Skip to main content
Jon Christensen

Featured proposal · Guelph Junction Railway

Guelph's Railway Made $2.4 Million Last Year.

It spent nothing making its own crossings safer. It should help fix that — and it wouldn't cost taxpayers a cent.

By Jon ChristensenPublished July 10, 20265-minute read

$2.4M

profit GJR posted in 2025

$0

spent on crossing equipment & bridge work in 2025

$250K

dividend paid to the City — the new fund sits on top of it

Jon wrote this piece as a guest column for local news. Because he's a registered candidate, it can't run as an op-ed during the campaign — so it's published here in full, along with the motion and the source documents to back it up.

The proposal in 60 seconds

  1. 1The dividend GJR already pays the City every year stays exactly where it is — untouched.
  2. 2On top of it, GJR sets aside a second, separate payment — sized to match some portion of that dividend — into a new Rail Corridor Safety Fund.
  3. 3The fund can only be spent on one thing: safe, legal trail crossings, signage, and rail-safety education along GJR's line.
  4. 4GJR, City staff, and the trail groups pick the priority project together, in public, every year.
  5. 5Any future crossing closure gives GJR 90 days to publicly show the hazard, a funded alternative, and a timeline.
  6. Cost to Guelph taxpayers: $0

Last month, members of the Guelph Hiking Trail Club and the Guelph Off-Road Bicycling Association packed a City Council meeting over something most Guelph residents never heard about: a well-worn crossing on the Radial Line Trail, near the Guelph Innovation District, had quietly been closed off with new signage — courtesy of Guelph Junction Railway, the freight railway the City of Guelph has owned outright since 1910. The reason given was safety. But here's the problem with that: posting a closed sign on a crossing people already use every day doesn't make anyone safer. It just tries to absolve responsibility.

Planners have a name for the paths people wear into the ground when the official route doesn't match how they actually move: desire lines. This crossing is one of them. The runners, cyclists, and families who've crossed here for years aren't going to stop because a sign went up, they'll just cross with less guidance about how to do it safely, not more. Close the crossing and GJR's (the City's) risk arguably goes up, not down. The question was never “open or closed.” It's “safe or unsafe.”

A steel rail bridge crossing the Speed River in Guelph, with a riverside walking path and handrail in the foreground
Where the tracks meet the paths people use: rail lines — including the city-owned Guelph Junction Railway's — cross the Speed River in Guelph. Photo: Ryan Hodnett, CC BY-SA 4.0

GJR's liability worry isn't crazy on its face. The trail and the tracks sit on land owned by two different parties, and the moment someone steps from one to the other at a spot nobody ever formally engineered for it, GJR is on the hook if something goes wrong. Fair enough. But the answer to that isn't a sign telling people to stop. It's a properly built, legally sanctioned crossing — the kind that actually manages the risk instead of pretending it away. That costs money. So who pays?

Here's what should bother every Guelph taxpayer: the money is already sitting in GJR's bank account. In 2025 — the same year this dispute became public — GJR posted $2.4 million in profit and grew its cash reserves from $3.3 million to $5.4 million in a single year. And it spent zero dollars on crossing equipment or bridge work, after spending more than $700,000 on those exact categories the year before. By its own rules, it only ever has to hand the City up to 10 percent of its annual profit as a dividend — the other 90 percent stays with GJR. This is NOT a company that's short of money. It made a choice about where that money went, and trail safety lost.

Councillor Rodrigo Goller saw this clearly at that same meeting and tried to fix it: a motion to tie a share of GJR's dividend to safety infrastructure. Three parts of his motion passed. That part didn't — ruled out of order, because Council, sitting as GJR's shareholder, can't simply redirect money the City has already claimed as its own. Good instinct Mr. Goller, but the wrong tool.

Here's a fix that doesn't hit that wall. And this part is worth reading twice, because it's easy to hear it as something it isn't. The dividend GJR already pays the City every year? Leave it completely alone. Not a cent of it moves. It goes exactly where it's always gone, into the City's Infrastructure Renewal reserve fund. What I'm proposing sits on top of that: a second, separate payment, sized to match some portion of the dividend, earmarked for one purpose only — building and upgrading legally sanctioned, safe crossings along GJR's line.

GJR's dividend to the City has climbed from $80,000 in 2020 to $250,000 last year. If GJR hands over a $250,000 dividend, it should also set aside an amount for safe crossings. Nothing is redirected from the City's budget. Nothing is added to anyone's tax bill. A share of the railway's own profit gets reinvested into the one corridor it's responsible for.

GJR's dividend to the City keeps climbing

Annual dividend paid to the City of Guelph, 2020–2025

GJR's annual dividend to the City of Guelph, 2020 to 2025
YearDividend
2020$80,000
2021$0
2022$105,000
2023$164,000
2024$210,000
2025$250,000
GJR paid no dividend in 2021, the pandemic year. 2025 (highlighted) is the dividend the proposed safety fund would be pegged to. Source: City of Guelph official records response to registered candidates, 2026.

And that money shouldn't just land in a bank account. Put GJR, the City's engineering and parks staff, and the trail groups themselves on a small standing committee that decides, in public, which crossing gets fixed each year. The trail community doesn't just want a cheque. They want a real say in the fix, and they've earned one.

There's already a template for this. A pedestrian crossing at Heffernan Street was built with a Trans Canada Trail grant covering about a fifth of the cost, the City and GJR splitting the rest. And GJR's own latest annual report says it's already quietly exploring a formal, safe replacement crossing at this exact location — it just hasn't set a deadline. This fund gives that project a budget and a date.

It also doesn't help that GJR's CEO is also the City's own General Manager of Parks — the department you'd expect to be the trail community's biggest advocate is currently also the one closing crossings. That's not a knock on the person in the job. It's exactly why this needs to be a rule, not an arrangement that depends on everyone's good faith lining up.

One more piece: this same fight has now played out, unresolved, at four straight GJR annual meetings. So the next time GJR closes an informal crossing, give it 90 days to publicly report the safety concern, a funded option for a safe alternative, and a timeline — in open Council, not buried in a glossy annual report. “We're still exploring this” stops being an acceptable answer, year after year.

This isn't a tax increase, and it isn't City Hall handing a grant to whichever group shows up loudest. It's a permanent rule: if Guelph's own railway keeps posting multimillion-dollar profits, a fair share of that gets reinvested in making its own corridor safe for the people who live and walk beside it. We've owned this company outright for over a century. That's not too much to ask of it.

If elected to Council this October, I'll bring exactly this forward: a motion directing City staff to build this rule into GJR's governing policy, with a real deadline attached. Guelph doesn't need another year of “still exploring.” It needs a decision.

— Jon Christensen is a candidate for Guelph City Council, Ward 5.

Not just words

Here's the actual motion, ready to file.

Campaign promises are easy to make and hard to pin down. So here is the Notice of Motion Jon will bring to a regular meeting of council if elected — drafted, sourced, and ready to go. It directs City staff to develop the actual policy amendment, the same process the City would use for any change to GJR's governing policy, rather than attempting to rewrite the railway's rulebook from the council floor.

Notice of Motion

Guelph Junction Railway — Rail Corridor Safety Fund


WHEREAS Guelph Junction Railway Limited (“GJR”) is a federally incorporated railway wholly owned by the City of Guelph, which has been its sole shareholder since 1910;

WHEREAS GJR's profitability has grown substantially in recent years, with net income of approximately $2.4 million in fiscal 2025, and with dividends paid to the City rising from $80,000 in 2020 to $250,000 in 2025, pursuant to GJR's Board-approved Dividend Policy, which sets the dividend at up to 10 percent of GJR's annual net income, with the remaining net income retained by GJR;

WHEREAS these dividend payments flow into the City's Infrastructure Renewal Reserve Fund (Reserve Fund 150);

WHEREAS GJR's capital expenditures on crossing equipment and bridge infrastructure fell to $0 in fiscal 2025, notwithstanding growth in GJR's overall capital reinvestment, cash reserves, and retained earnings over the same period;

WHEREAS in 2025, GJR installed signage restricting informal trail crossings in the area of the Guelph Innovation District, citing liability concerns associated with undesignated crossings of the rail corridor;

WHEREAS members of the Guelph Hiking Trail Club, the Guelph Off-Road Bicycling Association, and other members of the public raised concerns regarding these crossing closures at the June 23, 2026 meeting of Council Acting as Shareholder of GJR;

WHEREASa motion at that meeting to allocate a portion of GJR's dividend to safety infrastructure was ruled beyond the scope of matters properly before Council in its capacity as shareholder;

WHEREAS the City, as GJR's sole shareholder, has the authority to establish requirements of GJR through amendment of its Dividend Policy and Shareholder Declaration that are separate from, and would not reduce or otherwise affect, the dividend paid to the City;

WHEREAS GJR's own 2025 Annual Report indicates that GJR and City staff are engaged in exploratory work to assess the feasibility of a formalized, safe crossing in this area, without an established timeline or funding commitment;

WHEREAS a comparable crossing project at Heffernan Street was successfully delivered through a cost-sharing arrangement between the City, GJR, and a Trans Canada Trail grant;

THEREFORE BE IT RESOLVED THAT:

  1. Council direct the Chief Administrative Officer, in consultation with the City Solicitor, the General Manager of Finance, and GJR, to report back to Council within 120 days with a proposed amendment to GJR's Dividend Policy and/or Shareholder Declaration that would require GJR, concurrent with any declaration of a dividend to the City, to allocate an additional amount toward a dedicated Rail Corridor Safety Fund, separate from and in addition to the dividend paid to the City;
  2. The Rail Corridor Safety Fund be restricted in use to the design, construction, and upgrade of safe, Transport Canada-compliant trail and pedestrian crossings, associated signage, and rail-safety education along the GJR corridor;
  3. The report include options for sizing the required contribution relative to the dividend amount, including a minimum annual floor to maintain funding continuity in years where GJR's net income or dividend is reduced;
  4. The report include a proposed governance structure for the Rail Corridor Safety Fund providing for representation from GJR, the relevant City divisions (including Engineering and Transportation Services and Parks), and affected community trail organizations, to publicly recommend priority projects for funding on an annual basis;
  5. The report identify the ongoing feasibility work respecting a formalized crossing connection in the Guelph Innovation District area as an initial priority for funding under this program, and identify options for leveraging matching funds, including from Trans Canada Trail or other active transportation grant programs;
  6. The report include a proposed policy requiring GJR to publicly report, within 90 days of closing or materially restricting any informal or undesignated trail crossing along its corridor, the specific safety rationale, at least one funded option for a safe alternative, and an implementation timeline, to Council or its applicable committee in open session; and
  7. This report be brought forward to a regular meeting of Council in open session, with any resulting amendment to GJR's Dividend Policy or Shareholder Declaration to be considered at a subsequent meeting of Council Acting as Shareholder of GJR.

Check the numbers yourself

The source documents, in full

Don't take this piece's word for anything. These are the actual records — GJR's audited financial statements, annual reports, and governing documents — obtained from the City of Guelph through a records request to the City Clerk's office, and republished here so you can check every number in this piece yourself.

The dividend history and its destination (Reserve Fund 150) are confirmed in the City's official records response to registered candidates. The June 23, 2026 shareholder meeting and the fate of Councillor Goller's motion were reported in Guelph Politico's council recap.

Where the “zero dollars” comes from — and one fair nuance

Note 4 of GJR's 2025 audited financial statements records capital additions of $0 for crossing equipment and $0 for bridgesin fiscal 2025 — against $536,064 and $188,825 (a combined $724,889) the year before.

GJR's 2025 Annual Report (p.12) notes one crossing project completed in 2025: a rehabilitation of the Victoria Road crossing, a new track panel recorded outside those two capital lines. That was a road crossing — for vehicles. The subject of this piece, safe trail and pedestrian crossings, is the one GJR's own report lists no 2025 investment in. What that category got instead was a closure sign.

Think Guelph should get this done? Pass it along.

Stay in the loop

Get the next proposal first

A few emails a month: Jon's proposals, plain-English breakdowns of what's happening at City Hall, and campaign updates. Unsubscribe any time.

We'll never share your information. Unsubscribe any time.

Read more: Jon's full priorities for Ward 5 · the 2026 satisfaction survey, explained