City Council · January 27, 2026 · Item 6.1

Approve the Corporate Climate Action Plan, with implementation of the Corporate Climate Action Plan subject to the pace of capital investment.

Main motion under the agenda item Corporate Climate Action Plan - 2026-24

Carried (11 to 0)

11 in favour, 0 against — unanimous

What was voted on

The motion in its exact words, as recorded in the minutes.

That Council approve the Corporate Climate Action Plan, with implementation of the Corporate Climate Action Plan subject to the pace of capital investment.

Moved by Councillor Goller, seconded by Councillor Allt.

How the room voted

In favour (11)

  • Allt
  • Billings
  • Busuttil
  • Caron
  • Caton
  • Downer
  • Gibson
  • Goller
  • Guthrie
  • Hauser
  • Richardson

Who spoke to it

Ian Scott, General Manager, Facilities and Energy Management and Bryan Ho-Yan, Manager, Energy and Climate Change, presented on the Corporate Climate Action Plan. The following delegates spoke: Martin Collier Evan Ferrari

What council was given

The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.

A summary is this site’s description of a document, not the City’s. Open the document before relying on one.

What was said

10,345 words from the meeting recording, transcribed automatically. Times are from the start of the recording.

Read the debate(click to open)

2:01:49We have a presentation to kick us off on our corporate

2:01:54climate action plan from both Ian Scott and

2:01:57Brian Hoyan and I'm going to ask

2:02:00Both of them to get prepared to come up and and give us that presentation

2:02:04And then after that we have a couple delegations as well

2:02:09So welcome to them, but Ian. I'll kick it on over to you right away. Go ahead

2:02:20I'm Ian Scott

2:02:23Thanks. Sorry. Good evening mayor and council. I'm Ian Scott general manager of facilities and energy management

2:02:30And today we are here presenting to you the corporate climate action plan

2:02:34This plan builds on momentum and work that the corporation is currently undertaking and has direct control over

2:02:40This includes electrophlying our transit and fleet along with investments into our buildings for energy reduction such as led lighting upgrades

2:02:48Building envelope upgrades and solar panel installations

2:02:52These investments have saved the corporation 11 million dollars since 2018

2:02:58And continue to save three million dollars annually on our utility bills

2:03:02The annual savings will continue to grow as utility rates increase into the future

2:03:08Moving forward this plan provides a roadmap for reducing energy and greenhouse gases across the city

2:03:14Cross city operations to meet the corporation's climate and energy reduction goals for race to zero and 100 renewable energy by 2050

2:03:24While there is still much work to do the information presented today and investments in the associated actions

2:03:30provides measurable impacts reductions and returns to the corporation

2:03:34And with that I will turn it over to brian huyan our manager of energy and climate change to present the corporate climate action plan

2:03:55Okay

2:03:59okay

2:04:00Back in may 2025 we presented the community call to climate action which detailed the focus areas and actions for all residents

2:04:08businesses and institutions in the city of guelph

2:04:11Referring back to the sphere of influence model

2:04:15municipalities operate across three levels

2:04:18The community call to climate action spoke to where the municipality has indirect control and limited or no control

2:04:26And plays more of a supporting role to foster and encourage climate action in the community like the guelph greener homes program

2:04:33free guelph transit bus rides

2:04:35and healthy landscape visits

2:04:39During that council meeting we also said we would come back to you and discuss the direct control part

2:04:48So this is the part this is the part where we're more focused on the ways we can support

2:04:53In how we run our business

2:04:55This would be optimizing the municipal operations and what the corporation can do with the assets we manage to save energy

2:05:02And reduce greenhouse gas emissions

2:05:08Defining further on energy and emissions for municipal operations

2:05:12This is a diagram that illustrates the corporate energy and emissions boundary

2:05:17Within the dash lines is our operations where we include

2:05:21the energy usage and emissions from all buildings

2:05:24Like city hall parks washrooms west end community center

2:05:28And also the more industrial and process driven facilities like water pumping stations and wastewater treatment at the water resource recovery center

2:05:36We also include things like street lights and traffic signals

2:05:40Also included is all of the fleet vehicles that drive around and provide services throughout the city

2:05:46Are also and these include vehicles like wealth transit buses ambulances plows fire trucks

2:05:53And we also look at the energy we generate like the biomethane or digester gas

2:05:56We recover from waste or the electricity from the solar panels on a bunch of our buildings

2:06:03Finally, we also need to consider things outside of our operations

2:06:06Specifically where we get our energy from

2:06:09What different types of energy and how clean or dirty they are

2:06:13Like where our electricity comes from say nuclear solar natural gas plants, etc

2:06:23So why a corporate climate action plan?

2:06:27The corporate climate action plan

2:06:29sets the direction and roadmap

2:06:31On strategic actions that are needed to continue building on our progress and get towards our targets

2:06:37And as we continue that progress through smart investments

2:06:41We keep reducing operating costs by lowering our utility bills and reduce exposure to increasing rates

2:06:50These cost savings really come from being good environmental stewards that eliminate resource waste and reduce greenhouse gas emissions that cause climate change

2:07:00Overall running a strategic fiscally responsible and environmentally conscious municipality is what wealth residents expect of the corporation

2:07:16As we've been at this for some time, it's good to check in on how we're doing

2:07:21Here's our progress for each year up to 2024

2:07:24Since we set the baseline back in 2018

2:07:28On the left in the blue bars is the total energy use

2:07:33This is the amount of energy from all different types of fuel we use

2:07:37Like electricity natural gas diesel gasoline

2:07:42Last year we used 27.5 million less kilowatt hour equivalent of energy than we did back in 2018

2:07:51This is more than a 17 drop compared to the 2018 baseline

2:07:57On the right in the gray bars is the greenhouse gas emissions per capita

2:08:03This accounts for how much of all of the different fuels and energy sources we use

2:08:08And how clean or dirty they are and puts that against wealth's population as an indicator of how the municipality is growing

2:08:16Here we are also seeing long-term reductions with more than an 11 drop from 2018 levels

2:08:28This progress is not only good for the planet. It's also good for the pocketbook

2:08:33Energy costs are a large part of the operating budget

2:08:36The annual spend on energy and fuel is around 14 million dollars

2:08:404 million of that on fleet fuels 10 million on facility energy

2:08:46On top of that energy rates fluctuate a lot excluding rates

2:08:50Dipping during covid overall the increase over time

2:08:55If we use the same amount of energy each year as we did in 2018

2:08:59And were charged at the actual rates

2:09:02Over the years we would have paid over three million dollars more than we have in real life

2:09:07This is what the top row is showing

2:09:09Our savings from escalating energy rates

2:09:12But we did better than that

2:09:16We did better than just maintaining our levels of energy usage

2:09:19In reality we became more energy efficient since 2018

2:09:23And lowered how much energy we consumed

2:09:26Every unit of energy we don't use that's a unit of energy we don't pay for

2:09:32By using less we saved more than 8.2 million dollars

2:09:35Putting this together since 2018 the accumulated savings from energy efficiency efforts has been over 11.2 million dollars

2:09:43Worthy of note

2:09:45The cost savings is even more when you add the millions of dollars of grants and rebates we've received for energy management projects

2:09:52Essentially investment in energy projects unlock grants and rebates that discount the capital costs

2:09:58So as we see good progress and cost savings

2:10:04There's a strong case to maintain the momentum and keep moving forward towards our climate change target

2:10:11Let's refresh from the climate change targets

2:10:14The municipality is a part of the community and supports wealths raised to zero

2:10:20By doing its part to help the community reduce per capita emissions by 63 by 2030 against the 2018 baseline

2:10:27And become a net zero carbon community by 2050

2:10:31Putting this in the context for the corporation

2:10:34And applying population growth projections

2:10:36To achieve 63 reduction by 2030 this works out to about 10 000 tons

2:10:42For the corporation to remove the 10 000 tons of carbon dioxide equivalent. They there are key areas of focus across the corporation

2:10:58Policies and standards such as training setting policies and operating procedures and tracking energy and energy

2:11:04Having high performing buildings

2:11:06Through reviewing building systems implementing energy retrofits and zero carbon new construction

2:11:12Optimizing process equipment to be more energy efficient through process upgrades and recovering waste heat

2:11:21Transitioning to low emissions fleet vehicles by right sizing the fleet

2:11:25Building charging infrastructure and going electric

2:11:29And generating renewable energy where we get fuel from the energy source

2:11:33And generating renewable energy where we get further utilization out of our assets by installing solar on facility roofs and convert waste to energy

2:11:43Diving into these areas of focus key strategic actions have been identified that will move the needle and achieve the 10 000 tons reduction

2:11:56For policies and standards

2:11:58Maintaining ISO 5001 is important as it is the systematic backbone of how we manage corporate energy and emissions

2:12:05By ensuring we track data identify opportunities develop action plans

2:12:10Implement those actions and monitor and verify performance

2:12:14It's one thing to install a new piece of energy efficient equipment. It's another to make sure you run it right to get the benefits

2:12:21HVAC systems for heating and cooling corporate facilities are the largest energy users when looking around the whole facility portfolio

2:12:29By implementing clear building temperature standards for the different zones

2:12:32We can better operate maintain and optimize the HVAC system with no capital cost

2:12:42for municipal facilities

2:12:44We need to consider both new and existing buildings and how to get them to be high performing

2:12:50For new buildings nothing comes for free

2:12:53When we build a new building and add it to our portfolio, we use more energy to build it and run it

2:12:59We have to ensure that we don't go out of control and aren't just adding in in a wasteful way

2:13:04New facilities like south the south end community center and baker library

2:13:08Are prime examples by meeting zero carbon building standards where they have been designed to be well insulated

2:13:14Use energy efficient heat pump technology throughout

2:13:16And recover heat when it would normally be wasted

2:13:20It greatly reduces that impact

2:13:23This also applies to our existing building stock too

2:13:27Through energy audits and building recommissioning we must continue to implement capital retrofit projects

2:13:33and operating changes

2:13:35Like upgrading HVAC systems to heat pumps optimizing building controls or led lighting retrofits

2:13:46Some facilities we have include industrial process equipment

2:13:49Although more complex than at bigger scale, there are key strategic actions that can yield significant emissions reduction and cost savings

2:13:58The organic waste processing facility

2:14:00Where residential green bin waste gets processed and converted to compost

2:14:04Is approaching the need for refurbishment in the coming years

2:14:08This is an opportunity to further optimize this process by introducing anaerobic digestion to recover methane and convert it

2:14:15To a renewable biofuel that can be sold and injected into the natural gas grid

2:14:20And used as a renewable alternative by others

2:14:25Anaerobic digestion isn't new to gulf

2:14:27The water resource recovery center has incorporated this into its wastewater treatment process for years

2:14:33This facility recovers the gases from the digester and burns it in engines that generate electricity and process heat

2:14:42As the cogen equipment and infrastructure are getting on in years

2:14:46They will need replacement in the future

2:14:49This is another enhancement opportunity

2:14:52Where process heat can be recovered from the wastewater stream and leaving it all

2:14:57Leaving all of the digester gas to be converted to a renewable biofuel that we can sell to the grid

2:15:03As mentioned there are more complex and bigger scale projects

2:15:08Further work is required to take the findings from preliminary investigations to a detailed level

2:15:13To determine more of the technical constraints as well as the capital requirements to determine how best to deliver these projects

2:15:25Significant emissions come from fossil fuels used to power our fleet vehicles

2:15:29By transitioning to low emissions fleet vehicles, we are reducing GHG emissions in a big way

2:15:36A lot of good work is already underway with the electrifying

2:15:39With electrifying the conventional 40-foot buses, the largest fleet grouping responsible for the most emissions

2:15:45With 19 electric buses now in service and charging infrastructure being incorporated into the new gulf transit and fleet services facility

2:15:53More electric buses can be used

2:15:55So we can continue to provide affordable public transit

2:15:59In an energy efficient way

2:16:02For mobility buses electric options are available and are being explored and evaluated for when life cycle replacement comes up

2:16:09Good progress is being made with light duty vehicles

2:16:12As more options become available on the market

2:16:16That said there are more complicated vehicles to electrify

2:16:19The solid waste packers another vehicle that does lots of travel also has a lot of heavy equipment on it that makes it tough to electrify

2:16:28Other municipalities and businesses have piloted electrified waste packers and we will monitor their progress and see what can be adopted

2:16:39Finally generating renewables is a way to offset our energy consumption and emissions

2:16:44And a way to get more utilization out of our sites to reduce energy costs or generate revenue

2:16:51The corporation has expanded its facilities over uh solar pv portfolio from 78 kilowatts to over 500 kilowatts over the past few years

2:17:01On a larger scale the east view landfill is a big opportunity to install ground mount solar on the lands that can be used that can't be used for much else

2:17:10The design of the system must consider continued gas management storm water and other environmental impacts

2:17:21Looking at these corporate strategic climate actions. There is a range of no cost or low cost measures through to large capital investments

2:17:29With the overall investment estimated at 247 million over 10 years

2:17:34alternative project delivery models will also be considered

2:17:39These actions lay out a practical path of how to invest resources

2:17:43And capital so we can build and improve at the times we need to replace infrastructure and equipment

2:17:49And do so in a more energy efficient manner

2:17:58And through these investments significant energy savings can be had

2:18:02Which as demonstrated reduces energy costs and mitigate risks

2:18:07forever increasing energy rates in a big way

2:18:11Not only is it smart money. It reduces corporate emissions by 12452

2:18:17tons of carbon dioxide equivalent

2:18:20Which gets us to our 63 reduction target levels and really moves the needle towards net zero by 2050

2:18:29And on that I will hand it back to Ian Scott

2:18:36Thank you, brian

2:18:38So the plan today or the plan before you today for council's approval as per the recommendation on the screen

2:18:45Presents core investments to move the corporation towards our goals of race to zero and 100 renewable energy by 2050

2:18:53The recommended investments have defined and measurable returns for the corporation in both energy and greenhouse gas reductions

2:19:01along with the associated cost savings

2:19:03This can be seen through the savings the city is currently experiencing from previous energy retrofits

2:19:09And replacements along with solar panel installations

2:19:13The greenhouse gas reductions and and savings will increase as the city progresses with transit and fleet electrification

2:19:20Many of the actions recommended within this plan are in alignment or have a direct impact on other key initiatives within the city

2:19:28Examples of this include long-term affordability by reducing our energy usage and associated costs

2:19:34Or indirectly supporting the community called a climate action by providing cleaner and more sustainable forms of public transportation

2:19:41This plan is the next step towards meeting the city's long-term goals with the associated actions

2:19:47Realizing a reduction of approximately 10 000 tons of carbon dioxide equivalent

2:19:51Meeting our interim target of 63 reduction for greenhouse gas emissions

2:19:57More work is still required to meet our long-term climate goals by 2050

2:20:012050 after the actions contained within this plan are completed

2:20:07Staff will continue to work to advance this plan and the associated actions

2:20:11Updates will be brought to council as appropriate through the multi-year budget or the corporate energy reporting as

2:20:18as items become more defined and as time progresses

2:20:22And thank you and with that we will turn it back over to you. Mr. Mayor and we'll be happy to answer any questions

2:20:29Great, thank you very much

2:20:31um, I think if you don't mind everybody we just have two delegations and we might as well hear

2:20:36From them and and then we can wrap it up with questions back and after they're done. Okay

2:20:41the first uh

2:20:43that we have on our list is martin collier

2:20:47and joining us, I believe by telephone

2:20:50And martin, I see your name on the screen. I believe you have to hit star six to unmute

2:20:57Hello, mayor

2:21:07Yes, we can hear you and it's no more than five minutes and uh, so I'll interrupt if you're getting close to that point

2:21:14But I'll turn it over to you martin. Your time will start when you start. Okay. Go ahead

2:21:20Okay. Hi, I'm martin collier as you know and a sustainable transportation planner and spokesperson for the residents for a safe speed vell avenue

2:21:27RSA we support sustainable transportation infrastructure where it meets the mobility needs of the most people at the lowest cost

2:21:35While reducing emissions projects like the emma url bridge and speed vell reconstruction ask

2:21:40Exaltor Bay issues related to our environment public safety and city finances, especially in this COVID altered and tariff

2:21:47tariff altered world we live in in terms of the corporate climate action plan the rsa recommends its staff update it to include

2:21:55transparent calculations evaluations and communications of environmental impacts from road and bridge construction projects

2:22:02This includes inviting ghg emissions from onsite and offslate construction of infrastructure

2:22:08We'd like to see this clause added to the city's procurement policy bylaw number

2:22:132018 20259 the contractors provide the same data when submitting tenders and while construction is taking place

2:22:20On the demand side of the equation

2:22:22We'd like to see free parking passes the free parking passes for 2400 city and police staff

2:22:28Be phased out the revenues should be earmarked to sustainable modes that reduce ghg

2:22:33Guelph brands itself is a progressive community making a difference

2:22:36But on the transportation front it appears we're failing where emissions are concerned

2:22:41According to local journalist adam donaldson 30 percent of the city's emissions come from 100,000 registered vehicles in guelph

2:22:48And guelph transit isn't providing a viable alternative

2:22:51Of course inbound vehicles from across the gtha contribute as well

2:22:55In relation to emissions that the city has control over the elephant in the room is how the selection and construction of road

2:23:01And bridge infrastructure increases co2 emissions

2:23:04Case in point is the mro bridge, which doesn't help the majority of vulnerable road users traveling along and across speed veil

2:23:11It was extremely depressing to watch the destruction of speed river habitat due to the construction of this bridge to nowhere

2:23:17Even though it's proposed to reduce emissions due to increased biking and walking which hasn't happened to date

2:23:23The bridge must be analyzed for embodied ghg spewed during construction operations

2:23:28This includes emissions from three sources first from materials and equipment that were imported from all over the world

2:23:35And subsequently trucked in from ontario and kebek

2:23:38And massive emissions spewing excavators bulldozers trucks drove in and out of the destruction site each day

2:23:44Diesel generators ran all week and often through weekends when nobody was working

2:23:49The manufacturing and installation of concrete and steel are two major contributors to climate change

2:23:54The bridge is constructed with 35 slabs of concrete each weighing five tons

2:23:59That's 175 tons shipped from rodney, we believe

2:24:03And four masses steel beams totaling 164 meters. I have no idea how much they weigh, but they are shipped

2:24:09900 clouds from kebek city

2:24:11Second is transport emissions from contractors

2:24:14There were maybe up to 50 companies working on site since habitat and climate destruction started in late 2023

2:24:21Male engineers contracted some laborers all who lived outside wealth drove their f 150s from locations 50 to 100 kilometers away

2:24:28For at least one month one movie construction

2:24:32drove

2:24:34Sorry, um, about 320 000 kilometers for the eight month project

2:24:38So it'll take at least 390 000 bicycle

2:24:42headbridge trips over to recover emissions from this one construction worker

2:24:47Third is the emissions by loss of natural co2 absorption due to destruction loss of habitat

2:24:53According to u of t professor shoshana sacks the calculation of the embodied ghc in a construction project requires first actor

2:25:00An assessment of the quantity and types of materials and energy needed to construct the facility and second the ghc

2:25:07intensity of the materials of energy used in construction

2:25:10I can go into more detail on that if you'd like

2:25:13Calculating and communicating ghc in a transparent way must happen at the planning stage, but also at the procurement stage if it gets that far

2:25:21Goodson services by law number

2:25:24201 a 20259 has a great definition of environmental sustainability

2:25:29The protection and enhancement of the climate ecology and natural resources for future generations through approaches that reduce carbon dependency

2:25:36Enhanced energy resilience conserve energy and resources

2:25:40Another thing that the city has control over but it's not mentioned in the staff report

2:25:44It's the free parking passes provided the 2400 city and police staff

2:25:48These should be phased out with revenues earmarked to sustainable modes that reduce ghc

2:25:54Eventually council should phase out free parking on all street city streets

2:25:58Which isn't free

2:26:00Hopefully that decision will be made through the city wide parking strategy

2:26:05So I don't have time to reiterate those first those three recommendations

2:26:09But we'll be glad to do that and we're grateful if you will support them

2:26:13I'm just sorry. I couldn't be there with you in person, but wanted to save time and admissions instead. Thank you

2:26:21Great and thank you for your delegation. We appreciate that. Is there any questions for martin at this time?

2:26:28No, okay. Thank you very much martin

2:26:31It's all clear. Thank you, sir

2:26:33Okay, take care

2:26:35Uh evan evan frary come on down

2:26:39Evan's here in person. Thank you for coming

2:26:43And you know the drill levin no more than five minutes. I'll turn it over to you whenever you're ready great. Thank you

2:26:56Thank you, mr. Mayor and

2:26:58members of council um professor

2:27:01Darya taran from the university of guelph was planning to co-present with me this evening

2:27:04But unfortunately he's come down with the flu and and unable to make it

2:27:09Um professor taran and I are in the early stages of a joint research project. I say and I us at emerge

2:27:16Um, and I'm here somewhat prematurely

2:27:19Um, however the corporate climate action plan encouraged us to share our intentions of this research project publicly this evening

2:27:26First I want to say how encouraged we are at the by the project staff has brought forward in the plan at the same time

2:27:32It's disappointing to see that five of the most significant projects fall outside of the city's 10 year plan 10 year capital plan

2:27:40That's where we believe that we can help

2:27:43Emerge sustainability in conjunction with professor taran from the university of guelph would like to advance

2:27:48One of those projects is a community call it project a climate project that we've called

2:27:54making climate lemonade

2:27:57When the world hands us a lemon let's make some lemonade

2:28:01In the plan that's before you tonight this project is referred to as the east fuel landfill site thus thus the the

2:28:09uh the lemon

2:28:11So the east fuel landfill site solar pv projects using available land at the landfill to generate solar power

2:28:19We want to explore explore the feasibility of delivering this as a community invested solar project in this model solar electricity is generated

2:28:29um

2:28:30Is generated and sold to the grid or to a large user?

2:28:34potentially the city of guelph

2:28:36The city would not be responsible for capital or operating costs. It would simply pay for the power it receives

2:28:43local residences

2:28:46Local residences and businesses could invest directly in the project with minimum investments of as small as a thousand dollars

2:28:54This isn't about large investors. It's about making climate solutions and investment opportunities

2:28:59Accessible to as much of the community as possible

2:29:03Instead of installing panels on their own rooftops community members would receive bond style payments over the length of the contract

2:29:10This also allows participation by renters homeowners the business the business community and without any of those without suitable rooftops

2:29:19Community solar is not a new idea

2:29:22There are a dozen examples across the Ontario including at least four projects that have been operating in the city of guelph

2:29:30For more than 10 years. There are also

2:29:33Ontario based companies at least two Ontario based companies that are capable of facilitating

2:29:39These type this type of a project and have done so in in the past at this scale

2:29:43We estimated a capacity at the site solar capacity at the site of approximately 11 megawatts

2:29:49Which aligns closely with the staff suggesting of somewhere between 10 and 15

2:29:54megawatts who are a little conservative. I think on that end

2:29:57there are also um, we asked um, pardon me

2:30:01for context

2:30:02The city staff are suggesting 10 to 15 megawatts for context

2:30:07The entire city the entire community of guelph the city city's average peak electricity demand is 250 megawatts

2:30:15So as you can see 10 to 15 megawatts is a sizable amount of power that we could bring into the city

2:30:21what makes um, um, what makes making climate limit lemonade different is the challenge of building solar infrastructure on a former landfill site

2:30:30Fortunately, there are examples we can learn from from in Calgary the shepherd landfill solar project was completed in 2018

2:30:37and 2019 and now generates enough electricity for approximately 750 homes

2:30:43To put that into context the size of the project that we would be talking about at the land of the east view landfill site

2:30:50Would be significantly over the the amount the same amount of electricity significantly over a thousand homes

2:30:56Hamilton has studied solar development

2:30:59um solar development on its closed

2:31:02A glanford landfill site and saskatoon operates solar alongside its landfill gas

2:31:07Collection system like these projects east view will come with technical and regulatory challenges

2:31:14We are currently in the early stages of developing the research scope and criteria and we recognize this is a long-term effort that will take years to develop

2:31:22There is considerable amount of background information. We need already

2:31:26That's already available throughout the city's website or ask of council this evening is a simple one that we request assistance from staff

2:31:33In accessing possible additional information as the research progresses

2:31:38the information

2:31:40Would allow us to better define the scope of our research and assess whether a community invested solar project at east view is feasible

2:31:47We look forward to sharing our findings with council and the broader community and helping to build a movement that gives wealth residents

2:31:53The opportunity to invest in a local renewable energy project

2:31:57Take meaning and make climate lemonade

2:32:04All right. Thank you. Uh evan we appreciate your your delegation

2:32:08Um, especially if you're not feeling the best. So thank you for making the effort

2:32:14Um, I know I have a question, but it looks like I saw some hands. So I'm just going to go uh, feel

2:32:20Sorry, councillor Allt and karan and uh galler

2:32:24Uh, and then if they don't ask my question, then I will go uh, but you go uh first council

2:32:30Thank you very much, uh mayor bob. Oh, sorry got three

2:32:35Uh, uh through you to uh to mr. Ferrari the delegate mr. Ferrari

2:32:41um

2:32:42I appreciate your metaphor of making climate lemonade

2:32:45um, but um

2:32:47What I heard from you. I think is an elevator pitch. I was wondering if you could outline uh in in perhaps broader terms

2:32:56Uh, how this community investment project

2:32:59might work and

2:33:02You'd you'd mentioned other jurisdictions, but what I'm really curious about is guelph

2:33:06And so I'm wondering how guelph compares to other communities in Ontario

2:33:10I guess if you have to go overseas to talk about it fair enough, but but I am quite curious about this

2:33:16Um through you mr. Mayor Guthrie, um

2:33:19There there are sort of two aspects to this one is the actual landfill and there are multiple examples of landfills being turned into solar

2:33:26But um through you mr. Mayor, I believe the councillor is specifically asking about the the business model the actual model of what how

2:33:34Catch me if you could yeah, so so so there are a couple of different entities that there are there are two

2:33:39relatively large entities one one, uh, that's a solar not-for-profit co-op with over 80 million dollars worth of assets

2:33:46In ontario solar assets within ontario and it's built on this model that essentially

2:33:52While there may be some

2:33:54Some debt on the on the capital costs of the initial project that the bulk that that might be through traditional lenders

2:34:03The bulk of the the bulk of the the financing of the program

2:34:07Of these programs are by people investing small amounts like thousand dollars

2:34:13It's essentially exactly the same thing that many of you on council will know is the bond the bonds that uh, 10c issues

2:34:20As as an operation

2:34:23That they're financing an awful lot of their debt by going by going down this path

2:34:27there are

2:34:30As it turns out not that

2:34:33Full disclosure i'm the chair of a solar co-op hearing walf and we have approximately 300 kilowatts worth of projects

2:34:42All of our board members are volunteers

2:34:45We don't have the capacity to take on this type of a project in no way shape or form

2:34:50That's wearing that my hat as the chair of that of that solar project. Um, but um, uh, there's also another company called

2:34:58said co that that has at least three if not four

2:35:03Um, uh solar co-ops as well where people have invested as little as a thousand dollars or as much as 50 thousand dollars into each one of those things

2:35:11And and how they uh, how that essentially that's the financing model of being able to come up with the capital essentially to

2:35:17To to start the business in the first place and it's paid out over over the length of the contract in Ontario. It's through the through the

2:35:26Uh, the contract is guaranteed through the Ontario power authority as some of you will know as as

2:35:31that have solar on your house you're guaranteed that that, um, um, uh, that amount of

2:35:37Of revenue over a period of of 20 years

2:35:41I hope that's a little clearer your worship

2:35:45Um, uh, thank you

2:35:47Maybe the harder question because I understand what you said that they're uh, just yes or no

2:35:52That it would appear that there's community interest, but the harder question. I'll ask this to uh staff as well

2:35:58How does this fit into the corporate energy strategy?

2:36:01uh, well the simple thing would be that that, um

2:36:04What we're looking at is can

2:36:07Can the model be used in such a way where at the end of the day the city would put out a tender

2:36:14For companies to come forward with a business model that appeared like this

2:36:18But essential but what that what the city would be looking for

2:36:22Is a power purchase agreement with that company or with that co-op and what that power purchase agreement would be is is

2:36:30Currently the the city is is buying electricity an awful lot of electricity

2:36:34And this would provide the city to the opportunity to buy 100% renewable renewable energy from that specific

2:36:41facility, so that's ultimately where we would like to go

2:36:45We know there are going to be many trap doors along the way and and, um, um

2:36:51We're not shy. We're going to give it we want to give it our best shot and see how far we can take this

2:36:56Thank you very much

2:36:58Councillor Caron and then goller, please

2:37:00Thank you. Along a similar line, you know capital investment seems to be the

2:37:05You know the key roadblock to these large scale projects and you know our staff have brought for

2:37:11Our their best recommendation with the resource we as council have given them

2:37:15Um, but we know there's payback and you've outlined in your presentation. There's payback

2:37:19Um, we also know there's more than one lemon and i'm just wondering why you or perhaps it's because it's in the presentation

2:37:27Why east view is the the focus?

2:37:30Um, because we do have you know pollinator habitat there and we have other projects happening there disc golf, etc

2:37:37We maybe it's my algorithm, but I get all kinds of pop-ups in my social media about

2:37:43parking lots

2:37:44We have the west end parking lot and we have the vik road parking lot and and that parking lot solar arrays can be one to two acres

2:37:52And can also you know have co-benefits of not having to plow those parking lots because there's warming infrastructure underneath

2:37:59As well as storage on site and closer to actual residences and homes and buildings

2:38:06um

2:38:07I wonder if you could just talk about

2:38:10What lemons are the best lemons to choose in this lemonade making lemonade stand

2:38:17um

2:38:19Three three, mr. Mayor

2:38:21Um, uh, we landed on that what we also are considering imico and we and the only reason we're talking about this one is because it's what was in

2:38:30What was in the report? Um, we were we were also putting some effort into the into the imico site

2:38:36I understand that there are a whole other set of trapdoors associated with that and students including some legal issues that

2:38:42that have been

2:38:45It that have been ongoing

2:38:47You make excellent examples of all the others, but the short answer to your question is the economy of scale

2:38:53The size of the east view landfill site

2:38:56Is such that enables us to put somewhere between 10 and 15 megawatts on there

2:39:01Imico in comparison would be approximately 1.8 megawatts. So it's not you know, it's you start understanding the size and the scale of it

2:39:10Um, and and I think your instincts on parking garages is a good thing

2:39:15um

2:39:17Uh, of course the economics of it tend to be different and I'm and I'm

2:39:23Doing this off the side of my desk here on this part of it is that um, uh

2:39:30Going with solar carports the mounting systems wind up being significantly more expensive than ground mounting, you know

2:39:38Ground mounting systems. So the cost per or what what's called the the lcoe the the levelized cost of

2:39:44energy over the price over the price the sorry the

2:39:49Uh, the time frame of the of the contract would be significantly greater. That's not to say that it won't work

2:39:55But I think it's good to be looking at all of those

2:39:58It was a size issue and the larger the system the lower the the lcoe becomes with a larger project

2:40:06Granted there are other challenges

2:40:10caller, please

2:40:13Um, your worship, uh, thank you for your presentation. Mr. Ferrari

2:40:16Um, very exciting prospect. I just have you already reached out to city staff and presented them this project

2:40:23Or is this the first time that they're hearing about it? Uh, I I I did have a conversation

2:40:28With uh with mr. Hoi-Yan on friday. Just to say I don't want to I don't want to blindside you on monday

2:40:34We we we wanted to to have a little more work involved with the the the scope

2:40:40Um of of the research project that we're working on so we're still working on that piece

2:40:44But I I felt it this was an appropriate place to bring it forward because I I think it's an idea that

2:40:50that provides

2:40:53A wonderful opportunity for collaboration and and I think for creative thinking on all of this

2:40:59Yeah, yeah, I I would agree. Thank you so much for bringing this to us

2:41:03And I look forward to asking some more questions of staff. Thank you

2:41:07Great thanks. I didn't see anybody else all this quickly say pretty much did odor what my colleagues said they did kind of capture some of my questions already

2:41:15Thank goodness because now I only have one question left

2:41:18Um, so it's a little bit along the lines of what councillor Caron said is and I'll ask staff this as well

2:41:24But from an economies of scale or options perspective, I'm almost wondering if it would be better for us to have like a catalog

2:41:32of all of our assets

2:41:35across the entire city

2:41:37All the rooftops all the all the parking garages all the park what what like the landfill included

2:41:44and and almost have that as a

2:41:46as an open bidding sort of

2:41:49Bidding maybe the wrong word but an open process of a stock gate of all of our assets that could

2:41:56accommodate this and then open it up for

2:41:59Uh, you know groups to be able to come forward and say look I I can't afford to do

2:42:05You know, we can't we can't do this for this reason, but we can do it here. So it's almost like a

2:42:11uh, a plotting of a map across our bird's eye view of all of our

2:42:16Available assets where this kind of idea could happen

2:42:20And then groups could come in and go like there could be one group that goes

2:42:23I I can handle the big one but there could be seven other groups that go

2:42:27I can do a medium sized one or a small sized one

2:42:30But at least then we have a kind of a a lay of the land of all of the assets that might be doable for this type of idea

2:42:37Is that something that that might be warranted here?

2:42:41over and above just what the landfill site is and

2:42:45The second part of that question is have you seen that sort of because i'm just thinking about it on the fly

2:42:50But have you seen that sort of idea happen in other cities at all where they've they've mapped out the available assets

2:42:57To do this type of infrastructure from a community-based

2:43:01fundraising initiative

2:43:03And maybe co-op ownership

2:43:05Other than what the idea that i'm just coming up with on the fly

2:43:09um

2:43:11Mr. Mayor, I think that you've got a number of questions there

2:43:14The first one is I don't know of other municipalities that have taken that approach

2:43:18But I believe staff has a good inventory of where potential projects are at least they I know that they've done that kind of analysis in the past

2:43:27um, and and I know that historically just to put things into into in the context that

2:43:31I believe mr. Ho-yan mentioned that the city has about 500 kilowatts of um, um, of um

2:43:38Of solar capacity right now 400 of which is across the street

2:43:43So there's another hundred but those are primarily in very small projects

2:43:4810 kilowatt microfit projects if i'm not mistaken at the time and

2:43:53And I get why that was done at the time even on on buildings that are that could

2:43:59In some cases accept larger capacity

2:44:02but there may be

2:44:05There are

2:44:06Permitting issues around putting a second project and it's not permitting issues from the city standpoint but from the the the

2:44:13Ontario power authority in the iso that um, not sorry the iso not the power authority

2:44:20That would that would change it. So it's a there is a bureaucratic side of that as well

2:44:25But the concept I think I I like where you're going and I think the concept of saying

2:44:32We don't want to build it. We want to buy the electricity come and impress us

2:44:37I think is is is ultimately

2:44:40To put the city in a driver's seat under those circumstances and if and if the research that that we're doing can help move along that path and then

2:44:50We'd like to help as much as possible. Okay. Well, look, I really appreciate

2:44:54I appreciate you answering that and your question and I see nothing further

2:44:58So I'll come back to us to just engage with staff now, but thanks. Hope you feel better too. Thank you

2:45:03Yeah

2:45:04Okay, I see a few hands going up

2:45:06But I I did know that councillor Goller wanted to I think move the motion that was here councillor Allt

2:45:11You want a second if that's okay?

2:45:13councillor uh, galler I think had a question of staff

2:45:17And then I'm going to go to alt and then I see Gibson on the screen as well. Okay

2:45:23Thank you and through your worship to staff. Um, first off, thank you so much for this

2:45:27Report, it's it's really really good to see where we are and where we're going and I really appreciate you shown as the reality of

2:45:35The funding limitations of how far you can go

2:45:39in the given time

2:45:41Along the lines of what mr. Ferraris said

2:45:45Are there opportunities when we look at some of these large projects that are partially funded to

2:45:51Borrow internally to to fill out those costs. I mean one of the big projects that I see here is the the partial

2:45:59That is partially funded as the internal fleet

2:46:03conversion is there an opportunity to do that

2:46:06in lieu of finding new dollars for that or for the

2:46:10High efficiency building upgrades if we know that there will be cost savings

2:46:15Is there an opportunity to borrow internally to fill out knowing that there will be

2:46:20cost savings in the future

2:46:27So through the mayor to you counselor goller, uh, some of these items are

2:46:32What we will be bringing back to council as part of the multi-year budget as well

2:46:36Or the alternative project delivery methods that we talked about before

2:46:40This is really the start of the plan and we have more work to do and so yes

2:46:44We will look at those items that as you have suggested and where they fiscally make sense and we'll work with our

2:46:49Finance team to put that together as part of budgets in the future

2:46:56Thank you for that

2:46:58when when

2:47:00Are we looking at receiving that you know next step information of of that alternative funding method then

2:47:09so

2:47:11This is a long-term plan. Uh, our goal is 25 years in the future. So this isn't a

2:47:19A lot of these projects are large capital projects large capital investments long-term projects

2:47:25that do take time to go through the process and so

2:47:29This isn't a we're going to come back to council later this year or next year on some of these items. This will take

2:47:37Multi-year budgets and budget cycles to get through and and develop these projects

2:47:43Into the city's work plan. Yeah. Yeah, I I appreciate that fully. These are big ones

2:47:49I'm looking at items like the building energy retrofits the 12 million dollar that is not

2:47:55in the 10-year funding window

2:47:58But we have here between 20 25 and 20 29 we could realize

2:48:03350

2:48:05What is it tons per year? So when I look at that on page 14 of the presentation

2:48:12That 350 is that something that we are not going to realize because the funding is not present

2:48:17for that

2:48:23So

2:48:26It's hard to give an exact answer to that unfortunately because there are instances where our asset renewal we can

2:48:35Provide those upgrades where the existing equipment matches and fits

2:48:39There are other instances where if we don't have the funding to do

2:48:43Ancillary upgrades like upgraded structural

2:48:46We can't upgrade the equipment to the full energy efficient potential. So that's

2:48:51That's where we sit with the funding that we have in our asset renewal accounts right now

2:48:57Okay, okay. And what I'm hearing is that the exploration of of borrowing internally is not something that that is in your work plan for this year

2:49:06That that we could do

2:49:08I'm uh through through the mayor. I'm gonna

2:49:12Just jump in here

2:49:15Um

2:49:16I would just say that through our budget and through all of our financing and capital planning

2:49:22We are internal borrowing already

2:49:25To a high degree if you recall as it relates to our growth and because of the the development charge

2:49:32Uh exemptions and as well as just the the downturn in in the pace of housing right now. So, um, I would just say we we

2:49:40Absolutely look at internal borrowing all the time. We are actively involved in it

2:49:45And um, and really this is about trying to look at as many alternative financing options that we can

2:49:52To to be able to move these types of projects forward. So we're looking for grants where like the the

2:49:59Having this plan

2:50:01Helps us now to focus as we look for financing

2:50:06options

2:50:07Okay, I really appreciate that. Thank you. And I hope that many

2:50:10Grant opportunities come our way in the next couple of years

2:50:13Then my second set of questions going along the lines of what mr. Ferrari said

2:50:18Does the city have the ability to do that?

2:50:22crowd funding sort of project or would we have to go to a

2:50:26non-profit third party to do that sort of work, you know, could we

2:50:31Choose out to to build the

2:50:33um

2:50:34The east view solar plant as a community funded

2:50:38Project by the city or is that you know beyond the scope of what we should be doing at a municipality?

2:50:45um, so through the mayor

2:50:47I in in the past I had looked into a bit of this

2:50:51The the bonds and and the community bonds. Um, and so I I can't recall in the moment here

2:50:58But it is something that I think we can look into

2:51:01um, I just it would be something we need to report back on in terms of

2:51:06the the city's authority and and the legislative framework for that, um, but uh

2:51:12But um, that is something we can probably look into in a bit more of a shorter term to understand

2:51:17I don't know if we would report back to council

2:51:19Uh, immediately, but it's in it's in scope for for understanding that

2:51:24Okay, okay. Thank you

2:51:26And along those lines if you will be exploring that, you know

2:51:30Is that something that could be done in the next year or two to to look at the visibility of either doing it ourselves or going to

2:51:37third parties that have the experience and having them work with us to build out these

2:51:43um energy generation projects

2:51:48Um, yeah, I would I'll just through the mayor

2:51:51Yes, we can be we will be looking at those types of things in the shorter term and and that will then inform longer term planning

2:51:58And these ideas and how we how we start moving the needle on financing

2:52:02So I think all of those will be in the shorter term kind of investigation stage

2:52:08Okay, and and then in terms of um the feedback to council and to the public

2:52:13Would we be looking at next year around this time the next report will give us more information or would there be any time

2:52:20before that

2:52:27I'll just uh, maybe I'm gonna uh, just ask uh, Ian to uh

2:52:32Jump in here on the the annual reporting that we do as it relates to

2:52:37Climate and and they'll probably be that would probably be the the time in which we're giving those updates

2:52:43But may I defer over to to the team?

2:52:46uh through the mayor to you counselor goller

2:52:54yes, I I

2:52:57think I agree with

2:52:59cao baker that

2:53:01The annual reporting would be

2:53:04probably the place where we could

2:53:06respond to that

2:53:08Or through projects in the multi-year budget cycle as well

2:53:13would be another place that we could if

2:53:15there was

2:53:16some investigation that

2:53:18made sense for the corporation

2:53:20Perfect. I I really appreciate that. Thank you. And on my last question through your worship

2:53:25uh, do you need direction to to have conversations with emerge and with mr.

2:53:31Ferrari about this or would you be doing that anyways as part of the research that you're going to do?

2:53:35Uh through the mayor to you counselor goller. No, we would be doing that anyways

2:53:41Okay, thank you and to alt please

2:53:44Thank you very much mayor Guthrie. Um, I only have one question for staff and it really is a follow-up

2:53:49but one of the things that uh, that I'd like to two things I'd like to state first of all

2:53:54I don't want to get um bogged down in just this particular initiative because I think that what we're here for is the

2:54:01The corporate energy strategy as much as anything else

2:54:03But what I do like about what has been proposed is that this

2:54:07Provides a bit of an amalgam of the community energy initiative and our corporate energy strategy by pulling the two together

2:54:15Eight years later, but really the question that I have is

2:54:20In in my mind the way mr. Ferrari presented this this does fit into the corporate energy strategy

2:54:27And I look to you if you wouldn't mind if you could please comment upon that

2:54:32I mean there's alignment. Sorry to you

2:54:41counselor all through through the mayor

2:54:43um

2:54:44There definitely is alignment in terms of you know renewable energy generation and how that will assist in in

2:54:51offsetting our energy usage and reducing our emissions

2:54:55um

2:54:56As we were discussing

2:54:58Just through the other questions too about that financing gap and whatnot too. So there are alternatives or

2:55:04considerations that we can have to to move those projects forward

2:55:09um

2:55:12I just want to to caution though like

2:55:16There are complexities and constraints when dealing with such a large-scale project

2:55:21also working with uh, you know a landform like the landfill in terms of the gas monitoring that we have to do there

2:55:27As well as you know, there was mentioned about

2:55:30The lands and other uses there in the environmental heritage

2:55:34The natural heritage aspects of it

2:55:36So that was all considered as proposing this to make sure that we're looking at just the unusable lands

2:55:43um

2:55:44So not impacting as well say pollinator parks or or I think it was disc golf that was mentioned

2:55:50um

2:55:52And then also just looking at from a solar optimization and what makes sense

2:55:56From a solar irradiance just where the sun is shining on that southern slope

2:56:01And thank you as I said, I don't want to just pick on or cite this particular aspect of what we're doing

2:56:07I think that we we need to be very mindful about

2:56:11about building

2:56:13Refurbishment new buildings so on and so forth

2:56:16I expect that much of this is also going to be affected by changing

2:56:20Construction standards as well moving into the future

2:56:23So we are really looking at a plan that will evolve over time as as national and provincial standards change as well

2:56:30Would that be correct?

2:56:36Through you mr. Mayor to the councillor Allt. Yes

2:56:39We're always monitoring the Ontario building code looking at how we can make improvements

2:56:44On top of that, you know as we see it with the south end community center and baker being

2:56:48Going over and beyond the the Ontario building code and and achieving the the zero carbon building

2:56:54design standard as per the Canadian Green Building Council

2:56:58And it it's smart

2:57:01In the way that we operate and looking at the overall life cycle cost

2:57:04Of running these buildings. We also have to consider technology as well as that's changing

2:57:08So we're constantly adapting and and seeing where we are applying these technologies in a suitable manner

2:57:15Thank you very much. Very happy to support the report

2:57:18Okay, and uh councillor Gibson is last go ahead councillor Gibson. Yep. Thank you through mr. Mayor

2:57:22Thank you to staff for a good a great presentation

2:57:26A couple of questions and maybe a couple of takeaways

2:57:30The the micro fit projects that we have installed at the city those are

2:57:37Previously installed through I gather the micro fit program, but are they are they contracted for 20 years back to the grid?

2:57:45They're not net metering for our own energy use at this point. We're selling that energy back to the grid for the time being

2:57:53Through you mr. Mayor to councillor Gibson. Uh, yes, that's correct. So um the smaller micro fit sites which were 10 kilowatts and less

2:58:02They do have the contract with at the time the Ontario power authority now with the ISO

2:58:08It is a 20 year contract

2:58:10They weren't based on the the install date of when they were so some of them were kind of in later years

2:58:17And yes, they are being sold to the ISO for them

2:58:21Right. Thank you. I assume this so so when that 20 year contract comes up

2:58:26um

2:58:26That's when I'm assuming and when you we talk about buying someone else's power or someone else's got the power

2:58:33Are ready to sell to us. We're assuming that um those contracts would likely turn into a net metering contract

2:58:41Not rather than a straight sale back to the grid. Am I am I safe in assuming that or is there a chance to

2:58:46renegotiating keep selling to the grid?

2:58:51through you mr. Mayor um

2:58:54I'm not so

2:58:56It's my understanding however, I would have to confirm this but yes that they would transfer over to say a net meter

2:59:03Or a behind the meter load displacement arrangement. I haven't heard any any um any cases where it would be direct fed

2:59:11At that size

2:59:14Direct sell to the to the grid that that's my understanding as well. Thank you for clarifying

2:59:18um, so just a little bit about again just to talk about the complexities and I'm not going to spend too much time on the

2:59:24On the east field east side, but the current l t2 electricity procurement program in ontario

2:59:31There's no longer financial incentives associated with certain technologies. So to my understanding

2:59:37I'm reading it here from the website that it's technology neutral as in solar now competes with wind competes with hydro competes with bioenergy for

2:59:45grid contracts not net metering contracts, but grid contracts. So my question is

2:59:51um

2:59:52Even if we wanted to I'm not pouring cold water on this but even if we wanted to say

2:59:57build a partnership that

2:59:59Created a project life like maybe we had an association of power producers in Ontario approach us and say we'd like to

3:00:05lease the east v landfill and propose something back to the

3:00:09IESO for for power select that would be

3:00:12That would be almost like a competitive bid process to see if there was interested out there to see if someone wanted to

3:00:18contract create a

3:00:20A proposal to the IESO

3:00:23It would be less in our control unless we wanted to net meter to ourselves

3:00:32Through you mr. Mayor to council Gibson

3:00:35um

3:00:36Yes, uh, we we would have to I mean if if we were to go through something like the the lt2 um

3:00:44Competitive sale to direct grid

3:00:47That could be a way to go about it and we would probably have we would likely have to be cured for those services and

3:00:53Determine the commercial terms that are going to be

3:00:56Through that project right in terms of ownership and and who is doing what and what proponents we'd want to look at

3:01:03So as we develop say if we go down that route the terms of reference

3:01:06um

3:01:07We would be still in the position to to set those terms as we see the project going

3:01:13However, it would be in the framework of say an lt2 program or like where we'd be competing with other projects

3:01:21For that for that energy space. Okay. I'm gonna flip switch this because I'm really interested in the bio collection

3:01:26Program that you're you've talked about. I think I was aware of that almost 10 years ago now

3:01:31you guys were looking at that as a heat source or something like that at the

3:01:36Solid at the waste resources. Um, the wastewater resource

3:01:40Facility, I think that's really exciting. Is that energy going to be used to power the facility?

3:01:46And not as a contract back to the grid am I correct in understanding that?

3:01:56Uh through you mr. Mayor to council Gibson. So currently there is digester gas that is being

3:02:02collected at at the wastewater treatment plant or the water resource recovery center

3:02:06Currently that is being run through the cogeneration

3:02:10Engines and it is powering the wastewater treatment process equipment

3:02:15As well as we're recovering heat off of that to feed or to keep the digesters warm. It's a process heat

3:02:23um

3:02:25What is being proposed here and yet still to be determined and detailed?

3:02:29But in some initial investigation is is looking at alternative ways of doing this

3:02:34So we can continue on with a cogen like facility

3:02:38And continue on doing that or there is opportunity to recover waste heat from the wastewater stream

3:02:46Have that be recovered as heat for the digesters

3:02:51And then allowing us to capture more of that digester gas and not having to burn them in the cogen

3:02:57engines

3:02:58and then

3:03:00Almost like a fit contract but for renewable or sorry for natural gas

3:03:05sell it to

3:03:07The likes of end bridge as renewable natural gas. That's great

3:03:11Um, thank you for that explanation. So two comments to end with my last tour of the wastewater treatment plant

3:03:17I remember there being a large flume of water and it was a very consistent flow of water

3:03:22I think it was two or three maybe even four cubic meters per second of flow

3:03:25through this concrete flume and I always wondered what it would look like to

3:03:31Bring in a consultant or bring in someone who who understands the business well and talk about a kinetic turbine or a hydrokinetic turbine

3:03:36To go into that flume because I gather it's a very consistent 24 hours a day flow that could be easily captured

3:03:43For for quick renewable energy generation. I'll leave that with you. That's a comment

3:03:49The last comment I'll make is that I think I talked about this about 10 years ago too

3:03:53Is about the common currency that's in this file

3:03:56If financial return on investment is your currency is what you're looking for

3:04:00You can find it if ghd remissions reductions is your currency and you want to see that in this file

3:04:06You can find it and I think it's a great. Um

3:04:09I think it's a great unifying topic and I appreciate staff's effort on this. Thank you

3:04:15Great. Thank you very much councillor kipson

3:04:18So it's already been moved and seconded and I'll just make a quick comment to say thank you very much to staff for this

3:04:24This is this is a maturing. I think in our in this area

3:04:28It's something that council really wanted this term to to see more of and more communication of

3:04:35I've I've started to hear

3:04:37feedback from community members and much how much they've appreciated the annual reports

3:04:41About the presentation that you brought to us in may of last year

3:04:45I've even talked to some about this here to that's in front of us today

3:04:48And it's just ongoing sort of positivity that I've seen

3:04:53Come from this type of an opportunity to present these types of things

3:04:56Because people are interested in them and I think as councillor kipson said

3:05:00Depending on where you're coming from you can see both the environmental benefits and the financial benefits as well

3:05:06It also as our cio said because I wrote it down here myself and then she said it

3:05:10But was this is a great opportunity for us from an advocacy point of view

3:05:14We we can now I can and whoever's talking to ministers or whoever can now actually point to this report and be like we need money for this

3:05:21Oh, this this fits this, you know grant opportunity

3:05:25So even just by bringing this up is a really great opportunity for us to know more about the asks

3:05:30That we might have with upper levels of government or other people

3:05:33And then my final just take away and you can just take it away. It's just

3:05:36And if it's not a good idea, I'm fine to hear back into the day for you to say no

3:05:41But the idea of sort of taking

3:05:43A look at all of the assets that we have that might be able to be leveraged into sort of energy or

3:05:49Options I I don't know. I think that's kind of a neat idea

3:05:53So just take it away. I just don't have to do it

3:05:55But if it's something that you would ever need council direction on or whatever just like if you think it's

3:06:01Something of value. I would love to explore that a little bit more

3:06:05And in the meantime, you know

3:06:08our delegate Evan

3:06:10Mentioned his partnership with someone from the university if there if there is that ability for staff to

3:06:16Continue to engage on that opportunity just to get some more research value

3:06:21Looking into maybe the site to see if there's opportunities there. I personally think it's a great idea

3:06:28So I would just leave that with you as a comment to take away to check that out

3:06:31So with that, I'll call the vote. Is there anyone against this?

3:06:37It's unanimous. So again, thank you very very much for for this. We really appreciate it

3:06:42We only have one more item in front of us today and it is going to be let me just get to my

Automatic transcription is imperfect. Treat quotes as a guide and check the recording before relying on exact wording.

Check this against the City’s official minutes

The motion, the vote and the debate come from the City of Guelph’s published record, reproduced rather than interpreted. The document summaries above are the exception: those words were written for this site.