City Council
December 16, 2025 · 11 recorded decisions · 22,622 words of debate
Decisions
- 5. Colleen Harper, Melissa Mitchell, and Lili Ann Prenger be appointed to the Accessibility Advisory Committee for a term ending November 2026 or until such time as…Carried (13 to 0)
- 8.1 Final Design for St. George’s Square, as outlined in report 2025-548, dated December 16, 2025, be approved.Carried (13 to 0)
- 8.3 Capital project budget adjustments in Attachment 2, Funding Adjustments (Table 4) be approved.Carried (13 to 0)
- 8.4 Association of Municipalities of Ontario and other GRCA member municipalities be added to the circulation list.Carried (13 to 0)
- 8.4 Association of Municipalities of Ontario and other GRCA member municipalities be added to the circulation list.Carried (13 to 0)
- 8.4 Guelph City Council respectfully requests that the Minister of Environment…Carried (13 to 0)
- 9. By-laws (2025) – 21164 through by-law (2025) - 21166, (2025) - 21179, (2025) - 21180, (2025) - 21182…Carried (13 to 0)
- 9. 21-day in-year budget amendment period prescribed in Ontario Regulation 530/22 Section 9 (3)…Carried (12 to 1)
Routine business (3)adopting minutes, adjourning and similar
The whole meeting, as text
Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.
Read the full transcript (22,622 words)
11:31All right, good morning everyone. It is 9 o'clock. It is December 16th, 2025. We're meeting here in
11:38council chambers for our council meeting and right off the top we do have a request to go in camera
11:49and it is under I think four items. Yep, the chief administrative officer, 2025 year end
11:56performance review which is section 239 to BND of the municipal act regarding personal matters
12:03of an unidentifiable individual including municipal or local board employees and labor relations or
12:09employee negotiations. The second is closed December 25 public appointments to advisory
12:15committees of council. Section, let's cut off on my screen 239 to BND of the municipal act regarding
12:24personal matters about an identifiable individual nine. Yep, doing the right thing. Include municipal
12:29or local board employees. Number three is expression of interest 170 Stephanie drive section 239 to C
12:35of the municipal act regarding a proposed or pending acquisition or disposition of land by the
12:41municipality or local board. And the last is affordable housing property acquisition section 239
12:48to C of the municipal act regarding a proposed or pending acquisition or disposition of land
12:53by the municipality or local board. Before I ask to see if we want to move in camera on those items
13:00does anyone have any disclosure of pecuniary interest or any general nature thereof for those
13:05items? Hearing and seeing none would someone be willing to move a motion to move into closed?
13:12Kate and Richardson and I'll call the vote. Is anyone against moving into close on those items?
13:18No, okay, that passes unanimously for anyone watching online or in the gallery here interested.
13:24I'm going to guess maybe about 45 minutes roughly and then we'll be back. Okay. Thank you. Hi everyone.
13:38Thanks for your patience. Just to let everyone know we are going to start at 10 15 so like in two
1:20:14or three minutes. Okay, so just give us a minute just to get settled. Okay. Thank you. All right.
1:20:19Thanks everyone for that extra few minutes. We appreciate it and we'll call the meeting back to
1:26:59order out here in the public. So thank you very much. I will quickly just ask that we I'll do the
1:27:07summary in just a moment. But please if you can stand if you're able to please join us as we
1:27:12recognize our national anthem. Okay. Thanks everyone. And just as we move forward just a moment of
1:28:45silent reflection. Thank you and our territorial acknowledgement as we gather. Let us take time
1:29:01to reflect on our privilege to live and work here in Guelph, a city that's built over rich
1:29:05indigenous histories as guests here. We should reflect upon the land and the responsibility
1:29:10to care for this land, the people who live here today and the generations to come. If our actions
1:29:15today can move us towards reconciliation, we should take pause and make those decisions with
1:29:20intention and gratitude. This place we call Guelph has served as traditional lands and a place of
1:29:26refuge for many peoples over time, but more specifically the Anwarak and the Hone Shoni.
1:29:32This land is held as the treaty lands and territory with the Mississaugas of the
1:29:36Credit First Nation and Guelph lies directly adjacent to the Haldeman track. It's also part
1:29:41of a long established traditional hunting grounds for the six nations of the Grand River. Many
1:29:46First Nations, Inuit and Métis people who have come from across Turtle Island call Guelph home
1:29:52today. Thank you. Are there any disclosure of pecuniary interest, any general nature thereof
1:29:59from any members of council on the items in front of us today? Seeing and hearing none, I'll
1:30:05consider that matter closed. I did indicate I would give a quick summary of our closed
1:30:12session. We went and closed session under four items. So the first one was the Chief Administrative
1:30:18Officer 2025 year end performance review and council did give direction on that matter.
1:30:27And the other one, I'll save the other one to the end there, but the other one was an expression
1:30:32of interest on 170 Stephanie Drive and we did give direction on that item as well.
1:30:40And the other one was affordable housing property acquisition. We also gave direction on that matter
1:30:46as well. And then on the last one, which is the closed December 2025 public appointments to advisory
1:30:55committees of council. I'm going to ask that councillor Allt please bring forward what has come
1:31:01from the closed session. Thank you, Mayor Guthrie. Clerks, would you like the whole thing read out or
1:31:08sorry? Okay. Thank you. Moved by me, seconded by a counselor, a house, the public appointments to
1:31:19the advisory committees of council are as following in three areas, accessibility advisory committee,
1:31:25economic development, tourism advisory committee and transportation advisory committee.
1:31:30We're happy to take any questions, but I think it's straightforward. Thank you,
1:31:34councillor. Yep. Any questions on this or can I call the vote? Okay, I'll call the vote. Does
1:31:39anyone against those appointments? That's unanimous. Thank you. Thank you very much to everyone that
1:31:45put their name forward. We appreciate that very much. So thank you for doing that work for us.
1:31:53Moving right along, we have a consent agenda with the first one and only one being the 2025
1:32:00external audit plan and it's the recommendation of receiving the KPMG's external audit plan. Does
1:32:08anyone, do they miss the minutes? Oh, okay. I did the minutes. Sorry, I missed the minutes.
1:32:15Let me go back to the minutes. Thanks, Kathy. Sorry, councillor Downer. The minutes are for the
1:32:21council open council meetings November 12th, 18th and 26th for 2025 and the open minutes of the
1:32:27committee, the whole meeting on November 4th, 2025 to be confirmed as recorded and without being
1:32:33read. Since you caught my mistake, I'll let you move it. Thank you. Move it. Seconded by, okay,
1:32:39Boussatil. Thank you. Is there anything more on those minutes? No. Okay, I'll call the vote. Is
1:32:45anyone against? That's unanimous as well. Sorry about that. Thank you. Good catch. 2025 external
1:32:52audit plan is the consent agenda for council. Does anyone need that poll? No. Councillor Caron,
1:33:01I think you're willing to move the consent. Thank you and Billings is willing to second.
1:33:05Thank you. I'll call the vote then. Is anyone against that? No one. Okay, so I consider that
1:33:12matter closed and that's unanimous as well. So now we're into our items for discussion
1:33:18and right off the top, we have a final design presentation of the St. George's Square and
1:33:25so we're going to have some staff do some presentations for us. We've got three delegations
1:33:29as well that have signed up and we'll see what we do from there. So we got Kyle and Stacey from
1:33:44our staff that I think are going to come forward and I'll turn it over to you. Good morning, Mr. Mayor
1:34:05and Council. After significant community engagement, we are excited to present the final plan for St.
1:34:11George's Square for approval. My name is Kyle Gibson. I am the acting general manager of Engineering
1:34:18and Transportation Services. Attending with me today are James Goodrum, Stacey Lachlan, Andrew Miller
1:34:25and Red Russford. The reimagining of St. George's Square as part of the downtown renewal program
1:34:32of work aligns with strategic goal 12 make downtown a vibrant place for everyone. The approval of the
1:34:39final plan for St. George's Square means that another milestone in the overall downtown renewal
1:34:45program of work has been reached. The reconstruction of St. George's Square will be part of phase one
1:34:51of the work which will include Wyndham Street from Wellington Street all the way up to Woolwich Street.
1:34:58Based on the proposed construction sequence, surface works in St. George's Square
1:35:02will be completed at the end of phase one in late 2027 with the final touches or as Reg likes to say,
1:35:09the icing on the cake happening in early 2028. Downtown renewal, the reimagining of St. George's
1:35:18Square and the upgraded streetscape will provide the foundation for community success over generations.
1:35:31I think I pressed the wrong one. In July, Council approved this design concept for the square.
1:35:54This concept was inspired by Guelph's unique landscape and designed as a vibrant year-round
1:35:59destination at the heart of the community. It proposed a durable flexible layout with paved areas,
1:36:06adaptable seating and open spaces that could easily transform for festivals, markets,
1:36:12performances and gatherings. It was designed to be an active hub for connection, play and celebration,
1:36:20inviting people of all ages to come together and experience our downtown. At the July meeting,
1:36:26Council provided direction that the final design of St. George's Square should increase flexibility
1:36:31to support seasonal patios and community events. Council also requested that the final design
1:36:38reflect the heritage and character of downtown through the integration of natural materials
1:36:43and heritage inspired elements. In September of 2024, Council also provided direction that the
1:36:50downtown infrastructure renewal program of work, including St. George's Square, should provide
1:36:55an enhanced level of streetscaping for the most efficient operating budget. The Downtown Business
1:37:02Association also passed motions regarding the design concept. In September of 2025, the DGBA
1:37:09requested the concept plan for St. George's Square be modified to ensure that design reflects
1:37:15and enhances Guelph's unique heritage character while supporting a vibrant downtown for public
1:37:21space. To incorporate the placemaking initiative proposed by Barb Manette related to Robert Munch's
1:37:31Paper Bag Princess and to find more discreet location for the public washrooms. I'm now going
1:37:37to pass a presentation over to Stacey so that she can outline the changes to the plan and how those
1:37:42changes address what we have heard from Council, the DGBA and our community. Thank you, Kyle.
1:37:57So during engagement with the community, key interest holders and Council, we heard that the
1:38:02concept plan should include a wow factor. It should also have more natural materials, including
1:38:08more trees and native plantings and less concrete. The design should also be more flexible in order
1:38:13to provide space for events and to accommodate business. We also received comments that the
1:38:19design should be more sympathetic to the heritage character of downtown Guelph. We received mixed
1:38:24feedback regarding the public washroom, some in support of it, others were requesting that it be
1:38:29removed and still others requesting that it be relocated elsewhere downtown. We also received
1:38:35mixed feedback regarding the placemaking structure or the area for play. The feedback ranged from
1:38:41support and desire to see it expanded to those who think it was unnecessary to those who were
1:38:46suggesting it be relocated within the square. And then during our September open house, a community
1:38:52led idea for a tribute to Robert Munch in the form of a paper bag princess statue was brought
1:38:58forward for consideration in lieu of the potential interactive placemaking structures that were
1:39:03proposed. Some of the public feedback also requested reconsideration of the need for gateway features
1:39:11at the entrances to the square. And there were also requests for space for outdoor patios to be
1:39:17located and businesses to operate, additional lighting and more opportunities for shade and seating.
1:39:28So the final plan that we are presenting to you today directly responds to what we heard from
1:39:34the community, key interest holders including the DGBA and council over 2024 and 2025. In particular,
1:39:42the final plan addresses what we heard in response to the concept design that was presented to council
1:39:47in July and the more detailed plan presented to the public in September. This final plan balances
1:39:54the needs and desires of the business community with the needs and desires of residents, visitors,
1:39:59and downtown customers. It recognizes the existing heritage character of downtown. It also reflects
1:40:05our community and that we value the environment and nature. And we would also like to highlight that
1:40:11this plan is flexible to accommodate day-to-day use as well as being able to accommodate larger
1:40:17events and evolve over time. Elements that are not currently proposed or included in the design
1:40:23can be added to it. So this fly-through you can see in the northwest corner of the square that
1:40:31there is an open area for the future place making initiative. Trees and planters and soil cells to
1:40:36provide a balance between a natural setting and an open area to accommodate events. The trees also
1:40:42provide shade along with the movable umbrellas. In the southwest corner there's a flat area that
1:40:48can accommodate a temporary stage for different events. The trees and umbrellas provide shade
1:40:53for everyday use and the existing transit stops are also maintained on both sides of Windham
1:40:57Windham Street. On the easterly side of Windham Street the family fountain is located so that
1:41:03is highly visible both within the square but also to those traveling toward the square.
1:41:09Wide stairs are proposed that provide informal seating opportunities as well as a natural stage
1:41:14area if needed. The DGBA's Big Heart is accommodated and frames the view along Douglas Street
1:41:20towards St. George's Anglican Church. So again this video is just looping so this is the second
1:41:26time through and you're seeing the southwest corner here and then over to the easterly side
1:41:35of Windham Street. So to help identify and define the square and to add that wow factor we have added
1:41:58emphasis to the promenade that surrounds it. The width of the promenade has been increased and will
1:42:04be a minimum of six meters wide and maybe up to eight meters wide in some areas. The promenade
1:42:09will include overhead lighting supported by a wood structure that complements the heritage
1:42:13character of downtown Guelph and Guelph's natural heritage. The promenade will accommodate private
1:42:18patios or public seating as well as a pedestrian sidewalk that is intended to help drop pedestrians
1:42:24to the edges of the square to access the businesses that surround it. By defining the edge of the
1:42:29square ample flexible space is maintained for events as well as day to day use. In these images
1:42:35you can see the promenade lighting at night in the top left corner how the promenade can
1:42:40accommodate private patios in the top in the bottom right corner and then how the promenade
1:42:47still allows for the central portion of each quadrant to be used for events when needed.
1:42:56To increase flexibility the planters have been reduced in size and shifted toward the edge
1:43:01areas of each quadrant of the square. This revision allows for different configurations of the square
1:43:07to be used to accommodate events of different sizes including each quadrant to be used individually.
1:43:13The westerly side of Wyndham street to be used as an event space if you close down a portion of
1:43:17Quebec or using the square in its entirety with the option to close down the streets using the
1:43:22proposed removable ballards. As I mentioned during the fly-through a stage area is located in the
1:43:29southwest corner of the square near the current location of RBC. This stage area will be a flat
1:43:36space that it can accommodate temporary stages of different sizes with each event bringing in the
1:43:41size of stage that best fits their event. For day to day use or events that do not require a stage
1:43:47this is a flexible flat area. On the easterly side of Wyndham street the family fountain has been
1:43:54shifted further toward old Quebec street shops to create more flexible space between the fountain
1:43:59and Wyndham street. The lower basin of the fountain will be reduced in size by approximately 1.2 meters
1:44:07while generally maintaining the existing shape. The location shift and reduction in size also
1:44:12creates the opportunity for the area at the top of the stairs to be used as a natural stage
1:44:17with room for an audience at the bottom of the stairs. And in these images you can see how we've
1:44:23also tried to show how events such as Spirit of the Season can be accommodated in the revised
1:44:28design that's in the sort of right-hand side bottom picture. To introduce more natural materials
1:44:39and better reflect the heritage character of downtown we've added more trees and modified
1:44:43materials. Trees in soil cells and planters have been grouped to replicate the edge of a small
1:44:50forest in each quadrant of the square. This helps to provide a more natural feeling in the area
1:44:54and reduce the impact of the proposed hardscaping all while maintaining flexibility.
1:44:59The addition of more trees also increases the amount of shade that will be provided.
1:45:04Again the lighting structure that's part of the promenade has been designed as a wood structure
1:45:11and has an organic shape which is to be reflective of sort of that natural materials and the heritage
1:45:16character of Guelph. With the introduction of the lighting structure and the additional trees
1:45:23we have proposed to remove the shade structures because it created conflicts between the elements
1:45:28but if the shade structures are required in the future they will be designed to fit into the space
1:45:34constructed of wood and similar to the lighting structure. For the planters we're looking at
1:45:40the use of limestone or something that is a limestone appearance. The design of the planters has
1:45:46also been modified to no longer have any ramped edges which then allows for more public seating
1:45:51as part of the planters. As I briefly mentioned earlier the public feedback regarding the
1:46:01placemaking structure was mixed. Some community members expressed enthusiasm for family and child
1:46:06friendly elements within the square. Others expressed concern about creating an area for play within the
1:46:11downtown and then again that community led idea for a paper bag princess statue did come forward
1:46:18in September. So with the mixed feedback on the interactive placemaking structure as well as the
1:46:25new idea the revised plan for St. George's Square protects space for one or both of these elements
1:46:31to be installed in the future. The protected space is located in the northwest corner of the square
1:46:36to be more directly linked with the new public library and that's to help support people moving
1:46:42between the two areas. The community led paper bag princess suggestion is currently proceeding
1:46:49through the approved proposal process identified in the city's public art process. So we've set up
1:46:54our plan to be able to accommodate that should that public art process decide to to put it in the
1:46:59square. So additional lighting has been added to the design. A catenary lighting structure has been
1:47:17added to the promenade which adds a significant amount of lighting. The lights themselves will
1:47:21have a more traditional appearance while being appropriately shielded to direct light downwards.
1:47:27And again as I've mentioned a couple times we've looked at the design of that structure
1:47:32made sure it's built out or proposed to be built out of wood and that it has a more of an organic
1:47:37shape to reflect Guelph's natural heritage. So the top left image on the slide shows that
1:47:43lighting structure at night. Area lights which can be seen in the top right image are proposed
1:47:51all around the square and these are additional lighting on taller poles to ensure that we have
1:47:56appropriate lighting levels throughout the square. These lights will be the same as those that are
1:48:02proposed for the Baker district. The shape of these lights is somewhat organic and whimsical
1:48:07informed to play nicely with the design of the promenade lighting structure and the shape of
1:48:12the planters and the natural elements within the square. The lights can also accommodate
1:48:16specialized lights that can project shapes or images as part of enhancing the placemaking
1:48:22aspect of the lighting. In the bottom two images you can see clusters of light sticks have also
1:48:28been introduced into the square and they provide visual interest and add some dynamic lighting
1:48:34and the size and color of these light sticks will vary. We have been and continue to explore adding
1:48:40more string lights to connect to the catenary lighting structure and other elements within the
1:48:45square. In order to connect string lights to things they have to be able to withstand the weight of
1:48:51the cable and the lights both in normal conditions but also on windy days and during winter weather
1:48:57that include ice and snow. So those requirements have created some technical challenges but we
1:49:02will be adding more if it's technically feasible. And then planter lighting which you can see in
1:49:08the top left image and then around the base of the family fountain you can see in the bottom
1:49:13right image. We've added lighting to those elements to again add lighting to the square and visual
1:49:20interest. For all of the lighting within the square the fixtures used will be dark sky friendly to
1:49:25ensure that light shines down towards the square rather than up to the sky. So other modifications
1:49:34to mention in the July design concept there was a self-cleaning automated public washroom proposed
1:49:40as council is aware from the October 31st information report. Staff undertook some additional
1:49:46consultation with other municipalities that have experienced operating self-cleaning public washrooms.
1:49:52The feedback we received highlighted that there are both benefits as well as operational
1:49:56supplier and maintenance challenge with those facilities facilities right now. This feedback
1:50:03together with the mixed feedback we received from the public on the proposed washroom within the
1:50:07square has resulted in it being removed from the plant at this time. Well we still feel it's important
1:50:14to pursue a public washroom within or close to St. George's Square. So we are going to install the
1:50:21underground infrastructure to accommodate it in the future but we are also going to continue to
1:50:26explore other options. It could be a more traditional washroom either a standalone one or in a store
1:50:32front or we'll continue to monitor the technology that supports the automated public washrooms
1:50:38to be in a position to install it in the future. So in these images on the easterly side of
1:50:44Wyndham Street you can see that the public washroom has been removed. I also briefly mentioned that
1:50:50the gateway features have been removed and again that was due to sort of the conflict between the
1:50:56elements when we added the added the promenade lighting structure and the additional trees.
1:51:00It created too many sort of vertical elements in one location and created those conflicts
1:51:05in the similar situation for the shade structures. So as Kyle mentioned at the beginning of this
1:51:14presentation there has been extensive internal and external consultation on the design of the square.
1:51:21In 2024 we focused on collecting ideas and opportunities about the square. In early 2025
1:51:27the project team worked through various design options and evolved that design from multiple
1:51:32options to a design concept which was presented to council in July. Since July we have received
1:51:38valuable feedback which has led to the design evolving into the final plan before you today.
1:51:44As council is aware one of the key interested parties in downtown is the DGBA. In late November
1:51:51the DGBA reviewed the final plan and passed a motion recognizing that the final plan addresses
1:51:56the board's previous motions and concerns and the board also passed a motion supporting the final plan.
1:52:03In addition to engaging with members of the Guelph community the project team has met and
1:52:08shared information with the Mississaugas of the Credit First Nation about the downtown infrastructure
1:52:12renewal program and specifically about the proposed design for St. George's Square.
1:52:18Following council approval of the concept in July MCFN provided some ideas into how the indigenous
1:52:24history of the lands could be recognized and honored in the final design. These ideas include
1:52:30the utilization of the planters and the plants within them as a method of teaching the First
1:52:35Nation stories and the value of green space. Another suggestion was to use text or symbols
1:52:41within the promenade area to recognize that St. George's Square is a long travel path as well
1:52:46as being a destination. So as we finalize the technical details of the design discussions with
1:52:52MCFN will continue. So the changes to the plan between the concept that you saw in July and the
1:53:05final plan results in changes to the cost to construct the square. Some of the changes reduce
1:53:11the cost some of the changes increase the cost and technical details related to the final plan
1:53:17as well as how the family fountain will function when it's reinstalled are still being developed
1:53:22and refined. However given the nature of the changes both increases and decreases we don't
1:53:28anticipate a substantial change to the project budget to accommodate the final plan. So as directed
1:53:34by council in July if there are any budget impacts stemming from the final plan staff will report
1:53:40back through the 2026 budget monitoring process or the 2027 budget update. So in conclusion we are
1:53:48recommending that council approve the final plan that is being presented today recognizing that as
1:53:54the technical details of the design are worked out minor details may be slightly modified. However
1:53:59the overall final plan of the square will remain. This final plan addresses what we heard from various
1:54:05interested interest folders and groups again over 2024 and 2025. In particular it addresses what we
1:54:12heard in response to the concept design presented to council in July and the more detailed plan
1:54:17presented to the public in September. So again we feel that the the final plan balances the needs
1:54:24and desires of the business community with the needs and desires of residents visitors and
1:54:28downtown customers. It recognizes and honors the existing heritage character of downtown.
1:54:34It reflects our community and in that we value the environment and nature and it can and will
1:54:39evolve over time. Elements such as gateway features and public art can be added to it.
1:54:44So the reimagined St. George's Square will be an active urban plaza and central gathering place
1:54:50that provides flexibility to accommodate a wide range of events and activities including daily
1:54:55use and self-activation as well as larger events and festivals. Thanks. Thank you both very much.
1:55:05And to the team that worked on this too. I mean it was a lot of work and engagement
1:55:12and a lot of refinement and you know just right off the top I just want to say thank you for
1:55:21listening to the community and what you've presented here today. You know this I get so upset
1:55:28sometimes when I hear people say oh staff never listen. Exhibit A you know right here you did that
1:55:37and so thank you very much for for presenting that to us. We do have as I mentioned off the top
1:55:45three delegations so why don't we go to the three delegations then if there's questions back to staff
1:55:50as well we can go. Uh Sia I think my glasses on. Sia here oh there's Sia. Sia Vanguiste is coming up
1:56:04and then is Alex Purves here in the room. Okay you're going to be coming up next. So just so
1:56:10everyone knows no more than five minutes you'll hear a chime at the four minutes and 30 second
1:56:16mark which is your warning that your microphone will be cut off at five minutes so don't get there
1:56:22because we want to hear everything you're saying. All right so go right ahead the time timer starts
1:56:26when when you start Sia go right ahead. Thank you Mayor Garcia and thank you Council and thank you
1:56:35the staff at City that park is so impressive that's going to be an absolutely amazing drawing card.
1:56:42I'm here to address the amendment to include paperback princes and Robert Munch. Now we all
1:56:50know a lot of the statistics about Robert but behind that data those that want us to reflect a
1:56:55little bit what the implications are. For instance the whole idea that uh uh there are over 87 million
1:57:05million uh Robert Munch books uh Worldwide Soul has already been sold. Think of the implications
1:57:12of that that means all over this globe so when my husband and I were traveling in Japan we
1:57:18imagine our delight that here in the show window was the paperback princesses in Japanese or being
1:57:25in the Netherlands and seeing the enormous suitcase there. So everybody around the globe knows Robert
1:57:32Munch and just to reflect a little bit on some of the implications that we've seen in Guelph itself.
1:57:38So when I'm a member of the Guelph Guild of Storytellers and we organize a number of events
1:57:45and every time we have Robert Munch on the agenda there's startling things that happen.
1:57:50Just this past year Robert had hoped to be at Canada Day and he was able to be there. We had
1:57:57over 700 people in the shelter in Riverside Park. That same year earlier in the summer we had a
1:58:05children's event organized in the enabling garden our our staunch partners and again over 700 people
1:58:13in that enabling garden and that was the last time we had Robert Munch on the agenda and did
1:58:18nothing but but have them in the shelters. Road to eat uh Trilliums, Ribfest, the Saturday morning
1:58:26event that we had for children. Now think of this over 1200 people came in that park. So there we
1:58:33were in that front of that central stage and all these people are just coming so I don't need to
1:58:39tell us just how significant Robert Munch is in Guelph but the important part is he's a draw.
1:58:45If you go to Copenhagen nobody in the right mind would leave Copenhagen and not visit the little
1:58:51mermaid. It's a real tourist draw and Robert Munch and everything that he represents is going to be
1:58:57that draw. That's going to be translated into economic kinds of advances as well. I love the
1:59:04idea of the paperback princess and then organizing that and linking that to the new Guelph public
1:59:10library because they want to enhance that collection as well because as Robert Munch said in his recent
1:59:16interview on CBC that that's where his collection is going to go. So the value of having the arts,
1:59:25the rich arts of Guelph we are and amazingly blessed with the most profound authors and I'm not sure
1:59:33we're giving them enough recognition to tell the honest truth and I think budget wise even we should
1:59:39think about that. I hope that the cost of this would not be an issue. Just imagine if you put out a
1:59:46crowdsourcing oh my goodness we'd have millions of dollars guaranteed or corporate sponsors that we
1:59:51would have in Guelph. So I urge us to recognize that and recognize that for its artistic impact
1:59:59and influence but also economically and for the dollar ones.
2:00:07We know that Robert is recognized globally in terms of his awards. Do you know that he's been
2:00:13nominated a number of times for the Astridge Lindberg Award which is the richest word for
2:00:21children's literature. It's 750,000 Canadian dollars. It's an award that globally recognizes
2:00:30a children's author in a story and Robert has been nominated by Canada for a number of times to be
2:00:37a candidate in that award. He's going to get that someday absolutely guaranteed. Think back in the
2:00:4470s when the New York Times first calculated the highest selling children's authors and they were
2:00:55amazed. There's what there's there's a book called Love You Forever and it's by whom it's by Robert
2:01:02Munch who is he. We haven't even reviewed this book so they were amazed and beat out all these
2:01:07profound children's literature books. So Robert has an amazing man. He has an amazing influence
2:01:15and I think we all know that and but I want us to think of that in a larger context of the arts
2:01:23and I know budget's a huge issue here and I must say that in the last budget I was a little bit
2:01:28taken aback by the lack of emphasis in the arts. Okay. Thanks. Thanks. Thanks so much. Sorry I
2:01:41had to cut you off there but I didn't want to cut you off thanking staff so that's a good part.
2:01:45Thank you. Is there any questions for this delegation at all? Councillor Caron.
2:01:52Yes thank you and thank you to the delegate and an excellent presentation and I know that you have
2:01:57a history of being passionate about literacy in our city and the new public library near that space.
2:02:04So my question was actually about your role as a storyteller. When you look at the design of the
2:02:09whole square not just the area where the public art project will be located do you see this as an
2:02:17area where the wealth guild of storytellers might be able to have some of their events? Is there
2:02:22event capacity there or are you speaking just to the public art piece? Actually I was looking for that
2:02:29and I'm glad you mentioned that because I thought there was a little there could be almost a little
2:02:35more inviting designated space for storytellers. We know that Indigenous concept of stories
2:02:42circles and I think it'd be wonderful to have that invitation and even clearly marked so that we
2:02:48invite international tellers, local tellers, the storytelling guild who focus on storytelling
2:02:54and I think that would be a lovely feature and I could see that as being part of encompassing
2:03:01Robert Munch's Paper Bag Princess and having that very much an integral part and just even an
2:03:06invitation for families to even sit down and listen to stories. Have a storytelling bench,
2:03:12have some children around there so yes absolutely integrate that as part of the concept.
2:03:18Thank you. Anything else further from council?
2:03:27Nothing more. Sayah thank you so much and all the best in the holidays. Thank you.
2:03:32Okay we have Alex Perves coming up and good morning everyone. First of all as far as Robert
2:03:53Munch is everything that she said I would 100 100% agree with except for one thing is to have a bust
2:04:02or a statue or a bench named after him in St. George's Square. We could do so much more.
2:04:08We have Jean Little has a public school named after her. Ken Danby has a school named after them.
2:04:15I know this is not within your jurisdiction to be able to do that and I know that in 20 29 2030
2:04:22that the school board is actually coming forward and they're revisiting their renaming of schools
2:04:28and everything else so I would more imagine with Robert Munch there would be more of an ideal
2:04:34of having a school named after him and the impact that would have on that community.
2:04:39And all likelihood that school in 2030 2032 with the growth of Guelph there will be a new school
2:04:47down in the south and in Ward 6 probably being being built and everything else. That would be
2:04:53the ideal time to be able to really put pressure on the school board and for those that are really
2:04:59interested if they want to honor the man named in the school after him where hundreds of kids will
2:05:05come through that door on a daily basis and families and that entire community that would have a
2:05:10bigger impact of who this man was and knowing more about what he is. Now talking about St. George's
2:05:16Square there's just one thing that that I would like you guys to consider and it wouldn't cost it
2:05:23to the city a penny is that up to now is that we've looked at the layouts of the square there's been
2:05:29revisions and changes and everything else and that's great but the one thing that's missing is
2:05:35why would people want to come down to the square? All you're doing is moving pieces around right now
2:05:41you're adding a few trees you're putting in a lot more tables but that's basically it. I've been down
2:05:48during the summertime almost every second third day going down grabbing a coffee at the
2:05:54beast throughout the square getting a suburbia or getting a sausage and bun from Moe's and there's
2:06:02always been those three tables that are there they've always been empty or only one of them's occupied
2:06:09in the drawing that you have you have 40 of these tables throughout the entire square. To me that
2:06:16seems like an overkill first of all you don't need that many because most of them are always going
2:06:21to be empty. The three that we have now the majority times when you walk by they're empty during the
2:06:28summertime that's before construction so that's the first thing. The second thing is is that when
2:06:34you've been down there in the mayor you were down there about three weeks ago when when they had the
2:06:39lighting ceremony and and Roger you were there as well is that the stage is facing towards the royal
2:06:47bank is that it's three quarters of the stage the back is against it is what I would suggest is move
2:06:56the power box right into the corner where the royal bank is and more importantly stop with the
2:07:01temporary stages you know it costs taxpayers money every time that you end up fronting the stage
2:07:07bringing it in you then you got to bring in all the technicians and everything else and hook everything
2:07:11up have a permanent stage in that corner have a power box there a permanent stage that corner
2:07:19and don't let the city pay for it there has to be corporations people from the music community
2:07:26maybe one of the financial institutions maybe an individual would be willing to be able to fund the
2:07:31money to be able to have that stage there so that when when you are having storytellers or you are
2:07:38having things like the downtown golf and association has as far as their friday concerts or if you want
2:07:44to do bigger things like as far as the memorial cup or as far as the bicentennial is that that stage
2:07:51is pointing out to the entire square it's overlooking the entire square you're not segregating a small
2:07:59section of the square but you have the opportunity to be able to fill that entire square up for things
2:08:05like the bicentennial for maybe a new year's celebration for maybe something like the memorial
2:08:10cup and it gives you a second option what's happening at the marketplace right now at the
2:08:16marketplace oftentimes you end up shutting down the street and you end up bringing in staging and a
2:08:20whole bunch of things again that costs money if you had a permanent stage in that corner that gives
2:08:27you a second option as far as to be able to have a lot of bigger events or smaller events but it
2:08:34gives you that option and let the community have an opportunity to be able to pay for that to be able
2:08:40to fund that and give some recognition on their behalf so it doesn't cause taxpayers a single penny
2:08:46that's basically all I have to say fine thank you very much and let me see if I have a question
2:08:54from any of my colleagues on those suggestions no but thank you very much we appreciate it
2:09:01and Morgan dandy is going to be joining us I believe by video yep and we see you popped on the
2:09:14screen Morgan but just uh you might need to turn your camera on if you wish it's just slow
2:09:31okay no problem we can hear you okay um if it comes up great if it doesn't my
2:09:40computer's just not that great oh it's okay we we see and hear you now okay perfect go ahead thank you
2:09:50good morning mayor council members staff and fellow ball fights when I viewed the final concept
2:09:56drawings for st. George's Square I noticed some things that we may wish to change before these
2:10:03drawings are used in telling the good news story about the redesign of our downtown the
2:10:10predominance of bimo the windows of the bimo building and the stairs in front of the cibc
2:10:20the bank of montreal will shutter the downtown location in the spring
2:10:25do we truly want a defunct business to be prominently featured in our good news
2:10:33additionally the artist depiction of the windows is a misrepresentation of reality
2:10:39I also wonder why the sidewalk in front of the cibc is now stairs I have mobility issues
2:10:46and being able to get to douglas without needing to walk out to windham first is something
2:10:54I believe would benefit many including parents with strollers in July and again this morning
2:11:02when I rewatched the july meeting as I listened to the delegations I was gobsmacked about their
2:11:10stands on the location of the public washroom in the downtown the dgba is talking about adding
2:11:16more events following the renewal and have already begun use of social media influencers
2:11:24to bring in thousands of people yet they don't support the installation of a highly visible
2:11:2924 7 public washroom in the square the guelph labs report on access to public washrooms in guelph
2:11:38was clear on in its conclusion that a 24 7 public washroom in the downtown core is a necessity
2:11:49if the tgba wants to have events centered on st. george's square I would think they would be the
2:11:57biggest proponent of installing bathroom facilities for these visitors stating that the washrooms at
2:12:04the library are not far away and should be the place people go confuses me since the library is
2:12:10not open 24 7 there's already plans for washroom facilities at the transit building to be built
2:12:16at transit at the central station and when they mentioned the fact that the washroom facilities
2:12:24outside seahall are rarely open I remembered an encounter with a visitor on cargan street
2:12:31when he was trying to find somewhere to go to the washroom and having to tell him that we didn't
2:12:36have any that were regularly open that his only options were to go to the port of parties in the
2:12:42macdonald lot the old kebac street mall if it was open or to purchase something in a business that
2:12:50had a toilet I was embarrassed to give that response in the new concept drawing it's not
2:12:57indicated where access to the infrastructure for fountain will be I originally love the idea of
2:13:03colloic cating the infrastructure for the fountain washroom and transit shelter until I realized
2:13:10that the chemicals used for self cleaning would mean I wouldn't be able to use either the washroom
2:13:16or the transit shelter when I was a member of golf environmental justice collective we spoke
2:13:23with miss laughlin a few times regarding the access to sanitary facilities in the downtown
2:13:28and had conversations with the lead of the golf labs as staff continue to explore options for
2:13:35providing a public washroom including a more traditional not automated public washroom
2:13:42I have a suggestion the traditional washroom facility outside city hall that is rarely open
2:13:50the washroom facilities at the new transit building and the needed washrooms in the area
2:13:56of st. George's square could all be clean on a rotational basis in a similar manner to provincial
2:14:02and conservation area parks if there were a dedicated position we need easily accessible public
2:14:10washrooms if the dgba is going to draw more visitors to the downtown and I believe this could
2:14:17be an avenue to achieve that goal thank you for your attention thank you very much morgan
2:14:27and is there any follow-up for morgan on questions for her presentation
2:14:32there isn't and again thank you for joining us and have a good holiday to yourself as well
2:14:44we are back to us everybody and so right off the top can I maybe look to my colleagues that are
2:14:52in the downtown to move the to want to move the motion yeah I think that makes sense so clausen
2:14:58and galler will will move in second the recommendation and yep I'll put you second on the list I have
2:15:07councillor Allt first and then go to clausen and I can make my way around the room if necessary okay
2:15:14thank you mayor guthrie through you to staff we heard from delegates about final design concerns
2:15:21and I only have one and I'm being somewhat careful in the way that I present this there was comments
2:15:28about some sort of a recognition of robert munch and I have two concerns that I that I need to raise
2:15:35I understand from public uh from public uh statements that the library will become a
2:15:42depository for robert munch's papers at some point and so number one I wonder whether a more
2:15:48appropriate place for some sort of a recognition of munch might be at the library similar to what
2:15:55glen gould uh how glen gould is recognized in toronto um in front of the cbc that's the first
2:16:01start but the other concern is I recognize how important munch is um I love munch forever but
2:16:09the other thing is we have many people and in literature we have for example gene little as
2:16:14well who has significance um in in the same uh genre but we also have artists as well like
2:16:21ken damby who we remember because of the carousel and in music there's edward johnson and maybe even
2:16:26james gordon we have four nobel prize winners that we've never acknowledged uh publicly in guelph which
2:16:33I think proportionately to any other community in canada perhaps in the world that's a heck of a
2:16:38number uh including james or binski who received the nobel peace prize for medicines on frontier
2:16:44and then we could get to one of the most important things downtown which is drinking
2:16:50and there's george sleiman who has been identified as having been a tremendous city booster and
2:16:56builder and let's not forget premier george drugh as well so with all these things how will
2:17:04taking this to the arts uh council uh for consideration how are we going to address this
2:17:10to see which would be the most important I recognize a paper bag princess would be fabulous
2:17:15but I recognize other uh recognitions would be important as well so I'm actually I'm going to
2:17:22answer the question over here councillor Allt through the mayor um because this is about our public
2:17:25art process so we have a council approved public art process and policy which was approved a couple
2:17:30of terms of council uh go um and so through that policy all um any public art that comes onto city
2:17:37owned property or in city owned buildings comes through our what used to be called our public
2:17:41art advisory committee that has recently been renamed our arts and culture uh council appointed
2:17:46advisory committee and so to your point the proposals that you've heard mentioned today those
2:17:50will and I don't want to get into specifics of proposals that may be in the works because I
2:17:54don't think that's what we're here to talk about today but um citywide not just in the downtown
2:17:59core any proposals that come forward come through that committee and they get vetted uh and and
2:18:04considered um the city we do not currently have uh money earmarked to go out and commission new
2:18:12public art ourselves simply because of budget constraints we do when we look at new buildings
2:18:17look at opportunities for where we can do public art however the public art advisory committee
2:18:22I should now call it by its new name the arts and culture advisory committee uh this is not a
2:18:25process that's new to that committee the exact same process uh occurred when we did the john
2:18:30necres statue that's at gulf museum so a community group came forward they fundraised they expressed
2:18:35interest in the proposal and then they worked through the public art advisory committee so
2:18:39what I can say is that both for downtown for st georgia square for the library we're already in
2:18:44conversations with those organizations or those individuals who are interested we will um work
2:18:49through the process with them um but it really in this instance it's about individuals in the
2:18:54community coming forward and bringing that proposal forward so that the committee can then
2:18:57consider it and decide next steps and thank you very much for that thorough answer I think that
2:19:02clarifies everything that that there is a a process and that the community can be involved but the
2:19:09the city very clearly has a an important role in establishing where and when anything might be
2:19:14erected okay clausen please thank you yes uh thank you through you mr. mayor um and I will just say
2:19:23I wanted to say thank you to staff um mr. mayor already said it but I I just I did want to say
2:19:31thank you because there has been so many opportunities for public input or along the way I've been at
2:19:36lots of those and there's lots that I haven't been at as well and I know that there's so much
2:19:41that has that has gone into this and I do appreciate all of your efforts and I know that
2:19:47there has been a lot of changes from the original from their first presentation until now and I do see
2:19:52those reflected did we all get everything we wanted perhaps not but I certainly think that
2:20:00this is a really good way forward and I just I also wanted to say that you know this space
2:20:06addresses those core functions of engineering of transportation but I think that it's going to also
2:20:13provide a really great opportunity for the public for everyone to be able to come down and use that
2:20:18space and also for the community to present more um and higher frequency of public events
2:20:25the spirit of the season I hope that everyone had the chance to go down but I really think that it
2:20:30you know it drew a lot of people to our core from both locally within our community and from beyond
2:20:35and I think that having a space like this that can accommodate and welcome um more more people will
2:20:43certainly be a benefit to the wider community for multiple reasons um and so with that said I
2:20:50this is question so I will withhold any further of my comments but um one of the delegates alluded
2:20:56to this um but I believe it was removed from the the final design there was at some point I thought
2:21:01there was a stage that was integrated into the design or maybe it was naturally built into like a
2:21:06stair structure and I just wanted to ask if you could clarify why why that change was made and
2:21:12and and how the stage will be integrated going forward through you Mr. Marietta councillor
2:21:18class and yes the July concept did propose um a stage area in the I would say the northwest
2:21:24corner of the square sort of where uh Royal sorry Bank of Montreal and Canada post meet and that
2:21:32was a function of how the natural grading worked and it became sort of a natural stage
2:21:37we heard through the consultation that there was a strong preference for the stage area to be in
2:21:43the southwest corner of the square so again we don't have natural grades there that would facilitate
2:21:49a stage so the idea was to create a flat flexible area for you know that could accommodate day to
2:21:57day activities you saw in some of the images umbrellas there and things like that which then
2:22:02can be moved out of the way to accommodate a temporary stage um we did also hear a lot about
2:22:09flexibility and maybe not having a permanent stage because the use of that on a day to day
2:22:14basis isn't very good or some events don't need a stage um so we have that for an option for certain
2:22:21events that could bring in temporary stages and then what we did on the easterly side of Wyndham
2:22:27Street um there are stairs there because there is a natural grade to make up there is an accessible
2:22:33route as well but there are there does have to be stairs there instead of having a retaining wall
2:22:37as we do today it's a wide open staircase to increase the ability to move through that area
2:22:43but it also creates a natural stage should you want to use that side of the street so we've
2:22:48tried to provide options and flexibility for stage areas within the square
2:22:54okay thank you for that explanation I appreciate it um so another question I had was with regard
2:23:01to another delegate but another question that came up for me as well during the process was that
2:23:05some of the community members had talked about our community's art scene and you know this is also
2:23:11kind of touching on what Kelsler Alt said um but but they wanted to see them themselves and the
2:23:17arts community reflected within the square will there be future opportunities um for you know public
2:23:23art or for um you know I don't know that's only the only the only thing but for animation and
2:23:31opportunities for the arts community to contribute to this space uh through you Mr. Maradon,
2:23:35Councillor Klassen, sort of building on Colleen's answer yes there this square sort of sets the
2:23:42stage or like creates that canvas so that we can then have those opportunities in the future so
2:23:48we've designed it so that it's flexible enough so that it can evolve over time and we can add
2:23:53things to it so it we've removed the gateway features but there could be potential gateway
2:23:58features that are also public art in the future those are the types of things that can be added
2:24:02over time thank you I appreciate that um and then through you Mayor another question and
2:24:11it's with regard to the Robert Munch structure and and thank you for the delegates and for
2:24:16Councillor Allt for for talking about all of the great um you know contributed to the arts in
2:24:21in Guelph and particularly Robert Munch we're hearing a lot about right now um it has been
2:24:27shared with me that friends of the Guelph Public Library have also been working on a tribute to
2:24:32Robert Munch within the new Guelph Public Library uh and it it's a bit of a nod to their fundraising
2:24:39efforts they they raised a million dollars for the new public library which is no small feat
2:24:43and so my question is is there going to be an opportunity for the city
2:24:47and for the committee to work with all of these stakeholders who have been kind of coming forward
2:24:52with you know similar seemingly similar proposals so through the mayor yes as I indicated the arts
2:24:58and cultural advisory committee who you appoint is who will do that work we we do know that there
2:25:03is more than one sort of there there are a couple of discussions going on about potential ways
2:25:08to honour Robert Munch so again I don't want to get into the specific details here because it
2:25:12hasn't come to the arts and culture advisory committee yet for their review we're still in
2:25:16that proposal stage but to answer your question yes the opportunity will be there and we will look
2:25:21to bring forward for the committee's consideration any of the proposals that come forward.
2:25:26Thank you um and Mr. Mayor through you two more um will staff continue their work on sourcing
2:25:33public washroom spaces for the downtown. Through the mayor to you Councillor Klassen yes we are
2:25:41going to continue that work. Okay thank you very much um and then lastly um one of the one of the
2:25:50the motions that were brought forward at the previous time this was brought forward to council
2:25:55was with regard to sort of including um heritage and I think in indigenous elements within within
2:26:01the square I was just wondering you did elaborate on on what we could be seeing with you know the use
2:26:07of um native plants for and and different ways of potentially storytelling that could be potentially
2:26:14approved as well but I was just wondering if you could speak to some of the heritage and natural
2:26:17elements that are within this current iteration of the design. Through you Mr. Mayor to Councillor
2:26:23Claeson um again the use of limestone materials for the planters or something that um has the
2:26:30appearance of limestone those are the types of things that we're considering um to bring in that
2:26:34natural element and then we really did focus on increasing the number of trees to really focus
2:26:40on the natural aspects of it um to respond to some of the comments that there was a lot of
2:26:45concrete so trying to balance that need for flexibility which requires paving stones and open
2:26:51areas um and then the natural elements of um like green space and having things in planters and having
2:26:58the trees so we focused on that and then adding in heritage elements where possible.
2:27:04All right thank you Mr. Mayor those are all of my questions. Thank you uh Councillor Pousatil is next.
2:27:13I do see Koran and uh Kate and sorry just to let you guys know you can save your hands.
2:27:25Thank you and through the mayor um to build a bit more on Councillor Art's question about uh
2:27:32what else? Alt. Alt's. You mean the Mona Lisa? Alt's the Annika. Um process about public art um
2:27:40not disrespecting Robert Munch who was a neighbor and our family is a funny story of how we're in
2:27:45one of the books but I do have a question about the process. Is this an open process or is it
2:27:53individuals who come with money in hand and I guess I'd just like to ask a question of equity
2:28:03in the process and I assume the committee the advisory committee would take that into consideration.
2:28:10Through the mayor yes that's part of the terms of reference and I can certainly send them around
2:28:13to council if you would like to see those the terms of reference both for that advisory committee
2:28:18as well as our public art process that council approved we have had public art um installations
2:28:24come through two mechanisms one where the city has a funding to contribute um the the the public
2:28:30art installation that's near the farmers market would be an example of that um and so then when
2:28:34we bring the funding forward and we ask the public art committee again now called the Arts and
2:28:38Culture Advisory Advisory Committee to go out and commission art we have also had the circumstances
2:28:44where a group comes forward with in the case of the McCrae statue an existing vision for a statue
2:28:49and the funding to do it in the in essence donated to the city both of those processes still go through
2:28:53the Arts and Culture Advisory Committee it is uh it is a council appointed advisory committee so their
2:28:58process is open and transparent um and so I can certainly send out to council the information
2:29:03about the terms of reference as well as the process. Thank you very much for outlining that.
2:29:09I just have two more through the mayor quick questions one of the delegations
2:29:13to the staff raised about the stairs and access to Douglas where the stairs are located next to
2:29:21the CIBC can you just comment on that and then I have one final question. Through the mayor to you
2:29:27councillor Boussatel there is a great change there so we do have to make up that great change
2:29:34and there's a combination of stairs as well which exists today in front of CIBC
2:29:40and then there is an accessible path it would require traveling out a bit towards Windham
2:29:44Street to get around but again to make up that great change it is necessary what we have done to
2:29:51improve sort of movement through that area is instead of having a retaining wall that everybody
2:29:55has to go around is opening up those stairs and making them wide so they also provide seating
2:30:00opportunities um they're intended to not be quite as steep so that it provides an easier way to get
2:30:07through that area but with the grades as they are today and as they will be into the future
2:30:13based on where buildings are we will need stairs in that location. Thank you so I did I did hear
2:30:19the piece about the retaining wall so there's no kind of Zed access for accessibility built into
2:30:25the stairs. Through you Mr. Mayor that's correct. Thank you my last question is just a clarification
2:30:33during your presentation around the washrooms I thought I heard you say that infrastructure will
2:30:38be built in and my question is has a location of that already been predetermined? Through the
2:30:46mayor to you councillor Boussatel at this time we intend for it to generally be in the location
2:30:53that we presented in July but we are not fully committed to that because it will also depend on
2:30:58where the mechanical elements of the fountain go and again if we proceed if we think we're
2:31:05proceeding with that standalone washroom so when we get closer to it would generally likely be on
2:31:11that easterly side of Wyndham Street is where we're looking at but we have we don't have a specific
2:31:17location for you today. Thank you that's all. And my apologies to my friends on screen but I did
2:31:25forget councillor Downer and she's closer to me to throw something at me so I'm going to go
2:31:29to her first and then I will go to the screen thank you. Thank you Mr. Mayor through you to the staff
2:31:35just also ditto thank you for doing such a great job engaging with everybody again going back out
2:31:42and I think through that you've certainly reached a lot more consensus and what I would say it's the
2:31:52this is such a great platform for so many events I don't know if any of you made it down to Spirit
2:31:56of the Seasome the last two weekends but I was volunteering thousands of people it was absolutely
2:32:03incredible and not just Guelphites who were raving about it but you know we met people from Sarnia
2:32:12Tottenham they do they'd heard about it through probably through those influencers but they heard
2:32:16about it and so it's a great platform for a lot of events for celebrating in Guelph but also just
2:32:25you know showing off our city and being a welcoming place for other people. So I just want to I do
2:32:32have one final question though because it keeps coming up at the the GBA too the heart you know
2:32:38looking at the design like is there a reason why it has to be moved or because most of those pictures
2:32:44like there's 24 seven people like getting their pictures taken in front of that heart but I noticed
2:32:50and this year I noticed it was the dogs that they brought their dogs to have their picture taken
2:32:55in front of it. Is it and the background actually of Quebec Street or Quebec Street mall with the
2:33:03lights and everything was was quite catching in the pictures is there a reason that has to be changed?
2:33:10Through you Mr. Miranda, Councillor Downer with the current location of the heart it would conflict
2:33:16with the proposed location for the family fountain. I don't see why we couldn't explore having it in
2:33:25that same area we just have to see what kind of conflicts what might be created for all the other
2:33:30things. We did try to place it in a location where you still have sort of that interesting vista
2:33:36behind it with St. George's Church and we had a lot of comments through the public process about
2:33:41how Douglas Street is sort of a jewel within downtown so it frames that view and St. George's
2:33:47Anglican Church so the intent was to keep that sort of Instagram view for all of those people that
2:33:53use it for that purpose but again it is an element that is relatively easily moved so through
2:34:00yeah through the technical details we can look if it fit. I mean even with the fountain in the
2:34:04background and the Quebec Street mall I mean it would there's lots but anyway I'll leave that to
2:34:08you but I would put that as something that to to further explore but and again thank you it's a
2:34:14great work. Okay for real this time Councillor Ciaran then Councillor Caton. Great thank you
2:34:21echoing all of my colleagues great work I always find that you know especially when you're looking
2:34:26pictures of your kids you see their evolution only when you look back at those first photos and you
2:34:33see where we've come from and where where they've gone and I looked back at the first iteration of
2:34:38this square and where we'd come and I think you've you've got that wow factor and listening to the
2:34:43community was certainly part of that so so thank you for that. More questions of clarifications I
2:34:48think I heard it in your presentation really quickly but the edge treatment along the street
2:34:53I see just these planters there is that because it wasn't in the scope of the St. George's square
2:34:59design and that will be part of the Wyndham Street design. Through you Mr. Brande, Councillor Caron,
2:35:08so just to clarify along the edge of the like the curb where the road meets the square I just see
2:35:18these planters in the renderings and yet when we did the Wyndham Street design we talked about
2:35:25good better best on street trees so I'm just wondering whether that's that interface where
2:35:31curb meets road is part of a different project. The two projects are combined there are bollards
2:35:39in in locations to again provide that distinction between where cars are to drive and where people
2:35:44are to walk there are street trees along Wyndham Street and we have when you get into the square
2:35:50it's not exactly sort of regular street trees at every interval because we've moved into that more
2:35:56natural setting for the trees so along Wyndham you'll see street trees in both soil cells and
2:36:02planters more at regular intervals and then within the square you see a lot of trees actually we
2:36:09have increased the number of trees but they're just not at that regular interval along the street
2:36:14so it fits in with the overall design of the square. Okay so on the on the on the renderings
2:36:20that we saw today wherever there's a planter it might not necessarily be just a planter with
2:36:26flowers it could it could be a tree. Agreed yes it could be. Great thanks. Thank you Councillor Caron
2:36:37and to Kate and please. Thanks through you to staff again like everybody else kudos on a very
2:36:47large project in tech we have a term that we say committee by design and and how horrifying that is
2:36:55on the the layer of people who have to actually create the design to take the feedback from
2:37:01a million different people and everyone's got a different idea of what they think is the best thing
2:37:06and so I know that that's a very very hard project and a onerous process and you all did a great job
2:37:13um I personally like the other design a little bit more but I am not everybody
2:37:19so I appreciate that you had to kind of do what you needed to do um I personally would really
2:37:26like to hear more about the the washroom as time goes on because I think um for usability
2:37:33and accessibility that's really necessary I know that the self-cleaning washrooms themselves are not
2:37:39as accessible with the types of chemicals they use their environmental impact and things like that
2:37:44so I I do understand and appreciate not going with that particular option right away um but I'm
2:37:51just wondering when we'll hear back about the potential for the washroom inside a building
2:37:58versus other places what's the timeline on that? Through you Mr. Mayor to Councillor Caton I can't
2:38:07give you a specific timeline today as we've worked through the details of this project to get to this
2:38:11point um but it is part of our 2026 work plan or my 2026 work plan to continue uh to explore options
2:38:20and opportunities to bring that back so I can't give you a specific timeline only to commit
2:38:25that work is continuing. Great thank you so much. Awesome and Councillor Chew do you have a comment as well?
2:38:35Our question. Thank you through you Mr. Mayor um yeah just the whole team here great work Stacey,
2:38:41Andrew thanks for meeting with me and Mike on a personal meeting uh I just want to address some
2:38:47of the comments that I made during my consultation with you guys which I feel like got captured
2:38:52I really appreciate the attention to the detail with the paving materials I think that really
2:38:58makes the biggest difference um just the variation um and also the alignment towards Douglas Street
2:39:05I personally like the heart where it is lining up to Douglas Street as a photographer myself
2:39:11and many others I think this will be a great thing to capture that subculture and niche that
2:39:17would patronize downtown. I also think this the steps by the CIBC is it'll correct me if I'm wrong
2:39:26but it will serve as a natural amphitheater of sorts for um for future events um I guess you can
2:39:36that is our attention yes okay yeah so I think like that kind of solves the stage issue from my
2:39:42perspective and I think it frames Colbeck Street better especially for all the storm games that
2:39:48happen it's a natural staging I'm from Vancouver and in Rogers Arena where the Canucks play
2:39:55there's a natural staging that happens before the queue up and I think this this area where the
2:40:01fountain is it'll naturally help frame a lot of those community conversions so great work I feel
2:40:09like for the first time with community engagement a lot of my comments have been captured so I really
2:40:14appreciate the thoughtfulness and I know a lot of people in the landscape architecture community
2:40:18also appreciates your work and I also just want to say the tapering of the the herb and the plancher
2:40:26that was a nice touch as well and to sub to add the heart there to really define that corner
2:40:33that honestly will make the biggest difference in draw so great work thanks councillor Chew
2:40:41all right I think we're ready to call the vote which staff would appreciate
2:40:47so uh I'm going to call that right now because I think I've given my comments off the top about
2:40:52how thankful I am too so I'll call it right now is anyone against this new design for st. George's
2:40:58Square nobody we'll get a shovel let's go all right perfect thank you very much
2:41:11uh we've already done the next thing on the agenda which was the public appointments
2:41:17and so what I'm going to suggest is that we do the third quarter budget monitoring report we have
2:41:22one delegation to that and then I then we're going to have a break and break for lunch a little bit
2:41:28okay so it's just the way the just the way the day is going so then we'll come back and do the
2:41:35Grand River Conservation Authority bill 68 item and then go on from there so we have a delegation
2:41:44a Christopher plumber okay welcome Christopher and I'm sorry I don't know if you've been here
2:41:58sorry I don't have my glasses here I don't know if you've been here for the other delegations but
2:42:02you have up to five minutes uh four minutes and thirty second mark there'll be a time okay
2:42:07that will ring to give you a thirty second warning and you're here to talk about the 2025 third quarter
2:42:14budget monitoring report so go right ahead okay first off um thank you uh to uh to Mayor Guthrie
2:42:22and Council uh I must also commend Council on Staff for putting in the work um in regards to
2:42:31a grant that will be uh perceived in this report um a total of 11 million from the community support
2:42:41or community sport and recreation infrastructure fund uh 10 million which will go directly to improve
2:42:50the facilities that are sorely needed in the South End Community Center uh this grant writing is
2:42:56truly laborious but uh with this windfall has absolutely paid off very well for the city
2:43:03now budget monitoring usually will contain some reference to the city's north star the city's
2:43:10strategic plan and more on this in a bit uh given that the improvements of the South End Community
2:43:17Center will soon see uh thanks to this uh grant from the CSRIF uh I would like to show my concern
2:43:27and curiosity on how this relief will be used to best serve the community as a whole um
2:43:365.5 million of this is intended to enhance the project and potential revenue generation it also
2:43:42diverts 4.5 million into other much needed projects within the city's budget that may help um a
2:43:50vulnerable part of the population to access said facility um to reference the 2025 second quarter
2:44:00budget monitoring report uh it did find that the Rhodes Division of the Operations Department projects
2:44:07um uh projects a winter controlled deficit of 900,000 at year end um this basically states that a
2:44:17single department's first quarter overshadows the entire budget allocated to the fractional part
2:44:24of maintenance of which is a part of the city's north star the city's official plan
2:44:31um transportation master plan and vision zero um that one in particular should be on every city
2:44:42and corporation's top priority uh and quite frankly the public is weary of these commitments being
2:44:48pushed aside um this now is the time to take count and use these funds um available to
2:44:57the city and this opportunity to make things right now i think it's pretty apparent that
2:45:06i'm actually speaking um to win their maintenance of bike lanes but i will see the floor after this
2:45:13one last point um 65.2 million so far is a lot of money to uh this much needed south end project
2:45:22um but so is 10 million um and it could really go far to cover even a measly 650,000 as well
2:45:36that uh that about concludes what i do have to speak to cancel about thank you very much
2:45:45all right thank you is there any questions as a follow-up
2:45:48well there isn't thank you very much we appreciate it thank you ma'am um so can i have someone move
2:45:57the move this this one i'll boost it till and uh ritchardson thank you and uh i think i just because
2:46:06of the delegation's comments i think i would like to just ask staff to confirm clarify uh
2:46:17what was brought up was basically a difference between capital and operating and a grant that
2:46:23comes from the government is specified for certain capital improvements not ongoing operating costs
2:46:32so there's no correlation there at all am i correct uh yes to you mr. mayor you are correct this grant
2:46:38was very specifically intended for capital in recreation facilities yeah and so that is what
2:46:42it's being used for okay thank you for that clarity okay so it's been moved and seconded
2:46:49and i'll call the vote is that okay with everyone yep okay i'll call the vote is anyone against
2:46:56no one okay so that's unanimous as well so as i said we are going to take a break right now um
2:47:03and we'll come back here for
2:47:06uh let's make it uh
2:47:1112 okay um 12 30 okay we're gonna have a lunch break until 12 30 okay we'll see you then thank you
2:47:22well mr. mayor oh sure yeah before we break um because i can't see the gallery um but is uh
2:47:31cao uh samantha loson in the gallery to answer the questions from members of council because
2:47:38if she is is it necessary could we not do the uh g rca motion before a break um like if she's in
2:47:49the gallery i'd like to know but i don't know no everyone i'm not looking for her yeah i know okay
2:48:01i'm looking for our other delegations as well okay and they're not here so um i understand where
2:48:08the conversation is going and that is fine so why don't we do that but i i'm trying to honor that
2:48:15we have a delegation that has also signed up who was supposed to be here in person and he was not
2:48:20here so um maybe what we could do is a two-parter i'm trying to make it up on the fly so um no because
2:48:32then we're gonna yeah you know why don't we just do a little bit of a shorter break okay so we're
2:48:38not waiting as long and so why don't we come back for what did i say originally i'm sorry
2:48:44i said 12 30 okay let's make it 12 20 okay when we get 12 20 to come back here i'm just sorry i'm
2:48:50just trying to balance that we yes we have someone in the audience but we also have someone that's
2:48:53supposed to be signed up as a delegate too okay so uh we'll come back here for uh for 12 20 okay thank
2:49:00you okay for my councilmates online i think we're just doing the one minute warning okay we are
3:33:10calling the meeting back to order so thank you so much for uh for coming back we do have this item
3:33:18is the grand river conservation authority bill 68 which is a plan to protect ontario act and because
3:33:27this was uh asked to be brought for by councillor billings all this allow councillor billings to
3:33:32speak to the item uh just to kind of set the stage and we have a couple delegations that have
3:33:38also signed up as well and so councillor billings i will turn it over to you thank you mr marrick
3:33:47do you want me to put the motion down first before or or what what is your preference for order
3:33:56no i i'm giving you the opportunity to kind of the grace just to allow um you to you know table what
3:34:03you're looking to try to do to set the stage and then we'll allow the delegations to go any questions
3:34:09and then and then we'll we'll come back to you to formally put it on the floor at that point
3:34:14okay okay mr marrick okay so the the province announced a new provincial body intended to
3:34:20strengthen and the coordination and oversight i.e governance and and this body is called the
3:34:25Ontario Provincial Conservation Agency and the province is proposing to consolidate 36
3:34:32conservation authorities into seven larger regional bodies and many uh c.a.s and municipalities
3:34:42have passed motions with respect to this matter um and essentially uh part of their their motion is
3:34:50they're rejecting the seven larger regional bodies that are being proposed so in summary which is
3:34:58from the attachment mr marrick uh the g rca is unique in that they're offering an alternative
3:35:05to the provincial proposal and the g rca board believes the the province's modernization and
3:35:12goals can still be achieved more effectively through a refined right-sized regional model
3:35:18aligned with the scale of the existing source protection regions that we have so i asked
3:35:28for this motion to be placed on the agenda for council's approval to support the g rca's bid
3:35:34to have the source protection regions be the boundaries instead of the proposed seven larger
3:35:41bodies so okay that's that's the stage okay thank you very thank you very much and uh
3:35:53uh just so you know like from a emo point of view with me being on the emo board and such
3:36:00there's a lot of municipalities that are passing these types of support motions in various similar
3:36:04fashion so i think it is important that we look at this and uh it's also timely we sort of have to
3:36:10get get these things done prior to the break so thank you councillor billings and we do have two
3:36:17delegations as i said the first is susan watson and the second one is dr. hu whiteley
3:36:22and susan is here in person and then dr. whiteley will join us online
3:36:28and i think you would both know but just because i always say it it's up to five minutes with the
3:36:34chime at the four minute and thirty second mark and just stick around in case any of my colleagues
3:36:39or myself have any questions i do want to just reiterate that we are speaking to what's been
3:36:47tabled by councillor billings and in regards to bill 68 as much as possible please okay thank you
3:36:54very much susan over to you yeah mayor guthrie and members of gulf city council i'll start by saying
3:37:00that i completely support the resolutions brought forward by councillor billings and i encourage all
3:37:05of council to vote in favor of them it's clear that bill 68 is going to have a massive impact on
3:37:11levies governance and accountability but bill 68 also appears to have very serious implications
3:37:17for current g rca assets including infrastructure financial reserves and land in his letter to
3:37:25you john chaloner says the following the g rca maintains significant watershed specific infrastructure
3:37:33reserves and land assets including infrastructure financial reserves and land
3:37:42sorry the g rca maintains significant watershed specific infrastructure reserves and land assets
3:37:47built through decades of watershed investment key concerns include the potential redistribution
3:37:52of well-developed g rca reserves to support capital needs in other watersheds that have not made
3:37:58comparable investments clear assurances are required to ensure these resources remain dedicated to
3:38:04the watershed communities they were intended to serve so the g rca is clearly concerned about what
3:38:10is going to their happen to their assets i want to speak about the implications of bill 68 for the
3:38:17eight hectare field which was once part of the former frank court right waterfowl center which is
3:38:22at risk of being sold off and developed back in july of this year staff and the mayor were assuring
3:38:29the public that they were on this file there was supposed to be a public report back in the fall of
3:38:34this year and it's now december 16th but just a couple of weeks ago the mayor stated in a ctv
3:38:40interview that the ultimate fate of this land is not up to the city the g rca determined that it was
3:38:46deemed surplus they will control the process on what happens with those lands this is a complete
3:38:52abdication of council's responsibility in the 1970s the city of guelph contributed hundreds of
3:38:59thousands of tax dollars towards the assembly of land for the future handland creek conservation
3:39:04area part of which was the purchase of the former frank court right waterfowl park i've provided you
3:39:10with a historic documentation that proves that guelph contributed 30 to 40 of the purchase price
3:39:16the mnr 50 to 60 percent and the g rca only 10 percent that original investment is now worth millions
3:39:26former civic leaders norm jerry ken hamill and eileen hamill advocated for this contribution so the
3:39:32g rca could hold these lands in trust for the city of citizens of guelph in perpetuity i obtained a
3:39:41copy of the mnr grant letter via an foi and it contains this statement please refer to the
3:39:48attached copy of the report to management board for further particulars and conditions of approval
3:39:54the g rca was unable to locate this document in their files and at the july 16th council meeting
3:40:01councillor billings asked staff if they were going to try to obtain that document from the archives
3:40:07of ontario and the answer was that the legal department was working on it it's now five
3:40:12months later has that document been retrieved what does it say because that document could have
3:40:18potential legal implications around the ability of the g rca or any other conservation area to
3:40:24sell those lands and you also need to fix the problem that you created i would not advise depending
3:40:32on any assurances from the province margoth reasserted in his ctv interview that the city
3:40:39understands the importance of parkland how is it then that in 2017 under margoth re's leadership
3:40:46the city removed open space parkland zoning for eight hectares of conservation land within the
3:40:52city's boundaries i still don't have a clear understanding of how or why that happened and
3:40:59and this is in a context where we're on track to incur a massive parkland deficit by the year
3:41:052051 a shortage of 174 hectares relative to projected population by riverside parks
3:41:14whilst city council changing the zoning of this land jacked its value into the stratosphere
3:41:21and the temptation was simply too much for the g rca they fabricated a false acquisition narrative
3:41:28about the he spler dam project to justify declaring it surplus and cashing in with the looming
3:41:35conservation area amalgamations as anyone's guess now what could happen to that land in a couple of
3:41:40months you will have the opportunity to correct this historic error and protect this land when an
3:41:46official plan update comes to council in february 2024 you need to act on that opportunity and
3:41:53change the zoning back to open space parkland thank you thank you very much for your opinions
3:42:00and uh is there any questions at all for the delegate no seeing hearing none thank you very
3:42:06much thank you and now we have uh dr. Hugh whiteley going to join us by video looks like he's joining
3:42:13us now just got to turn on your video if you can hear all right we do see a hue we just need you to
3:42:22unmute i unmuted once so i'll do it again all right we can we can hear and see you so your
3:42:34five minutes will start whenever you're ready thank you thank you mr. Guthrie and council members
3:42:41for this most important issue being presented to council for some action i want to focus attention
3:42:52exclusively on bill 68 because it represents an extraordinarily
3:43:00lead damaging act by the provincial government to remove local involvement in conservation
3:43:10activities and i want council to be aware of how extensive is the background of the city of
3:43:21guelph in the formation of the original conservation uh authorities act the record is clear that it was a
3:43:311941 conference held in memorial hall at the university of guelph that triggered off the
3:43:39recognition that southern ontario conservation depended on the formation of conservation authorities
3:43:48um the motion from that 1941 meeting pointed out that deterioration in the natural resources
3:43:58in southern ontario was so severe in the 30s and early 40s that the future sustainable
3:44:08prosperity of the communities of that area were at risk and to answer that difficulty
3:44:17the meeting called for the formation of voluntary municipal coordination on a watershed basis as the
3:44:31way that governance could properly give attention to conservation of natural resources
3:44:38this call was taken up by the provincial government under the leadership of george true i'm
3:44:45interested to learn that he's a favorite of one of the council members as the only
3:44:52wealth-based premier of ontario anyway george true recognized the importance of forming these
3:45:00communities led municipally coordinated conservation authorities and the essential
3:45:10feature of them is that they are voluntary the province did not force municipalities to form
3:45:18conservation authorities it allowed them to recognize the wisdom of gathering together
3:45:26and operating on a watershed basis to produce good conservation policies
3:45:33this was further strengthened by another conservative premier leslie frost in his longest
3:45:43period of leadership in ontario leslie identified himself as an environmentalist
3:45:51and quite properly strengthened conservation authorities activities
3:46:00the overall outcome from this is that it's been an outstanding success and the city of
3:46:07gulf in particular has benefited more the probably than any other municipality
3:46:13were having conservation authority basis for natural resource management we not only have
3:46:21outstanding conservation areas in gulf lake and rockwood and i would point out that the reason
3:46:30that there is a rockwood conservation area is that a gulf leadership personality or a smack
3:46:42was strongly in favor of forming it and created it in addition the gulf gulf has benefited from
3:46:55a huge amount of natural area retention there's the 775 acres of the
3:47:06hanneland creek conservation area that has developed from gulf-based
3:47:14operations within the conservation authorities framework to acquire that land and i don't know
3:47:22that council members are aware that two other very important conservation areas in the vicinity of
3:47:32gulf starkey hills and the smith property on the aramosa river both of those were reached
3:47:42hi hi hu it's it's maric gothree and i'm sorry that you just went over your five minutes there and
3:47:48so the the time stopped for you my apologies but thank you for your your presentation let me just
3:47:55ask if there is a follow-up question from any of my colleagues uh yeah councillor Caron please
3:48:03i think we were about to get information on the history of the smith property and how it parallels
3:48:09with the g rca land uh history and i just wondered if we could give another 30 to 60 seconds to
3:48:18dr whiteley or i'll ask it as a question dr whiteley what is the history of the smith property
3:48:24as it relates to this agenda item okay just so everyone knows we don't usually allow that anymore
3:48:34to use a question to help someone continue on on a delegation but i'm charitable and it's the
3:48:41holiday season so i'm going to allow it right now as the chair i'm going to make that ruling
3:48:46but please in the future we shouldn't use this as an opportunity to allow people just to continue
3:48:50on just from a process point of view dr dr whiteley go ahead and answer that question for
3:48:55councillor Caron okay and us thank you hey dr whiteley i'm going to give you your time back here
3:49:04you just you're still muted could you unmute for us can can our clerks unmute for him yeah okay sorry
3:49:24yeah dr whiteley did you want to try one more time after i was all charitable there and letting
3:49:29answer the question uh it's not working darn it sorry dr whiteley it's it's just not working
3:49:42another another five seconds give it a try i'm so sorry dr whiteley it's just not working
3:49:54by all means we know you're good with email if you want to maybe just send a
3:49:58council a quick quick email with that story i found another lucky i kept talking there you go
3:50:04another section okay keep going you answer that question for councillor Caron the city of
3:50:11gulf undertook with the g rca the gulf valley lands project the first three pieces of land that were
3:50:19on city of gulf request list bought by the g rca were the smith property the very first property
3:50:28the second was the hanlon creek um estate property and the third was the starkey hills
3:50:37200 acre urches all right you got a thumbs up from councillor Caron and all of us here
3:50:48thank you very much and thank you for your delegation okay yep thanks dr whiteley have
3:50:54a good holiday bye bye all right councillor billings i'm going to turn it back to you if you want to
3:51:01state anything uh and i know you would love to move the the motion as well so i'll turn over to you
3:51:09so mr maro i'll move the motion and it's seconded by councillor chou do you do you want me to read
3:51:17the entire motion i really don't um but we're gonna ask we're gonna ask uh the clerks to throw it up
3:51:26on the screen at least just maybe uh just as you speak about the importance of this we can have it
3:51:34at least up there for everyone to see okay so so essentially mr maro you know the g rca board
3:51:42believes that you can still modernize like the province wants us to do while preserving local
3:51:49responsiveness and using the source protection regions would be in my mind uh well it would make
3:51:58sense and it would be more effective and and manageable uh where i feel that what the province
3:52:05is proposing would be nonsensical under the now therefore be it resolved which is the third clause
3:52:13i i added that clause because well stated in the attachment municipalities are to fund all or a
3:52:21portion of this new agency's operation so it really means municipalities pay and have no say
3:52:30but by the way this is a precedent setting method for funding a provincial agency which in my view
3:52:37is just wrong on so many levels so hold on okay so so you're saying i don't have to read them the
3:52:51entirety of the motion no you can if you wish just that there's a lot of a lot of one too there's a
3:52:59lot i think everyone could read it yeah okay i'm seconded by councillor Chew and you still have the
3:53:08floor go ahead yes and just quickly uh ceo samantha lawson uh i believe is uh in the in the gallery
3:53:17and she's here um to answer any questions from from members of council with respect to this matter
3:53:26actually i'm going to invite you to the microphone for a moment because you have been here
3:53:30would you like to just validate or clarify speak to the importance of what you think
3:53:37gulf council is looking to vote on sorry if you hope that's okay everybody give me the
3:53:42ability to do that you've been here thank you okay thank you very much for the opportunity
3:53:48i think just to um further highlight the recommendation from the provinces to
3:53:54basically consolidate 81 municipalities so that would be the number of municipalities
3:53:59that would be in the new proposed regional conservation authority that the g rca would
3:54:03be included into so that's going to run basically from guelph right to winzer so it's a fairly large
3:54:11landscape and i think most of the municipalities can recognize that the the success of conservation
3:54:17authorities is because of the local focus and the local input that happens to create the programs
3:54:24and services that we provide so the g rca is proposing um recognizing um as cancer billings
3:54:32had mentioned that there are some needs to modernize the system um and that can come through consolidation
3:54:39but at a much smaller scale so the g rca is proposing um the source protection regions which would
3:54:45consolidate four c a's into one but it's already a proven governance model and it um is at a size
3:54:53that we feel can still um it doesn't dilute the local input or opinions or programs and services
3:54:59that it would provide um the other item too um that was mentioned was the new provincial agency
3:55:07and that is something new for the province and so that is to provide greater provincial oversight
3:55:13to whatever the new conservation authorities um are and that would include governance as well as
3:55:19operational items it's also a tool the province is using to help standardize um and advance some
3:55:25of the tools that the conservation authorities um could utilize so increasing greater capacity for
3:55:30permitting and managing the variety of programs and services that we have so um really appreciative
3:55:37of the opportunity and and the support from the city as well as the other watershed municipalities
3:55:42and happy to answer any questions thank you very much i'm going to go to alton busatil and then
3:55:49up to ferron please thank you very much mayor guther and thank you to the delegate for or
3:55:55standing here in front of us to clarify some things um with regards to the 81 municipalities
3:56:00and the various conservation authorities how many of them are expressing similar concerns to what
3:56:07we are discussing here um through you mayor to council all of them there we go that's a great
3:56:14answer nice and short um the other concern that i have is with regards to uh i think it was a comment
3:56:20by uh councillor billings and also clause three about um uh downloading of costs to municipalities
3:56:27could you unpack that this is a big concern to me we can't afford any more downloading
3:56:33i'm through you mayor to council so um the amendments to the conservation authorities act
3:56:38that were tabled in bill 68 have been enacted so the bill was passed the one part of the
3:56:44amendments that was not enacted was the ability of the agency to levy the conservation authorities
3:56:50for costs associated to their operations so the province has is still doing consultation on the
3:56:57amalgamation or consolidation of the conservation authorities and at those sessions they've said
3:57:02that the first term of the agency will be funded by the province so the first term is three years
3:57:09starting uh effectively i think uh 2026 um and that they won't be utilizing their powers to levy
3:57:17the conservation authorities in that time i will put heavy caveats around it that's what they've said
3:57:24so uh they also mentioned too that in the spring they will be issuing regulations to more formalize
3:57:31the responsibility of the agency relative to um the new proposed conservation authorities because
3:57:37the relationship is still not clear either how much oversight and input they will have
3:57:43into the management of the new conservation authorities but yes they have put in there the
3:57:48ability to levy the conservation authorities for the costs and operations of the agency
3:57:53thank you very much so what i understand just to try to break it down is from 2026 to 2029
3:57:59this might be revenue neutral from 2029 onward which is a year before uh the the the next municipal
3:58:09election after this one it would be incumbent upon uh the conservation authorities and the
3:58:16municipalities to fund further the conservation authorities therefore putting a a greater
3:58:23tax burden on the municipalities is that a correct assumption um through you mayor gut three i yes i
3:58:30think so because the um agency has the ability to levy the conservation authorities who in turn
3:58:36apportion the municipalities and just to follow up and it also sounds like without any
3:58:44significant oversight over the the the new uh whatever they are conservation authorities
3:58:50whatever is that correct yeah so through you mayor the um legislation states that they will
3:58:55be provincial appointments to the board that governs the agency sounds like fun thank you very
3:59:01much thank you and then spooce atil and then karan and then shoot thank you and through the mayor
3:59:12thank you for for staying thank you for staying so i want to first acknowledge and thank uh
3:59:18councillor billings for raising the governance concern and putting it into emotion it's a huge
3:59:24concern about the centralization of decision making um and to councillor absolutely about
3:59:30the downloading on the local residents i just he asked a number of my questions just a quick
3:59:35question around has this resolution uh similar resolutions been shared with you know public
3:59:42health ontario other kinds of bodies and agencies uh to kind of raise the concerns um through you
3:59:50mayor a g r c specifically hasn't shared it with other public agencies but we have shared it um
3:59:57with the local m p p's first nations and all the watershed municipalities thank you thank you
4:00:04very much uh karan then shoot uh thank you through you mr mayor and thanks to the delegate for
4:00:13sticking around as well um two of the previous delegates talked about the risk of um land
4:00:22acquisitions over a long period of time that were funded in part by the city of guelph being at risk
4:00:29with this consolidation plan is that is that a risk that you the g r c a is talking about and a risk
4:00:35that you share uh and then the second question is about the the document from the 1970s that that is
4:00:43still being um searched for just wondered if you had an update on what that document might contain
4:00:52okay so to answer the first question about the concern what will happen under consolidation to
4:00:59all of g r c a's assets uh yet that is a significant concern of the g r c a um again it's it's not
4:01:07clear what the process is for the consolidation or how that's going to happen um g r c a is seeking
4:01:13legal advice um to best prepare us um for that um from the g r c a's perspective i think it's it's
4:01:21fairly similar that we don't um necessarily want you know the authorities been around for 80 years
4:01:29and has built up reserves and has a very sophisticated program particularly in terms of our management
4:01:34of our water infrastructure and our concern is that that similar sort of longevity of the organization
4:01:40but also approach is not matched with some of the other ca's that potentially could be consolidated
4:01:46with the authority and our concern is that g r c a priorities would not surface as high
4:01:53based on a regional context so there's a lot of concern around a number of assets that the authority
4:01:58has um in regards to the 1970s document um i think the delegate mentioned we didn't find a copy of
4:02:07that report um uh in our files um and we have not asked for it um from the province but um
4:02:18my understanding is the city has okay thank you councillor crown two please
4:02:26thank you through you mr mayor uh sam thank you for coming to gulf council on this matter
4:02:31i'm just curious uh based on the working group conversations uh at g r c a um how much emphasis
4:02:38in advocacy has there been around preserving the source water protection regions uh in the
4:02:43administrative boundary changes um so g r c was one of the first conservation authorities to formally
4:02:50table detailed comments um to the province as well as our other um agencies um i think the province
4:02:59has been clear in some of the roundtable discussions that we've had that uh we will not have 36
4:03:05conservation authorities after 2027 um they're flexible in the the seven or appear to be flexible
4:03:12in the seven um i think uh around the table with other um conservation authorities considering that
4:03:20there is already a framework in place and a governance model in place at the source protection
4:03:24level um i think some of my colleagues would agree that that's a more of a logical step versus
4:03:31the large-scale regional consolidations okay and we are one of the largest
4:03:36c a's in ontario is that correct um geographically yes we're the largest okay and can you very quickly
4:03:43speak to some of the i guess cultural and governance issues uh perhaps some of the smaller c a's and
4:03:49rural c a's compared to the structure and culture that we've had here at in southwestern ontario
4:03:57yeah so i think the province actually highlighted at one of the sessions that
4:04:02the toronto regional conservation authority has a budget of 177 million and that there are a number
4:04:08of c a's that have budgets of less than two to three million so you know i do think that there
4:04:14are capacity issues when it comes to offering programs and services um i think that the province
4:04:20is recognizing and some of the municipalities in the province have also requested that there needs
4:04:26to be uh more capacity in certain areas and some of the conservation authorities and the programs
4:04:32and services that they deliver given the importance of natural hazard management so the flood
4:04:37mitigation management as well as source protection and some of the other programs that the conservation
4:04:42authority offers um i think one of the other items too that the province is really concerned about is
4:04:50is also the consistency in terms of standards across um conservation authorities and i think
4:04:55that speaks again to some of the capacity of the smaller conservation authorities um to have more
4:05:02modern policies in place um you know the ability to have digital systems in place for for managing
4:05:09permits and that sort of thing so i think um you know there is some agreement around the table that
4:05:16there is some benefits to consolidating and modernizing the programs um and yeah i'll probably
4:05:23leave it at that yeah i just bring that up because uh there are conversations that you guys have within
4:05:30like eerie um source protection regions and perhaps that could be maximized further from a
4:05:37governance lens to kind of address uh the consistency component uh moving beyond just
4:05:43source protection conversations but also operational issues um and maybe that could be a takeaway as well
4:05:51and i'm finished thank you thank you councillor shoo that's it i think for questions to you thank
4:05:58you for sticking around as well thank you we appreciate your work too thank you it's i must
4:06:02be trying times with with the whole announcement and everything when the province so we wish you
4:06:08all the best okay thank you for what you do yeah thanks okay uh councillor downer has a question
4:06:15for uh staff and i do see councillor gibson and okay you can do questions or comments just so we
4:06:22can get to the end of this item are you miss me yeah and thanks to council rulings for bringing
4:06:26this forward i think it's a like a really important issue um the one i have a question for staff and i
4:06:34notice jody's not here but uh in the information items that we get uh under intergovernmental
4:06:42consultation it says on this issue um that staff may prepare a letter for submission via the
4:06:49environmental registry of Ontario did we do that so through the mayor to councillor downer so staff
4:06:57are working on that right now so the idea is to have that posted uh this friday in the information
4:07:01packages and so that that work is to come but what i can say um is certainly staff overall are
4:07:07fundamentally aligned with with what's in front of you today um you know our perspective in that
4:07:12water is paramount and with golf being a drinking water uh groundwater based drinking water community
4:07:17the the watershed work here is is imperative it's of utmost importance to us and so you'll see that
4:07:23type of commentary reflected in the staff um documentation perfect thank you yeah because
4:07:28i know the deadline i think is the 22nd for this consultation so that's perfect um the other thing
4:07:34i would add i wonder if councillor billings would mind if i added one uh amendment to number four
4:07:41which would be to include amo in this circulation the association of municipalities of Ontario
4:07:50okay so could i move that as an amendment do you need it you don't need it in writing to you
4:07:55no and councillor billings will second that and i'm going to call the vote on amo if that's okay
4:08:01are we talking about the amendment councillor crown number four who the circulation is
4:08:10uh yes i had an amendment to the amendment so i do that now i're waiting for this to pass
4:08:15because i was going to add the other other g rc a member municipalities i guess that would
4:08:20be covered in amo if amo circulates it to everyone well i think that you can do that too
4:08:27i amo won't be circulating it yeah circulating it to okay so i'll add an amendment and other
4:08:34g rc a member municipalities hope it's okay and it's seconded by councillor chou on the amendment
4:08:50okay councillor chou uh just through you to um councillor um caron i i just wonder if that
4:08:57would be redundant to add g rc a member municipalities because virtually all the
4:09:03municipalities are doing a similar form as we are today and they're tabling their own motions so
4:09:08i'm just saying they're already doing that so i wonder if we need to add that piece
4:09:13um you know what as the chair i will just say that it doesn't hurt so i say we support councillor
4:09:19crowns amendment to the amendment and we move on okay can i yeah can i uh can i call the vote on
4:09:27the amendment to the amendment of adding g rc a member municipalities good is anyone against that
4:09:34nobody good we're back to the amendment now of councillor uh councillor downers about adding
4:09:41amo it's already been seconded any questions on that no i'm going to call the vote anyone against
4:09:47adding amo as an amendment nobody that's unanimous awesome we're back to the main motion as amended
4:09:57now and on my list i did have billings and then Gibson and then that is it so through you mr mayor
4:10:06i mean uh the question i had uh councillor downer asked it so to staff when the staff do the posting
4:10:15is it going to be clear that we are like the city of Guelph is supporting the source protection
4:10:22regions and to make that extremely clear through the mayor to council of billings i can tell you
4:10:30certainly that staff's um position and perspective so as a takeaway we'll make sure the language is
4:10:35reflective of the comment thank you thank you so much thank Gibson please yeah thank you
4:10:43not a question comments i just wanted to applaud the conscription 30 and everyone who works with them
4:10:48i think aligning with source water protection is a logical approach as an alternative to the
4:10:52province i know in working with um advocacy with the province like you don't always appreciate the
4:10:58direction the province wants to go but you acknowledge that they have the ability to do that so you have
4:11:03to offer them alternatives and i just want to say it's a sound argument i'm glad that um the
4:11:10conservation authorities seem to be broadly adopting it um and i think it's wise the one thing that i
4:11:15have observed from this government over the last eight years is that he's the premise famous for
4:11:20saying i'll put water in my wine sometimes if he if he gets too far ahead of his skis and sometimes
4:11:24they want to move the ball you know they want to move the ball 20 yards down the line but they
4:11:28realize they can really only get five or six and still achieve what their objectives are but it's
4:11:33not what they first proposed so i've seen that in multiple times and i just again i applaud the
4:11:40the advocacy because it's it's worthwhile and i think it i think it would be successful okay thank
4:11:47you i'm gonna call the vote then okay everybody this is on the main motion as amended okay is anyone
4:11:54against nobody okay that's unanimous too awesome okay motion to adjourn just kidding
4:12:09come on a little a little a little levity right just just a little levity okay by the way my council
4:12:19colleagues uh online i there's a few people in the audience that's who i was speaking to there
4:12:24there's a lot to see if you can't see them okay um just just one second everybody just one second
4:12:29i was actually in the middle of just doing something okay um we are at the bylaws probably the most
4:12:47exciting bylaws we've ever had since uh since i've been mayor anyways so uh look uh can i just
4:12:57have some grace for a moment for everyone to just to speak for a moment thank you thank you i found
4:13:06a way to figure it out okay dylan do you happen to have the strong mayor order it's a compromised
4:13:18position council may like it or not because it's on them but here it is i using the strong mayor powers
4:13:29i'm increasing the operating budget by 650 000 to reinstate the snow removal services for the on
4:13:36street bike lanes of which 349 118 will be funded by increasing the 2026 tax levy and 300
4:13:458882 will be funded from the environment and utility contingency reserve one time in 2026
4:13:53resulting in the remaining 300 000 tax levy impact into 2027 in other words this will be ongoing
4:14:00it's not just a one year removing the addition of the two bylaw officers included
4:14:07all associated office operating expenses which will decrease the net tax levy by 991 17
4:14:16and decreasing the operating budget by 250 000 by decreasing the transfer to the 100 re reserve
4:14:24reducing the tax levy and decreasing the capital budget for capital project gb 026100
4:14:31re initiatives by 250 000 in each year from 2026 to 2035 capital budget and forecast i'm just
4:14:39pausing on that moment for a second that can always be amended year by year but moving into 2026
4:14:44it will be taken out i have signed this main mayoral order and it's signed by the clerk which means
4:14:51it's done you have the bike lanes back maintained starting today okay now i want to give i want to
4:15:05give some context and no notes in front of me you all know me well enough i don't have notes
4:15:11usually at all maybe i get in trouble for that but um this has been extremely difficult to figure out
4:15:22there are some of you may be listening online some of you in this audience that i have not
4:15:28maybe been contacting you back which is not like me and i've been straight to the point and some of
4:15:34my responses of thank you for your feedback it's because all of my time has been trying to figure
4:15:41this out okay there were a lot this is new ground and i'm going to blame i'm going to blame the
4:15:52strong mayor powers for the situation we have found ourselves in because the strong mayor powers
4:15:59do not allow any of my colleagues to do a notice of reconsideration on emotion
4:16:05if that didn't exist then anyone in my colleagues that had a change of heart on an issue could come
4:16:12they could present a notice of reconsideration they could we could figure it out we could debate it
4:16:17we could approve it okay but they're not allowed because of the strong mayor powers it's all on me
4:16:26and it shouldn't be a shock to anybody that i don't like raising taxes that's what i've been as the
4:16:34mayor and a counselor for years it shouldn't be a shock but i've been trying to figure out a way
4:16:41to get this to work while making it no impact on property taxes which is what i figured out okay
4:16:50so in the absence of a notice of reconsideration it is my duty as the leader as the mayor to
4:17:00acknowledge my council colleagues and the public but my council colleagues who are rightfully coming
4:17:06with concerns changes of heart differences of opinions saying i do i ignore that as the as a
4:17:13leader do i ignore that as the mayor is that good governance is it me to say well too bad for you
4:17:22so here i am using the strong mayor powers in this way which i kind of said i would never do
4:17:27in which i might add many of my colleagues around here have written extensively and told me extensively
4:17:33that it would be undemocratic and that i should never use them but there has been some unity around
4:17:42using them in this way and i believe that to do the right thing i have found a way forward which is
4:17:52taken me through many un-maintained bicycle lanes to get here and i want to explain the situation
4:18:03then because i have signed the mayor order it means that the bylaw that is on here now is mute
4:18:13it has to be removed because as the mayor i have i have directed that this be funded so it is out
4:18:25now there's more to this process though council technically has 21 days from right now
4:18:33to confer with the clerk and say i would like to challenge the mayor's strong mayor order
4:18:42they have the you have the authority to do that but i'll be blunt if you do that then you are raising
4:18:49taxes and i'm not here for that so this is a compromise we're getting this done starting today
4:18:59that certainty is then given to the public and to all of us but there's a compromise built in on
4:19:04this for one year where we're reducing a little bit because i do not want to raise taxes i'm not
4:19:10like that and i hope you understand as the mayor with the authority to do this under this
4:19:15strong mayor legislation this is the way i move forward and if you want to challenge that then
4:19:20you go ahead but i think this is a good compromise and all of it can be on the table for another term
4:19:27and another year and i want to thank my council colleagues who have fully and respectfully
4:19:36talked to me for the entire last week about this topic and raised very valid points
4:19:43and some of those valid points have come from the public too thank you some of them i thought went
4:19:49a little overboard but i hope you understand my position and the frustration that i had in trying
4:20:01to uphold unity amongst council banging my head against the municipal act banging my head against
4:20:08the strong mayor powers trying to figure out how not to raise taxes to land at this compromise today
4:20:14so with that i don't think there's really much more to say
4:20:21unless someone wants to jump in because i'm being hospitable but um i want to thank staff too
4:20:30because let me tell you staff have this is all new territory right this is all new territory
4:20:38i hope i've landed at a good place for everybody i really and honestly and authentically do
4:20:43and this has been a really tough budget okay we have to make our city affordable
4:20:56and it means everything has to be on the table sometimes this shouldn't have been one of them
4:21:06and i acknowledge that i think leaders sometime needs to say i'm sorry so i'm going to say it
4:21:14i'm sorry and i mean that i can understand the reasons why this should be funded more so than
4:21:26i knew a few weeks ago okay so i'll i'll no clapping even though i would love that but please
4:21:34no clapping in the chambers all to then boost it till thank you mayor guthrie on a point of
4:21:39personal privilege i would like to extend my thank you to you for as i said to you three or four days
4:21:45ago a road to Damascus moment i don't think there were bike lanes on that particular road so you
4:21:51were probably walking it but for many people and go off this will indeed be perceived as christmas
4:21:57coming early we all understand that this was a safety issue that regrettably became a a challenge
4:22:03at budget time it takes a lot to take a step back and do what you did and i know that many many many
4:22:10people in guaff appreciate this thank you if you could please capture everywhere councillor Allt has
4:22:17said and put that in the minutes that would be awesome uh yeah councillor boosted till and then
4:22:22how's her thank you you know ditto to what councillor Allt said but i also want to acknowledge
4:22:29publicly you don't see this but you know i'm texting cam i'm calling cam and he's like in
4:22:35meetings if you can picture like a big ball of wool all tied tied together with the legislation
4:22:41and the regulations and the acts and kudos to the mayor for you know taking the time hours and hours
4:22:47you don't see the bruises on his head just trying to sort through this but the other thing you don't
4:22:52see i had the privilege after the chamber breakfast i calmed cam into buying me lunch but anyway so
4:22:59we went and had lunch at the delta and i didn't see these emails as a councillor but there must
4:23:04have been a dozen emails that the mayor received from senior citizens about affordability in the
4:23:12city and just his breaking heart around this so many talks about affordability this is sincere
4:23:18these are people who and i do lots of community work who can't afford housing you know and can't
4:23:24afford food so we're trying to find the balance given as you heard earlier with more downloading
4:23:31coming on us as a city trying to do more with last so thank you thank you to the mayor thank you
4:23:37councillor buschett house or um i also wanted to just um express my uh gratitude for finding this
4:23:44compromise um and i do have a takeaway from this whole process um so the amendment period exists
4:23:52so that people can reconsider and go back and look at things and i would suggest strongly to any
4:23:56future council to not waive the amendment period that's all thank you amen to that
4:24:05that's right well you said road to demacus so okay uh clausen and then uh chie and then kipson
4:24:14yes um ditto to what all my colleagues are saying and and thank you for all of the members of public
4:24:21who reached out with their personal stories of their need to ride their bikes every day their need
4:24:27to use bike lanes for motorized scooters and other mobility devices i think it makes a difference
4:24:33when we hear all of those stories um and i'm grateful for those and i also just want to say thank
4:24:38you to my colleagues who reconsidered um particularly councillor gibson um because i think that you
4:24:45put it before us in a in a way that i think many people started to ask questions um about how uh what
4:24:52a process to bring back the winter maintenance of the bike lanes and what that could look like um and
4:24:57it might be different from our you know some of our other reasons but i do appreciate that you did
4:25:02reconsider that with your uh residents in mind and finally thank you for cam for finding that compromise
4:25:09um it again isn't the compromise that all of us want but i also appreciate that you uh apologized
4:25:16and and and and took took the accountability for that so thank you for finding this thank you i'm
4:25:23sorry i didn't uh was it to chew and then gibson and then i see katin as well um coran as well
4:25:30yeah thank you through you mr. mayor thank you for bringing this forward so we have a chance to
4:25:35publicly comment and yeah we appreciate all your efforts uh i don't think look public policy at the
4:25:41end of the day there's black there's white and there's all the gray in between and i think sometimes
4:25:47especially in the last budget conversation a lot of us were zeroing in a lot of the policies and some
4:25:52of the organizational challenges that we face and at the end of the day i just want to share a lot of
4:26:00us were in the position that we needed to stabilize some of our services so some of our local roads
4:26:06can get attention because we have a lot of inclement weather events that are beyond our
4:26:10staff's ability and i think about the folks on tolton i think about the folks on dallen
4:26:16mcnulty hunt street we have a lot of insular communities especially uh outside the downtown
4:26:23core that often don't get attention that they need um we have a policy where uh stone plows get out
4:26:30when it's eight centimeters or more sometimes our those roads don't get seen much more after that so i
4:26:39think this is a good conversation i met with many of you in the downtown community in particular
4:26:45and it's a great opportunity that i had to share with you some of the operational issues that we
4:26:50face that outside the core and i hope in your advocacy that you could share some of those stories
4:26:55from uh some of our insular streets and communities where winter maintenance is very difficult and
4:27:04again we're we have a city that's over 200 years old uh a downtown core that's over 200 years old
4:27:11and that's it juxtaposed by some of the urban communities that have been built up with them
4:27:16the last 20 years so we have a lot of challenges to meet to bridge those service gaps that we have
4:27:21but i just want to commend staff on their work uh again we're trying to build a culture of
4:27:26material solutions on this council and i think this is a good uh step to help um
4:27:32help us have more productive conversations uh that don't pit you know issues against issues
4:27:37because again public policy there's the black there's the white and then there's all the
4:27:42grain between that require all of us to work together so thank you mr mayor for your work
4:27:46as well in particular okay thank you i think i said gipson and then uh uh karan and katin
4:27:53sure yeah thank you mr mayor and i do appreciate you bringing this forward i i sincerely do um
4:27:59i i i want i'm not gonna do any storytelling but i did share this with a few counselors earlier
4:28:04today um you know a couple of issues over the years have been perceived very black and white at
4:28:09the beginning but end up becoming very reconciled with different opinions and i go back to the
4:28:15driveway issue it was a like and my my my ward mate um councillor Caton we didn't agree on why
4:28:22we needed to relax the driveway issue but we agreed that we did and there was different reasons for it
4:28:27i come back to online voting the decision i'll cancel her down and i we have different reasons
4:28:32why we supported online voting but we both did for our various reasons in this situation
4:28:36there are multiple reasons why we need to maintain um we need to maintain maintenance of our corridors
4:28:42throughout the winter my reasons may not be particularly aligned with every single person's
4:28:46reasons but they are aligned in the fact that we do need to maintain the service um so mr mayor thank
4:28:51you you took my calls i know you have 13 different people to listen to and in china managed through
4:28:58but you you did take my calls and you did work very hard on this issue and you for full credit for that
4:29:07to achieve a restoration of service with no impact to the tax base is a win i think for everyone around
4:29:12the horseshoe uh from every angle so thank you all right thank you and caron and then katin
4:29:18yeah just echoing my my colleagues so much of leadership is collaboration um and i know you
4:29:25made a lot of phone calls yesterday uh in an attempt to collaborate but until i saw what was on the
4:29:32screen i was not aware that this was coming when i asked for the bylaw to be pulled so i didn't get
4:29:37to read the entire document of where all of the pieces were coming from and where the offsets were so
4:29:44if you could forward a copy of that to members of council i know it goes on our website
4:29:49but if i if we could get a copy of it as your colleagues um via email that would that would be
4:29:54great and then we can we can move past this and dust off our dust off our bikes no problem it's part
4:30:04of the process that it's actually emailed to all of councils so the clerks is doing that
4:30:09in regards to timing uh this was figured out by me at 12 30 12 45 so this idea came to me
4:30:23while eating so so uh anyways um because up until just yesterday i honestly did not know
4:30:33up a path forward until i figured it out just an hour and a bit ago so uh it's sometimes a
4:30:40little bit easier with some people that are in the room just to be able to talk to you a little bit
4:30:44with those that are online and so i apologize if you didn't catch wind of it but it literally
4:30:48happened within the last hour and a half uh and then i'm sorry oh katin go ahead thanks uh through
4:30:55you mr mayor so i i wanted to to thank like i i've been one of the people who is against strong
4:31:01mayor powers and i understand that uh specifically with the budget the the province didn't give mayors
4:31:10um it wasn't doing you a favor i don't think to like put all of that on the mayor's shoulders um
4:31:17and when we got ourselves into the situation that we were procedurally i think that that was
4:31:23the only path forward so i appreciate that you used it in this moment and um i wanted to thank
4:31:29all of the folks who have been contacting us and bringing up the issues and um and i want to
4:31:36thank my council colleagues because there has been a lot of conversation in this past week
4:31:41and we don't always vote on the same side of things and like councillor gibson said we all
4:31:44have different reasons for that um but it was really good to be able to talk through these issues
4:31:51with you all and um kind of bring forward those thoughts and the community's thoughts together
4:31:59and i'm very happy with the outcome of the resolution overall and i also want to thank snow
4:32:05because i think that without seeing it in action uh i don't think we would have been able to kind of
4:32:11visualize the actual impact there's a lot of things that i didn't think of until i saw it and
4:32:15i was like oh yeah that um so i appreciate everyone and i'm happy that uh it's come about in this way
4:32:23thanks okay thank you i don't think i see anyone else so thank you oh okay billings go ahead thank
4:32:32you mr mayor yes ditto um however just one thing i want to mention and that is thank you so much
4:32:39procedurally because voting against the bylaw is horrible governance and it was very disturbing to
4:32:48meet um to do that so thank you thank you for doing this so that that we were not put in that
4:32:55in that terrible position thank you yeah i did owe to that um okay um so may i ask someone to
4:33:09please move the bylaws without that one bylaw counselor downer will do that oh i'm sorry i
4:33:18didn't have the sorry counselor downer will move all except for or have you already fixed it it's
4:33:24been removed okay okay go ahead do you want me to read this all or do you want to buy a lot of
4:33:29no that's good i'm going to buy a lot seconded by counselor out okay any questions i hope not
4:33:37all right i'll call the vote is anyone against the bylaws all right thank you um
4:33:48guys confer with the clerk for a moment everyone just one second everybody um there is one option
4:34:13that i want to i want to speak to you all about and that is uh you can i just i didn't know what
4:34:20was going to be said around the room here it seems like there is a lot of unity here around this issue
4:34:25so i throw it back to my council colleagues um there is a motion that can be tabled right now
4:34:31if you want to throw it up on the screen dylan just so council can see it that you we could right now
4:34:39stop the 21 day period and accept my mayoral order right now and then that way we're done
4:34:46or you can take 21 days and try to figure it out and and consider your next moves but yes
4:34:53we ask a question of clarity yes of course if we don't accept this amendment will it delay the
4:35:00implementation of the winter maintenance it will not and i'm going to have a calling
4:35:06wco clock bush confirm that publicly right now thank you through the mayor we in fact have already
4:35:12updated our public notice to say that the winter maintenance of the bike lanes has been restored
4:35:16and we will resume that work immediately so i you know we could we could table this motion we could
4:35:25see if it passes and then we we are done um and then there's no sort of our clerks waiting up to
4:35:3121 days which is your right by the way of no pressure but 21 days and then also there's
4:35:37scheduling of meetings like in the new year early in the new year whether or not we have to come back
4:35:42and decide all that um so i leave it to my council colleagues if there's someone that wishes to
4:35:47consider moving and seconding it okay linda busatil and and and councillor howzer will okay so that
4:35:54motion has been moved and seconded is there anything more on that then before i call the vote
4:36:01no okay i'll call the vote is anyone against limiting the 21 day just goller okay so that
4:36:10considers the matter then then done okay thank you everyone i am looking for a motion to adjourn so
4:36:16we can all bike i mean go home uh who's going to move that all right uh gibson and uh billings
4:36:25and is anyone against adjournment no okay um have a good christmas and holidays everybody
4:36:34and how you celebrate and have a great rest of the day thank you very much