)
12:11All right everybody if I could have my colleagues on online just to put their cameras on I'd appreciate it if you're there
12:19Thank you right off the
12:24right off the bat I have a
12:26Regrets official regrets from councillor Klassen for tonight
12:31and
12:32We're also looking to move into a closed session
12:37Before I do that though does anyone have any disclosure of pecuniary interest or any general nature thereof for the matters for closed session
12:47Okay, hearing and seeing none. Thank you
12:52So we have just two items
12:56That are on our closed agenda and they're titled chief administrative officer
13:022026 performance objectives update
13:05Section 239 to BND of the municipal act regarding personal matters
13:11Unidentifiable individual including municipal or local board employees and labor relations or employee negotiations
13:18And the section the second one is Sloan Hill Park encroachments
13:23section 239 to F of the municipal act regarding advice that is subject to solicitor client privilege including communications
13:31necessary for that purpose
13:33Those are the only two items that we would look to be discussing as your colleague of mine that be willing to move
13:40Councillor Richardson and alt will second. Thank you
13:44I'll call the vote if that's okay. Is anyone against those two items to talk about enclosed
13:49Nobody that's unanimous. Thank you very much. And so we'll have that meeting now and then
13:55We will look to have a summary when we come out of closed session to continue with the open
14:02I probably will do the summary at six o'clock when the public meeting is actually
14:10To start at six. So just so if anyone is watching online or is
14:15in the room
14:17Which nobody is
14:19Then just be prepared that we probably will not come back out until six o'clock no matter what to start at that time
14:26Okay, so thank you very much. All right. Good evening everybody
1:34:30It is
1:34:32About five minutes to six and normally our open session meeting would start at six
1:34:38We've had a little bit of a delay. So we are going to start the open session at six fifteen
1:34:43Okay, so we're sorry about that. I will give the uh, the
1:34:48in-camera summary
1:34:50At that time when we start the open session. Okay. Thank you very much
1:54:32Okay, everybody. This is your one minute
1:54:35friendly warning
1:54:37Before we start our open session
1:55:59Okay, if I could just have my friends online, uh, maybe throw their cameras on just so I can see how many are there to see if we have
1:56:05quorum
1:56:08Okay, we do I am going to call the meeting to order in the open session right now
1:56:14Um, we did move into a closed session earlier around around 4 30
1:56:20And as described on the open agenda, we had two items that we went in camera on
1:56:25The first one was the chief administrative officer
1:56:292026 performance objectives update and the second one was the slownhill park encroachments
1:56:36I'll just start with the second one as the high level summary there. So we did give
1:56:40a direction to staff in regards to the slownhill park encroachment issue
1:56:45In regards to the chief administrative officer 2026 performance objectives update
1:56:51We have actually a motion that's coming from closed session into the open session right now
1:56:56And I'll just ask a counselor karan uh to consider moving that please sure happy to move it seconded by counselor
1:57:03Richardson that the report 2026 chief administrative officer performance review proposed objectives dated january 20th 2026 be approved
1:57:13Great. Thank you very much and just before I call the vote on that because uh, this happens every year
1:57:19and what we changed several years ago was uh to actually have
1:57:24Once it's approved the ceo actually come in open session to do a delegation and presentation
1:57:31To everybody about what these objectives actually are and that will be happening in the next couple of weeks
1:57:36We're going to have terra come and and speak about that. So just so just so everyone knows from the open session
1:57:41She'll come and she'll speak about that in the uh here as well. Okay in a couple weeks. So uh with that
1:57:47I'll call the vote if that's okay everybody. Yep. Okay. Is anybody against?
1:57:54Nobody so that's unanimous. Thank you very much
1:57:57And that's the only two issues that we had for our in-camera and that's my summary for that
1:58:02So let's kick off our open session meeting now
1:58:06If stand if you're able, please as we recognize our national anthem
1:58:10So everybody will just have a moment of silent reflection before we move into our territorial acknowledgement
2:00:06Great. Thank you
2:00:08As we gather let us take time to reflect on our privilege to live and work here in Guelph a city built over rich indigenous histories
2:00:14We're guests here and should reflect upon the responsibility to care for this land
2:00:19The people who live here today and the generations to come
2:00:22If our actions today can move us towards reconciliation, we should take pause
2:00:26And make those decisions with intention and gratitude
2:00:29This place we call Guelph is served as traditional lands and a place of refuge for many peoples over time
2:00:33But more specifically the Anahuanarok and the whole Nishoni
2:00:37This land is held as the treaty lands and territory with the mississaugas of the credit first nation
2:00:43Guelph lies directly adjacent to the Haldeman track and is part of a long-established traditional hunting grounds for the six nations of the Grand River
2:00:50Many first nations Inuit and Métis people who have come from across Turtle Island call Guelph home today
2:00:57Thank you. Is there any disclosure of pecuniary interest or any general nature there of for the items in front of us tonight?
2:01:07I'm not hearing anything not seeing anyone. So i'll consider that matter closed. We do have
2:01:14confirmation of the open minutes and that is from the meeting held on November 25th
2:01:19December 9th and 16th 2025
2:01:22And the open minutes of the committee the whole meeting that was held on December the 2nd 2025
2:01:27To be confirmed and as recorded and without being read with someone bubbling a busitil and hauser
2:01:35Thank you. Anything further on the minutes anybody?
2:01:40No, okay. I'll call the vote. Is anyone against those minutes?
2:01:44Okay, hearing and seeing no one that's unanimous. So I'll consider that matter closed
2:01:49We have a presentation to kick us off on our corporate
2:01:54climate action plan from both Ian Scott and
2:01:57Brian Hoyan and I'm going to ask
2:02:00Both of them to get prepared to come up and and give us that presentation
2:02:04And then after that we have a couple delegations as well
2:02:09So welcome to them, but Ian. I'll kick it on over to you right away. Go ahead
2:02:20I'm Ian Scott
2:02:23Thanks. Sorry. Good evening mayor and council. I'm Ian Scott general manager of facilities and energy management
2:02:30And today we are here presenting to you the corporate climate action plan
2:02:34This plan builds on momentum and work that the corporation is currently undertaking and has direct control over
2:02:40This includes electrophlying our transit and fleet along with investments into our buildings for energy reduction such as led lighting upgrades
2:02:48Building envelope upgrades and solar panel installations
2:02:52These investments have saved the corporation 11 million dollars since 2018
2:02:58And continue to save three million dollars annually on our utility bills
2:03:02The annual savings will continue to grow as utility rates increase into the future
2:03:08Moving forward this plan provides a roadmap for reducing energy and greenhouse gases across the city
2:03:14Cross city operations to meet the corporation's climate and energy reduction goals for race to zero and 100 renewable energy by 2050
2:03:24While there is still much work to do the information presented today and investments in the associated actions
2:03:30provides measurable impacts reductions and returns to the corporation
2:03:34And with that I will turn it over to brian huyan our manager of energy and climate change to present the corporate climate action plan
2:03:55Okay
2:03:59okay
2:04:00Back in may 2025 we presented the community call to climate action which detailed the focus areas and actions for all residents
2:04:08businesses and institutions in the city of guelph
2:04:11Referring back to the sphere of influence model
2:04:15municipalities operate across three levels
2:04:18The community call to climate action spoke to where the municipality has indirect control and limited or no control
2:04:26And plays more of a supporting role to foster and encourage climate action in the community like the guelph greener homes program
2:04:33free guelph transit bus rides
2:04:35and healthy landscape visits
2:04:39During that council meeting we also said we would come back to you and discuss the direct control part
2:04:48So this is the part this is the part where we're more focused on the ways we can support
2:04:53In how we run our business
2:04:55This would be optimizing the municipal operations and what the corporation can do with the assets we manage to save energy
2:05:02And reduce greenhouse gas emissions
2:05:08Defining further on energy and emissions for municipal operations
2:05:12This is a diagram that illustrates the corporate energy and emissions boundary
2:05:17Within the dash lines is our operations where we include
2:05:21the energy usage and emissions from all buildings
2:05:24Like city hall parks washrooms west end community center
2:05:28And also the more industrial and process driven facilities like water pumping stations and wastewater treatment at the water resource recovery center
2:05:36We also include things like street lights and traffic signals
2:05:40Also included is all of the fleet vehicles that drive around and provide services throughout the city
2:05:46Are also and these include vehicles like wealth transit buses ambulances plows fire trucks
2:05:53And we also look at the energy we generate like the biomethane or digester gas
2:05:56We recover from waste or the electricity from the solar panels on a bunch of our buildings
2:06:03Finally, we also need to consider things outside of our operations
2:06:06Specifically where we get our energy from
2:06:09What different types of energy and how clean or dirty they are
2:06:13Like where our electricity comes from say nuclear solar natural gas plants, etc
2:06:23So why a corporate climate action plan?
2:06:27The corporate climate action plan
2:06:29sets the direction and roadmap
2:06:31On strategic actions that are needed to continue building on our progress and get towards our targets
2:06:37And as we continue that progress through smart investments
2:06:41We keep reducing operating costs by lowering our utility bills and reduce exposure to increasing rates
2:06:50These cost savings really come from being good environmental stewards that eliminate resource waste and reduce greenhouse gas emissions that cause climate change
2:07:00Overall running a strategic fiscally responsible and environmentally conscious municipality is what wealth residents expect of the corporation
2:07:16As we've been at this for some time, it's good to check in on how we're doing
2:07:21Here's our progress for each year up to 2024
2:07:24Since we set the baseline back in 2018
2:07:28On the left in the blue bars is the total energy use
2:07:33This is the amount of energy from all different types of fuel we use
2:07:37Like electricity natural gas diesel gasoline
2:07:42Last year we used 27.5 million less kilowatt hour equivalent of energy than we did back in 2018
2:07:51This is more than a 17 drop compared to the 2018 baseline
2:07:57On the right in the gray bars is the greenhouse gas emissions per capita
2:08:03This accounts for how much of all of the different fuels and energy sources we use
2:08:08And how clean or dirty they are and puts that against wealth's population as an indicator of how the municipality is growing
2:08:16Here we are also seeing long-term reductions with more than an 11 drop from 2018 levels
2:08:28This progress is not only good for the planet. It's also good for the pocketbook
2:08:33Energy costs are a large part of the operating budget
2:08:36The annual spend on energy and fuel is around 14 million dollars
2:08:404 million of that on fleet fuels 10 million on facility energy
2:08:46On top of that energy rates fluctuate a lot excluding rates
2:08:50Dipping during covid overall the increase over time
2:08:55If we use the same amount of energy each year as we did in 2018
2:08:59And were charged at the actual rates
2:09:02Over the years we would have paid over three million dollars more than we have in real life
2:09:07This is what the top row is showing
2:09:09Our savings from escalating energy rates
2:09:12But we did better than that
2:09:16We did better than just maintaining our levels of energy usage
2:09:19In reality we became more energy efficient since 2018
2:09:23And lowered how much energy we consumed
2:09:26Every unit of energy we don't use that's a unit of energy we don't pay for
2:09:32By using less we saved more than 8.2 million dollars
2:09:35Putting this together since 2018 the accumulated savings from energy efficiency efforts has been over 11.2 million dollars
2:09:43Worthy of note
2:09:45The cost savings is even more when you add the millions of dollars of grants and rebates we've received for energy management projects
2:09:52Essentially investment in energy projects unlock grants and rebates that discount the capital costs
2:09:58So as we see good progress and cost savings
2:10:04There's a strong case to maintain the momentum and keep moving forward towards our climate change target
2:10:11Let's refresh from the climate change targets
2:10:14The municipality is a part of the community and supports wealths raised to zero
2:10:20By doing its part to help the community reduce per capita emissions by 63 by 2030 against the 2018 baseline
2:10:27And become a net zero carbon community by 2050
2:10:31Putting this in the context for the corporation
2:10:34And applying population growth projections
2:10:36To achieve 63 reduction by 2030 this works out to about 10 000 tons
2:10:42For the corporation to remove the 10 000 tons of carbon dioxide equivalent. They there are key areas of focus across the corporation
2:10:58Policies and standards such as training setting policies and operating procedures and tracking energy and energy
2:11:04Having high performing buildings
2:11:06Through reviewing building systems implementing energy retrofits and zero carbon new construction
2:11:12Optimizing process equipment to be more energy efficient through process upgrades and recovering waste heat
2:11:21Transitioning to low emissions fleet vehicles by right sizing the fleet
2:11:25Building charging infrastructure and going electric
2:11:29And generating renewable energy where we get fuel from the energy source
2:11:33And generating renewable energy where we get further utilization out of our assets by installing solar on facility roofs and convert waste to energy
2:11:43Diving into these areas of focus key strategic actions have been identified that will move the needle and achieve the 10 000 tons reduction
2:11:56For policies and standards
2:11:58Maintaining ISO 5001 is important as it is the systematic backbone of how we manage corporate energy and emissions
2:12:05By ensuring we track data identify opportunities develop action plans
2:12:10Implement those actions and monitor and verify performance
2:12:14It's one thing to install a new piece of energy efficient equipment. It's another to make sure you run it right to get the benefits
2:12:21HVAC systems for heating and cooling corporate facilities are the largest energy users when looking around the whole facility portfolio
2:12:29By implementing clear building temperature standards for the different zones
2:12:32We can better operate maintain and optimize the HVAC system with no capital cost
2:12:42for municipal facilities
2:12:44We need to consider both new and existing buildings and how to get them to be high performing
2:12:50For new buildings nothing comes for free
2:12:53When we build a new building and add it to our portfolio, we use more energy to build it and run it
2:12:59We have to ensure that we don't go out of control and aren't just adding in in a wasteful way
2:13:04New facilities like south the south end community center and baker library
2:13:08Are prime examples by meeting zero carbon building standards where they have been designed to be well insulated
2:13:14Use energy efficient heat pump technology throughout
2:13:16And recover heat when it would normally be wasted
2:13:20It greatly reduces that impact
2:13:23This also applies to our existing building stock too
2:13:27Through energy audits and building recommissioning we must continue to implement capital retrofit projects
2:13:33and operating changes
2:13:35Like upgrading HVAC systems to heat pumps optimizing building controls or led lighting retrofits
2:13:46Some facilities we have include industrial process equipment
2:13:49Although more complex than at bigger scale, there are key strategic actions that can yield significant emissions reduction and cost savings
2:13:58The organic waste processing facility
2:14:00Where residential green bin waste gets processed and converted to compost
2:14:04Is approaching the need for refurbishment in the coming years
2:14:08This is an opportunity to further optimize this process by introducing anaerobic digestion to recover methane and convert it
2:14:15To a renewable biofuel that can be sold and injected into the natural gas grid
2:14:20And used as a renewable alternative by others
2:14:25Anaerobic digestion isn't new to gulf
2:14:27The water resource recovery center has incorporated this into its wastewater treatment process for years
2:14:33This facility recovers the gases from the digester and burns it in engines that generate electricity and process heat
2:14:42As the cogen equipment and infrastructure are getting on in years
2:14:46They will need replacement in the future
2:14:49This is another enhancement opportunity
2:14:52Where process heat can be recovered from the wastewater stream and leaving it all
2:14:57Leaving all of the digester gas to be converted to a renewable biofuel that we can sell to the grid
2:15:03As mentioned there are more complex and bigger scale projects
2:15:08Further work is required to take the findings from preliminary investigations to a detailed level
2:15:13To determine more of the technical constraints as well as the capital requirements to determine how best to deliver these projects
2:15:25Significant emissions come from fossil fuels used to power our fleet vehicles
2:15:29By transitioning to low emissions fleet vehicles, we are reducing GHG emissions in a big way
2:15:36A lot of good work is already underway with the electrifying
2:15:39With electrifying the conventional 40-foot buses, the largest fleet grouping responsible for the most emissions
2:15:45With 19 electric buses now in service and charging infrastructure being incorporated into the new gulf transit and fleet services facility
2:15:53More electric buses can be used
2:15:55So we can continue to provide affordable public transit
2:15:59In an energy efficient way
2:16:02For mobility buses electric options are available and are being explored and evaluated for when life cycle replacement comes up
2:16:09Good progress is being made with light duty vehicles
2:16:12As more options become available on the market
2:16:16That said there are more complicated vehicles to electrify
2:16:19The solid waste packers another vehicle that does lots of travel also has a lot of heavy equipment on it that makes it tough to electrify
2:16:28Other municipalities and businesses have piloted electrified waste packers and we will monitor their progress and see what can be adopted
2:16:39Finally generating renewables is a way to offset our energy consumption and emissions
2:16:44And a way to get more utilization out of our sites to reduce energy costs or generate revenue
2:16:51The corporation has expanded its facilities over uh solar pv portfolio from 78 kilowatts to over 500 kilowatts over the past few years
2:17:01On a larger scale the east view landfill is a big opportunity to install ground mount solar on the lands that can be used that can't be used for much else
2:17:10The design of the system must consider continued gas management storm water and other environmental impacts
2:17:21Looking at these corporate strategic climate actions. There is a range of no cost or low cost measures through to large capital investments
2:17:29With the overall investment estimated at 247 million over 10 years
2:17:34alternative project delivery models will also be considered
2:17:39These actions lay out a practical path of how to invest resources
2:17:43And capital so we can build and improve at the times we need to replace infrastructure and equipment
2:17:49And do so in a more energy efficient manner
2:17:58And through these investments significant energy savings can be had
2:18:02Which as demonstrated reduces energy costs and mitigate risks
2:18:07forever increasing energy rates in a big way
2:18:11Not only is it smart money. It reduces corporate emissions by 12452
2:18:17tons of carbon dioxide equivalent
2:18:20Which gets us to our 63 reduction target levels and really moves the needle towards net zero by 2050
2:18:29And on that I will hand it back to Ian Scott
2:18:36Thank you, brian
2:18:38So the plan today or the plan before you today for council's approval as per the recommendation on the screen
2:18:45Presents core investments to move the corporation towards our goals of race to zero and 100 renewable energy by 2050
2:18:53The recommended investments have defined and measurable returns for the corporation in both energy and greenhouse gas reductions
2:19:01along with the associated cost savings
2:19:03This can be seen through the savings the city is currently experiencing from previous energy retrofits
2:19:09And replacements along with solar panel installations
2:19:13The greenhouse gas reductions and and savings will increase as the city progresses with transit and fleet electrification
2:19:20Many of the actions recommended within this plan are in alignment or have a direct impact on other key initiatives within the city
2:19:28Examples of this include long-term affordability by reducing our energy usage and associated costs
2:19:34Or indirectly supporting the community called a climate action by providing cleaner and more sustainable forms of public transportation
2:19:41This plan is the next step towards meeting the city's long-term goals with the associated actions
2:19:47Realizing a reduction of approximately 10 000 tons of carbon dioxide equivalent
2:19:51Meeting our interim target of 63 reduction for greenhouse gas emissions
2:19:57More work is still required to meet our long-term climate goals by 2050
2:20:012050 after the actions contained within this plan are completed
2:20:07Staff will continue to work to advance this plan and the associated actions
2:20:11Updates will be brought to council as appropriate through the multi-year budget or the corporate energy reporting as
2:20:18as items become more defined and as time progresses
2:20:22And thank you and with that we will turn it back over to you. Mr. Mayor and we'll be happy to answer any questions
2:20:29Great, thank you very much
2:20:31um, I think if you don't mind everybody we just have two delegations and we might as well hear
2:20:36From them and and then we can wrap it up with questions back and after they're done. Okay
2:20:41the first uh
2:20:43that we have on our list is martin collier
2:20:47and joining us, I believe by telephone
2:20:50And martin, I see your name on the screen. I believe you have to hit star six to unmute
2:20:57Hello, mayor
2:21:07Yes, we can hear you and it's no more than five minutes and uh, so I'll interrupt if you're getting close to that point
2:21:14But I'll turn it over to you martin. Your time will start when you start. Okay. Go ahead
2:21:20Okay. Hi, I'm martin collier as you know and a sustainable transportation planner and spokesperson for the residents for a safe speed vell avenue
2:21:27RSA we support sustainable transportation infrastructure where it meets the mobility needs of the most people at the lowest cost
2:21:35While reducing emissions projects like the emma url bridge and speed vell reconstruction ask
2:21:40Exaltor Bay issues related to our environment public safety and city finances, especially in this COVID altered and tariff
2:21:47tariff altered world we live in in terms of the corporate climate action plan the rsa recommends its staff update it to include
2:21:55transparent calculations evaluations and communications of environmental impacts from road and bridge construction projects
2:22:02This includes inviting ghg emissions from onsite and offslate construction of infrastructure
2:22:08We'd like to see this clause added to the city's procurement policy bylaw number
2:22:132018 20259 the contractors provide the same data when submitting tenders and while construction is taking place
2:22:20On the demand side of the equation
2:22:22We'd like to see free parking passes the free parking passes for 2400 city and police staff
2:22:28Be phased out the revenues should be earmarked to sustainable modes that reduce ghg
2:22:33Guelph brands itself is a progressive community making a difference
2:22:36But on the transportation front it appears we're failing where emissions are concerned
2:22:41According to local journalist adam donaldson 30 percent of the city's emissions come from 100,000 registered vehicles in guelph
2:22:48And guelph transit isn't providing a viable alternative
2:22:51Of course inbound vehicles from across the gtha contribute as well
2:22:55In relation to emissions that the city has control over the elephant in the room is how the selection and construction of road
2:23:01And bridge infrastructure increases co2 emissions
2:23:04Case in point is the mro bridge, which doesn't help the majority of vulnerable road users traveling along and across speed veil
2:23:11It was extremely depressing to watch the destruction of speed river habitat due to the construction of this bridge to nowhere
2:23:17Even though it's proposed to reduce emissions due to increased biking and walking which hasn't happened to date
2:23:23The bridge must be analyzed for embodied ghg spewed during construction operations
2:23:28This includes emissions from three sources first from materials and equipment that were imported from all over the world
2:23:35And subsequently trucked in from ontario and kebek
2:23:38And massive emissions spewing excavators bulldozers trucks drove in and out of the destruction site each day
2:23:44Diesel generators ran all week and often through weekends when nobody was working
2:23:49The manufacturing and installation of concrete and steel are two major contributors to climate change
2:23:54The bridge is constructed with 35 slabs of concrete each weighing five tons
2:23:59That's 175 tons shipped from rodney, we believe
2:24:03And four masses steel beams totaling 164 meters. I have no idea how much they weigh, but they are shipped
2:24:09900 clouds from kebek city
2:24:11Second is transport emissions from contractors
2:24:14There were maybe up to 50 companies working on site since habitat and climate destruction started in late 2023
2:24:21Male engineers contracted some laborers all who lived outside wealth drove their f 150s from locations 50 to 100 kilometers away
2:24:28For at least one month one movie construction
2:24:32drove
2:24:34Sorry, um, about 320 000 kilometers for the eight month project
2:24:38So it'll take at least 390 000 bicycle
2:24:42headbridge trips over to recover emissions from this one construction worker
2:24:47Third is the emissions by loss of natural co2 absorption due to destruction loss of habitat
2:24:53According to u of t professor shoshana sacks the calculation of the embodied ghc in a construction project requires first actor
2:25:00An assessment of the quantity and types of materials and energy needed to construct the facility and second the ghc
2:25:07intensity of the materials of energy used in construction
2:25:10I can go into more detail on that if you'd like
2:25:13Calculating and communicating ghc in a transparent way must happen at the planning stage, but also at the procurement stage if it gets that far
2:25:21Goodson services by law number
2:25:24201 a 20259 has a great definition of environmental sustainability
2:25:29The protection and enhancement of the climate ecology and natural resources for future generations through approaches that reduce carbon dependency
2:25:36Enhanced energy resilience conserve energy and resources
2:25:40Another thing that the city has control over but it's not mentioned in the staff report
2:25:44It's the free parking passes provided the 2400 city and police staff
2:25:48These should be phased out with revenues earmarked to sustainable modes that reduce ghc
2:25:54Eventually council should phase out free parking on all street city streets
2:25:58Which isn't free
2:26:00Hopefully that decision will be made through the city wide parking strategy
2:26:05So I don't have time to reiterate those first those three recommendations
2:26:09But we'll be glad to do that and we're grateful if you will support them
2:26:13I'm just sorry. I couldn't be there with you in person, but wanted to save time and admissions instead. Thank you
2:26:21Great and thank you for your delegation. We appreciate that. Is there any questions for martin at this time?
2:26:28No, okay. Thank you very much martin
2:26:31It's all clear. Thank you, sir
2:26:33Okay, take care
2:26:35Uh evan evan frary come on down
2:26:39Evan's here in person. Thank you for coming
2:26:43And you know the drill levin no more than five minutes. I'll turn it over to you whenever you're ready great. Thank you
2:26:56Thank you, mr. Mayor and
2:26:58members of council um professor
2:27:01Darya taran from the university of guelph was planning to co-present with me this evening
2:27:04But unfortunately he's come down with the flu and and unable to make it
2:27:09Um professor taran and I are in the early stages of a joint research project. I say and I us at emerge
2:27:16Um, and I'm here somewhat prematurely
2:27:19Um, however the corporate climate action plan encouraged us to share our intentions of this research project publicly this evening
2:27:26First I want to say how encouraged we are at the by the project staff has brought forward in the plan at the same time
2:27:32It's disappointing to see that five of the most significant projects fall outside of the city's 10 year plan 10 year capital plan
2:27:40That's where we believe that we can help
2:27:43Emerge sustainability in conjunction with professor taran from the university of guelph would like to advance
2:27:48One of those projects is a community call it project a climate project that we've called
2:27:54making climate lemonade
2:27:57When the world hands us a lemon let's make some lemonade
2:28:01In the plan that's before you tonight this project is referred to as the east fuel landfill site thus thus the the
2:28:09uh the lemon
2:28:11So the east fuel landfill site solar pv projects using available land at the landfill to generate solar power
2:28:19We want to explore explore the feasibility of delivering this as a community invested solar project in this model solar electricity is generated
2:28:29um
2:28:30Is generated and sold to the grid or to a large user?
2:28:34potentially the city of guelph
2:28:36The city would not be responsible for capital or operating costs. It would simply pay for the power it receives
2:28:43local residences
2:28:46Local residences and businesses could invest directly in the project with minimum investments of as small as a thousand dollars
2:28:54This isn't about large investors. It's about making climate solutions and investment opportunities
2:28:59Accessible to as much of the community as possible
2:29:03Instead of installing panels on their own rooftops community members would receive bond style payments over the length of the contract
2:29:10This also allows participation by renters homeowners the business the business community and without any of those without suitable rooftops
2:29:19Community solar is not a new idea
2:29:22There are a dozen examples across the Ontario including at least four projects that have been operating in the city of guelph
2:29:30For more than 10 years. There are also
2:29:33Ontario based companies at least two Ontario based companies that are capable of facilitating
2:29:39These type this type of a project and have done so in in the past at this scale
2:29:43We estimated a capacity at the site solar capacity at the site of approximately 11 megawatts
2:29:49Which aligns closely with the staff suggesting of somewhere between 10 and 15
2:29:54megawatts who are a little conservative. I think on that end
2:29:57there are also um, we asked um, pardon me
2:30:01for context
2:30:02The city staff are suggesting 10 to 15 megawatts for context
2:30:07The entire city the entire community of guelph the city city's average peak electricity demand is 250 megawatts
2:30:15So as you can see 10 to 15 megawatts is a sizable amount of power that we could bring into the city
2:30:21what makes um, um, what makes making climate limit lemonade different is the challenge of building solar infrastructure on a former landfill site
2:30:30Fortunately, there are examples we can learn from from in Calgary the shepherd landfill solar project was completed in 2018
2:30:37and 2019 and now generates enough electricity for approximately 750 homes
2:30:43To put that into context the size of the project that we would be talking about at the land of the east view landfill site
2:30:50Would be significantly over the the amount the same amount of electricity significantly over a thousand homes
2:30:56Hamilton has studied solar development
2:30:59um solar development on its closed
2:31:02A glanford landfill site and saskatoon operates solar alongside its landfill gas
2:31:07Collection system like these projects east view will come with technical and regulatory challenges
2:31:14We are currently in the early stages of developing the research scope and criteria and we recognize this is a long-term effort that will take years to develop
2:31:22There is considerable amount of background information. We need already
2:31:26That's already available throughout the city's website or ask of council this evening is a simple one that we request assistance from staff
2:31:33In accessing possible additional information as the research progresses
2:31:38the information
2:31:40Would allow us to better define the scope of our research and assess whether a community invested solar project at east view is feasible
2:31:47We look forward to sharing our findings with council and the broader community and helping to build a movement that gives wealth residents
2:31:53The opportunity to invest in a local renewable energy project
2:31:57Take meaning and make climate lemonade
2:32:04All right. Thank you. Uh evan we appreciate your your delegation
2:32:08Um, especially if you're not feeling the best. So thank you for making the effort
2:32:14Um, I know I have a question, but it looks like I saw some hands. So I'm just going to go uh, feel
2:32:20Sorry, councillor Allt and karan and uh galler
2:32:24Uh, and then if they don't ask my question, then I will go uh, but you go uh first council
2:32:30Thank you very much, uh mayor bob. Oh, sorry got three
2:32:35Uh, uh through you to uh to mr. Ferrari the delegate mr. Ferrari
2:32:41um
2:32:42I appreciate your metaphor of making climate lemonade
2:32:45um, but um
2:32:47What I heard from you. I think is an elevator pitch. I was wondering if you could outline uh in in perhaps broader terms
2:32:56Uh, how this community investment project
2:32:59might work and
2:33:02You'd you'd mentioned other jurisdictions, but what I'm really curious about is guelph
2:33:06And so I'm wondering how guelph compares to other communities in Ontario
2:33:10I guess if you have to go overseas to talk about it fair enough, but but I am quite curious about this
2:33:16Um through you mr. Mayor Guthrie, um
2:33:19There there are sort of two aspects to this one is the actual landfill and there are multiple examples of landfills being turned into solar
2:33:26But um through you mr. Mayor, I believe the councillor is specifically asking about the the business model the actual model of what how
2:33:34Catch me if you could yeah, so so so there are a couple of different entities that there are there are two
2:33:39relatively large entities one one, uh, that's a solar not-for-profit co-op with over 80 million dollars worth of assets
2:33:46In ontario solar assets within ontario and it's built on this model that essentially
2:33:52While there may be some
2:33:54Some debt on the on the capital costs of the initial project that the bulk that that might be through traditional lenders
2:34:03The bulk of the the bulk of the the financing of the program
2:34:07Of these programs are by people investing small amounts like thousand dollars
2:34:13It's essentially exactly the same thing that many of you on council will know is the bond the bonds that uh, 10c issues
2:34:20As as an operation
2:34:23That they're financing an awful lot of their debt by going by going down this path
2:34:27there are
2:34:30As it turns out not that
2:34:33Full disclosure i'm the chair of a solar co-op hearing walf and we have approximately 300 kilowatts worth of projects
2:34:42All of our board members are volunteers
2:34:45We don't have the capacity to take on this type of a project in no way shape or form
2:34:50That's wearing that my hat as the chair of that of that solar project. Um, but um, uh, there's also another company called
2:34:58said co that that has at least three if not four
2:35:03Um, uh solar co-ops as well where people have invested as little as a thousand dollars or as much as 50 thousand dollars into each one of those things
2:35:11And and how they uh, how that essentially that's the financing model of being able to come up with the capital essentially to
2:35:17To to start the business in the first place and it's paid out over over the length of the contract in Ontario. It's through the through the
2:35:26Uh, the contract is guaranteed through the Ontario power authority as some of you will know as as
2:35:31that have solar on your house you're guaranteed that that, um, um, uh, that amount of
2:35:37Of revenue over a period of of 20 years
2:35:41I hope that's a little clearer your worship
2:35:45Um, uh, thank you
2:35:47Maybe the harder question because I understand what you said that they're uh, just yes or no
2:35:52That it would appear that there's community interest, but the harder question. I'll ask this to uh staff as well
2:35:58How does this fit into the corporate energy strategy?
2:36:01uh, well the simple thing would be that that, um
2:36:04What we're looking at is can
2:36:07Can the model be used in such a way where at the end of the day the city would put out a tender
2:36:14For companies to come forward with a business model that appeared like this
2:36:18But essential but what that what the city would be looking for
2:36:22Is a power purchase agreement with that company or with that co-op and what that power purchase agreement would be is is
2:36:30Currently the the city is is buying electricity an awful lot of electricity
2:36:34And this would provide the city to the opportunity to buy 100% renewable renewable energy from that specific
2:36:41facility, so that's ultimately where we would like to go
2:36:45We know there are going to be many trap doors along the way and and, um, um
2:36:51We're not shy. We're going to give it we want to give it our best shot and see how far we can take this
2:36:56Thank you very much
2:36:58Councillor Caron and then goller, please
2:37:00Thank you. Along a similar line, you know capital investment seems to be the
2:37:05You know the key roadblock to these large scale projects and you know our staff have brought for
2:37:11Our their best recommendation with the resource we as council have given them
2:37:15Um, but we know there's payback and you've outlined in your presentation. There's payback
2:37:19Um, we also know there's more than one lemon and i'm just wondering why you or perhaps it's because it's in the presentation
2:37:27Why east view is the the focus?
2:37:30Um, because we do have you know pollinator habitat there and we have other projects happening there disc golf, etc
2:37:37We maybe it's my algorithm, but I get all kinds of pop-ups in my social media about
2:37:43parking lots
2:37:44We have the west end parking lot and we have the vik road parking lot and and that parking lot solar arrays can be one to two acres
2:37:52And can also you know have co-benefits of not having to plow those parking lots because there's warming infrastructure underneath
2:37:59As well as storage on site and closer to actual residences and homes and buildings
2:38:06um
2:38:07I wonder if you could just talk about
2:38:10What lemons are the best lemons to choose in this lemonade making lemonade stand
2:38:17um
2:38:19Three three, mr. Mayor
2:38:21Um, uh, we landed on that what we also are considering imico and we and the only reason we're talking about this one is because it's what was in
2:38:30What was in the report? Um, we were we were also putting some effort into the into the imico site
2:38:36I understand that there are a whole other set of trapdoors associated with that and students including some legal issues that
2:38:42that have been
2:38:45It that have been ongoing
2:38:47You make excellent examples of all the others, but the short answer to your question is the economy of scale
2:38:53The size of the east view landfill site
2:38:56Is such that enables us to put somewhere between 10 and 15 megawatts on there
2:39:01Imico in comparison would be approximately 1.8 megawatts. So it's not you know, it's you start understanding the size and the scale of it
2:39:10Um, and and I think your instincts on parking garages is a good thing
2:39:15um
2:39:17Uh, of course the economics of it tend to be different and I'm and I'm
2:39:23Doing this off the side of my desk here on this part of it is that um, uh
2:39:30Going with solar carports the mounting systems wind up being significantly more expensive than ground mounting, you know
2:39:38Ground mounting systems. So the cost per or what what's called the the lcoe the the levelized cost of
2:39:44energy over the price over the price the sorry the
2:39:49Uh, the time frame of the of the contract would be significantly greater. That's not to say that it won't work
2:39:55But I think it's good to be looking at all of those
2:39:58It was a size issue and the larger the system the lower the the lcoe becomes with a larger project
2:40:06Granted there are other challenges
2:40:10caller, please
2:40:13Um, your worship, uh, thank you for your presentation. Mr. Ferrari
2:40:16Um, very exciting prospect. I just have you already reached out to city staff and presented them this project
2:40:23Or is this the first time that they're hearing about it? Uh, I I I did have a conversation
2:40:28With uh with mr. Hoi-Yan on friday. Just to say I don't want to I don't want to blindside you on monday
2:40:34We we we wanted to to have a little more work involved with the the the scope
2:40:40Um of of the research project that we're working on so we're still working on that piece
2:40:44But I I felt it this was an appropriate place to bring it forward because I I think it's an idea that
2:40:50that provides
2:40:53A wonderful opportunity for collaboration and and I think for creative thinking on all of this
2:40:59Yeah, yeah, I I would agree. Thank you so much for bringing this to us
2:41:03And I look forward to asking some more questions of staff. Thank you
2:41:07Great thanks. I didn't see anybody else all this quickly say pretty much did odor what my colleagues said they did kind of capture some of my questions already
2:41:15Thank goodness because now I only have one question left
2:41:18Um, so it's a little bit along the lines of what councillor Caron said is and I'll ask staff this as well
2:41:24But from an economies of scale or options perspective, I'm almost wondering if it would be better for us to have like a catalog
2:41:32of all of our assets
2:41:35across the entire city
2:41:37All the rooftops all the all the parking garages all the park what what like the landfill included
2:41:44and and almost have that as a
2:41:46as an open bidding sort of
2:41:49Bidding maybe the wrong word but an open process of a stock gate of all of our assets that could
2:41:56accommodate this and then open it up for
2:41:59Uh, you know groups to be able to come forward and say look I I can't afford to do
2:42:05You know, we can't we can't do this for this reason, but we can do it here. So it's almost like a
2:42:11uh, a plotting of a map across our bird's eye view of all of our
2:42:16Available assets where this kind of idea could happen
2:42:20And then groups could come in and go like there could be one group that goes
2:42:23I I can handle the big one but there could be seven other groups that go
2:42:27I can do a medium sized one or a small sized one
2:42:30But at least then we have a kind of a a lay of the land of all of the assets that might be doable for this type of idea
2:42:37Is that something that that might be warranted here?
2:42:41over and above just what the landfill site is and
2:42:45The second part of that question is have you seen that sort of because i'm just thinking about it on the fly
2:42:50But have you seen that sort of idea happen in other cities at all where they've they've mapped out the available assets
2:42:57To do this type of infrastructure from a community-based
2:43:01fundraising initiative
2:43:03And maybe co-op ownership
2:43:05Other than what the idea that i'm just coming up with on the fly
2:43:09um
2:43:11Mr. Mayor, I think that you've got a number of questions there
2:43:14The first one is I don't know of other municipalities that have taken that approach
2:43:18But I believe staff has a good inventory of where potential projects are at least they I know that they've done that kind of analysis in the past
2:43:27um, and and I know that historically just to put things into into in the context that
2:43:31I believe mr. Ho-yan mentioned that the city has about 500 kilowatts of um, um, of um
2:43:38Of solar capacity right now 400 of which is across the street
2:43:43So there's another hundred but those are primarily in very small projects
2:43:4810 kilowatt microfit projects if i'm not mistaken at the time and
2:43:53And I get why that was done at the time even on on buildings that are that could
2:43:59In some cases accept larger capacity
2:44:02but there may be
2:44:05There are
2:44:06Permitting issues around putting a second project and it's not permitting issues from the city standpoint but from the the the
2:44:13Ontario power authority in the iso that um, not sorry the iso not the power authority
2:44:20That would that would change it. So it's a there is a bureaucratic side of that as well
2:44:25But the concept I think I I like where you're going and I think the concept of saying
2:44:32We don't want to build it. We want to buy the electricity come and impress us
2:44:37I think is is is ultimately
2:44:40To put the city in a driver's seat under those circumstances and if and if the research that that we're doing can help move along that path and then
2:44:50We'd like to help as much as possible. Okay. Well, look, I really appreciate
2:44:54I appreciate you answering that and your question and I see nothing further
2:44:58So I'll come back to us to just engage with staff now, but thanks. Hope you feel better too. Thank you
2:45:03Yeah
2:45:04Okay, I see a few hands going up
2:45:06But I I did know that councillor Goller wanted to I think move the motion that was here councillor Allt
2:45:11You want a second if that's okay?
2:45:13councillor uh, galler I think had a question of staff
2:45:17And then I'm going to go to alt and then I see Gibson on the screen as well. Okay
2:45:23Thank you and through your worship to staff. Um, first off, thank you so much for this
2:45:27Report, it's it's really really good to see where we are and where we're going and I really appreciate you shown as the reality of
2:45:35The funding limitations of how far you can go
2:45:39in the given time
2:45:41Along the lines of what mr. Ferraris said
2:45:45Are there opportunities when we look at some of these large projects that are partially funded to
2:45:51Borrow internally to to fill out those costs. I mean one of the big projects that I see here is the the partial
2:45:59That is partially funded as the internal fleet
2:46:03conversion is there an opportunity to do that
2:46:06in lieu of finding new dollars for that or for the
2:46:10High efficiency building upgrades if we know that there will be cost savings
2:46:15Is there an opportunity to borrow internally to fill out knowing that there will be
2:46:20cost savings in the future
2:46:27So through the mayor to you counselor goller, uh, some of these items are
2:46:32What we will be bringing back to council as part of the multi-year budget as well
2:46:36Or the alternative project delivery methods that we talked about before
2:46:40This is really the start of the plan and we have more work to do and so yes
2:46:44We will look at those items that as you have suggested and where they fiscally make sense and we'll work with our
2:46:49Finance team to put that together as part of budgets in the future
2:46:56Thank you for that
2:46:58when when
2:47:00Are we looking at receiving that you know next step information of of that alternative funding method then
2:47:09so
2:47:11This is a long-term plan. Uh, our goal is 25 years in the future. So this isn't a
2:47:19A lot of these projects are large capital projects large capital investments long-term projects
2:47:25that do take time to go through the process and so
2:47:29This isn't a we're going to come back to council later this year or next year on some of these items. This will take
2:47:37Multi-year budgets and budget cycles to get through and and develop these projects
2:47:43Into the city's work plan. Yeah. Yeah, I I appreciate that fully. These are big ones
2:47:49I'm looking at items like the building energy retrofits the 12 million dollar that is not
2:47:55in the 10-year funding window
2:47:58But we have here between 20 25 and 20 29 we could realize
2:48:03350
2:48:05What is it tons per year? So when I look at that on page 14 of the presentation
2:48:12That 350 is that something that we are not going to realize because the funding is not present
2:48:17for that
2:48:23So
2:48:26It's hard to give an exact answer to that unfortunately because there are instances where our asset renewal we can
2:48:35Provide those upgrades where the existing equipment matches and fits
2:48:39There are other instances where if we don't have the funding to do
2:48:43Ancillary upgrades like upgraded structural
2:48:46We can't upgrade the equipment to the full energy efficient potential. So that's
2:48:51That's where we sit with the funding that we have in our asset renewal accounts right now
2:48:57Okay, okay. And what I'm hearing is that the exploration of of borrowing internally is not something that that is in your work plan for this year
2:49:06That that we could do
2:49:08I'm uh through through the mayor. I'm gonna
2:49:12Just jump in here
2:49:15Um
2:49:16I would just say that through our budget and through all of our financing and capital planning
2:49:22We are internal borrowing already
2:49:25To a high degree if you recall as it relates to our growth and because of the the development charge
2:49:32Uh exemptions and as well as just the the downturn in in the pace of housing right now. So, um, I would just say we we
2:49:40Absolutely look at internal borrowing all the time. We are actively involved in it
2:49:45And um, and really this is about trying to look at as many alternative financing options that we can
2:49:52To to be able to move these types of projects forward. So we're looking for grants where like the the
2:49:59Having this plan
2:50:01Helps us now to focus as we look for financing
2:50:06options
2:50:07Okay, I really appreciate that. Thank you. And I hope that many
2:50:10Grant opportunities come our way in the next couple of years
2:50:13Then my second set of questions going along the lines of what mr. Ferrari said
2:50:18Does the city have the ability to do that?
2:50:22crowd funding sort of project or would we have to go to a
2:50:26non-profit third party to do that sort of work, you know, could we
2:50:31Choose out to to build the
2:50:33um
2:50:34The east view solar plant as a community funded
2:50:38Project by the city or is that you know beyond the scope of what we should be doing at a municipality?
2:50:45um, so through the mayor
2:50:47I in in the past I had looked into a bit of this
2:50:51The the bonds and and the community bonds. Um, and so I I can't recall in the moment here
2:50:58But it is something that I think we can look into
2:51:01um, I just it would be something we need to report back on in terms of
2:51:06the the city's authority and and the legislative framework for that, um, but uh
2:51:12But um, that is something we can probably look into in a bit more of a shorter term to understand
2:51:17I don't know if we would report back to council
2:51:19Uh, immediately, but it's in it's in scope for for understanding that
2:51:24Okay, okay. Thank you
2:51:26And along those lines if you will be exploring that, you know
2:51:30Is that something that could be done in the next year or two to to look at the visibility of either doing it ourselves or going to
2:51:37third parties that have the experience and having them work with us to build out these
2:51:43um energy generation projects
2:51:48Um, yeah, I would I'll just through the mayor
2:51:51Yes, we can be we will be looking at those types of things in the shorter term and and that will then inform longer term planning
2:51:58And these ideas and how we how we start moving the needle on financing
2:52:02So I think all of those will be in the shorter term kind of investigation stage
2:52:08Okay, and and then in terms of um the feedback to council and to the public
2:52:13Would we be looking at next year around this time the next report will give us more information or would there be any time
2:52:20before that
2:52:27I'll just uh, maybe I'm gonna uh, just ask uh, Ian to uh
2:52:32Jump in here on the the annual reporting that we do as it relates to
2:52:37Climate and and they'll probably be that would probably be the the time in which we're giving those updates
2:52:43But may I defer over to to the team?
2:52:46uh through the mayor to you counselor goller
2:52:54yes, I I
2:52:57think I agree with
2:52:59cao baker that
2:53:01The annual reporting would be
2:53:04probably the place where we could
2:53:06respond to that
2:53:08Or through projects in the multi-year budget cycle as well
2:53:13would be another place that we could if
2:53:15there was
2:53:16some investigation that
2:53:18made sense for the corporation
2:53:20Perfect. I I really appreciate that. Thank you. And on my last question through your worship
2:53:25uh, do you need direction to to have conversations with emerge and with mr.
2:53:31Ferrari about this or would you be doing that anyways as part of the research that you're going to do?
2:53:35Uh through the mayor to you counselor goller. No, we would be doing that anyways
2:53:41Okay, thank you and to alt please
2:53:44Thank you very much mayor Guthrie. Um, I only have one question for staff and it really is a follow-up
2:53:49but one of the things that uh, that I'd like to two things I'd like to state first of all
2:53:54I don't want to get um bogged down in just this particular initiative because I think that what we're here for is the
2:54:01The corporate energy strategy as much as anything else
2:54:03But what I do like about what has been proposed is that this
2:54:07Provides a bit of an amalgam of the community energy initiative and our corporate energy strategy by pulling the two together
2:54:15Eight years later, but really the question that I have is
2:54:20In in my mind the way mr. Ferrari presented this this does fit into the corporate energy strategy
2:54:27And I look to you if you wouldn't mind if you could please comment upon that
2:54:32I mean there's alignment. Sorry to you
2:54:41counselor all through through the mayor
2:54:43um
2:54:44There definitely is alignment in terms of you know renewable energy generation and how that will assist in in
2:54:51offsetting our energy usage and reducing our emissions
2:54:55um
2:54:56As we were discussing
2:54:58Just through the other questions too about that financing gap and whatnot too. So there are alternatives or
2:55:04considerations that we can have to to move those projects forward
2:55:09um
2:55:12I just want to to caution though like
2:55:16There are complexities and constraints when dealing with such a large-scale project
2:55:21also working with uh, you know a landform like the landfill in terms of the gas monitoring that we have to do there
2:55:27As well as you know, there was mentioned about
2:55:30The lands and other uses there in the environmental heritage
2:55:34The natural heritage aspects of it
2:55:36So that was all considered as proposing this to make sure that we're looking at just the unusable lands
2:55:43um
2:55:44So not impacting as well say pollinator parks or or I think it was disc golf that was mentioned
2:55:50um
2:55:52And then also just looking at from a solar optimization and what makes sense
2:55:56From a solar irradiance just where the sun is shining on that southern slope
2:56:01And thank you as I said, I don't want to just pick on or cite this particular aspect of what we're doing
2:56:07I think that we we need to be very mindful about
2:56:11about building
2:56:13Refurbishment new buildings so on and so forth
2:56:16I expect that much of this is also going to be affected by changing
2:56:20Construction standards as well moving into the future
2:56:23So we are really looking at a plan that will evolve over time as as national and provincial standards change as well
2:56:30Would that be correct?
2:56:36Through you mr. Mayor to the councillor Allt. Yes
2:56:39We're always monitoring the Ontario building code looking at how we can make improvements
2:56:44On top of that, you know as we see it with the south end community center and baker being
2:56:48Going over and beyond the the Ontario building code and and achieving the the zero carbon building
2:56:54design standard as per the Canadian Green Building Council
2:56:58And it it's smart
2:57:01In the way that we operate and looking at the overall life cycle cost
2:57:04Of running these buildings. We also have to consider technology as well as that's changing
2:57:08So we're constantly adapting and and seeing where we are applying these technologies in a suitable manner
2:57:15Thank you very much. Very happy to support the report
2:57:18Okay, and uh councillor Gibson is last go ahead councillor Gibson. Yep. Thank you through mr. Mayor
2:57:22Thank you to staff for a good a great presentation
2:57:26A couple of questions and maybe a couple of takeaways
2:57:30The the micro fit projects that we have installed at the city those are
2:57:37Previously installed through I gather the micro fit program, but are they are they contracted for 20 years back to the grid?
2:57:45They're not net metering for our own energy use at this point. We're selling that energy back to the grid for the time being
2:57:53Through you mr. Mayor to councillor Gibson. Uh, yes, that's correct. So um the smaller micro fit sites which were 10 kilowatts and less
2:58:02They do have the contract with at the time the Ontario power authority now with the ISO
2:58:08It is a 20 year contract
2:58:10They weren't based on the the install date of when they were so some of them were kind of in later years
2:58:17And yes, they are being sold to the ISO for them
2:58:21Right. Thank you. I assume this so so when that 20 year contract comes up
2:58:26um
2:58:26That's when I'm assuming and when you we talk about buying someone else's power or someone else's got the power
2:58:33Are ready to sell to us. We're assuming that um those contracts would likely turn into a net metering contract
2:58:41Not rather than a straight sale back to the grid. Am I am I safe in assuming that or is there a chance to
2:58:46renegotiating keep selling to the grid?
2:58:51through you mr. Mayor um
2:58:54I'm not so
2:58:56It's my understanding however, I would have to confirm this but yes that they would transfer over to say a net meter
2:59:03Or a behind the meter load displacement arrangement. I haven't heard any any um any cases where it would be direct fed
2:59:11At that size
2:59:14Direct sell to the to the grid that that's my understanding as well. Thank you for clarifying
2:59:18um, so just a little bit about again just to talk about the complexities and I'm not going to spend too much time on the
2:59:24On the east field east side, but the current l t2 electricity procurement program in ontario
2:59:31There's no longer financial incentives associated with certain technologies. So to my understanding
2:59:37I'm reading it here from the website that it's technology neutral as in solar now competes with wind competes with hydro competes with bioenergy for
2:59:45grid contracts not net metering contracts, but grid contracts. So my question is
2:59:51um
2:59:52Even if we wanted to I'm not pouring cold water on this but even if we wanted to say
2:59:57build a partnership that
2:59:59Created a project life like maybe we had an association of power producers in Ontario approach us and say we'd like to
3:00:05lease the east v landfill and propose something back to the
3:00:09IESO for for power select that would be
3:00:12That would be almost like a competitive bid process to see if there was interested out there to see if someone wanted to
3:00:18contract create a
3:00:20A proposal to the IESO
3:00:23It would be less in our control unless we wanted to net meter to ourselves
3:00:32Through you mr. Mayor to council Gibson
3:00:35um
3:00:36Yes, uh, we we would have to I mean if if we were to go through something like the the lt2 um
3:00:44Competitive sale to direct grid
3:00:47That could be a way to go about it and we would probably have we would likely have to be cured for those services and
3:00:53Determine the commercial terms that are going to be
3:00:56Through that project right in terms of ownership and and who is doing what and what proponents we'd want to look at
3:01:03So as we develop say if we go down that route the terms of reference
3:01:06um
3:01:07We would be still in the position to to set those terms as we see the project going
3:01:13However, it would be in the framework of say an lt2 program or like where we'd be competing with other projects
3:01:21For that for that energy space. Okay. I'm gonna flip switch this because I'm really interested in the bio collection
3:01:26Program that you're you've talked about. I think I was aware of that almost 10 years ago now
3:01:31you guys were looking at that as a heat source or something like that at the
3:01:36Solid at the waste resources. Um, the wastewater resource
3:01:40Facility, I think that's really exciting. Is that energy going to be used to power the facility?
3:01:46And not as a contract back to the grid am I correct in understanding that?
3:01:56Uh through you mr. Mayor to council Gibson. So currently there is digester gas that is being
3:02:02collected at at the wastewater treatment plant or the water resource recovery center
3:02:06Currently that is being run through the cogeneration
3:02:10Engines and it is powering the wastewater treatment process equipment
3:02:15As well as we're recovering heat off of that to feed or to keep the digesters warm. It's a process heat
3:02:23um
3:02:25What is being proposed here and yet still to be determined and detailed?
3:02:29But in some initial investigation is is looking at alternative ways of doing this
3:02:34So we can continue on with a cogen like facility
3:02:38And continue on doing that or there is opportunity to recover waste heat from the wastewater stream
3:02:46Have that be recovered as heat for the digesters
3:02:51And then allowing us to capture more of that digester gas and not having to burn them in the cogen
3:02:57engines
3:02:58and then
3:03:00Almost like a fit contract but for renewable or sorry for natural gas
3:03:05sell it to
3:03:07The likes of end bridge as renewable natural gas. That's great
3:03:11Um, thank you for that explanation. So two comments to end with my last tour of the wastewater treatment plant
3:03:17I remember there being a large flume of water and it was a very consistent flow of water
3:03:22I think it was two or three maybe even four cubic meters per second of flow
3:03:25through this concrete flume and I always wondered what it would look like to
3:03:31Bring in a consultant or bring in someone who who understands the business well and talk about a kinetic turbine or a hydrokinetic turbine
3:03:36To go into that flume because I gather it's a very consistent 24 hours a day flow that could be easily captured
3:03:43For for quick renewable energy generation. I'll leave that with you. That's a comment
3:03:49The last comment I'll make is that I think I talked about this about 10 years ago too
3:03:53Is about the common currency that's in this file
3:03:56If financial return on investment is your currency is what you're looking for
3:04:00You can find it if ghd remissions reductions is your currency and you want to see that in this file
3:04:06You can find it and I think it's a great. Um
3:04:09I think it's a great unifying topic and I appreciate staff's effort on this. Thank you
3:04:15Great. Thank you very much councillor kipson
3:04:18So it's already been moved and seconded and I'll just make a quick comment to say thank you very much to staff for this
3:04:24This is this is a maturing. I think in our in this area
3:04:28It's something that council really wanted this term to to see more of and more communication of
3:04:35I've I've started to hear
3:04:37feedback from community members and much how much they've appreciated the annual reports
3:04:41About the presentation that you brought to us in may of last year
3:04:45I've even talked to some about this here to that's in front of us today
3:04:48And it's just ongoing sort of positivity that I've seen
3:04:53Come from this type of an opportunity to present these types of things
3:04:56Because people are interested in them and I think as councillor kipson said
3:05:00Depending on where you're coming from you can see both the environmental benefits and the financial benefits as well
3:05:06It also as our cio said because I wrote it down here myself and then she said it
3:05:10But was this is a great opportunity for us from an advocacy point of view
3:05:14We we can now I can and whoever's talking to ministers or whoever can now actually point to this report and be like we need money for this
3:05:21Oh, this this fits this, you know grant opportunity
3:05:25So even just by bringing this up is a really great opportunity for us to know more about the asks
3:05:30That we might have with upper levels of government or other people
3:05:33And then my final just take away and you can just take it away. It's just
3:05:36And if it's not a good idea, I'm fine to hear back into the day for you to say no
3:05:41But the idea of sort of taking
3:05:43A look at all of the assets that we have that might be able to be leveraged into sort of energy or
3:05:49Options I I don't know. I think that's kind of a neat idea
3:05:53So just take it away. I just don't have to do it
3:05:55But if it's something that you would ever need council direction on or whatever just like if you think it's
3:06:01Something of value. I would love to explore that a little bit more
3:06:05And in the meantime, you know
3:06:08our delegate Evan
3:06:10Mentioned his partnership with someone from the university if there if there is that ability for staff to
3:06:16Continue to engage on that opportunity just to get some more research value
3:06:21Looking into maybe the site to see if there's opportunities there. I personally think it's a great idea
3:06:28So I would just leave that with you as a comment to take away to check that out
3:06:31So with that, I'll call the vote. Is there anyone against this?
3:06:37It's unanimous. So again, thank you very very much for for this. We really appreciate it
3:06:42We only have one more item in front of us today and it is going to be let me just get to my
3:06:51It's a petition on the parkland development fees at 53 Woodside road
3:06:56Just we only have one delegation that's going to come up
3:06:59Gary Scanlon in a second if you don't mind Gary, I'm just going to ask
3:07:03Councillor Caron just to just to kind of give us a little bit of an overview of
3:07:08The issue that's here and then and then after she's done feel free to come right on down. Okay
3:07:13Councillor Caron. Sure. Thank you, Mr. Mayor. This item's come before us after
3:07:19basically about a two-year period
3:07:21Where it came to the attention of my colleague in word five Kathy Downer and myself about a year ago
3:07:28and
3:07:30You know the the applicants
3:07:33Are following this process because it's the only process available to them
3:07:37They have followed all the directions that that the process has allowed
3:07:42It's not very often in my terms of council that we've ever, you know, I think two maybe two or three petitions that have come before us
3:07:49Of this nature. So I think we'll go to the delegation and they'll present their case
3:07:55and
3:07:57And hopefully this will be a very quick resolution. I do believe this is a very unique one-off situation
3:08:03A sandwiching of permit permits applications
3:08:07Over three different bylaws. So
3:08:09I'll turn it over to back to the the mayor to
3:08:14Hear the delegation
3:08:15I do have motions when when the delegation is complete. Yeah, as soon as the delegation's uh, don't go right back to uh, to you
3:08:23So thank you very much for for bringing it forward
3:08:26And gary, uh, thank you for coming back again
3:08:30We appreciate it. So, uh
3:08:33Please know you have five minutes and uh, you'll hear a chime at the four minute 30 second mark as your warning
3:08:38If you need the whole five minutes, so be it if you don't so be it
3:08:41Just in case there's a question as a follow-up just stay there
3:08:44There may not be but please go right ahead at the time. We'll start when you're ready. Thank you. Um, okay
3:08:53Just to make sure that I know how to
3:08:58The top one. Okay, perfect. Thank you. Mr. Mayor and Mr. Council staff. Thank you for
3:09:05The opportunity. Uh, we wanted
3:09:11Doesn't seem to be working
3:09:16It's the top one. Yeah
3:09:19Oh, there we go. Thank you
3:09:21So, um, obviously through uh, council, you know, uh, the reason why we're here
3:09:26We were here when you were considering, uh, an amendment to your current bylaw
3:09:32Basically that one was to
3:09:34remove
3:09:36alterations and additions from
3:09:39Having to pay the cash and lou and the parkland
3:09:41Um, we didn't that didn't provide for demolitions. I that
3:09:47Generally, we think it should be I can give some perspectives on that
3:09:50But I want to stay on the on course
3:09:53The property that we are is in question 53 Woodside road. It was purchased by my son and daughter-in-law
3:10:01July of 2023
3:10:03The intent was redeveloping it into a modern home the original home was four bedrooms
3:10:09But it was a side split with an open carport now. It's a newly constructed home once again four bedrooms two stories
3:10:16And uh with a full two car garage
3:10:21Basically the increase in the square footage you can see that it's a four bedroom to a four bedroom
3:10:25so from definitions of
3:10:28Of development charges. It's basically this um the same density
3:10:32However density is defined slightly different in the bylaw where a 50 percent increase would activate the requirement to make a payment
3:10:40Now this 50 percent increase is solely in areas of kitchen and general living
3:10:44in
3:10:45areas
3:10:46The uniqueness and thank you for using those words because I think we are unique
3:10:51through this process of looking to demolish and then get a building permit in December 2023
3:10:58My daughter-in-law was in conversation with the building department
3:11:03She said that they were going to apply for the permits in january
3:11:07The building official indicated that there was no rush
3:11:11You can uh if you wanted to start construction in may you've got until the end of march probably in order to put those submissions in
3:11:19um
3:11:20If we had not gotten that advice what would have happened was we would be paying about 21 000 less than what ultimately had to be paid
3:11:29So it was the direction or kind of the um
3:11:33Suggestion through the building department that actually caused us to incur an extra 21 000. That's where the uniqueness is
3:11:41We had in order to ensure that the uh construction gets going in may we actually put in the uh demolition permit
3:11:49um
3:11:50February 25th and then put in the um the actual building permit in um march 11th
3:11:57We could have very easily as you can see have moved the dates by over a week and had been before the bylaw
3:12:05Now the bylaw when you received it
3:12:07Uh, it was on an amended agenda
3:12:10There was no staff report. There was no advertisement. There was no notice on
3:12:15Websites there was no notice to anybody coming through the process that this bylaw was being changed
3:12:21Which would basically double the the uh the fees for parkland and that's where a big impact because no notification no public
3:12:29Um notice and as I say because of the advisement we're in a unique situation
3:12:35We tried to have a discussion with staff
3:12:38The their perspective is uh if the bylaw was applied properly
3:12:43We understand that the bylaw was applied once again our uniqueness was if you take a look at the broader process
3:12:50The broader advisement by the city on what we should be doing
3:12:54It caused us an extra 21 000 and what we're looking at is to try and recover that at least the 21 000
3:13:02Um through the process we were because of the timing we were told well if you want to
3:13:09Pursue this matter and pay with uh without uh to
3:13:14Pay with um further discussions
3:13:17We had to do it in protest and that meant applying to the ol t that cost money in order to apply the ol t
3:13:24As soon as we applied we were told we couldn't talk to staff. We couldn't talk to council
3:13:29We couldn't talk to anybody. We did apply the rules. I know myself because I do this stuff
3:13:36That we could talk without prejudice, but once again staff had the perspective they applied the bylaw properly
3:13:43um
3:13:45This is where we subsequently after we removed the um ol t
3:13:50submission we then got in touch with our counselor karan and um she has advised us
3:13:57The process to to come forward
3:14:00So I'd just like to indicate that you know what we're looking for is a refund of at least uh 20 260 dollars
3:14:08Because of the unique unique situation we have
3:14:15While the the second was is because of the broadness
3:14:19And some of the changes that you have made with the with the bylaw
3:14:23We really fall under a similar type of thing in that the density truly the density
3:14:28Hasn't changed on this unit a four bedroom with a four bedroom. So
3:14:36Thank you, mr. Mayor
3:14:41Looks like I can go back to council karan then so thank you very much. Great. Thank you. Thank you
3:14:46Yeah, so just to summarize when councillor downer and I became aware about we conferred with staff on what was and was not possible
3:14:54um
3:14:55Right up until this afternoon just ensuring that we're in compliance with with what's allowed under the planning act
3:15:01I just want to point out that staff are following the policy
3:15:04This is a no way a reflection of this of the staff decision on this because
3:15:09Staff are only following the policy
3:15:11Using the authority that they are permitted and allowed under the planning act and they don't have the authority to exempt
3:15:17Only council has the authority authority to do that
3:15:20Which is why the petition was the only recourse for for the property owners. So to that end
3:15:26I want to thank staff for confirming what is and with what is not possible
3:15:30And I understand from staff's advice today that the planning act allows only a
3:15:36All-or-nothing full refund. So I've prepared a motion
3:15:40With the assistance of clerks and that'll come up on the
3:15:46On the screen momentarily
3:15:49And it is for
3:15:51specifically for this site seconded by
3:15:54Patty, okay
3:15:56That council per section 32 j of the parkland dedication bylaw 2022
3:16:0020717 as amended exempts the project completed pursuant to building permit
3:16:05specifically 24 0010280
3:16:09002
3:16:10Brc from payment of the parkland dedication
3:16:13Cash and lune connection with the renovation of 53 wood site as specified therein
3:16:17And that council for the direct staff to issue reimbursement to the property owners of the payments previously made
3:16:23Okay
3:16:25And council or downer has been willing to second. Okay. Is there any is any question just uh at this time at all?
3:16:32Alt and then Gibson and then
3:16:35Kate please
3:16:36Thank you very much. Mayor Guthrie through you to staff and I actually don't know which staff to whom I should direct this but
3:16:45When I when I heard councillor Caron present her motion
3:16:49Statement was made. This is all or nothing
3:16:52So prior to february the 25th, there were parkland fees due
3:16:59After february 25th, there were different parkland fees due
3:17:04What we're now talking about is no parkland fees or all of the parkland fees. Is that correct?
3:17:12Through the mayor to councillor Allt so the petition process
3:17:15Council can only consider the petition that is before them petitions must be within council statutory authority to decide on
3:17:22Your statutory authority in this circumstance is limited to
3:17:26The options in the bylaw which is council retains discretion to exempt
3:17:31specific properties from the application of the bylaw the planning act does not allow you to
3:17:38To determine or grant individual rates and so a partial refund would be akin to granting it a
3:17:44Specific rate for a property which you do not have the authority to do under the planning act or the bylaw
3:17:50And to address the other part of your question councillor Allt
3:17:52It is correct that parkland dedication or cash and lou was due
3:17:56As at the earlier date with respect to the bylaw amendment
3:18:00What changed in the bylaw was the schedule which includes sort of standardized rates
3:18:05Which people can apply to the valuation
3:18:07So it's sort of an assumed valuation if you wish to pick from that suite of options
3:18:12And those rates increase every year
3:18:14On the you know, sort of as things would do with respect to property values
3:18:18It is always available to applicants to obtain their own valuation of their particular property
3:18:24And that right existed at the the earlier date and also at the second date
3:18:28So they could have obtained an actual appraisal of their particular property
3:18:33Rather than pay the kind of listed rate in the schedule which did change
3:18:37And those are do not require public notice of change that is an administrative process that is provided for in the bylaw to update those rates
3:18:45And just let me just carry that on because that was a a lot of legal stuff
3:18:50What is put it that way?
3:18:52So that is contained within the statutes of ontario related to parkland dedication fees. Am I correct?
3:18:59Three year america three the the planning act allows council to develop a bylaw
3:19:04For parkland dedication. So council has approved the parkland dedication bylaw. So the actual
3:19:11charging of cash and loo or the sort of the
3:19:16Losing my language here on the actual granting of land, which doesn't happen very often
3:19:19Is within the bylaw itself?
3:19:21But your authority to to pass that bylaw is through the planning act and the planning act does not permit
3:19:27Individualized rates and the bylaw does not reflect individualized rates nor does it give council any further discretion?
3:19:34So just to be absolutely clear what we're looking at is
3:19:39Uh, the data is in some senses immaterial that there were a were a number of concerns that you've raised
3:19:46But what's most important about this is that we are being asked either to
3:19:53uh, acknowledge and enact the bylaw or to um in in this particular case to set aside the bylaw
3:20:03Is that correct?
3:20:04What council would be doing would be granting the petitioner's request for a full refund on the basis of a provision in the bylaw
3:20:10That allows council to exempt certain developments and properties from the application of the bylaw
3:20:17So you can only give the full refund because that's part of what they asked for and that is within your statutory authority
3:20:24And finally one last question. I don't know whether this is appropriate. America three actually
3:20:28um
3:20:30conventionally what the city has done is we have
3:20:35For that lack of better words for a given parkland dedication in unique situations such as
3:20:42Non-profit housing development. I think I could be even wrong there
3:20:47Through the mayor to councillor. I actually cannot recall any particular examples
3:20:52um, perhaps
3:20:55Colleen is raising her and she may have one
3:20:58Oh, okay. Thank you
3:21:00Through the mayor to councillor Allt. I believe we came to council and you uh, uh
3:21:04amended to exempt all places of worship as an example
3:21:07But that wasn't across the board exemption for all places of worship. It was not specific to one particular
3:21:13I think there was also once during the pandemic
3:21:16Where you waived parkland dedication fees?
3:21:19Where it was related to uh testing
3:21:22locations, but again, it was it was for all it wasn't a specific site
3:21:28Location so those are the two examples that I can think of and mr. Matthews is nodding in agreement
3:21:33Thank you. So it does sound to me without any comment needed from staff. We're in our chartered territory on this one. Thank you
3:21:41Thanks, I believe it was Gibson then uh, katon and then I'll go to busatil. Yeah, thank you through mr.
3:21:46Mayor, so thank you to staff councillor Allt. You asked my questions. Where did staff?
3:21:51I wanted to hear staff's interpretation of of how they've sort of
3:21:55Implemented the bylaw and their interpretation of the bylaw
3:21:58They believe correct question to the mover. Where are you in disagreement with staff that they've not interpreted the bylaw, correct?
3:22:07Well, there's two factors. I did state that the interpretation under their authority
3:22:13um of the bylaw
3:22:16Is that on february 27th the the fees changed?
3:22:20Uh, what I'm suggesting is a one-off and and what we've heard from the delegation
3:22:26Is that the owners?
3:22:28specifically asked staff
3:22:30About the timing of their permits and were specifically advised that there was no rush when in fact there was
3:22:38And also that within three days of filing the demolition permit the the fees doubled
3:22:44Um, I think that this is a unique situation where that that sandwich of timing and the advice that was received
3:22:50Makes it it brings it into
3:22:53The reason why we're here today as a petition from the property owners and I I think there has to be some
3:23:00Humanity in this decision about the advice that they were given and the timing of the permits that they filed
3:23:08Thank you, uh, councillor kipzen. Uh, councillor Caton, please and then busit up
3:23:14Thanks through you mr. Mayor to staff
3:23:16um
3:23:17I was wondering about uh, the the notification so
3:23:23They had mentioned that there is no notification on
3:23:27The bylaw being enacted
3:23:29but do we have notification processes on
3:23:33All of the changes that were going to be put into the bylaw up until that point
3:23:42through the mayor to councillor Caton, um, the
3:23:44I
3:23:45Apologies if I'm misinterpreting your question
3:23:46But the bylaw itself was not amended the bylaw contains a mechanism to update the schedule of rates
3:23:53And so that is a change but it is not a bylaw amendment in the same way that there would be public notice of
3:23:59Bylaw amendments on a council agenda or coming on at the end of the night
3:24:03It is a mechanism within the bylaw in the form that was approved by council
3:24:07And again, those are standard rates that are at the option
3:24:11Of property owners
3:24:12It is always available to owners to obtain their own appraisal regardless of what rate is in effect at what time
3:24:20Thank you and also through the mayor
3:24:23um
3:24:25What would this do in terms of setting a precedent like how many other groups come back to us that
3:24:32um
3:24:33applied for a demolition somewhere close to when a rate change happens
3:24:38What is the the impact of?
3:24:42Saying yes to this um the mayor to councillor Caton. I think we would um
3:24:55Want to avoid any kind of um precedent or or answering that in the abstract
3:25:00We would deal with this on a on a specific case by case basis. I wouldn't want to respond to hypotheticals in the moment
3:25:09Thank you
3:25:11Thank you a busatil and then
3:25:13I have I have one or two questions
3:25:16Thank you. Thank you and through the mayor to staff. I need to hear it for a third time just to make sure that i'm very clear
3:25:22I'm looking at uh, yeah, it's
3:25:25Put it into mayor's terms for me
3:25:27um
3:25:29Yet so we have the parkland dedication bylaw that did not change what changed were the
3:25:36schedules and the amounts of the schedules and what I heard you say is that
3:25:41um
3:25:42When an application comes forward it says in there here's our schedule with the rates or
3:25:49You can do your own appraisal
3:25:52And then bring that in am I missing that there is always that it's not prescriptive
3:25:57It's not you have to pay this there is always that own that other option there and that was there
3:26:03Before the date changed before the schedule the amounts changed and after and that stays in the bylaw that's still there today
3:26:11Through the mayor to councillor Busuttil. I can't speak to the actual process
3:26:14Which you started your question with but yes, that is correct
3:26:18The the rates are in the bylaw in a schedule those rates that are sort of
3:26:23Choose your rate based on your category are always in there the notification
3:26:28Um if we're asking the question in terms of how does the public get notification of that update
3:26:32It's built right into the bylaw
3:26:34It was described in the information report that accompanied the bylaw when it came to council for approval
3:26:39And when maybe one of my colleagues can speak more to the process, but certainly when people go through the process
3:26:45Um, they it is you know, they are directed to contact park staff about parkland dedication or cash in lieu
3:26:52And park staff would give them the information at that time including the fact that it is absolutely
3:26:57They're prerogative to obtain an appraisal on their actual property
3:27:01Thank you. That's all
3:27:05Great. Thank you councillor Busuttil
3:27:07um, I have a
3:27:09I have one or two questions then as a follow-up and then
3:27:13Just just bear with me. I'm trying to trying to figure out a way maybe forward here
3:27:18um
3:27:20If nothing had if nothing had changed in this, you know week to week and a couple weeks
3:27:27timeframe
3:27:30The the applicants here in this situation they would have been responsible to pay the 20 ish thousand dollars
3:27:39That's my question. Yes
3:27:43Sorry, america. Three. Could you repeat the question? You're saying if the rates had not changed?
3:27:48So based on what their presentation and petition is based on my conversations with councillor Caron and others
3:27:55If none of that had changed at all
3:27:58Which triggered it almost a doubling of the amount
3:28:01The applicable amount that would have been charged would have been the 20 000 ish range
3:28:08That would have had to have been paid and that's what I feel the the petitioners are not really here arguing it was
3:28:15That was sort of known. It was the the delay of 10 12 days and then all of a sudden
3:28:22Almost a doubling of or at least a doubling of the issue
3:28:25So I just want to make sure I'm hearing from you that if the that change had not occurred
3:28:31Then status quo there would have been a 20 ish thousand dollar charge and the
3:28:37The process for them building their home and whatnot would have would have continued
3:28:41Thank you for that clarification
3:28:44Um, yes, so parkland dedication is is law. So those fees are payable
3:28:49They are applicable law for purpose of building permits. So if they apply they they must be paid
3:28:54um in terms of the timing if the the change in those sort of
3:28:58Um schedule rates had not occurred or if the timing had not overlapped
3:29:02they would have been had the option of sort of paying at the um at the
3:29:07Assumed appraisal value based on that schedule of rates or obtaining their own appraisal
3:29:12And I am not speaking with respect to this property or these owners
3:29:15But many property owners will just defer to those kind of schedule of rates for convenience
3:29:21It's also likely likely possible that certain properties are actually
3:29:26Highly more highly valued than those scheduled rates
3:29:29So those are there for administrative convenience so that everybody doesn't have to go and get
3:29:33Evaluation or appraisal of their property
3:29:36At the time those uh the the fees would be due
3:29:40Okay, but just as a clarification
3:29:42Forget appraisals
3:29:44Forget that process there was a rate
3:29:47And then the rate basically doubled within that like 12 day period if I may just clarify
3:29:52So we're using the term the rate changed colloquially the rate didn't change the rate is actually based on
3:29:58value of property calculated based on a formula in the bylaw
3:30:02The schedule gives essentially standard appraisal values that get plugged into that formula
3:30:08So the rate did not change the schedule of standard valuations that you can use for that formula was updated
3:30:15Okay
3:30:16So another way of me saying it was the outcome changed
3:30:20Within that 10 to 12 day period from x amount of dollars to y amount of dollars. That is correct. Okay
3:30:27Here's here's where I think I'm probably not alone
3:30:29You're now telling us
3:30:33If
3:30:35Under our authority we have to refund the entirety
3:30:40Am I hearing you right?
3:30:42You're saying basically
3:30:45They were able to do what they were able to do
3:30:48And we're going to go right back
3:30:51With and they're going to have to pay nothing
3:30:53Is that what is that what you're saying through your migratory?
3:30:56I'm not saying that you need to refund them at all that is certainly counsel's prerogative when you receive a petition
3:31:02You must consider what the petitioner is asking you so that is before you that is what we are here
3:31:07To to consider i'm here to provide information. I'm certainly not
3:31:11Um suggesting your decision one way or other
3:31:13But I am telling you that you can only make decisions on petitions that are with the scope of your authority
3:31:19It says right in the city's petition policy that petitions must be within council statutory authority
3:31:25So on its face it it must be that your decision is scoped
3:31:29To that authority and you do not have the authority to create individual rates under the planning act or under the bylaw
3:31:36Okay, but to dumb it down for me
3:31:40I'm asking you i'm not suggesting that you're giving us advice
3:31:44To do something or not that is under our preview. I get that
3:31:48But ultimately under the authority it's all or nothing
3:31:54Even though there's an admittance from the petitioners that they would have paid the original 20 ish thousands of dollars
3:32:02It's the extra doubling of the amount which is triggered why they're here. I personally get that
3:32:08But the authority that you're saying and that we would have is all
3:32:14Or nothing. That's all I need to hear from you. That's correct. Okay. Thank you. All right
3:32:19Um, may I I would like to have a three to five minute break for a moment? I'd like to confer
3:32:26um with my colleague for a moment and and and if I
3:32:31Please just have a five minute break. We're gonna come back. I appreciate that and councillor Caton
3:32:36I will go to you when I come back. Okay. Thank you
3:42:28Okay, we'll call the meeting back to order. I appreciate that break. I
3:42:32I needed to confer just with the mover for a moment and uh
3:42:35And uh, councillor Caron has done that. So thank you very much
3:42:39um
3:42:45If I could oh
3:42:48Yeah, if I if I could ask the the applicants just to come back up to the microphone for a moment
3:42:52That's what I was going to suggest. I think I I
3:42:56The petitioners whatever the right whatever you want to correct where it is. Yeah. Yeah
3:43:01But I do a preamble or do you do you want to do that?
3:43:04um
3:43:07If you don't mind I'll just quickly quickly do something and I'll I'll write to you. I'm just trying to work together on this. So
3:43:12um
3:43:13Thank you. Please please come forward
3:43:17and um
3:43:19You know, I just wanted to uh, just ask uh, you've heard you've heard what?
3:43:25Sort of the the friction is that council has in front of us on a decision here
3:43:30when you I believe of course have been uh upfront in regards to the issue of
3:43:36The difference between what was what was owed versus a few days?
3:43:41A few days 10 12 days later having to have that almost doubled, right?
3:43:46But from a decision point of view
3:43:48um
3:43:49It may be a requirement for us to to look at a full
3:43:53And of course it's up to the will of council here. I have no idea
3:43:56But a full a full refund
3:43:59And so my my question to you is uh,
3:44:03If that were to take place
3:44:07Can I ask if there would be a commitment on your behalf?
3:44:12To actually look to give that half back to the city of gulf, you know into our parkland
3:44:20reserve where that money would have been normally
3:44:24Given is that something that you'd be willing to consider?
3:44:27Mr. Mayor, I'm sure we'd be more than happy to donate the money back to the
3:44:32Parkland reserve fund. Okay. Thank you. And with that I'll go over to councillor Caron
3:44:38To consider next steps at least council remember that you can you can go back. Thank you
3:44:43Just remember that we technically have a motion on the floor right now
3:44:48So we either need to continue with kind of debating and discussing the motion on the floor or we can
3:44:54You know take that back and maybe look at something else, but I'll go to the original mover now
3:45:00Thank you. Actually, you've framed it very well. Mr. Mayor in the way you asked the question of the of the petitioner
3:45:05as I think from the discussions and the questions and also from the many discussions that we've had from staff in the last
3:45:12You know year about this case is that there was um
3:45:16that the partial refund was certainly um the intent when the petitioner came forward
3:45:24It was certainly my intent when I brought this forward and pulled it from the green sheets or we used to call them green info sheets
3:45:30Um to bring it forward to council and that was my intention right up to the point of sending a draft motion to the clerks
3:45:39It's only after we got further advice um that it became an all or nothing scenario
3:45:43So I think what is we the motion can't change so the motion that's on the floor is a standing motion
3:45:50But we have heard from the petitioner that the amount that would have been due prior to mark to february 27th
3:45:56will be um returned to the parkland reserve and I think um
3:46:00That is that is a win-win um and adds some some fairness to the process. So thank you. Thank you
3:46:06Uh all please it is a point of order. Uh, I believe sir. Mayor Guthrie. Um, I would like to move into closed session for client solicitor
3:46:15um advice
3:46:19Okay, we're going to confer with the clerk um on the exact wording that we would need just to have up on the screen there. Um, and uh
3:46:29So just wait a moment, okay
3:46:33For you, mr. Mayor first of all, uh, sorry to the clerk. Sorry about to interrupt you. Um, we would need a little bit more
3:46:39Just high level as to the reasoning why without you know, um, and also
3:46:44I would need to look to see if there's even the um a seconder to do that
3:46:49Instead of kind of let me just see if there's even a seconder that feels like we need to do that on this matter
3:46:55Okay, uh, busatil and and katin as well. So you got to so go right ahead. Thank you. Thank you very much. Mayor
3:47:01Yeah, I I am very concerned that this potentially can put us into either a
3:47:06A situation of prejudice or can in fact actually have an impact reputationly upon the city if this
3:47:13Ever arises at some other point. I think I need to hear from the solicitor
3:47:17I have no advice and I know that others were discussing
3:47:20Things I don't have it right now and I'm uncomfortable voting on anything without that
3:47:25Sure. Thank you very much. And so it's moved by yourself seconded by uh, councillor Busuttil
3:47:30Um, is there and here it is here that council held a meeting closed to the public
3:47:35pursuant to the municipal act on petition for parkland development fees at 53 wood side road section 239 2f of the municipal act
3:47:43Regarding advice that is subject to solicitor client privilege including communications
3:47:47necessary for that purpose
3:47:50And so I will call the vote on that as anyone against that
3:47:55No, so I would imagine will be 10 15 minutes or so
3:47:58Inclosed and and we'll come back out and continue from this point forward. Thank you very much
3:59:15Are we okay clerks for me to to speak right now? We're making sure that we're live. Yep. Okay
3:59:21Okay, so again as I normally do with a with a summary high level summary of the closed session
3:59:28We did just move in to get solicitor client privilege information
3:59:33Um, and we received that information
3:59:36And no just no direction. No nothing else was given. We just received information on that and now we are back out here
3:59:42in the open so
3:59:44We have a motion that is still on the floor
3:59:47and um, I
3:59:49And I would ask the clerks to maybe put that just up on the screen for all of us just to look at one more time
3:59:56And there it is there. It's already been read out loud by uh by the mover
4:00:01um, and we've also heard we've also heard from
4:00:06The petitioners as well
4:00:08In regards to the question I asked them earlier. So I look I'm looking to call the vote
4:00:14Before I do that though. This is the last opportunity for any questions of staff. So councillor Gibson, please
4:00:23Well, thank you through mr. Mayor to staff. So based on the arguments two and four of this evening
4:00:31Is it safe to say that?
4:00:34Can you quantify the number of building permits that were perhaps within a five to six month window of this change
4:00:40In the schedule that may be watching this evening and maybe making decisions on their own based on the decision here
4:00:49Through the mayor to council. I don't want to give an exact estimate or or number in the moment
4:00:54I can say that the
4:00:57parkland dedication by-law is applied with
4:01:00great regularity
4:01:02Across the city on a number of files. So it certainly wouldn't be zero or nothing
4:01:08But again very hesitant to give a
4:01:12More detailed estimate that that but again, it is it is an ongoing topic
4:01:17In the in the planning end of things
4:01:20So you've told me that it's more than a few
4:01:23It's more than we're in the mayor to council. I'm comfortable with that. Yes. Okay. Thank you
4:01:28Thank you councillor Gibson. Uh, just to the mover, please
4:01:31To councillor croc
4:01:35It was going to be dependent on the answer to this because councillor Gibson asked for a six month window
4:01:40And I I do think we're really talking about a much much shorter winter window
4:01:44We're talking about a a 12 day window and a three day window prior to february 27th on the demolition permit
4:01:51So my question was was going to be
4:01:54During a pre-consult, what is the process?
4:01:58for a property owner to be advised related to the schedule
4:02:04of parkland fees being revised
4:02:07That if a property owner were to come in at any point during the pre-con
4:02:13phase
4:02:14Would they be advised by a member of staff that parkland dedication fees are annually
4:02:22updated
4:02:23You know every at the council meeting every february that there's a an annual cycle of updates
4:02:28Is there anything in the pre-consultation that would have flagged this for for any property owner?
4:02:33I mean obviously larger developers would be aware of this, but an individual
4:02:40Property owner doing a renovation or a rebuild on a single family home
4:02:46How would they have been flagged that this was an annual schedule update?
4:02:49through to the mayor to council
4:02:52So part of the package that planning
4:02:54And building will give to property owners
4:02:57Will include a number of city departments to reach out to for their own specific needs
4:03:02Reaching out to the parks department for this parkland dedication by-law matter is part of that document documentation and is part of that process
4:03:11From there should park staff be contacted?
4:03:14They will answer specifics to the by-law in terms of questions that the property owner may have to their file the exact specificity
4:03:23Of those kinds of conversations. I don't know in the moment though it would give
4:03:27opportunity
4:03:28For good conversation good expertise from the parks department as to the application of the parkland dedication by-law
4:03:35So on february 25th when the demolition application came in prior to the february 27th change of the schedule of fees
4:03:42A property owner could calculate their own date
4:03:44They would have an assessment value on their home if it was a recent purchase and they could calculate the fees based on
4:03:50The way the formula works in the schedule
4:03:52They would they would have a sense of what the fees would be based on their own calculations without it
4:03:56Without an appraisal through the parks department. Is that is that correct through the mayor to council?
4:04:01Property owners are allowed to get their own appraisal
4:04:03There's a process for that and that can be engaged against through that process. Okay, and then my last question has to do with
4:04:10Whether you are aware of any
4:04:13annual update in the schedule of fees that has
4:04:16This was approximately 50 percent increase a doubling of the parkland fees at any point in
4:04:24I don't know. I don't know how long you've been here mr. Matthews, but are you aware of any
4:04:29Any major increase to that schedule of fees to to that significant level through the mayor to council
4:04:35So 2019 i've been here right about the time we were kind of getting to this by-law
4:04:39From the onset and as miss charles mentioned earlier
4:04:43We're talking about property value here, which is a factor in
4:04:46Determinating the fees so as property values increase the fees obviously change with that
4:04:52In the moment. I can't speak to whether we've seen that jump
4:04:56That's something that I can take away for future consideration in the moment. I can't speak to that though
4:05:01But conceivably if someone had a property value from the fall of 2023 to february of 2024
4:05:09The the property assessment value
4:05:14I guess you can't answer that question
4:05:16But within a six month period from the purchase price and the property valuation one would not assume that there had been
4:05:22Would be a great increase in the valuation
4:05:25Of the property in that six month period
4:05:29Through them through the mayor to councillor Caron so the formula
4:05:33Cannot be based on the assessment value so tax assessment value is is significantly behind
4:05:39The update of those standard rates in the by-law the city actually engages a professional appraiser
4:05:45And so in any given year those rates made the percentage of increase in those sort of standard appraised values
4:05:51Would be based on you know experts with market intelligence
4:05:55It is not a matter of sort of staff arbitrarily updating that schedule of values right understood
4:06:00I appreciate that just for clarity then that appraisal values
4:06:05Are are something that is normally done at the time of a home purchase
4:06:09So obviously to qualify for a mortgage one would would get a an appraisal done by a qualified professional
4:06:15at the time of purchase
4:06:18Through the mayor to councillor Caron you can procure an appraisal at any point
4:06:22Certainly people probably do at purchase, but it's not limited to that point in time. Okay
4:06:28Thanks
4:06:35All right, I appreciate you councillor Caron
4:06:38Thank you very much for
4:06:41For bearing with us and and for everyone in the room bearing with us. This is this this I mean, I'll just say the word out loud
4:06:48That's been said many times. This is very unique. So I just want to thank you very much and also thank the petitioners
4:06:55for coming forward and for
4:06:58stating that you would
4:07:00help with
4:07:02Call it a donation if you wanted to and I trust that that would occur
4:07:08personally so
4:07:09I think this is a very unique an unique situation. So
4:07:13I'll call the vote. So if anyone is against please raise your hand. Okay, so we got uh,
4:07:20alt and busitil and uh,
4:07:23katyn and
4:07:24Gibson and
4:07:26Richardson
4:07:29Okay, that's five just want to make sure
4:07:32Because we've lost a couple of councillors here
4:07:36Through you, Mr. Mayor, we have 11 members present. That's five against the vote carries six five. Okay. Thank you very much. So that carries
4:07:43And so, uh, thank you very much
4:07:45Um, and with that we'll move on to our last item
4:07:50Which will be uh, the bylaws. Uh, councillor causson's not here
4:07:55As the ward mate, would you be willing to uh, move those for us please councillor Goller?
4:08:00Yes, that bylaws 2026 to
4:08:021199 through
4:08:042026
4:08:072122
4:08:092124
4:08:112120 well, I guess that's it's 21202
4:08:1421204 21205 be subject to section 284
4:08:20114 of the minutes for lacked
4:08:23All right, thanks. Uh, alt would you second the bylaws for us tonight? Thank you
4:08:27Uh, and with that anything further on the bylaws
4:08:30Seeing none. I'll call the votes anyone against the bylaws
4:08:36Nope, okay, so that passes
4:08:38Uh, I got no mayor's announcements. Everyone loves that
4:08:44And so now we'll do adjournment
4:08:46Hauser boost a till will second
4:08:48Uh, anyone against adjournment
4:08:52Nobody that's uh, that uh passes and I wish everyone a good night. Thank you very much