March 10, 2026 · 9 recorded decisions · 25,896 words of debate
Decisions
- 5.1 City Clerk be authorized to publish and serve notice of intention to designate 225 Waterloo Avenue pursuant to Part IV…Carried (11 to 0)
- 5.2 City Clerk be authorized to publish and serve notice of intention to designate 35 Foster Avenue pursuant to Part IV…Carried (12 to 0)
- 6.1 Statutory Public Meeting Report for the applications received from UP Consulting… be receivedCarried (12 to 0)
- 6.2 Statutory Public Meeting Report regarding proposed Official Plan and Zoning By-law Amendment applications submitted by MHBC Planning Limited, on behalf of the owner, Fusion Homes… be receivedCarried (12 to 0)
- 7.1 Housing in Guelph 2025 Report 2026-74, dated March 10, 2026 be received.Carried (10 to 0)
- 7.1 Staff to explore next steps to re-establish the Brownfield Community Improvement Plan and to report back to Council in early 2027.Carried (10 to 0)
- 8. By-laws (2026) - 21213, (2026) - 21219, (2026) - 21221…Carried (10 to 0)
Routine business (2)adopting minutes, adjourning and similar
The whole meeting, as text
Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.
Read the full transcript (25,896 words)
3:37All right, good morning everybody.
6:30Any of my colleagues online there,
6:33if you could throw on your camera, that would be great.
6:37But we do have quorum and so thank you very much
6:39for joining our Tuesday, March 10th, 2026 planning meeting.
6:46It is just 9.30 in the morning,
6:48so we'll kick things off by looking
6:50to move into a closed session.
6:53And it's only one item which is listed on the open agenda
6:58with the title council education session,
7:02which is land use planning and legal considerations.
7:06As per section 239, 3.1, one of the municipal act
7:11regarding a meeting held for the purpose
7:13of educating or training the members.
7:16It's the only item, and before I call the vote
7:19to consider moving into closed,
7:21does anyone have any disclosure of pecuniary interest
7:24or any general nature there of for that one item?
7:28Hearing nine, would someone be willing to move
7:31into closed, Boussatil and Hauser?
7:34Great, anything further?
7:36If not, I'll call the vote.
7:38Okay, I'll call the vote.
7:39Is anyone against moving into closed on that item?
7:42Nobody, that's great, that's unanimous then.
7:45And we'll do that now.
7:46And when we're done, I'll do a high level summary
7:50at the start time for our open session at 10 a.m.
7:53Thank you.
51:29Good day everyone, just 30 seconds
51:31as we get ready to start the open session, okay?
51:33Thank you very much.
51:34And I want to apologize for the delay in our start time.
51:38So just give us one second.
51:49All right, so we will start right away now.
51:52We do have quorum as confirmed by the clerk.
51:54So thank you very much.
51:57I normally would do my summary here of the in-camera
52:03meeting, but we actually did not finish it.
52:07We cut it off to come out here and get going
52:10in the open session meeting.
52:11So at the end of this, we will be going back
52:14into closed session to finish off
52:16that educational report and presentation.
52:22But at this time, there really is nothing to summarize
52:25because we're still having it.
52:27But I will just say, we are there for educational purposes.
52:30There's no decisions being made at all anyways.
52:33But I'll close that up at the end of the meeting
52:36with another statement just to make sure everyone
52:39is aware of that.
52:40With that, if you could please stand if you're able
52:43as we recognize our national anthem.
54:14Thanks everyone, just a moment of silent reflection
54:17as we continue with the agenda.
54:29Thank you in our territorial acknowledgement.
54:32As we gather, let us take time to reflect on our privilege
54:34to live and work here in Guelph,
54:36a city built over rich indigenous histories.
54:38As guests here, we should reflect upon the responsibility
54:41to care for this land and the people who live here today
54:43and the generations to come.
54:45For actions today can move us towards reconciliation.
54:47We should take pause and make those decisions
54:50with intention and gratitude.
54:52And this place we call Guelph has served as traditional lands
54:54and a place of refuge for many peoples over time,
54:56but more specifically, the Anoanarok and the Honanashoni.
55:00This land is held as the treaty lands in territory
55:03with the Mississaugas of the Credit First Nation.
55:06Guelph also lies directly adjacent to the Haldeman track
55:09and is part of a long established traditional hunting grounds
55:12for the six nations of the Grand River.
55:14Many First Nations, Inuit and Métis people
55:17who have come from across Turtle Island
55:19call Guelph home today.
55:23Thank you, is there any disclosure of pecuniary interests
55:25or any general nature thereof
55:26for the items in front of us today?
55:29Yeah, Councillor Caron, please.
55:32Yeah, thank you, Mr. Mayor.
55:33I'll be declaring a conflict on consent item 5.1,
55:37which is a notice of intent to designate
55:39as the owners are immediate family members.
55:44Okay, appreciate that.
55:46What we'll do is we'll move right into consent
55:51just as a heads up, though I do have official regrets
55:54from Councillor Gibson today.
55:58With that, we'll actually maybe just ask you
56:02just to turn off your camera
56:04and I'll do look to my colleagues
56:07to maybe look to handle 225 Waterloo Ave
56:12as a consent item separately.
56:14So would someone be willing to move that one?
56:16First of all, does anyone need a poll?
56:19No, okay.
56:20So I saw Guller and Billings with moving of just 225
56:24Waterloo Ave notice of intention to designate.
56:27Can I call the vote on that one?
56:29I can, is anyone against that?
56:33Nobody, that's unanimous.
56:35So thank you.
56:36And at this time, I'll just ask if Councillor Kerrion
56:39could come back into the meeting now.
56:41Beautiful, thank you.
56:43And so while you're back,
56:44would you mind maybe moving the other consent item
56:47that are in front of us, 35 Foster Avenue?
56:51Yeah.
56:52Okay, thank you.
56:53Okay, thank you.
56:54And Councillor Allt, you're good to second that one.
56:56Great.
56:57Is there anything further on that item?
57:00No, okay.
57:00I'm gonna call the vote then on that.
57:02Is anyone against 35 Foster Avenue
57:04the notice of intention to designate?
57:08Nobody, so that is unanimous as well.
57:10Thank you.
57:12Okay, in regards to the public meeting now,
57:14to hear any applications,
57:16our first one is going to be 70 Fountain Street.
57:21We're gonna have a presentation from our own staff,
57:24and then we're gonna be moving into some delegations
57:27on this matter as well.
57:28There is correspondence that's attached.
57:31And so I will turn it over to you.
57:34And I'm sorry, I'm gonna embarrass myself,
57:38but I do that every day anyways.
57:41Is this your first time?
57:43Oh, I didn't embarrass myself, good.
57:45Excellent, welcome.
57:47And thank you for being here and presenting
57:50on behalf of staff.
57:51And am I gonna say your name right here?
57:54Let's see here.
57:55Is it Kachan?
57:56Yes.
57:57Did I say that right?
57:58Yeah.
57:59Okay.
58:00And is it Gadjt?
58:01Yeah, Kanchan Khadge.
58:03Whatever you said, that's great.
58:04Perfect.
58:05All right, well, welcome.
58:07And thank you for joining us.
58:08I'll turn it over to you to walk us through it, okay?
58:10Go right ahead.
58:17Good morning, Mayor Ghatri, members of the council,
58:20members of the public and staff.
58:22My name is Kanchan Khadge,
58:23and I'm presenting the Statutory Public Meeting
58:25for the proposed Official Plan Amendment
58:27and Zoning By-law Amendment applications
58:30for 70 Fountain Street East.
58:32This is a Statutory Public Meeting under the Planning Act,
58:35and no decisions are being made on the application today.
58:39Applications for the Official Plan Amendment
58:41and Zoning By-law Amendment have been received
58:43for the subject lands from up consulting
58:45on behalf of Fitzrovia residential Inc.
58:48To facilitate the development of a 24-story mixed use building
58:52having approximately 440 square meters
58:55of ground floor retail space,
58:57five stacked townhouse style units
58:59integrated into the building's podium
59:01at the lower and upper floor,
59:03upper ground floors, and a residential tower above
59:06having 419 purpose-built rental dwelling units
59:09along with indoor and outdoor amenities.
59:18The subject property is located
59:19at the southeast corner of Fountain Street East
59:22and Windham Street South,
59:24is approximately 2,030 square meters,
59:27that is 0.2 hectares in size,
59:29with 65 meters of frontage
59:31along Fountain Street and Parkour Street,
59:33and 33 meters along Windham Street South.
59:36The property is within the downtown secondary plan area
59:40and is adjacent to the Gualt Central Station,
59:42major transit station area.
59:44The subject lands are currently occupied
59:46by a three-story office building
59:48with surface parking at the rear.
59:50The existing building is proposed to be demolished
59:53to facilitate the redevelopment.
59:56The subject lands are within
59:57the downtown heritage conservation restrict.
59:59The property 70 Fountain Street East,
1:00:0475 Parkour Street, has been listed
1:00:07as a non-designated heritage resource built
1:00:10in the municipal register
1:00:12of cultural heritage properties since 2009.
1:00:15The surrounding land uses a predominantly
1:00:17a mix of commercial, residential,
1:00:19and mixed-use buildings.
1:00:24The subject lands are designated mixed-use one
1:00:28in Schedule II of Gualt's official plan
1:00:30and are within the downtown secondary plan area.
1:00:33The lands are also identified
1:00:35as part of the Urban Growth Center,
1:00:37downtown Gualt, and are located
1:00:38within a major transit station area
1:00:40as shown on Schedule Ia.
1:00:43Schedule D for downtown secondary plan
1:00:46maximum building heights, that is OPA 106,
1:00:49permits building heights of up to 24 stories
1:00:52on the subject lands.
1:00:57The official plan amendment application
1:00:58is proposing to retain the mixed-use one designation
1:01:01but is requesting a site-specific amendment
1:01:04to delete section 11.1.7.3.9.1
1:01:08of the downtown secondary plan.
1:01:10This section currently requires a minimum
1:01:12of 1,550 square meters of gross floor area,
1:01:16solely as office space,
1:01:17a maximum building height limit of 16 stories,
1:01:20and the applicable condominium conversion policy,
1:01:23which is policy, OP policy 7.2.5,
1:01:27which does not allow the conversion
1:01:29of condominium housing tenure to rental accommodations.
1:01:32The application is requesting removal of this subsection
1:01:35of the OP in its entirety
1:01:37to align with the broader mixed-use one permissions,
1:01:40including 24-story height permitted through OPA 106.
1:01:48The subject lands currently zoned downtown one
1:01:51with site-specific special provisions D127
1:01:54and has a holding provision H28
1:01:56in the city's comprehensive zoning bylaw.
1:01:59The applicable section 9.1 of the zoning bylaw
1:02:02permits a broad range of uses
1:02:05in a mix of highly compact development forms
1:02:08in downtown one zone.
1:02:10Section 9.2 of the zoning bylaw permits
1:02:12apartment buildings, retail, mixed-use buildings
1:02:15in downtown one zone, among other uses.
1:02:18Site-specific zoning provisions of section 18.14.29
1:02:22applicable currently to the site
1:02:25are a result of a previous zoning bylaw amendment
1:02:27that was approved at the OLT in March of 2022.
1:02:31The H28 holding symbol applies to the site,
1:02:34and H28 holding provision are applied to lands
1:02:37to ensure the development of the subject lands
1:02:40does not proceed till the sanitary sewer conditions
1:02:43and sanitary capacity is confirmed and available
1:02:46for the proposed development
1:02:48to the satisfaction of the city.
1:02:52The zoning bylaw amendment application requests
1:02:54to repeal the site-specific D121 zone
1:02:57and rezone the subject lands
1:02:59with a new site-specific special zoning provision.
1:03:02The application also requests the removal
1:03:04of the H28 holding provision.
1:03:09To facilitate the proposed development,
1:03:11the applicants are requesting the following site-specific
1:03:14special zoning regulations, which include
1:03:16a maximum floor plate of 1,128 square meters
1:03:21on the seventh and eighth floors,
1:03:23whereas the bylaw permits 1,200 square meters.
1:03:26A maximum floor plate of 1,059 square meters
1:03:30on the above the eighth floor
1:03:31compared to the permitted 1,000 square meters.
1:03:35And a length to width ratio of 2.2 is to one,
1:03:39whereas the bylaw requires a ratio of 1.5 is to one.
1:03:43A minimum one active entrance for Windham Street,
1:03:46whereas the entrance is required every 15 meters
1:03:48of street line.
1:03:52The site-specific special provisions also request
1:03:54to permit a minimum glazing of 56% of the facade
1:03:57up to 4.5 meters above grade,
1:04:00whereas 60% glazing is required
1:04:02to permit rooftop amenity space,
1:04:05to permit a maximum building height of 24 stories
1:04:08with the building height being measured
1:04:10from Farqua Street frontage,
1:04:12and to not consider lower ground floor as a story
1:04:14while counting the total number of stories.
1:04:20This slide shows the site plan of the proposed development
1:04:23with the top view of the building set,
1:04:26top view and the building step backs.
1:04:28We are looking at the rooftop amenities
1:04:30on the 24th story tower building,
1:04:32with step backs on the eighth and fifth floor.
1:04:35The proposed development also includes approximately
1:04:37440 square meters of ground floor retail space
1:04:40strunting Windham Street south.
1:04:42The plan shows the two vehicular accesses
1:04:45to the building from Farqua Street and Pountain Street.
1:04:50This slide shows the east and north elevations,
1:04:53which illustrate the 24th story tower
1:04:55on a four-story podium base.
1:05:00And this slide shows the south and west elevations.
1:05:07This slide shows the three-dimensional renderings
1:05:09of the proposed development.
1:05:14Once the application is reviewed and all issues are addressed,
1:05:17a staff report with a recommendation
1:05:19will be brought forward to council for a decision
1:05:21with members of the public wish to stay informed
1:05:23of any revisions or decisions on the application.
1:05:26Please reach out to the following email addresses
1:05:28and provide your name and contact details.
1:05:30And this concludes the staff presentation.
1:05:33Thank you.
1:05:34Thank you very much.
1:05:36We appreciate it.
1:05:37We'll jump to the delegates and see if there's any questions
1:05:42from us at the end of all that, okay?
1:05:44But again, thank you for the presentation.
1:05:46So on our agenda, we have several delegations,
1:05:50but I was told before the meeting that we have sort of
1:05:54one presentation with several people involved.
1:05:58We like that.
1:05:59So thank you.
1:06:01So we have Chris Vanderwater coming up, Greg Gilbert,
1:06:06and Renata, oh boy.
1:06:10Shamsa Danova?
1:06:13Did I say that right?
1:06:14Okay, thank you.
1:06:15Also we have Christian,
1:06:17yeah, Samatnitas?
1:06:23That was close, okay.
1:06:24And you are all from the applicant for this project, right?
1:06:29Okay.
1:06:30So you're gonna share the 10 minutes.
1:06:33What I was told, is that right?
1:06:34That's correct.
1:06:35Okay.
1:06:36Thank you for coming.
1:06:37Thank you for your application.
1:06:39You will hear a chime or, yeah, a chime
1:06:43at the nine minute and 30 second mark,
1:06:46which is your 30 second warning that you gotta wrap it up.
1:06:49And if you get to 10 minutes, the microphone goes off.
1:06:52So we don't want that, okay?
1:06:54And so when you are done, stick around.
1:06:57Just in case myself or any of my colleagues
1:06:59have a follow up question, okay?
1:07:01Over to you.
1:07:02Thank you.
1:07:03Thanks.
1:07:04Good morning, Mayor, members of council.
1:07:06My name is Christian Samatnitas,
1:07:08Senior Planner Without Consulting.
1:07:10So our firm has been retained to provide planning services
1:07:12on behalf of the applicant, Fitzrovia,
1:07:14who's in attendance this morning with you.
1:07:16And they'll provide formal introductions
1:07:18of Chris and Renata.
1:07:19So this presentation pertains to the Official Plan
1:07:21and Zoning By-law Amendment for 70 Fountains Street East
1:07:24in Guelph.
1:07:26So this slide here just provides an outline
1:07:28of the presentation, but I just wanna highlight
1:07:30that my portions will namely focus on the site,
1:07:32location and context, as well as the planning matters.
1:07:35And then I'll pass it along to the Fitzrovia team
1:07:37to provide a more detailed description
1:07:39of the development and who they are.
1:07:45Sorry.
1:07:46Yeah, so again, city staff already went through this,
1:07:48so I just will go over pretty quickly.
1:07:50So the site is known as 70 Fountains Street,
1:07:52bounded by three public streets.
1:07:55It's listed on the municipal heritage register
1:07:57and is not designated under the Ontario Heritage Act
1:08:02under part four and part five.
1:08:05What I wanna note here on this slide
1:08:07in terms of the surrounding context
1:08:08is that this is certainly an exciting opportunity
1:08:10for increased density within the downtown,
1:08:13being that a number of goods and services
1:08:15will be within walking distance of the subject property.
1:08:18Notably the site is within walking distance
1:08:20of Guelph Central Station and Transit Hub
1:08:22being a major transit station area.
1:08:27So I'll note that the applicant is proposing
1:08:28a mixed use development consisting
1:08:30of 424 purpose-built rentals units
1:08:33for height of 24 stories.
1:08:35Rental units, retail units are proposed
1:08:38along the ground floor, namely along the Windham frontage
1:08:41for a total of 440 square meters.
1:08:43While zero parking spaces are required within an MTSA,
1:08:46a total of 95 parking spaces are provided.
1:08:49So that's a 0.22 space per unit ratio.
1:08:53320 bicycle parking spaces are provided
1:08:55as well as some amenity space
1:08:57both on rooftop and indoor.
1:09:00This slide again, I won't go over too much in detail
1:09:03but what I will note is that the north
1:09:05is on the right hand side and generally the massing
1:09:08is transitioned from two stories on the podium,
1:09:10four stories, eight stories and then up to the 24 stories
1:09:13to provide an appropriate transition
1:09:16to the low rise residential that's existing
1:09:17on the north.
1:09:21Again, I won't go too much into detail on this
1:09:24but what I wanna note too is that Schedule D
1:09:26really here is the focus and that was the permission
1:09:29of 24 stories for a maximum height,
1:09:32for the new maximum height as a result
1:09:33of the downtown height study to which we believe
1:09:36that this is implementing the direction from council.
1:09:39In terms of the required planning approvals,
1:09:43so these site specific requests are detailed
1:09:46in the agenda package, however I like to note
1:09:48that the intent of these provisions
1:09:49are to essentially repeal and replace
1:09:51these site specifics from the previous development concept
1:09:55and implement ones that are tailored to this
1:09:57that are more so in the direction of OPA 106.
1:10:02And as part of the application requirement,
1:10:04you can see that a number of reports were submitted.
1:10:06You can really see that the technical nature
1:10:08that's involved so with that I'll pass it along
1:10:11to the Fitzrovia team.
1:10:14Thank you very much everyone.
1:10:15To briefly introduce Fitzrovia,
1:10:17we are a purpose built rental developer.
1:10:20We also form Canada's,
1:10:31we form Canada's largest fully integrated
1:10:34rental housing platform.
1:10:35Our team includes approximately 450 employees.
1:10:40Over the past nine years we have built 11 purpose
1:10:42built rental towers across the GTA,
1:10:45all of which we manage ourselves,
1:10:47including previously acquired buildings.
1:10:49We currently manage more than 12,500 rental units.
1:10:55With our offices in Toronto and Montreal,
1:10:57we are very excited to be here in Guelph today
1:11:00and to expand beyond the GTA.
1:11:02The 70 founded proposal is part of the Fitzrovia's
1:11:06broader plan to grow our student housing portfolio
1:11:10with other student housing projects
1:11:13that we have in Kingston and London, Ontario.
1:11:19One of the Fitzrovia key strengths
1:11:21is fully integrated platform.
1:11:23What this means is that we develop,
1:11:25build, own, operate and manage buildings ourselves.
1:11:29We take a long-term approach.
1:11:31We care deeply about communities we create
1:11:33and make thoughtful decisions at every stage of the process.
1:11:38Our integrated model really gives us opportunity
1:11:41to share knowledge across the teams,
1:11:44take feedback and make our new buildings better.
1:11:50Our buildings also design with a strong focus
1:11:53on high quality materials.
1:11:54You can see on those pictures on the slide
1:11:58that we create thoughtful design
1:12:02pedestrian friendly communities.
1:12:05And to support this approach,
1:12:06we work with leading Canadian architects
1:12:09for 70 Fountain, we will be partnering,
1:12:12already partnered with award-winning firm
1:12:15a Harvey Rippon Torini Architects
1:12:17to develop this proposal.
1:12:23I would like to introduce you to the Waverly brand.
1:12:26This is our Fitzrovia student housing brand.
1:12:30So you can see on the slide as well
1:12:34the ground floor coffee lobby,
1:12:37which will give our resident students
1:12:40a welcoming place to meet, study and spend time together.
1:12:43The same thinking carries through our amenity spaces.
1:12:47We focus on creating high quality shared spaces,
1:12:49including the coworking lounges,
1:12:51commercial grade fitness center,
1:12:53virtually walking clinic and outdoor amenity as well.
1:13:00And having very successful Waverly project,
1:13:02we have studied student demographics
1:13:05across our portfolio today.
1:13:07And students already make up a really large number
1:13:10of the residents in many of our buildings.
1:13:13We see the demand for curated living for students.
1:13:17And this is one of the reasons we are here today in Guelph.
1:13:19And we are really excited about this project.
1:13:26Thanks, Renata.
1:13:27So I'll start my presentation just by saying,
1:13:30thank you to any of the community members
1:13:34or members of staff that we've engaged with today.
1:13:36We've received a fair amount of feedback,
1:13:39which we've already incorporated into our design,
1:13:41which was part of our zoning application.
1:13:45First off, I'll highlight that, yes,
1:13:46we have a 24 story building and we are planning
1:13:51on rooftop amenity space.
1:13:53Simply put, we've got mechanical equipment,
1:13:55elevator overruns, things that have to go on the roof anyways.
1:13:58And so across our new build portfolio,
1:14:00this is a standard approach of ours.
1:14:02And we see it as taking advantage of space
1:14:04that would otherwise go unused.
1:14:07The second nuance of this site that was raised by city staff
1:14:11is the long rectangular nature of the site itself.
1:14:14We recognize and incorporated feedback
1:14:17into the overall architecture that addresses the concern
1:14:20that we are going to have a long,
1:14:22sort of generic building face,
1:14:25whether you're at grade really close to the building
1:14:27or standing a little bit further away.
1:14:28I think we've appropriately addressed this concern
1:14:31with a number of different architectural features.
1:14:33You can see the four story podium,
1:14:35as well as a number of vertical and horizontal features
1:14:38as you work your way up the tower.
1:14:40Another challenge or at least technical aspect of this site,
1:14:43and I'm just gonna skip ahead to the best rendering of it,
1:14:47is that we've got about a five meter grade change
1:14:49from one corner of the site to the other.
1:14:52And the way we've designed around that
1:14:53is that number one, we've addressed a staff comment
1:14:56requesting grand storefronts on Wyndham,
1:14:59so you're looking at Wyndham right here.
1:15:01So you essentially end up with sort of a two story grand
1:15:03entrance to any of the retail spaces
1:15:05as well as the building itself.
1:15:06As you work your way towards the back of the building,
1:15:10you lose a fair amount of height.
1:15:12And so we've designed around that technically
1:15:14by having what we're calling a lower
1:15:16and upper ground floor.
1:15:18Alternatively, we could have titled that as a mezzanine space.
1:15:23We did receive during our public meeting
1:15:24a couple of comments around transportation.
1:15:29And so what we've done is we've been thoughtful
1:15:31about the amount of vehicle traffic in the area.
1:15:34We currently have vehicle entrances
1:15:36on both the fountain and Farcours side,
1:15:38which should alleviate a bit of those traffic concerns.
1:15:41And when you look at the lower left corner of this image,
1:15:44you can see three doors sort of in the lower left corner.
1:15:47You can see our bicycle entrance,
1:15:48our vehicular entrance and our garbage and loading
1:15:51all contained within the building
1:15:52and screened when not in use.
1:15:56Focusing a little bit on the architecture,
1:15:58we've tried to reflect and respect some of the architecture
1:16:01that you can see in downtown Guelph today.
1:16:03We were very mindful about the use of masonry
1:16:05and respecting again,
1:16:08some of those more historic features of downtown Guelph,
1:16:11while also trying to give a bit of a modern touch
1:16:14to the building itself.
1:16:17And finally, I'll close just with speaking about active uses.
1:16:20You heard about Renata highlighting
1:16:21how much we care about people using our ground floor,
1:16:24people actively using the space.
1:16:26We have a lobby that's open to the public.
1:16:28We have our 10 Dean coffee shop,
1:16:29at grade that's open to the public.
1:16:31We also have three retail spaces along Wyndham
1:16:33and we have a retail leasing team
1:16:37that is very passionate about leasing to one-off uses
1:16:41that really complement the unique features of the building
1:16:43and attract people to it.
1:16:45We often come up with a typical user
1:16:48that might be a University of Guelph student.
1:16:50She starts her day, comes down the elevator,
1:16:52grabs a coffee from 10 Dean and takes her bike
1:16:54or the bus to school in the morning.
1:16:57Thanks very much.
1:16:59Great, thank you.
1:17:00And thanks for staying within the time limit.
1:17:02I appreciate that.
1:17:05Is there any questions for this delegate at this time?
1:17:07Okay, we'll start here on my left.
1:17:10We'll go with Downer and then Mr. Timm.
1:17:11Thank you, through you, Mr. Mayor.
1:17:13So I really like, first I like your podium design.
1:17:16I think that's, it looks really good.
1:17:19The arch has reminded me of the front of City Hall.
1:17:23The other, the question I have though is that
1:17:26at one time we thought we were gonna get
1:17:28a Conestoga College downtown
1:17:30and that's sort of in question now.
1:17:33I don't know what the final outcome of that be,
1:17:34but it's not as optimistic as I once was.
1:17:38So you'd be catering primarily to the University of Guelph
1:17:42students and there's a lot of other housing,
1:17:45student housing sort of being talked about these days
1:17:48and under some of it under construction.
1:17:51Have you got concerns at all about
1:17:55filling this building up with students?
1:17:57Given the...
1:17:59Or would you change your plans at all?
1:18:00Sorry, go ahead.
1:18:01Yeah, so I'll highlight two points.
1:18:03Number one, from just looking at demographics of the area,
1:18:06it's very clear to us that supply is a real challenge
1:18:09and that I think runs the across the spectrum.
1:18:12One thing that we've heard from our early conversations
1:18:15is that, hey, when you add to supply,
1:18:17you might have students that move in here
1:18:19that otherwise might be occupying a single family home
1:18:21or some other form of housing.
1:18:22So we definitely see that as an advantage.
1:18:25Another piece that I'll speak to is that, yes,
1:18:27we're targeting the student housing demographic here.
1:18:30You do not need to have a University of Guelph student card
1:18:33to live in our building.
1:18:34Frankly, you don't have to be a student,
1:18:36but frankly, that's the lane and that's the demographic
1:18:38that we're choosing to market this building to.
1:18:41Great, thanks.
1:18:42And Bousatil is next and then I saw Karan and Kate.
1:18:45Thank you and through the mayor,
1:18:46thank you for your presentation.
1:18:48Similar to my colleague here,
1:18:49I don't have any questions about the building.
1:18:51I think you've responded to a lot of the concerns.
1:18:56But Renata, you were talking about the research
1:18:58on the student demographics and so on.
1:19:00And as part of your research,
1:19:01to piggyback on my colleague here,
1:19:03have you been aware of the desperate need for family units?
1:19:09So if you are constructing for students,
1:19:11those are singles or maybe doubles.
1:19:14Really, we need desperately family housing.
1:19:17And so my question is,
1:19:19your intent is to build and to rent exclusively to students
1:19:24who are hearing no, because I could be an older adult learner,
1:19:29but family units.
1:19:30And that is something that I will be looking for
1:19:33and I've asked our planners to ask developers
1:19:37to look at three units and family units as well,
1:19:40because that is a huge gap in the community
1:19:43and I'm very concerned about that.
1:19:47So I think that came across as a comment,
1:19:50but would you like to respond if it was a question?
1:19:53I will just highlight with one stat,
1:19:55it is available on the stats page of our application.
1:19:57We currently are planning for 35% of the units within the building,
1:20:01being two and three bedroom units.
1:20:04So perhaps you are an older student that has a child
1:20:07or someone else in your family that you'd like to live with.
1:20:10From our research, that goes above and beyond
1:20:13some of the unit mixes that we're seeing elsewhere
1:20:15in the multi-res sector within Guelph.
1:20:17And so thank you for that.
1:20:19If I could through the mayor.
1:20:21When I think of three bedroom,
1:20:23I think of university equal three bedroom student units
1:20:27versus a family residence.
1:20:29And that's my question is,
1:20:31are you building it for a family rather than three roommates
1:20:37is very different than a family?
1:20:40Thanks for the question.
1:20:41That's something that we debate and discuss heavily
1:20:44with within our office.
1:20:45I mean, you'll find that our three bedroom units
1:20:48are, I'll call it any more family size range
1:20:51that you would be used to.
1:20:53Let's call it anywhere from 1,000 to 1,200 square feet.
1:20:56So these are not, I would call it three small rooms
1:20:59connected with one bathroom.
1:21:00This is definitely meant for a family
1:21:02or multiple people within one unit.
1:21:06And so just to follow up a supplemental,
1:21:08I know you were saying that your intent is to rent
1:21:11to exclusively to students.
1:21:13Would your marketing and your communication
1:21:17also welcome families?
1:21:19Absolutely.
1:21:23Perfect. Thank you.
1:21:25So I'm gonna go up on the screen now joining us.
1:21:29I'll start with Koran, please, then Kate.
1:21:32And then I'll come back here in the room to call her.
1:21:35Great, thank you.
1:21:36I think Councillor Blisattila addressed
1:21:38my primary question.
1:21:39Is it when we're talking about a planning application
1:21:42which is what we're here for,
1:21:44we can only talk about the form and the zoning.
1:21:47We cannot talk about people's.
1:21:49So although it's good information to have,
1:21:55talking about who you're gonna market to
1:21:57in the demographic that will fill the building
1:21:59is people's zoning.
1:22:01So I just want to make sure,
1:22:02and I think I've heard you say that the way
1:22:05the building is designed,
1:22:07it could be available to anyone.
1:22:10Singles, working couples, families,
1:22:14and that students is just one part of that demographic,
1:22:17that you're designing it
1:22:18so that it could be rented to anyone.
1:22:21That is correct.
1:22:23Another use case that I keep imagining,
1:22:25given that you can see the GO station out your window,
1:22:29is that you might work in another municipality
1:22:32or another place.
1:22:34You might be a couple where one person's a student
1:22:36and one person's a working professional
1:22:38in another municipality.
1:22:39Given the proximity to the train station,
1:22:44I think it's quite possible
1:22:46that we'll have working professionals
1:22:47that want to live in this building.
1:22:49Okay, great.
1:22:50Just cognizant that when we talk about people's zoning
1:22:54as part of an application,
1:22:56that we're really crossing the line there.
1:23:01I wanted to ask about the zoning amendment
1:23:03related to ground floor calculations for height,
1:23:06because there was a site-specific zoning amendment
1:23:10that the ground floor would be at raid with barcour
1:23:14and not chanted from the ground floor at Fountain,
1:23:18which from Fountain would be a 25-story building
1:23:20from Farquhar would be 24.
1:23:22Can we confirm that that's one of the amendments
1:23:24that you're seeking?
1:23:26I can confirm that, yes, we had to sort of pick a spot
1:23:29to measure the ground floor elevation,
1:23:32which is how we ended up with the designation
1:23:35of lower and upper ground floor.
1:23:36And again, we could have used the term mezzanine
1:23:38or come up with another term for it.
1:23:40Okay, but the 24 stories is from the farquhar side
1:23:43of the elevation.
1:23:46Okay, next question has to do with the community energy.
1:23:52I know your community energy letter isn't part of the package
1:23:54that I've seen so far, that will come a little bit later,
1:23:57but please tell me about how this building
1:23:59will meet our community energy goals
1:24:01of being that zero by 2050,
1:24:03because utilities and rising costs in energy
1:24:09are going to affect affordability for future tenants.
1:24:13Yeah, absolutely.
1:24:14I'll say we share a corporate aim
1:24:17to make every new building more efficient
1:24:19than the previous one.
1:24:20Unfortunately due to groundwater and geotechnical issues,
1:24:24we can't do geothermal heating here.
1:24:26So one of the thoughts is having the building
1:24:29be net zero ready.
1:24:31And what essentially that means is have it ready
1:24:33to be fully electrified when the grid is available to do so.
1:24:39So we put a lot of thought into future proofing
1:24:42of our mechanical and electrical systems
1:24:43in order to meet those goals.
1:24:45Okay, thanks for that intro.
1:24:47And hopefully as the project progresses
1:24:49that our staff will help with providing guidance
1:24:53on meeting those net zero standards.
1:24:55Then my last question is on the elevation to the east
1:24:59on the fountain side, I see a lot of glazing
1:25:02in the renderings, is that parking
1:25:04or is that usable indoor space?
1:25:08So there are five townhomes that call it
1:25:11the southeast corner.
1:25:13And that's where the majority of the glazing
1:25:15on the fountain side would be.
1:25:17Okay, great.
1:25:18Thanks so much.
1:25:19It's an exciting project.
1:25:22Great, thank you, Councillor.
1:25:23And Councillor, Kate is next and then to Guller.
1:25:26Thank you, through you, Mr. Mayor.
1:25:29I had seen that you're proposing
1:25:32that you have less entrances than required.
1:25:37I was wondering if you could comment
1:25:39as to how this might cause any accessibility concerns
1:25:45or potentially fire hazards in terms of emergency exits?
1:25:51Certainly.
1:25:52So the original bylaw, if I remember correctly,
1:25:55reads that an entrance is required every 15 meters.
1:25:59When we were looking at dividing up the wind-em-side
1:26:02of the site into three different retail units,
1:26:05we were looking for flexibility on the bylaw simply
1:26:07to allow for each one of those units
1:26:09to have a discrete front door.
1:26:11We are absolutely professionally required to meet fire code
1:26:14as well as accessibility requirements.
1:26:17When you're speaking to a retail
1:26:18or a food and beverage provider,
1:26:20it's also their intent to have one sort of main accessible
1:26:25fire-rated front door.
1:26:26And so that's the intent here rather than to...
1:26:29So, and that was our thinking rather than to try
1:26:33and get away from any specific restriction of the bylaw.
1:26:40Thank you.
1:26:41I was also wondering about the parking spaces.
1:26:45So you've got listed for accessible parking spots,
1:26:49but I know that typically you have to have at least 15%
1:26:53of the units available as accessible
1:26:56or at least convertible to accessible.
1:27:00Do you think that's enough?
1:27:05So one of the benefits of owning and operating
1:27:08and managing the building
1:27:09is that we do have flexibility on things like
1:27:12electric vehicle charging or accessible parking spots.
1:27:15If given that the majority of our parking spots
1:27:20will be leased out to tenants,
1:27:22if there's tenant demand for additional accessible spots,
1:27:24we have the flexibility to rejig some of the parking
1:27:27within the building to meet those needs.
1:27:31And will any of the parking be for general residential,
1:27:37commercial access to the ground floor?
1:27:41We are required to have a few visitor spots.
1:27:44The exact number is escaping me right now,
1:27:46but the answer is yes.
1:27:48So of the four accessible spots,
1:27:50how many are dedicated for visitors
1:27:52versus residential currently?
1:27:55I would have to get back to you on that.
1:27:57Okay, thank you so much.
1:28:00Great, thanks and Councillor Goller.
1:28:04Thank you and through your worship.
1:28:05Thank you for the presentation.
1:28:08I've been hearing from my constituents
1:28:11some concerns, the folks that live in the area
1:28:14about the shortage of parking units.
1:28:16Now, could you tell us from your experience
1:28:19owning this style of building,
1:28:21how realistic is it that you would fill it
1:28:23with people that are not then going to park
1:28:26on the residential streets for the couple of blocks
1:28:30out away from the building?
1:28:33So in our experience in catering
1:28:36to the student demographic,
1:28:37we find that by and large the demand for cars
1:28:41or vehicle parking is a lot less
1:28:43compared to the general population.
1:28:45We also think that it's part of our,
1:28:47I'll call it forward thinking as building developers,
1:28:50operators and managers,
1:28:52that we want to encourage people
1:28:53to use other forms of transportation.
1:28:55We want to encourage people to take the train,
1:28:59to take the bus, to ride their bike,
1:29:01to get to school or wherever they need to go.
1:29:04And so we built what we think is an adequate number
1:29:08of parking stalls for the population
1:29:10that we expect to live in the building.
1:29:13And just to follow up on that,
1:29:15that is, would that be backed up by your experience
1:29:17at other similar buildings that are built
1:29:20with much less parking than the number of units?
1:29:22Correct, and that's in consultation
1:29:24with our transportation engineer as well.
1:29:25Okay, thank you for that.
1:29:27Thank you, worship.
1:29:29Great.
1:29:31With that, doesn't seem like to see anything more.
1:29:37I only have one question.
1:29:38If this comes back for approval
1:29:40and if council gives approval,
1:29:42how quick can we see a crane in the sky?
1:29:44Great question.
1:29:45So just to spend a brief moment
1:29:48on our transaction with Conestoga College,
1:29:50it is expected to close in 2027.
1:29:53It's our intent that between now and then,
1:29:56we move through the zoning site plan
1:29:58building permit process.
1:29:59We'd love to be in there and starting construction.
1:30:02The day our transaction closes
1:30:04and they vacate the building.
1:30:06Okay, so do you have any idea?
1:30:092027 can be 365 days.
1:30:13Third quarter, 2027.
1:30:15Okay, and so you'll be working again with approvals.
1:30:18If you get the approvals with our staff as well,
1:30:22just have everything lined up
1:30:23so you're gonna be good to go right away.
1:30:25That's our intent to have a fully designed,
1:30:27fully permitted building.
1:30:28By the time we close on the transaction.
1:30:31Okay, thank you.
1:30:33With that, thank you very much
1:30:35for coming and presenting today.
1:30:37We appreciate it.
1:30:38We'll just move on to the others
1:30:39that have signed up to Dudley Key.
1:30:41And there's only two more.
1:30:42Paul Barson, you're in the front row and up next.
1:30:48And then, Anthony, I see you up there.
1:30:52You're in the wings.
1:30:53So get ready to come down, okay?
1:30:56And welcome, Paul.
1:30:57I think you heard me.
1:30:5810 minutes if you need it.
1:31:00And the chime at nine minutes, 30 second mark
1:31:02to give you the warning.
1:31:03Okay, go ahead.
1:31:04Thank you very much.
1:31:06Good morning, Mayor Guthrie, members of council.
1:31:09I live two doors away at 90 Fountain Street East.
1:31:12I live there with my wife, my three kids, and our dog, Chai.
1:31:16I do remember I delegated here a few years ago
1:31:19for almost the same building and the same spot.
1:31:22And I was one of, what, 40 delegates?
1:31:25How time tempers ire.
1:31:28So our family, we love downtown.
1:31:32We love it for all its warts, but it is suffering.
1:31:36We need more people downtown.
1:31:38People walking around, spending dollars,
1:31:40engaging in the community, people volunteering,
1:31:44people loitering, we need all of it.
1:31:45People in various stages of life,
1:31:47different backgrounds, different income levels,
1:31:49not just students.
1:31:50Hopefully that doesn't fill the building.
1:31:53Projects like this, although they may fail
1:31:55on most measures of when it comes to good city building,
1:31:59they certainly do bring more people.
1:32:02Although I would prefer four six-story buildings,
1:32:05over one 24-story, obviously, or 25,
1:32:08depending on what street you're looking from.
1:32:11And even though my backyard will lose a good portion
1:32:13of its daylight for a good portion of the year,
1:32:16we do need projects like this,
1:32:18just for the sake of more people downtown.
1:32:22For example, upcoming downtown events
1:32:24like the Guelph Recognition of Excellence in the Arts
1:32:25will benefit greatly from having more downtown engaged citizens
1:32:29visit gredis.ca to learn more.
1:32:33Also, we're looking for a good corporate sponsor
1:32:34if Fitzrovia is interested in some goodwill
1:32:39for affordable goodwill and free marketing.
1:32:42However, I am here today to speak mostly
1:32:44because my biggest concern I want to bring forward
1:32:46is the parking entrance locations.
1:32:50I believe that having an entrance off of an exit
1:32:54from the parking garage on Farquhar Street is a bad idea.
1:32:58So that's my street.
1:32:59There's three of us who have driveways on that street,
1:33:02and we exit onto Farquhar Street.
1:33:05And despite the low numbers of traffic
1:33:07in Fitzrovia's traffic count study,
1:33:10what it doesn't take into account is the difficulty.
1:33:12Visibility from Farquhar onto Wyndham is a nightmare,
1:33:16and it often takes a long time to turn left
1:33:19onto Wyndham from Farquhar.
1:33:22With increased traffic, this will become more evident,
1:33:25and there will be accidents.
1:33:26There already are and have been some pretty serious accidents
1:33:29at that intersection.
1:33:30On the Fountain Street side, although visibility
1:33:32is also not great, as cars come whipping out
1:33:36under the bridge from downtown, there are so many more paths
1:33:40to exit through Neve Street, Surrey Street.
1:33:43There's just more escape routes.
1:33:45So I would recommend having all of the parking exits
1:33:48onto Fountain Street.
1:33:50All the entrances can be from the Farquhar side for sure,
1:33:53but it's just the exits going onto Wyndham Street.
1:33:57I'd also wanna mention the lack of parking spots.
1:34:00I have to say this, I think.
1:34:02Tenants that move in will have to park somewhere.
1:34:05And even if their unit didn't come,
1:34:07or especially if their unit didn't come with a spot,
1:34:09this means our local streets will become
1:34:10essentially parking lots.
1:34:12They are already filled with local citizens parking there,
1:34:16people who work nearby.
1:34:18I do appreciate a kind of cars not required downtown,
1:34:23and that is coming someday.
1:34:25And maybe the way to do it is just to do it.
1:34:28I don't know.
1:34:29But I think it'll be many years of street parking chaos
1:34:33while we all figure out how to switch
1:34:35from the current reality that is Guelph,
1:34:38where we all have cars, to a new one
1:34:40that requires more walking.
1:34:45Maybe I would lean on the city for a solution,
1:34:47and suggest that maybe we should push
1:34:51to turn the Fountain Street West parking lot,
1:34:53or the lot at Neve and Fountain,
1:34:57into a parking garage.
1:34:59Time it with the opening of the Fitzerovia building
1:35:01so that there is more parking spots available.
1:35:05Just please don't make it 24 stories tall.
1:35:09That's it.
1:35:10Thank you.
1:35:11Great, thanks a lot, Paul.
1:35:12We appreciate that.
1:35:13Any follow-up for Paul at all before he goes?
1:35:16No, so thank you very much.
1:35:17Anthony, you're up next.
1:35:21Come on down, and you heard the same spiel
1:35:23I gave everybody else, so you can start whenever you're ready.
1:35:32Your worship, counselors, good to see everybody today.
1:35:37Couple things.
1:35:40First thing, we're fully behind this.
1:35:43We are the owners of 52 54 Cardin Street.
1:35:48All this development is needed for this downtown.
1:35:51The more people that live here, the better this downtown is.
1:35:54And right now, we're kind of at the lowest point
1:35:56we could ever be as a downtown.
1:35:59We have a big dig coming in.
1:36:01These guys are basically coming in around September, 2027,
1:36:05third quarter.
1:36:07So that's gonna create a staging area,
1:36:09traffic issues, inaccessibility to the downtown,
1:36:13which already is about to be hit with Wyndham Street,
1:36:17and whatever's gonna happen on Cardin Street, correct?
1:36:22So, we gotta figure some things out
1:36:26because the Feng Shui that we have going on downtown
1:36:30is broken.
1:36:32First thing, Wilson Street was,
1:36:35the direction was changed
1:36:37because of an environmental assessment
1:36:39that has no bearing on today.
1:36:42We have to really look at changing
1:36:44the direction of that street.
1:36:46We don't have very many entrances
1:36:48and this is getting taken away.
1:36:51If all these projects are going in at once,
1:36:54I become in a dry spot.
1:36:56I'll be shadowed in by construction,
1:37:00which means my commercial tenant is ruined.
1:37:03My residential, I don't know.
1:37:07So, my biggest concern is saving our downtown now
1:37:12rather than after all this construction,
1:37:15we're left with a big hole that we have to infill.
1:37:19Now, the other thing that's really hurting this area,
1:37:23mainly this street, is the splash pad.
1:37:27The restrictions that the splash pad put on the square
1:37:31don't create the ability to do good events
1:37:35and that's what's gonna save this downtown.
1:37:37Good events.
1:37:39The biggest driver for people or street people
1:37:42or walking traffic here is actually the train.
1:37:46And when we get two-way traffic,
1:37:49more regularly, then we move money.
1:37:53And when we start moving money, this downtown survives.
1:37:57And the whole thing is even Niagara
1:37:59has asked for more train routes.
1:38:02They've asked for more trains going to Niagara.
1:38:05We as a city need to do that as well.
1:38:09The only other thing I would say is
1:38:15we truly have to look at some of these things.
1:38:18As I said, the splash pad is actually
1:38:20a million dollar loser for this downtown.
1:38:23Wet kids don't spend money.
1:38:26Truly, this is a commercial zone.
1:38:29We have 13 other splash pads.
1:38:32We need to re,
1:38:33now that we have to get rid of it completely,
1:38:35we just need to rethink how we use it
1:38:37to its best ability.
1:38:39This was sold to us as a market square
1:38:42like Nathan Phillips Square.
1:38:45This ain't it.
1:38:47This is used to 10% of its potential.
1:38:51And we're just about to build another square.
1:38:54And we can't even use this one.
1:38:56It's called Market Square
1:38:57and it doesn't even have really a market.
1:39:00So we have to really think
1:39:02about how we want to rebuild this downtown
1:39:04and what investments,
1:39:05because we need to do it now,
1:39:08not further down the road.
1:39:10Thank you.
1:39:11Great, thank you very much.
1:39:12And we appreciate your delegation
1:39:15to any follow up at all.
1:39:17There isn't, thank you again.
1:39:19Appreciate it.
1:39:20So we're at that time now
1:39:21where we're gonna open it up for anybody else here
1:39:24if they would like to speak on the matter.
1:39:26Also a phone number will come up on the screen
1:39:29just in case anyone wants to call in.
1:39:31First of all, is there anyone in the audience
1:39:33that wishes to?
1:39:35No, okay.
1:39:36And I'll just yell at the number here, 519-837-5603.
1:39:42Again, that's 519-837-5603.
1:39:46We'll just wait a few moments here
1:39:48and we'll see if anyone wants to call in, okay?
1:42:44Okay, everyone, clerks has indicated I can bring us back
1:42:48and we did have one person call in.
1:42:50So Derek Mello, I believe I'm saying that right.
1:42:53Derek, it's Mayor Guthrie here.
1:42:55I think you need to hit star six.
1:42:58To be able to unmute yourself.
1:43:01Can you hear us okay?
1:43:06Hi there, Mayor Guthrie.
1:43:08I appreciate the time and the opportunity.
1:43:13Thank you, Derek.
1:43:14Yeah, go right ahead.
1:43:16Yeah, I would like to talk about 70 Fountain.
1:43:19This development I think would be a great development
1:43:22for the city of Guelph.
1:43:24It will create jobs, sorry.
1:43:29It will create jobs for the community.
1:43:32It will help local businesses
1:43:36by bringing new students in, buying everything
1:43:40in the city of Guelph, going to coffee shops,
1:43:43going to restaurants, many other things also.
1:43:48And then it will also,
1:43:51creating a student housing like this,
1:43:53it will, I believe, bring more investments
1:43:56and more developments in the near future.
1:43:59The building's going up before like 14 stories,
1:44:0315 stories, create a problem for developers
1:44:06to come in and invest.
1:44:08Going up to 24 floors, it's a great start.
1:44:12Hopefully one day it could go higher.
1:44:14That's what brings more developments in,
1:44:17where you're gonna bring more housing in.
1:44:20So I just wanted to make that point.
1:44:23And I think it would be a very great developments
1:44:26for the city of Guelph.
1:44:30Great, thanks Derek for calling in.
1:44:32We appreciate that.
1:44:33Is there any questions from my colleagues for Derek?
1:44:36There is not at this time.
1:44:38So thanks again, Derek, and have a great rest of the day.
1:44:41You too, thank you.
1:44:45All right, colleagues, it's back to us.
1:44:47I've been told Councillor Goller
1:44:51and I believe Wardmate Councillor Cossin
1:44:54are willing to move in second the receipt of this application.
1:44:59At this time, again, if anyone's following along,
1:45:01we're not making a decision here.
1:45:03It's just to receive at this time.
1:45:06Is there any comments that have not been stated
1:45:11that you would like to leave with our staff to take away?
1:45:15Okay, chew.
1:45:17And then is that your hand up, Cossin?
1:45:21Yeah, and then Quran as well.
1:45:23So you three.
1:45:25Okay, let's kick it off.
1:45:27Councillor Chew.
1:45:28Thank you, through you, Mr. Mayor.
1:45:31Just a staff, just in response to some of the comments
1:45:35made by the previous delegate,
1:45:38is there a way in which we can entertain,
1:45:41moving that garage entrance to Fountain instead of Farquhar
1:45:45and what's the feasibility of doing that?
1:45:59Yeah, we don't normally, can I be raised?
1:46:01No, it's okay.
1:46:02Just wanna say, we don't normally go back and forth,
1:46:04although I can see a jumpy wanting to.
1:46:07It's something that our staff will take away
1:46:09and they'll engage with you and others on.
1:46:11But Christa, do you wanna just maybe answer that out loud?
1:46:14Of course.
1:46:15Thank you, Mayor Guthrie,
1:46:16that how I was gonna respond,
1:46:17that we've heard the feedback today
1:46:18and we'll take it away and consider it
1:46:20during evaluation of the process
1:46:22and review of the traffic impact statements.
1:46:24Okay, yeah, no, it was just more of a confirmation
1:46:27that you guys can look into that.
1:46:29Yeah, no, I appreciate some of the comments
1:46:31made about the glazing as well.
1:46:33And I think there's a lot of goodwill in the community
1:46:35to support this application.
1:46:37So I'll just state that out there.
1:46:38First and foremost, and I think the attention to detail
1:46:41and intentionality to match the armory
1:46:45for the facade treatment is quite tasteful.
1:46:48So I think that's why you receive a lot of positivity here
1:46:50and I hope that can continue into the conversations of staff.
1:46:53But I think ultimately these conversations,
1:46:56even though we feel like a statutory,
1:46:58there's a lot of sincere concerns
1:47:01in regards with traffic circulation.
1:47:03And I think if we can evaluate the merits of that early on,
1:47:08it would move us better into a decision.
1:47:11So yeah, keep up the good work.
1:47:14Thank you.
1:47:15And I believe I'm going to the screen now.
1:47:19So that would be Klaassen and then Karan.
1:47:26Yes, thank you.
1:47:29I just wanted to say a lot of my questions
1:47:31were addressed within the presentation itself.
1:47:34So I didn't, most of them resolved,
1:47:37but I did really appreciate some of the attention
1:47:40to detail with regards to the masonry
1:47:42and the arches and sort of the architectural direction
1:47:45that the podium of the building brings to our downtown
1:47:51as well as the three spaces for retail
1:47:56outside of the cafe that will already be included.
1:48:00I think it's really important to have a mindful approach.
1:48:04And I heard that there's a retail leasing team
1:48:06who's dedicated to filling these spaces.
1:48:08We need active business storefronts downtown
1:48:13and we do need more people downtown.
1:48:14And I think that this is the type of development
1:48:17that can accomplish that.
1:48:20And so I did have a take, a couple of notes.
1:48:26One is I am concerned about all of the construction
1:48:30happening downtown and the impacts for our business owners.
1:48:33I don't think that's a surprise to hear from me,
1:48:36but there is the prospect.
1:48:39And I know that staff is aware of this,
1:48:41but our delegate from downtown is correct.
1:48:44All of the staging, all of the impacts
1:48:47to closures, to streets has an impact
1:48:50on our existing business owners downtown.
1:48:53And it's already post pandemic realities
1:48:57do make running and operating businesses downtown a challenge.
1:49:02And so as we move forward,
1:49:03I truly hope that we're being strategic
1:49:06about how we're making decisions,
1:49:09not decisions, but timing
1:49:11and how we're setting up our businesses for success
1:49:14as we grow and evolve our downtown.
1:49:16I think it's really important that we're thinking about them
1:49:19and everything that we do,
1:49:20because we want them to be around through the construction
1:49:24and after the construction to contribute to the thriving,
1:49:28you know, the thriving downtown that we want.
1:49:30And much of it does thrive.
1:49:32And I want it to continue to thrive.
1:49:35So that's my comment on that.
1:49:37And then we have the on street parking review coming up.
1:49:41And I hope that as a part of that,
1:49:44we're looking at the impacts
1:49:46that these developments might have on the surrounding streets.
1:49:49There is a little that little pocket of downtown,
1:49:53certainly is a weird combination of densities.
1:49:58And so I hope that this will line up
1:50:02the results of the on street parking review.
1:50:06We'll also address some of those concerns
1:50:07that our delegate had with regard to on street parking
1:50:11around the development.
1:50:13And that's it.
1:50:15Thank you.
1:50:16All right. Thank you.
1:50:18And Karan then Boussatel.
1:50:20All right. Thank you, Mr. Mayor.
1:50:22I have some similar comments.
1:50:24The first is that when we looked at this site many years ago,
1:50:28we noted that from Wellington Street,
1:50:31because of the elevation on the topography of the hill,
1:50:36it actually had a greater appearance
1:50:37in terms of max stories when looking from northward.
1:50:43And so I'm hoping that staff can take that into consideration.
1:50:47Obviously in 106, but 106 and OPA 106,
1:50:52we contemplated a maximum of 24 stories.
1:50:56But I'd like staff to perhaps provide some different renderings
1:51:01of what the elevation impact is.
1:51:03I don't know if staff would provide those
1:51:05or the proponent would provide those
1:51:07so that we have a better idea of what the actual impact
1:51:10of 24 stories is on that site from eye level,
1:51:13because we're seeing a lot of really beautiful renderings
1:51:15from a drone kind of view.
1:51:19Similar to that, I do have some concerns
1:51:21about measuring at grade on Farquhar.
1:51:24If truly it is a double grade,
1:51:26then the measurement of height should be from the lower grade,
1:51:30because that's where the visual impact,
1:51:33looking from the south to the north.
1:51:36And then just a comment that I know in the past,
1:51:40I've been rather hesitant on these taller buildings
1:51:43from an architectural downtown point of view
1:51:47related to the river and the skyline
1:51:49and the nearby heritage district
1:51:51and the designated amenities,
1:51:55the armories next door and the drill hole.
1:51:57I think obviously, OK, 106 changed all of that
1:52:01and I'm quite open to the additional stories,
1:52:04but I'd like some additional information and renderings
1:52:07on what that impact might be
1:52:08from different elevations at ground levels.
1:52:10So, and then of course, as you know,
1:52:13they're community energy,
1:52:14and I know you'll also address snow removal
1:52:16and waste management on site when you bring it back
1:52:20to potential stage areas for those civic functions
1:52:24that need to take place in the city.
1:52:26Thanks very much to staff.
1:52:28Okay, thank you.
1:52:29And to Boussatil please.
1:52:32Thank you.
1:52:33And through the mayor,
1:52:34I wanted to first appreciate the developers' response
1:52:38to my question about the three bedrooms
1:52:40that really this is a home and not a student residence.
1:52:43Really appreciate that.
1:52:44I think that's respectful.
1:52:47The second thing is for our staff,
1:52:50you've heard about family housing.
1:52:52We've been chatting unclear about the townhouse
1:52:56on Fountain Street if those are two bedrooms,
1:52:59three bedrooms, didn't quite clearly see that in there.
1:53:03If again, is it three?
1:53:05Okay, missed it.
1:53:07Problems loading this.
1:53:08And the last thing is just around the commercial.
1:53:11Downtown has talked quite a bit
1:53:13about the need for a grocery store.
1:53:16My parents are at 35 Church,
1:53:19grocery store there down on the Esplanade as well.
1:53:22Just really if you can have conversations
1:53:26around a grocery store, that would be great.
1:53:28Thank you.
1:53:30All right, thank you.
1:53:34Oh, Kate, I'm sorry.
1:53:35Oh my God, I just almost missed you there.
1:53:38Go ahead, you're gonna wrap us up.
1:53:40Thank you, Mr. Mayor.
1:53:41I was late to put my hand up, so you're all good.
1:53:46I was just, in terms of comments,
1:53:49as I said to the developers,
1:53:51I'm interested in accessibility impacts
1:53:55for the less entrances.
1:53:58I know that you're gonna be doing a traffic study
1:54:00to help look at if there's gonna be a need
1:54:04for crossing and lights in that area.
1:54:07And I do like that it's not exclusively students.
1:54:13And I think that the design is actually kind of cute.
1:54:16I have concerns with the height
1:54:19and not including that main floor,
1:54:22especially since it is so elevated as a story.
1:54:25And I was just wondering if we could get some information
1:54:30on the rooftop pool in terms of safety impact
1:54:34and water use when the report does come back.
1:54:38Thanks.
1:54:40Okay, thank you.
1:54:42Okay, nothing further.
1:54:46It's already been moved and seconded for receiving.
1:54:50My only comment is we had three delegates in a row
1:54:54that were positive about a development like this
1:54:57in the downtown.
1:54:59Bring it on.
1:55:03Yes, I think this is, that's a Christmas miracle, for sure.
1:55:08So I, yeah, that was,
1:55:12that just absolutely made my day.
1:55:15So I wish you all the best in answering the questions
1:55:18that have come up, maybe looking at things
1:55:19in a different way if you can,
1:55:23as it eventually comes back to us.
1:55:25And yeah, I've been told from others
1:55:31that you tend to get approvals and then you build.
1:55:35You're a builder.
1:55:35So we need that in our city and we want you to get going
1:55:41as soon as possible if the approval happens.
1:55:42So wishing you all the best.
1:55:45And with that, I'll call the vote on receiving.
1:55:48Is anyone against?
1:55:51Nobody, so that's unanimous.
1:55:52So thank you again.
1:55:54Council, we're gonna take a five minute break
1:55:56before we go to the next one,
1:55:59which is for the 328 Victoria Road South
1:56:04and 588 Stone Road East
1:56:07for the Official Plan Amendment and Zoning By-law Amendments.
1:56:11So let's come back here.
1:56:15Let's take a nine minute break.
1:56:19Let's come back and we'll start, start at 1130, okay?
1:56:23Thank you.
2:04:51If I could just have my colleagues on camera online,
2:04:54please turn their cameras on.
2:04:56That would be great just to at least start
2:04:58to see who's with us.
2:05:00Thank you.
2:05:05All right, we're good.
2:05:06We're gonna call the meeting back to order.
2:05:08As I said, we'll start off here
2:05:09with 328 Victoria Road South and 588 Stone Road East.
2:05:14Lindsay is gonna kick us off with the presentation
2:05:17and we have a couple of delegations.
2:05:21And that is it.
2:05:24So turn it over to you, go right ahead.
2:05:31Good morning, Mayor Guthrie, members of council,
2:05:33staff and members of the public
2:05:35who are here in person or watching online.
2:05:38Today, I will be presenting the statutory public meeting
2:05:41for the proposed official plan
2:05:43and zoning bylaw amendments for lands
2:05:45municipally known as 328 Victoria Road South
2:05:48and 588 Stone Road East,
2:05:51which are also referred to the Guelph Innovation District
2:05:54or a GID Block Plan Areas one and two.
2:05:57These development applications were received
2:05:59for the subject lands from MHPC Planning Limited
2:06:02on behalf of Fusion Homes.
2:06:04Today is a statutory public meeting for the applications
2:06:07and no decisions will be made on the applications today.
2:06:15The subject lands are mean as plain known
2:06:17as 328 Victoria Road South and 588 Stone Road East.
2:06:21The subject lands are located at the northeast corner
2:06:23of Victoria Road South and Stone Road East.
2:06:26The subject lands have a combined area
2:06:28of approximately 116 hectares with 1,497 meters
2:06:33of frontage along Stone Road,
2:06:36oh, sorry, with 1,497 meters of combined frontage
2:06:42along Victoria Road South and 874 meters
2:06:45of combined frontage along Stone Road East.
2:06:48The subject lands are primarily vacant
2:06:50and used for agricultural uses with two buildings
2:06:52located on the northwestern side of the subject lands.
2:06:59So the subject lands are identified as Block Plan Areas
2:07:02one and two in the Guelph Innovation District
2:07:04Secondary Plan.
2:07:05On September 10th, 2025, a special meeting of council
2:07:08was held to provide planning information
2:07:10and a staff recommendation to council
2:07:12regarding endorsement of Block Plans one and two
2:07:15of the GID secondary plan.
2:07:17At the special meeting of council,
2:07:18city council approved the applicant submitted Block Plans
2:07:21subject to revisions and directed the city's general manager
2:07:24of planning and building services
2:07:25to issue final Block Plan endorsement
2:07:28once required revisions are made to the Block Plan.
2:07:31The applicant has revised the Block Plan
2:07:32as directed by council's motion
2:07:34and the final version was submitted to the city
2:07:36in January of 2026.
2:07:40And the official plan in zoning bylaw amendments
2:07:42will facilitate the future subdivision of lands.
2:07:50In terms of the proposed official plan amendment,
2:07:52I'm just gonna go into some high level details.
2:07:55I know the applicant's gonna be speaking in more detail
2:07:58and the information is also provided
2:08:01in the planning justification report
2:08:04submitted with the application
2:08:05if you want the full details of the official plan amendment.
2:08:08At a high level, the proposed amendments
2:08:10to the city of Guelph Official Plan
2:08:11and GID secondary plan are summarized as follows.
2:08:15The amendment to schedule 1A of the official plan,
2:08:17the urban structure, which is to expand
2:08:19the strategic growth areas to reflect
2:08:21the additional residential designated lands
2:08:23on schedule B of the GID secondary plan land use,
2:08:26land use plan, an amendment to schedule 1B,
2:08:30which is the structure employment areas
2:08:33of the official plan.
2:08:34And so that is to reduce the employment areas
2:08:37to reflect the employment designated lands
2:08:39on schedule B of the GID secondary plan land use plan.
2:08:44Schedule A, the Guelph Innovation District
2:08:46secondary plan mobility plan,
2:08:49and amend the road the applicant is requesting
2:08:51to amend the road locations and classifications
2:08:53based on OPA 80, approved schedule B
2:08:56of the GID secondary plan
2:08:57and the council approved block plan.
2:09:07And continuing with the amendments
2:09:08to the proposed schedule,
2:09:09schedule B of the Guelph Innovation District
2:09:11secondary plan land use, amend the location
2:09:14of the designations for open space and park,
2:09:16residential mixed use corridor,
2:09:19employment mixed use, employment mixed use too,
2:09:21future city streets and amend the location
2:09:23of proposed parks.
2:09:25Schedule C, the Guelph Innovation District secondary plan
2:09:29built form elements, an amendment to amend the location
2:09:34of the two to six story, two to 10 story,
2:09:36four to 10 story, nine to six story,
2:09:38three to 12 story, three to 18 story designations
2:09:41and revise the future city streets
2:09:43to amend the location of the nodes.
2:09:48In addition to the amendments to the official plan
2:09:50and secondary plan schedules,
2:09:51amendments are proposed to the secondary plan text
2:09:54to align with the schedule changes made
2:09:56through official plan amendment 80
2:09:58and the approved block plan.
2:09:59Further revisions to the secondary plan wording
2:10:02are also proposed by the applicant
2:10:03to clarify policy implementation
2:10:06through the draft plan of subdivision
2:10:07and future site plan applications.
2:10:09So these amendments are detailed
2:10:11in the applicant submitted proposed official plan amendment.
2:10:17So specific proposed amendments
2:10:19to the GID land use schedule.
2:10:20There's the current schedule
2:10:22and proposed schedule on the screen.
2:10:25The applicant is proposing to amend the location
2:10:28of the designations for open space and park,
2:10:30residential, mixed use corridor, employment,
2:10:33mixed use one, employment mixed use two,
2:10:35future city streets and amend the location
2:10:37of the proposed parks.
2:10:43So the subject lands are currently zoned urban reserve
2:10:45and natural heritage system
2:10:47according to the city of Guelph zoning bylaw.
2:10:50The UR1 zone or urban reserve zone identifies lands
2:10:53which are subject to development constraints
2:10:55or require further study.
2:10:57The natural heritage system zone is intended
2:10:59to protect natural heritage features,
2:11:01provide open space for leisure
2:11:02and to prohibit development in the floodway.
2:11:11A zoning bylaw amendment is proposed
2:11:13for the subject lands to establish a zoning framework
2:11:15on the lands which will implement the permitted uses
2:11:18of the GID secondary plan
2:11:19and implement the future proposed draft plan
2:11:23of subdivision which includes approximately 4,544 dwelling units.
2:11:29The purpose of the zoning bylaw amendment
2:11:30is to change the zoning on the subject lands
2:11:32from urban reserve and NHS to the following zones.
2:11:36A low density residential, medium density residential,
2:11:39site specific, medium density residential six,
2:11:42site specific mixed use corridor,
2:11:44site specific mixed use corridor two and three.
2:11:56Site specific, another site specific mixed use corridor,
2:12:00community park, neighborhood park,
2:12:02site specific neighborhood park,
2:12:03site specific neighborhood park,
2:12:06urban square, employment mixed use,
2:12:08employment mixed use two, open space,
2:12:10natural heritage system.
2:12:17There are no site specific amendments proposed
2:12:19to the low density residential,
2:12:22employment mixed use one, employment mixed use two,
2:12:24open space or natural heritage system zones.
2:12:27The medium density residential six zone proposed
2:12:30for residential development blocks is proposed
2:12:33to include townhouse and stack townhouse units.
2:12:36A site specific provision is proposed
2:12:37for the medium density residential six zone
2:12:39to restrict the minimum building height to three stories.
2:12:42The lands which are planned for a mix
2:12:44of commercial apartment, townhouse and stack,
2:12:46townhouse buildings are proposed
2:12:47to be zoned mixed use corridor.
2:12:50Site specific amendments are proposed
2:12:51to reflect the GID secondary plan policies and schedules.
2:12:55In accordance with the mixed use corridor policies
2:12:57of the secondary plan, a mix of medium density
2:13:00and high density residential buildings
2:13:03are proposed to be permitted
2:13:04in the mixed use corridor exception one,
2:13:07mixed use corridor exception two
2:13:09and mixed use corridor exception four zones,
2:13:12including townhouse units, stack townhouse units
2:13:14and apartments.
2:13:16The mixed use corridor policies of the secondary plan
2:13:19also permit institutional and educational uses
2:13:24and the proposed site specific mix use corridor three zone
2:13:28seeks to permit a school in the mixed use corridor zone
2:13:30in accordance with the neighborhood institutional zone.
2:13:34Site specific provisions are also proposed
2:13:36in the mixed use corridor zones
2:13:38to amend the density permissions
2:13:39and to prevent minimum maximum building heights
2:13:42in accordance with schedule C of the secondary plan.
2:13:50The lands which are planned for parks
2:13:52are proposed to be zoned as community park,
2:13:55neighborhood park and urban square.
2:13:57There are no site specific provisions proposed
2:13:59to the community park and urban square zones.
2:14:02The council approved block plan included two parks
2:14:05which do not meet the city's neighborhood park zone
2:14:07requirements and so the site specific provisions
2:14:09are required to prevent reduced frontage
2:14:11in the proposed parks.
2:14:15And so the site specific neighborhood park,
2:14:17the first one would be to permit a minimum
2:14:19lot frontage of 50 meters.
2:14:21The site specific provision is required
2:14:24to remove the requirement of table 12.2
2:14:27of the zoning by-law to calculate a minimum lot frontage
2:14:31based on one meter of frontage per 100 square meters
2:14:33of park area.
2:14:35So block 63 or sorry, block 62 on the draft plan
2:14:38of subdivision provides 50 meters of lot frontage
2:14:41but would require 54.5 meters of frontage
2:14:44based on the overall park area.
2:14:51And then the next site specific neighborhood park zone
2:14:54is required to permit a lot frontage of 38 meters
2:14:57and the site specific provision is required
2:15:00to remove the requirement of table 12.2 again
2:15:04to calculate the minimum lot frontage
2:15:06based on one meter of frontage per 100 square meters
2:15:08of park area and a minimum of 50 meters of frontage.
2:15:12Block 64 on the draft plan of subdivision provides
2:15:15for 39 meters of lot frontage but would require
2:15:1964 meters of frontage based on the overall park area.
2:15:27So next steps for the official plan amendment
2:15:29and zoning by-law amendment applications
2:15:30include a full review of the applications
2:15:32and documents submitted.
2:15:34Once the applications are reviewed,
2:15:35a report from infrastructure development and environment
2:15:38with a recommendation will be considered
2:15:39at a future meeting of council.
2:15:41So if there are any members of the public
2:15:43who wish to be informed on any revisions
2:15:45or decisions on these applications,
2:15:47please provide your full name and contact details
2:15:49to planning at gulf.ca.
2:15:52And that concludes my presentation.
2:15:55Thanks Lindsay, we appreciate it.
2:15:57And again, any questions that pop up,
2:15:59we'll do it after any of the delegations.
2:16:01And so we'll start right away with those.
2:16:05Dave, come on down from Dave Aston from MHBC.
2:16:10This could have come as a representative
2:16:12for the application.
2:16:16And is make a turn and burn here.
2:16:20Okay, thanks Mike, you'll be in the wings, okay?
2:16:26And again, 10 minutes, no more than 10 minutes
2:16:28for this one as well, okay?
2:16:31Dave, welcome and we'll turn it over to you.
2:16:34Good morning, Mayor and members of council.
2:16:36Thanks for the opportunity to be here this morning
2:16:38to speak to the applications in the public meeting.
2:16:42I'm here this morning with Ryan and Meher from Fusion
2:16:45and Aliyah from our office.
2:16:47So as we get to questions, if we need to,
2:16:51we'll pull the rest of the group in to respond.
2:16:55First of all, thanks to Lindsay for her presentation.
2:16:59She covered a lot of the details.
2:17:00I think I'll just keep it at a high level
2:17:03and share what the objective is with the applications.
2:17:08And I think one of the things that Lindsay had mentioned
2:17:13is we've gone through a lot of background on the lands.
2:17:18The city's been involved in a lot of background,
2:17:21a lot of history on the land.
2:17:22And right now we're looking forward to get to the opportunity
2:17:30to develop the lands.
2:17:32There's been a lot of work done on the secondary plan,
2:17:35working with staff on the changes made to the secondary plan
2:17:40and then working through the block plan itself.
2:17:43One other thing I'd just like to mention
2:17:45is as part of the block plan process,
2:17:48there were a number of open houses that were held.
2:17:51And so information was gathered from the public
2:17:55on the proposed block plan that really informed,
2:17:59ultimately, the decision that was made by council.
2:18:02And well, it may have seemed like a lot of amendments
2:18:06and modifications and changes.
2:18:09Those really are a result of implementing
2:18:13the block plan that was approved
2:18:16or endorsed by this council.
2:18:18And then ultimately approved as we worked with staff
2:18:22to adjust the conditions
2:18:24and the final approval of the block plan.
2:18:26So we're here really with these applications
2:18:29to implement the direction
2:18:34and the approval of the block plan
2:18:38that has occurred in the past.
2:18:40And it's the official plan amendment
2:18:42and zoning bylaw amendment.
2:18:44And as Lindsay mentioned, the draft plan of subdivision,
2:18:47that is really another tool and planning approval
2:18:51that will really get into the details
2:18:54of how the lands will be developed.
2:18:56But it will reflect the approved block plan as well.
2:19:02So the proposed amendments,
2:19:05this just gives you a bit of a picture
2:19:07of the changes that are proposed to be made.
2:19:09Again, really all of these changes are implementing
2:19:13the block plan endorsement and approval,
2:19:17which also were part of the consideration
2:19:21of various amendments to the official plan
2:19:23through the city and minister approval of the official plan.
2:19:27So implementing past decisions.
2:19:34So the amendments, I don't want to really go
2:19:37into too much detail of them, they were covered off,
2:19:40but they relate to land uses,
2:19:41they relate to the transportation network
2:19:44and how we're dealing with those
2:19:47and how we're integrating the uses
2:19:49to implement the block plan that was endorsed.
2:19:56And there was changes associated with heights
2:20:01and how we're dealing with density
2:20:03and how we're looking to propose density
2:20:06kind of across the block plan areas,
2:20:09a way to calculate to provide for a range
2:20:12and mix of housing types throughout
2:20:14the entire block plan area.
2:20:19The vision you've heard,
2:20:21this has been something that's carried us through,
2:20:24working through the block plan
2:20:26and continues to be part of the design vision
2:20:30for the plan of subdivision
2:20:32and then future development of the lands
2:20:34in each of the blocks.
2:20:36And so these are key elements
2:20:38that we will continue to work toward
2:20:41to build this community within the city.
2:20:49And the concept plan, there's a few here,
2:20:51just gives a bit of a preliminary idea
2:20:53of where housing units would be located,
2:20:58general conceptual framework
2:21:00for how building forms may occur
2:21:04where massing may locate within the blocks.
2:21:10And again, just another way to illustrate
2:21:12a general approach to how we'll look at a building form
2:21:17and massing in relation to the various streets,
2:21:20the open space elements, the parks
2:21:22and utilization of the various land use types
2:21:25within the community.
2:21:28This plan is just giving me some indication
2:21:31of how the density allocation will occur,
2:21:35primarily looking at density along the main street
2:21:40into the lands and then extending outward
2:21:45with a lower density around the edges
2:21:48of the proposed development adjacent to the open space areas.
2:21:54So giving a good context of where density will be allocated,
2:21:58which will be generally integrated
2:22:01with the transportation network
2:22:03and in proximity to the mixed use areas,
2:22:06the retail areas, the school,
2:22:09to provide for good walkability
2:22:11and active transportation connections.
2:22:16The open space network and implementation
2:22:18of the block plan, but just to circle back on it,
2:22:22there's the natural heritage system,
2:22:24which will include existing trails
2:22:27and an opportunity for new trails
2:22:29and trail connections to those
2:22:32to continue that connectivity of trails.
2:22:36As we look at the road network
2:22:38and the cross sections of the road,
2:22:40there'll also be multi-use pass sidewalks
2:22:43that will provide internal connections
2:22:46to these various open space trails and parks.
2:22:54The proposed zoning, again, a mix of different zones
2:22:59at this point, proposing to utilize the zones in general
2:23:03that the city has incorporated or approved
2:23:08as part of the new zoning bylaw,
2:23:10generally reflecting the land use designations
2:23:13and the densities that are proposed
2:23:16in accordance with the block plan.
2:23:22And the site specific amendments to the zoning,
2:23:25Lindsay really did a great job
2:23:27at working through all of those.
2:23:28So there are a number of different aspects associated
2:23:31with the zoning bylaw,
2:23:33where changes need to occur
2:23:34to implement the land uses and other changes
2:23:38that are a result of the block plan.
2:23:43A number of technical studies have been submitted
2:23:47and these are under review now,
2:23:51but include everything from your environmental studies,
2:23:55servicing studies, hydrogeological, noise, traffic,
2:23:59heritage design.
2:24:01So the full range of study requirements
2:24:04that have been requested
2:24:06were submitted in our under review.
2:24:10And so in conclusion, as we made our submission,
2:24:14we appreciate the opportunity to receive public feedback.
2:24:17We believe that the proposed applications
2:24:20are implementing the direction of council
2:24:22as it relates to the block plan
2:24:24and are consistent with provincial planning direction
2:24:27and conform with the city's official plan.
2:24:30And we look forward to the opportunity
2:24:32to work through the process of the official plan and zoning
2:24:36and then get through the plan of subdivision
2:24:38so that fusion can be really working towards developing
2:24:43this community in short order.
2:24:45And happy to answer any questions.
2:24:49Thank you, Dave, for your presentation
2:24:51and walking us through that.
2:24:53May I just ask any colleagues at this time
2:24:55if there's any follow-up questions?
2:24:58Not at this time.
2:25:00All right, thank you very much.
2:25:03And our next one is Meg,
2:25:05Meg Thurmburne, coming on up
2:25:06from the Guelph Trail User Groups Coalition, I'm sorry.
2:25:12And welcome, Meg, and up to 10 minutes
2:25:16if you need it as well
2:25:17and you can start whenever you're ready.
2:25:19Okay, I'm just gonna make sure I know
2:25:22how to use this thing to change slides.
2:25:28Is there a pointer on this?
2:25:39Sorry, how do I get to the slides?
2:25:46And if I wanna go, I got them in reverse.
2:25:54That one's, please.
2:25:56That's forward.
2:25:58That one's backward.
2:25:59Okay, thanks.
2:26:01Sorry for the delay.
2:26:06I know, but I'm pushing the forward.
2:26:13Yeah, sorry for the delay.
2:26:15Mr. Mayor and members of council,
2:26:17thank you for this opportunity to speak.
2:26:18My name is Meg Thurburn.
2:26:20I'm the former chair of G-TUC,
2:26:22the Guelph Trails User Groups Coalition,
2:26:25standing in for the new chair who is currently at work.
2:26:28We are often here before you to raise concerns
2:26:31or oppose developments, projects, or other decisions.
2:26:35Thankfully, that is not the case today.
2:26:38I'm delegating in support of the Fusion Block Plan proposal.
2:26:42We thought it important that you hear
2:26:43from Guelph's trail using community on positive occasions
2:26:47as well as times of concern.
2:26:50We want to recognize and applaud good development
2:26:52when the needs of the community
2:26:54and our official plans are being met.
2:26:56We greatly appreciate Fusion's emphasis
2:26:59on active transportation connectivity
2:27:01within the development
2:27:02and to the adjacent trail system in the natural areas.
2:27:06We would further like to thank Fusion
2:27:09for signing a five-year land use agreement
2:27:11with our member club, the Guelph Hiking Trail Club,
2:27:14allowing continued access and maintenance of the trails.
2:27:18These are trails that have been used
2:27:19by Guelph residents for generations.
2:27:23As some of you may not be overly familiar
2:27:26with these trails, I've brought a couple of slides.
2:27:29So the first slide here is actually taken
2:27:32from the GHTC land use agreement with Fusion.
2:27:36And there's three trails I want to mention.
2:27:39The red trail on the top is part of the 37 and a half
2:27:44kilometer hiking trail connects Guelph
2:27:47to the Bruce trail near Limehouse.
2:27:51The blue line at the bottom of that slide
2:27:55represents the Cliff Top trail,
2:27:59a scenic hiking trail that runs along the top of the cliff,
2:28:04much beloved by hikers, dog walkers and runners.
2:28:07This will be a tremendous feature asset
2:28:10of the Fusion development.
2:28:13And then the middle trail there in blue
2:28:15is the Awkwood trail, which is heavily used
2:28:19for connectivity as well as recreation
2:28:22and will be a very important link for Fusion residents.
2:28:25The Awkwood trail is the route preferred by most
2:28:28for local connectivity to the Smith property in Arkel
2:28:32and for regional connectivity to the south and east of Guelph.
2:28:35The other options for connection York and Watson
2:28:37or Victorian stone roads are very dangerous.
2:28:44Now, as you can see, you've seen this slide before.
2:28:48These trails are in significant and other natural areas
2:28:53and it appears, I'm not gonna try to point it out,
2:28:55but that Fusion is planning to develop some trails
2:28:58to connect to the Cliff Top trail,
2:29:00the existing Cliff Top trail, which is really great.
2:29:03These existing trails are not only well embedded
2:29:06in the fabric of the community,
2:29:07but in city master plans as well.
2:29:10These documents secure those trails legacy
2:29:13and their growth as the city grows.
2:29:15They are important to connectivity,
2:29:18recreation and well-being.
2:29:20Although these trails are protected by our official plans,
2:29:23Guelph citizens do ask that we continually reiterate
2:29:26their point importance at every opportunity
2:29:29as some departments seem less familiar
2:29:31with their history usage and documentation.
2:29:34As you know, detox member organizations work
2:29:37with multiple municipalities, organizations, developers,
2:29:40private landowners and other interested parties.
2:29:43So again, I wish to commend Fusion
2:29:46for working so proactively with the community
2:29:49and our member club, GHTC.
2:29:51When a developer moves forward in a positive manner,
2:29:54intelligently recognizing the importance of trails
2:29:58and natural areas in the community,
2:30:00we feel we need to point it out
2:30:02and commend their insight and wisdom.
2:30:05However, that being said, we do have concerns
2:30:09with recent city developments affecting these community trails
2:30:13as they pass through Fusion's natural areas.
2:30:17We recognize this is not the forum to tackle
2:30:20the recent closure of these generations old trails.
2:30:25But please know that Fusion's natural heritage lands
2:30:29are also at risk from GJR decisions.
2:30:34This is a grave concern for the community.
2:30:36GJR's inability to work with the community
2:30:39to ensure access to these trails,
2:30:42as well as the possibility of trained sightings
2:30:45on the natural heritage land,
2:30:47will have a huge impact on Fusion's future residents,
2:30:51as well as thousands of other Guelph residents,
2:30:54ability to use these trails for enjoyment
2:30:57and or active transportation connectivity.
2:31:01Fusion has done extensive public consultation for
2:31:05and been highly transparent about their block plan,
2:31:08whereas GJR has been installing sightings
2:31:11and interfering with trail use and development
2:31:13throughout the city with no public consultation,
2:31:16no transparency, and seemingly no oversight.
2:31:20Surely natural heritage areas are not the place
2:31:24to store empty chemical tankers.
2:31:26As I said, this needs to be addressed in a different forum.
2:31:31We will be requesting a meeting to address the issue
2:31:35of how a city owned corporation does not act
2:31:37in the same transparent and puny manner
2:31:39as has Fusion a private corporation.
2:31:42To reiterate, GJR is in support
2:31:44of the Fusion block plan proposal.
2:31:47Yes, I am done.
2:31:48I'm happy to answer any questions.
2:31:51Okay, yeah, definitely a different forum.
2:31:54And I'm glad that you recognize that,
2:31:57and we are always open to having that conversation
2:31:59in a different forum, but today we're not here
2:32:02for that issue, we're here for this one,
2:32:03so I'm glad you stuck mostly to that.
2:32:06So thank you very much for doing that.
2:32:08Is there any other follow-up questions or conversation
2:32:12with this delegate on this matter?
2:32:14Seeing none, thanks for waiting your whole time too
2:32:17to make that delegation, we appreciate it, okay?
2:32:19Thank you.
2:32:20Thank you very much.
2:32:22Is there anyone else in the room
2:32:23that would like to speak to this particular item?
2:32:27Nope, okay.
2:32:28And a number's gonna come up on the screen here
2:32:30at 519-837-5603, again, that's 519-837-5603.
2:32:40And we'll just wait a few moments
2:32:43as we see whether or not there's anyone
2:32:45that wanted to call in, okay?
2:32:47So thank you, just pause for a few moments, thank you.
2:34:08Just while we're waiting for a few moments
2:34:09if someone wants to call in,
2:34:11just like staff to just be able to respond
2:34:14to what was indicated by the delegates
2:34:15a few moments ago.
2:34:19Yeah, thank you Mayor Guthrie, and through you,
2:34:21I'd just like to acknowledge that, you know,
2:34:24certainly the city and GGR and through its practices
2:34:26follow many transparent public processes
2:34:28and community engagement practices,
2:34:30and specifically as we're designing
2:34:32the city's trails system and bringing reports
2:34:34to council, master plans and things of that nature.
2:34:37There's substantial public engagement,
2:34:39and we're happy to continue to work with the community
2:34:42as those plans come forward.
2:34:45Okay, thank you very much.
2:34:48To clerk, so if we had anybody call in,
2:34:49would you like to wait another minute or are you okay?
2:34:52Okay, so we're good.
2:34:53So nobody's called in,
2:34:54and nobody in the gallery wants to speak
2:34:57to the issue as well.
2:34:59So it's back to us.
2:35:01Would anybody be willing to move receipt
2:35:04for this one, billings and a Pouser?
2:35:08Thank you very much.
2:35:10Is there anything that needs to be taken away
2:35:12on this one that has not been stated?
2:35:14It is just to receive only.
2:35:16Does anyone need to add anything to this?
2:35:19No, okay, that's great.
2:35:22Well, I'll just go get ready to call the vote then.
2:35:25Thank you again to Fusion for the application
2:35:27and for getting this in front of us.
2:35:30I do want to encourage that this comes forward
2:35:33as quickly as possible.
2:35:35I think that there has been a lot of work
2:35:38and time put into this,
2:35:39so hopefully both the applicant and staff
2:35:43can work together in trying to get this in front of us
2:35:46as soon as possible.
2:35:47We definitely need to see this move forward, so.
2:35:50That's great, thank you very much.
2:35:52I'll call the vote.
2:35:53Is there anybody against?
2:35:56Nobody, that's unanimous.
2:35:57Thank you very much.
2:35:59Okay, we are at our last,
2:36:03I think it's our last, let me look for a call.
2:36:05Yeah, it's our last.
2:36:06This is just under the items for discussion.
2:36:10It is a presentation that's gonna be done
2:36:13and then we can chat if we need to, of course.
2:36:16The report in front of us,
2:36:17it's the annual report for 2025.
2:36:20It's called Housing and Guelph.
2:36:22And so our staff have put together a presentation
2:36:28that is actually really important.
2:36:33Let's all make sure, me included,
2:36:35that we're really paying attention to this
2:36:36because there's been a lot of great work
2:36:41and to have it compiled in one report like this
2:36:44for not only us, but for the community
2:36:46is very, very important.
2:36:48And right off the top,
2:36:50I just wanna say on behalf of council,
2:36:52thank you to staff for all the work you do
2:36:54throughout the entire year when it comes to housing,
2:36:58but to be able to see it come together
2:37:00in sort of one presentation in one report
2:37:02is a good reminder.
2:37:04It's also a good presentation to be able to share
2:37:07with the public and also to correct a lot of misinformation
2:37:10that is sometimes out there too.
2:37:13And so this is a nice way of being able to amplify this
2:37:16in the public realm so that any disinformation
2:37:19or misinformation is tackled in this manner.
2:37:22So I really appreciate staff doing that
2:37:25and I'll turn it over to our CAO, Tara,
2:37:27to kind of kick us off.
2:37:30Great, yes, and thank you, Mr. Mayor, members of council.
2:37:33I am just gonna take a very small part
2:37:36of the presentation today to kick things off.
2:37:38We are very pleased to be here before you
2:37:41to share the recent housing ready accomplishments,
2:37:44key housing projects underway and highlight next steps
2:37:48in our journey as a partner
2:37:49in getting more homes built here in Guelph.
2:37:52This report is a function of our commitment
2:37:54to report twice annually on our housing progress.
2:37:58In 2025, the city made significant progress
2:38:01in advancing housing readiness
2:38:04and major initiatives continue through 2026.
2:38:09Progress on housing within our community
2:38:11goes well beyond the measures of housing units.
2:38:14Housing considerations have become a central force
2:38:17shaping many aspects of our work,
2:38:20driving operational priorities,
2:38:22long-term strategic planning, civic dialogue,
2:38:26budget investments, advocacy,
2:38:28and council decision-making.
2:38:31In our most recent edition
2:38:32of the Housing and Guelph Annual Report,
2:38:34we've now aligned our progress
2:38:36with the Ontario Big City Mayors or OBCMs,
2:38:39efforts to share the story and data
2:38:41of the work undertaken to advance housing
2:38:44by municipalities across the province
2:38:46in a consistent framework.
2:38:48So as described by OBCM,
2:38:51cities and municipalities play a vital role
2:38:54in meeting housing demand
2:38:55and building sustainable communities.
2:38:58Cities are working with regional governments
2:39:00and housing service managers
2:39:01to expand infrastructure and support affordable housing
2:39:04through five key strategies.
2:39:06Unlocking land for housing, enabling greater density,
2:39:10reducing barriers for developers and property owners,
2:39:13streamlining reviews and approvals,
2:39:15and supporting affordable and non-market housing.
2:39:18We're proud to be here before you today
2:39:21with this revised presentation
2:39:24and to share significant progress
2:39:26within each of these five areas.
2:39:28So with that, I'll hand it over to DCAO Gaiman.
2:39:39Thank you, CAO Baker,
2:39:40and good morning, Mayor Guthrie and council.
2:39:43Over this four-year term of council,
2:39:45through your approval and direction,
2:39:47staff have achieved many significant milestones
2:39:50as shown on the roadmap.
2:39:52To summarize these milestones,
2:39:53collectively contribute to things
2:39:55like a robust policy framework,
2:39:58data-driven growth plans and budget investments
2:40:00for critical infrastructure,
2:40:02short and long-term strategies and action plans,
2:40:06successful grant applications,
2:40:08process improvements and innovations,
2:40:11and we have advanced key developments
2:40:13that support more housing in the community.
2:40:16More than 120 housing-related staff reports
2:40:20have been before you for deliberation
2:40:22over this term of council.
2:40:23In 2025 alone, there were 34 housing-related reports.
2:40:29We're proud of the work that the city is leading,
2:40:31supporting and influencing,
2:40:33and to help address the housing crisis,
2:40:35sustain growth, strengthen investment readiness,
2:40:39and enhance wealth's overall livability.
2:40:42In our time together today,
2:40:43we're gonna focus on what we accomplished in 2025
2:40:47and the work that is underway this year.
2:40:49As you can see in the roadmap,
2:40:51as we look forward to the future of this year and beyond,
2:40:54our progress and momentum continue to build.
2:40:59Now, I will give you a heads up.
2:41:00The presentation is lengthy,
2:41:02maybe a bit longer than we normally would bring to you,
2:41:05but for good reason.
2:41:06There's a lot of good information
2:41:08that we need to highlight and recap in
2:41:10and to the mayor's point, get the information out.
2:41:13And so please bear with us.
2:41:14We appreciate your focus
2:41:16as we get through this presentation today.
2:41:18We are going to cover in this presentation
2:41:23the status of the housing units and data insights over time,
2:41:27a summary of the work we advanced in 2025
2:41:30and what we are working on now,
2:41:32the focus of our advocacy efforts,
2:41:35updates on grant funding,
2:41:37some of the challenges we will continue to face
2:41:40and highlights from our communications
2:41:42and engagement efforts.
2:41:44There are many takeaways here,
2:41:45so I'd like to be deliberate in pointing
2:41:47three of them out for you.
2:41:48Guelph's housing ready progress is evident.
2:41:52We see this in the increasing housing units identified
2:41:54through development applications in 2025,
2:41:57compared to 2024.
2:41:59Although building permit numbers were lower in 2025,
2:42:02the total number of housing units increased.
2:42:06That's an early indication
2:42:07that the city's strategic efforts are helping offset
2:42:11external pressures such as slower population growth
2:42:13and economic uncertainty.
2:42:15Despite challenges, Guelph remains on track
2:42:17to meet its long-term population forecast,
2:42:20continues to adapt to new economic realities
2:42:23and is well positioned for growth and investment.
2:42:26With that, I'm going to now invite Crystal Wachey,
2:42:28our chief planner and general manager
2:42:30of planning and building services up to the podium.
2:42:35Thank you, Mr. Gaiman.
2:42:37So as you will see on this first slide,
2:42:40that this is our housing pipeline.
2:42:43We have a number of units and we're showing 2024
2:42:47on the top in the dark blue and 2025 in green on the bottom,
2:42:51and that's going to continue for the next couple of slides.
2:42:54So our housing development applications
2:42:56are definitely trending positively,
2:42:57which demonstrates Guelph's housing readiness.
2:43:00At the pre-submission stage,
2:43:01the number of housing units for development applications
2:43:04was 4,903.
2:43:06This is nearly double those from 2024.
2:43:10There were 1,743 housing units approved
2:43:13in development applications last year,
2:43:15which is a 14% increase compared to 2024.
2:43:21When we moved to the site plan stage,
2:43:24again, the same formula for 2024 on top,
2:43:30we saw a 60% lower in the pre-submission stage.
2:43:35However, those that moved to formal were substantially higher.
2:43:38So we've done the early work early on
2:43:41and now they've moved into the formal application
2:43:44and we definitely saw more formal applications
2:43:46approved last year,
2:43:48and we are already halfway to that number
2:43:51so far this year in 2026.
2:43:54So site plan is moving along quickly now.
2:43:58As Mr. Gaiman indicated, our building permits though
2:44:00are still lower reflecting the market
2:44:05and the uncertainty that is around the housing realm
2:44:08and potential GST rebates and a bunch of other items.
2:44:11The highest number of permits
2:44:13were four additional dwelling units at 239.
2:44:16And it's worth noting as was indicated
2:44:18that our housing number, these are our permits,
2:44:21but the province counts housing starts,
2:44:24which is a different metric
2:44:27and is somewhat complicated and often difficult
2:44:29to calculate, but last year we did receive
2:44:33the Build Better Faster Fund
2:44:34because of the number of housing units that did occur.
2:44:39Consents, and this is worth noting
2:44:41what we wanted to share with council
2:44:43is it shares an important role in housing and wealth.
2:44:48In 2025, the committee approved 78 new residential lots
2:44:52in increase of 46 compared to 2024,
2:44:57but the 78 new lots represents 237 units
2:45:03that were brought forward.
2:45:04And that is a direct result of the three unit
2:45:08as a right policies that were implemented by this council.
2:45:12So our application volume
2:45:14at committee of adjustment is quite high.
2:45:18We have a 36% increase year over year
2:45:22and our volumes again this year are very, very high.
2:45:26So the committee of adjustment is a mechanism
2:45:28to support infill housing, intensification,
2:45:31additional residential units
2:45:34and conversion and expansion of existing dwellings.
2:45:39So unlocking land for housing.
2:45:42As CAO Baker indicated in the introduction,
2:45:45the city is advancing five key strategies
2:45:47to meet housing demand and build sustainable communities.
2:45:51One such strategy is unlocking land for housing
2:45:54by advancing critical water, wastewater, transportation
2:45:57and transit infrastructure upgrades
2:46:00to remove servicing constraints and create new homes.
2:46:04We're also generating more development sites
2:46:06through the strategic disposal of unused city land.
2:46:13Looking back over the past year,
2:46:15here are some examples
2:46:16and how we delivered on this strategy.
2:46:18We sold at fair American value half an acre
2:46:22of unused city owned land to our private developer
2:46:25to build a future residential development with 57 units.
2:46:28We continue to advance housing readiness
2:46:30through several environmental assessments
2:46:32for downtown, clear Maltby
2:46:34and the Guelph Innovation District.
2:46:36We substantially completed $13.5 million
2:46:40worth of linear construction, 2.5
2:46:42which was funded through development charges.
2:46:45And this resulted in the construction
2:46:46of 6.2 meters of road, 0.3 kilometers of water main,
2:46:510.3 kilometers of sanitary and 0.3 kilometers of storm
2:46:54because they're typically built together
2:46:56and one kilometer of cycling tracks or multi-use pass.
2:47:00We also started construction on projects in 2025
2:47:03that we'll be completing this year.
2:47:05And a notable highlight is the $2 million
2:47:08Street Sewer Up-Size Project on Wellington Street
2:47:11which unlocked housing and development
2:47:14and you had one of those housing applications
2:47:15before you earlier this morning
2:47:18which is a direct result of that Wellington Street
2:47:21construction that occurred last year.
2:47:24So the city is also now available
2:47:25to offer financial agreement opportunities
2:47:29for key infrastructure to remove servicing constraints
2:47:31and unlock capacity for new homes
2:47:34through the launch of what we call
2:47:35the municipal financing servicing and financing agreements
2:47:38but that's also known as the front end agreement
2:47:40that was put forward.
2:47:43So we found ways to increase budget certainty,
2:47:47speed up timelines for developers
2:47:49and we also made investments to improve
2:47:51our transit system and service which is needed for housing.
2:47:59Here's what you can expect this year.
2:48:02In the downtown, obviously the Windham Street
2:48:05reconstruction starts at the end of this month.
2:48:09And the Macdonnell Street, Macdonnell Bridge,
2:48:12Allen Dam structure and the downtown pedestrian bridge
2:48:16detailed designs are starting this spring.
2:48:20In the Claremont B secondary plan area,
2:48:23we have two environmental assessments underway.
2:48:26The Gordon St. Clair Road and Laird Road site
2:48:31as well as the Street A collector
2:48:33which runs parallel to that north-south
2:48:36and that will unlock servicing capacity
2:48:38for 27,000 residents.
2:48:41And both projects have open houses planned for this spring
2:48:44and there are web pages on those projects.
2:48:47For the Guelph Innovation District
2:48:48which we also talked about earlier,
2:48:51last summer the Victoria Road, Stone Road
2:48:53and McQuillen's Bridge municipal class EA started
2:48:57and the study team is looking for options on that
2:49:00which we will be bringing forward.
2:49:02We also have improvements to Stone Road
2:49:04which are planned for detailed design in 2030
2:49:07and construction in 2031.
2:49:10Other growth infrastructure, York Road Phase Four.
2:49:14I know we've had lots of talks about York Road
2:49:16but its construction continues in 2026.
2:49:19Exhibition Park, neighborhood area Phase One
2:49:23starts this year and the Hamlin Sanitary
2:49:26and Water Main Crossing detailed trunk design
2:49:29starts this year as well.
2:49:31University Avenue West construction starts later this year
2:49:35and we also note 87,000 new transit service areas
2:49:39will be added between 2026 and 2031
2:49:42subject to our annual budget process.
2:49:49Our second strategy is that we're enabling greater density
2:49:52through new policies and programs
2:49:54that make it easier and more affordable to build housing
2:49:56while keep growth aligned with our community priorities.
2:50:01In December, you'll recall Council approved an amendment
2:50:04to our ADU grant program as part of the
2:50:07Affordable Housing Community Improvement Plan
2:50:10which have unlocked additional potential,
2:50:12increased funding and eligibility amounts.
2:50:16The grant program so far has incented 15 affordable units
2:50:20all under the homeowner stream.
2:50:24Another key highlight of the CIP is the $320,000
2:50:31which was awarded to Wyndham House
2:50:33through the Cities Affordable Housing CIP
2:50:35Vacant Unit Renewal Grant.
2:50:38And this was for 10 youth spaces on Waterloo Avenue.
2:50:43And with the new support of housing development,
2:50:45this puts Guelph on track to become the first
2:50:47mid-sized city in Canada to end chronic youth homelessness.
2:50:53Last April, we approved the Official Plan Memant 106
2:50:58that allows taller buildings in the downtown
2:51:00secondary plan area to meet our population
2:51:03and employment growth to 2051.
2:51:06We are also bringing forward the downtown
2:51:08Community Planning Permit System next month
2:51:11for Council's decision.
2:51:18The CPPS will be brought forward next month.
2:51:22And then with that, we'll also be bringing later this year
2:51:24the accompanying built form standards
2:51:27to talk about height and have a city-wide standard
2:51:31on what that looks like so we can increase the clarity
2:51:34and certainty for developers for what we're looking
2:51:36on housing as it comes forward.
2:51:39Grant funding is still available through the city's
2:51:42Affordable Housing Community Improvement Plan
2:51:45and staff are continuing to work with interested parties
2:51:48in the affordable housing development space
2:51:50and encourage other housing nonprofits,
2:51:52builders and residents to apply.
2:51:55And we continue on our outreach
2:51:57and communication for that program.
2:52:03Our third strategy is what we're calling reducing barriers
2:52:06for developers and property owners
2:52:08by improving processes, shortening timelines,
2:52:10increasing flexibility in land uses
2:52:12and creating clear, more predictable development pathways.
2:52:17Last year, our building services team
2:52:19enhanced their services to better support
2:52:21the segment of customers calling
2:52:23for Building Permit Applications Assistant
2:52:25and for assistance remotely.
2:52:27Through the use of an app, customers can now share
2:52:29their screen with staff and together walk through each step
2:52:32in the application process from the comfort of their home.
2:52:36We also undertook a lean yellow belt
2:52:39continuous improvement project to increase the number
2:52:41of complete additional dwelling unit permit applications.
2:52:45Through their hard work of staff,
2:52:46they reduced incomplete ADU permits by 33%
2:52:51and allowed ADU permits to come in much easier
2:52:54and quicker for the applicants.
2:52:58Last April, this council approved the Stoneman-Edenborough Road
2:53:02Community Planning Permit System.
2:53:04So we're trying to bring a bunch of processes together,
2:53:07site plan, official plan amendment, zoning,
2:53:10minor variants all into one 45 day process.
2:53:13And as we talk, we do have two applications
2:53:15that are in the pre-console stage and stage in that area.
2:53:18So that's great news and the program is exciting
2:53:21for both those applicants.
2:53:25Planning has also started our multi-phased official plan
2:53:28amendment updates, phase one,
2:53:30which was presented to council in February,
2:53:33included provincial changes to the Planning Act,
2:53:36the Ontario Heritage Act,
2:53:37and the new Provincial Planning Statement.
2:53:40And phase two is underway,
2:53:41which is to be presented to council for approval in 2027.
2:53:46And it focuses on employment, transportation,
2:53:48and will include an interim employment land strategy
2:53:52because of changes to the definition by the province.
2:53:56As was approved last month,
2:53:57WEALTH will apply additional rigor
2:54:00in tracking our servicing allocation
2:54:02to proactively manage the city's unallocated water
2:54:06and wastewater servicing capacity.
2:54:13Last week, staff brought forward to council the DC updates
2:54:17that outlined regulatory changes and a call to action
2:54:20on other levels of government to help fund the gap.
2:54:24And last month, we also approved the citywide terms
2:54:27of reference for the parking study.
2:54:30Bill 185 enables municipalities to impose lapsing provisions
2:54:35on site plans and draft plans
2:54:36if a building permit is not issued
2:54:38within a prescribed period of time.
2:54:40We have been doing this for plans of subdivision
2:54:43as it was previously approved,
2:54:45but we are going to be doing it for site plans as well
2:54:48to encourage developers to move quickly through the process.
2:54:51And that is coming forward to council next month.
2:54:57Our fourth strategy is that we're streamlining reviews
2:55:00and approvals by digitizing our processes,
2:55:03improving transparency, and strengthening collaboration,
2:55:06resulting in faster, more efficient housing delivery.
2:55:12As part of our half action plan initiative number two,
2:55:15we committed to a series of milestones
2:55:17that will support and streamline development
2:55:19and the construction of new housing.
2:55:21To realize this, the planning services team
2:55:24and the IT department hired an outside consultant
2:55:28to review our work, to review our process workflows.
2:55:31And we worked together to complete a broad review
2:55:33of our development processes,
2:55:36I think for the third time since I've been here,
2:55:39but the results is a roadmap
2:55:41for making better use of our technology
2:55:43and expanding our digital services
2:55:44in a streamlined development review process.
2:55:48So the city's planning and IT teams are working together
2:55:51on how we can use our existing technologies
2:55:54as they relate to development processes.
2:55:56And this will be completed in Q2, 2026
2:56:00with the primary focus on customer needs,
2:56:03allowing for a IT solution versus a paper solution
2:56:10where applicants can track their progress
2:56:13in the development approval process.
2:56:15They can pay their fees online
2:56:17and everything can move to a digital system
2:56:20from the paper process we currently have.
2:56:22So again, we're trying to make it easier
2:56:23and quicker for developers to work within the city.
2:56:29Through our city's development advisor,
2:56:32we are proactively engaging the development community
2:56:35and identifying pain points.
2:56:38And the development advisor is working on those pain points
2:56:41to improve the processes
2:56:43and identify those key relationships
2:56:45with our interest holders.
2:56:51The other thing to note is last year
2:56:52in the planning department,
2:56:53we reorganized our structure
2:56:55and created a dedicated site plan team
2:56:58to get to that last mile, to get that last step
2:57:01to ensure that developers can move quickly
2:57:03from a early site plan process to a building permit,
2:57:06which would get shovels in the ground quicker.
2:57:08And we are seeing through that site plan stage
2:57:10that that is working.
2:57:19So in Q2, council will be receiving also recommendations
2:57:24for the value for money audit
2:57:27of the building permit process and inspections.
2:57:29And that was part of the council's audit plan.
2:57:32So again, we're continuing to look at our processes
2:57:34and see how we can do things better.
2:57:36And if there's any areas, gaps that can be found.
2:57:39So with that, now I will turn it over to Kushler Matthews,
2:57:43the city's manager of community and affordable housing.
2:57:46Great, thank you very much, Ms. Wauke.
2:57:58So our fifth and final strategy will come as no surprise.
2:58:03We're expanding affordable and non-market housing options
2:58:06through the implementation
2:58:07of the housing affordability strategy.
2:58:12So to recap for 2025,
2:58:15the housing affordability strategy was adopted
2:58:18by council in December of 2024.
2:58:20And we have the first year of implementation
2:58:22under our belts.
2:58:24Staff have been making strides
2:58:26in the first year of implementation,
2:58:28including the Stone Edinburgh Road
2:58:30Community Planning Permit System implementation, or CPPS,
2:58:34fulfilling action 1.1.2
2:58:36and allowing for that additional density
2:58:39and affordable housing through a more streamlined process.
2:58:42And as Krista mentioned or Ms. Wauke mentioned,
2:58:45to date we have met with developers
2:58:46at the pre-consultation stage.
2:58:48And specifically for Stone Edinburgh,
2:58:50there is a project with the possibility
2:58:52of 275 units total, some of which will be affordable.
2:58:57Last March, the affordable housing community improvement plan
2:59:00was approved by council in sending 17 units
2:59:02at the time of writing this report
2:59:05and completing action 1.1.5.
2:59:08Council direction was also provided in November 2025
2:59:12to begin work on the vacant home tax,
2:59:15the rental renovation bylaw,
2:59:16and the rental replacement bylaw.
2:59:18And that supports the advancement
2:59:20of action 2.1.1.
2:59:23Staff are also evaluating the city's role
2:59:25in building affordable housing, which is action 1.1.3,
2:59:30and are advancing this work on two city-owned sites
2:59:32at Five Normandy and Seven Eastview Road.
2:59:37Work is also underway on an affordable housing land strategy,
2:59:40adding to action 1.2.1.
2:59:44And Guelph's affordable housing seed funding program
2:59:47was also launched in 2025, completing action 3.3.1.
2:59:52So the seed funding program is funded annually
2:59:55through the Affordable Housing Reserve.
2:59:58And last year, the full program allocation of $100,000
3:00:03was committed to four organizations.
3:00:05And this money is expected to support the potential
3:00:08for at least 43 affordable units.
3:00:11And the four recipients of the seed funding program
3:00:15are Threshold Home and Supports for 14 Edinburgh Road,
3:00:18Kindle Communities for 10 Shelldale,
3:00:21Upbuilding Nonprofit Homes at 65th
3:00:24and Hardcourt Memorial United Church on Deedon Avenue.
3:00:28The 2026 allocation of $100,000 is also currently available.
3:00:36So as mentioned, work is underway on drafting
3:00:38a vacant home tax, the rental renovation bylaw,
3:00:41and the rental replacement bylaw.
3:00:44Have your pay page, have your say page,
3:00:49has been up since mid-February,
3:00:52providing our community with information
3:00:54on the purpose of this work and the summary of the direction
3:00:58that has been provided by council.
3:01:01In addition, a survey on the vacant home tax
3:01:04just closed yesterday and we'll be reviewing the responses
3:01:08as we continue to meet our Q2 deadline
3:01:10for returning to council with drafts of this work.
3:01:15Other light engagement touchpoints on the have your say page
3:01:18will be shared towards the end of this month
3:01:21on the renovation and rental replacement bylaw pieces.
3:01:26As mentioned, we're also very keen to take the lead
3:01:29on building some affordable rental units on city owned land.
3:01:33And an RFP is now posted on the city's bids and tenders page
3:01:37that will be up until April 16th,
3:01:40seeking a proponent to construct the 12 units
3:01:43on both the sites using CMHC's housing catalog
3:01:47forplex design.
3:01:49City staff are also exploring the potential
3:01:52to co-locate the new paramedic station at 218 Speedvale
3:01:58with potential future affordable housing.
3:02:00More information will be shared with council
3:02:03at a future date following further analysis.
3:02:07Two requests for proposals are also being prepared
3:02:09for the separate housing affordability strategy actions,
3:02:13the first of which is for that action 1.1.3
3:02:17to evaluate the city's role in getting more affordable
3:02:20housing built and really looking into the long-term
3:02:22financial and legal implications of that.
3:02:26So this work will build on affordable housing delivery models
3:02:31that were identified in a council report in 2025,
3:02:34council report 2025 461.
3:02:38And it will also provide the city with a framework
3:02:40for evaluating how it should participate
3:02:43in the delivery of affordable housing
3:02:45based on varying development contexts.
3:02:48It will also help us understand
3:02:49and provide a financial strategy for the city
3:02:52to understand the required investment
3:02:55needed to meet the targets identified
3:02:58in the housing affordability strategy.
3:03:00And its associated impacts on our existing
3:03:03financial strategies such as our debt strategy.
3:03:08The second RFP is related
3:03:09to the affordable housing land strategy
3:03:12and it's to study all city owned land,
3:03:14including in use land for sites that could be appropriate
3:03:18for affordable housing development.
3:03:20This builds on the findings that 97, sorry, 99%
3:03:25of city owned land is actively used
3:03:28for community or operational purposes
3:03:31and puts into action, Merrill direction
3:03:33and council's direction to explore the development
3:03:35of downtown surface parking lots
3:03:37and other properties excluding park land
3:03:41and sites earmarked for future green space.
3:03:45This work will identify criteria
3:03:47and sites to develop or add affordable housing as a use
3:03:51as well as analyze the potential costs
3:03:53and the community impact.
3:03:56This work on both those RFPs are scheduled to both start
3:04:00and conclude at the end of the year
3:04:02as a deliverable on housing affordability strategy
3:04:04action 1.2.
3:04:07Staff are also preparing the first housing affordability
3:04:11strategy monitoring and implementation report
3:04:14and that is planned to be released annually
3:04:16with the first release expected this summer.
3:04:22So now moving into grant funding updates.
3:04:27Progress on capital grant programs
3:04:29supporting housing initiatives is reported
3:04:31through the quarterly budget monitoring process
3:04:34and the third quarterly report was most recently published
3:04:37in December of 2025.
3:04:40And since then Guelph was awarded 3.69 million
3:04:44through Ontario's building faster BFF fund
3:04:48in December of 2025.
3:04:51Last August, the provincial government increased
3:04:54the municipal housing infrastructure program
3:04:56or M-HIP by $1.6 billion to speed up construction
3:05:01of homes and associated infrastructure
3:05:04like roads and water systems.
3:05:08We've also participated in eligible M-HIP streams
3:05:11since the program opened and secured funding
3:05:14for the Wyndham Wellington Water
3:05:16and Wastewater Capacity Improvement Project.
3:05:19And that's a key initiative to unlock
3:05:21additional housing potential in the downtown area.
3:05:26As of January, 2026, no new funding intakes
3:05:29of existing streams or new streams have opened
3:05:32but staff are closely monitoring this.
3:05:36Last year, the federal government opened
3:05:38a new federal agency called Build Canada Homes or BCH
3:05:42to support the growth of affordable housing in Canada,
3:05:46foster collaborative relationships to support building
3:05:49and financing affordable homes
3:05:51and catalyze a new housing industry.
3:05:54BCH is now accepting proposals
3:05:57and they're prioritizing those that demonstrate
3:05:59strong partnerships featuring collaborative projects
3:06:03that successfully leverage capital
3:06:06and really bundle submissions for regional impact.
3:06:10So city staff are engaged in collaborative discussions
3:06:14with numerous community interest holders
3:06:16with the goal of potentially supporting a proposal
3:06:19in 2026 that will advance growth
3:06:22of affordable housing and wealth.
3:06:25The federal government will also invest $51 billion
3:06:29over 10 years through the new build community strong fund
3:06:32or BCSF which will be administered
3:06:35by Housing Infrastructure and Communities Canada.
3:06:40The community or HIC, so the community stream of HIC
3:06:43is a rebranded version of the former Canada
3:06:46Community Building Fund and it continues to provide
3:06:49the city with an annual allocation
3:06:52to support a variety of infrastructure projects.
3:06:57The federal budget 2025 indicated the Canada Housing
3:07:01Infrastructure Fund or CHIF is to be repurposed to BCSF
3:07:06or that what I just mentioned,
3:07:07the Building Community Strong Fund.
3:07:10The city's CHIF application for $34.8 million
3:07:14was submitted last March
3:07:16and was supported with strong advocacy.
3:07:20However, in January of this year,
3:07:22the city was notified that this application
3:07:24was not selected for funding.
3:07:27However, it may be considered for funding under BCSF
3:07:34once it is established.
3:07:36So staff will also continue to monitor
3:07:38active funding opportunities and advocate
3:07:41with funding partners on applications currently under review.
3:07:49So as we move into advocacy,
3:07:52in 2025, the city focused on elevating Guelph's
3:07:55housing challenges and pushing for coordinated
3:07:59system-wide solutions across all levels of government.
3:08:03The city emphasized that municipal tools alone
3:08:06cannot address the scale of need,
3:08:09especially as Guelph continues to experience
3:08:12population growth, escalating construction costs,
3:08:16and mounting pressure on emergency
3:08:18and supportive housing systems.
3:08:22Our advocacy underscored how regulatory barriers,
3:08:25inconsistent funding streams, and misaligned policies
3:08:29across governments slow progress
3:08:31towards achieving collective housing goals.
3:08:35During the federal and provincial election periods,
3:08:37the city met with candidates
3:08:39to reinforce Guelph's housing priorities.
3:08:41And we continued that advocacy
3:08:44at the 2025 AMO conference
3:08:46in discussion with provincial representatives.
3:08:50These discussions focused on building awareness,
3:08:53strengthening partnerships, and encouraging collaborative
3:08:57action and support to address shared challenges
3:09:00across the housing continuum.
3:09:06So now moving into housing communications,
3:09:09marketing, and engagement.
3:09:12In 2025, we launched an ambitious,
3:09:15integrated marketing and communications plan for housing.
3:09:19Our goal was to provide clear,
3:09:21timely, and accurate information.
3:09:25We wanted to help our community understand
3:09:26the city's housing work and progress
3:09:28across major housing initiatives.
3:09:31This work was led by a dedicated team
3:09:34from our Strategic Communications
3:09:36Community Engagement Department.
3:09:39The plan combined organic social media,
3:09:42paid digital ads, website updates, media relations,
3:09:46community engagement, and more.
3:09:48And staff collaborated to bring housing conversations
3:09:51and stories to the forefront in Guelph.
3:09:59So here are some examples of how we turned
3:10:01our housing communications strategy
3:10:03into high impact outcomes.
3:10:06So we have a centralized housing hub.
3:10:09In 2024, we updated and centralized
3:10:12the city's housing web pages on guelph.ca slash housing.
3:10:16In 2025, we added a housing spotlight
3:10:19to highlight grants and other key opportunities.
3:10:23Staff also worked to refresh highly visited websites
3:10:27or web pages like guelph.ca slash ADU.
3:10:31Content was simplified.
3:10:33We also added resources and the ADU fee estimator,
3:10:36and then this week we'll be launching
3:10:38a new ADU assessment tool to help homeowners visualize
3:10:43how an ADU could fit on their property.
3:10:47We've also used our social media channels
3:10:49and paid digital ads strategically to reach residents,
3:10:52not for profits, housing providers, and builders,
3:10:56where they already spend their time online.
3:11:00We have an enhanced media approach.
3:11:03We kept our community informed
3:11:05through local and regional news outlets.
3:11:10We issued 18 news releases,
3:11:12and staff had 23 news interviews
3:11:15related to housing last year.
3:11:18We moderated conversations across the city's platform
3:11:22to answer questions and point people
3:11:24to the right information, and we corrected,
3:11:28we worked to correct misinformation quickly.
3:11:31As we gathered feedback from residents,
3:11:33agencies, and partners as part of our engagement
3:11:36on upcoming infrastructure projects that support housing.
3:11:41We also held regular meetings
3:11:43with the County of Wellington's communications team
3:11:45to coordinate housing updates.
3:11:48We connected with local nonprofits,
3:11:51housing providers, and home builders
3:11:53to encourage them to promote housing updates
3:11:56through their channels.
3:11:58So we worked with groups like
3:11:59Wealth Wellington Poverty Elimination Collaborative
3:12:02and the Grand Highland Home Builders Association.
3:12:06We also partnered with Wealth Transit for public ads,
3:12:09had postcards at service counters,
3:12:12and shared housing information on screens
3:12:14and city facilities, libraries, and community centers.
3:12:19And then later this month,
3:12:21the city will issue our first ever
3:12:22quarterly housing e-newsletter.
3:12:26People can get timely updates
3:12:28about the city's housing related work
3:12:29straight to their inbox.
3:12:32And to sign up, we encourage the public
3:12:34to go to gulf.ca slash housing
3:12:36and click on the blue sign up button that will be there.
3:12:44So our team is data driven.
3:12:47We are constantly evaluating key metrics
3:12:50and updating our approach based on
3:12:51what we're hearing from the community.
3:12:54And here are some data points that showcase
3:12:56how our housing story connected with the community in 2025.
3:13:02So our content appeared more than 11 million times.
3:13:05And so this content is an aggregate of,
3:13:08the aggregate impressions from organic social
3:13:10as well as paid Google, Meta, and LinkedIn ads,
3:13:15which is the equivalent of over 74 views
3:13:17per Guelph resident.
3:13:20This tells us we achieved broad awareness
3:13:23of the city's housing initiatives and progress.
3:13:28More than 800 people shared our housing content
3:13:30with friends, family, and networks.
3:13:33Those shares move our information through the community
3:13:36faster than we could ever achieve alone.
3:13:40Over 37,000 people clicked through
3:13:43to learn more about programs, grants, and initiatives.
3:13:48Our organic engagement rate was 2.5 times higher
3:13:53than the government average.
3:13:55A measure of how often people interact with our posts
3:13:58through likes, comments, shares, or clicks,
3:14:02showing strong consistent interest
3:14:04in the city's housing work.
3:14:07Earned media coverage reached about 835 million people
3:14:12in 2025, and this sounds like a phenomenally large number
3:14:16and because it is.
3:14:18So earned media reach estimates how many people could
3:14:22have seen the content using audience and traffic models.
3:14:27This combines news outlet circulation,
3:14:30social audience size, and engagement signals of platforms
3:14:35where the city of Guelph is mentioned.
3:14:37Media stories helped amplify our city updates
3:14:41and decisions far beyond our own channels.
3:14:44So what does all this mean?
3:14:47We're diversifying our channels to reach people
3:14:50where they're at and get uptake for our programs.
3:14:54We're able to target Guelph residents directly
3:14:56through digital campaigns and go broader when needed.
3:15:01And high engagement, earned media reach, and web visits
3:15:05show that housing remains a priority for our community.
3:15:10This work is continuing into 2026 and beyond.
3:15:14And with that, I'd like to invite DCO Gaiman
3:15:17back to the microphone.
3:15:24Thank you, Kushla.
3:15:26All right, we're almost there.
3:15:28Council, you've heard an impressive recap
3:15:31of the work done in Guelph to keep moving us forward.
3:15:34And what you should be feeling is a bit of a maturing approach
3:15:37on the housing delivery that the city is working towards.
3:15:40But despite all this great work, there's still more to do
3:15:43to tackle the housing file challenges.
3:15:45For instance, the city is navigating many lengthy
3:15:48development appeals, critical labor shortages,
3:15:52rapid and complex provincial legislative changes,
3:15:56economic uncertainty affecting housing supply,
3:15:59and the slowing population growth.
3:16:01The reality is that this creates operational strain,
3:16:05destabilizes development activity,
3:16:07and increases pressure to manage risks
3:16:09for our long-term growth.
3:16:11Staff are mitigating these impacts where possible
3:16:13through advocacy, internal and external collaboration,
3:16:16strategic planning, and innovative approaches,
3:16:19including development process refinements.
3:16:22We're also monitoring and assessing any opportunities
3:16:25these challenges present, which may result
3:16:27in evidence-based recommendations
3:16:29for future council consideration
3:16:31as we continue to improve our strategies, policies,
3:16:34and processes so that Guelph is ready
3:16:36for the housing market to bounce back.
3:16:42Housing considerations are central
3:16:44to how the city operates,
3:16:46supports sustainable long-term growth,
3:16:48and strengthens investment readiness.
3:16:50It's in our DNA staff to consider housing
3:16:52in everything we do.
3:16:55As we wrap up our presentation
3:16:56and open the floor to questions,
3:16:57I ask that you remember that we are unlocking housing,
3:17:01sorry, land for housing, enabling more density,
3:17:04reducing barriers, streamlining processes,
3:17:07and expanding affordable and non-market housing options.
3:17:10We saw an increase in 2025 of housing units
3:17:13in development and site plan applications.
3:17:16This offers evidence of strong market interest
3:17:19and a reflection of Guelph's housing readiness.
3:17:22Guelph is resilient and continues to adapt
3:17:24to economic realities and is well positioned
3:17:26for upcoming growth and investment.
3:17:29We are in fact ready.
3:17:31Thank you.
3:17:32Great.
3:17:33Thank you again to staff
3:17:34and thank you for putting this presentation together.
3:17:38Yep, sure, well, clap.
3:17:42Was there any questions at all?
3:17:44Okay, Boussatil, Gullwur, Koran, and Alt.
3:17:51Okay, go ahead, Boussatil, please.
3:17:53Thank you, and through the mayor
3:17:55and to the staff, huge amount of work,
3:17:57just huge appreciation.
3:17:59I think we should be doing a wave
3:18:00or something here in council.
3:18:02Amount of work with the changing regulations,
3:18:04and at the same time, our earlier presentations
3:18:07of the shrinking purse, our public purse,
3:18:11what is it, something from nothing?
3:18:12We're Matt magicians here
3:18:14making something happen with nothing,
3:18:16even with the funding that we get through half and so on.
3:18:20Just, I'm really proud of the work that you're doing,
3:18:23which is really, really proud
3:18:24and really respect that you're listening to council
3:18:27and to the community as well.
3:18:28I do have two questions.
3:18:31On page 16, the section 1.13 about the RFP
3:18:36and then below it, 1.2.1, just want to publicly ask,
3:18:41if this work also includes,
3:18:44I always bristle at affordable housing.
3:18:47I know Chris is gonna nod her head.
3:18:50Affordable housing to me is a provincial affordable housing
3:18:54and my question is about whether or not
3:18:56those sections will also look at community,
3:19:00which is the new county term for public social housing.
3:19:04If that scope of work will also look at
3:19:08the city's role in using our underutilized assets
3:19:13for not only affordable provincial housing,
3:19:16but also for partnerships with thresholds and so on,
3:19:22like we've already done.
3:19:22If that research work will encompass that.
3:19:29Through the mayor to council,
3:19:31Bruce Till thank you for the question.
3:19:33In terms of the RPs, yes.
3:19:35We, at this point, we would be putting out an EO,
3:19:38or an expression of interest in terms of,
3:19:42we would be using the provincial definition
3:19:44of affordability, but it, depending on applicants,
3:19:48we could get deeply affordable right up to just below market
3:19:52affordable for the units that come in.
3:19:54So again, it could be any number of levels of affordability
3:20:02in terms of what's coming in on city owned lands.
3:20:04Okay, thank you.
3:20:05Thank you for that.
3:20:06And the second one is,
3:20:08during your presentation there,
3:20:09Chris, you were talking about writing funding applications
3:20:12and collaborative proposals,
3:20:14same kind of question around affordable,
3:20:18my assumption is that the collaboration could also be
3:20:22for deeply affordable community public housing.
3:20:27I think we need to have some consistency in the language,
3:20:30but we're also, we're not just looking at affordable,
3:20:33but also those community housing that we have seen
3:20:37a dearth of development and a huge need for that
3:20:40with the centralized wait list.
3:20:45Through the mayor to council, Bruce Till, that's correct.
3:20:49Again, the definition of affordability
3:20:52or what could be provided through grants and applications
3:20:55could be arranged right from deeply affordable
3:20:57right up to below market.
3:21:00Thank you.
3:21:01And again, just excellent work to the planning department
3:21:04and the rest of the team and everyone,
3:21:06just thank you very much for this.
3:21:08Thank you.
3:21:09And Guller is next.
3:21:12Thank you through your worship to staff.
3:21:15I wanted to echo councillor Bush Till's
3:21:17congratulations on this huge amount of work
3:21:21that has been done.
3:21:22I also wanted to just remark that a few years ago,
3:21:27when it came down to housing issues,
3:21:28I would ask Wellington County,
3:21:31how much affordable housing does wealth need?
3:21:33And they would say, well, that's up to you.
3:21:35And now we had this issue where we didn't have the capacity.
3:21:37So I want to acknowledge that we've pivoted very quickly
3:21:40in the last year and a half to now have dedicated staff
3:21:43that are doing this work in-house to give us that information
3:21:47and to create this plan,
3:21:49which I'm very, very grateful for.
3:21:51I have put this out to my constituents
3:21:54and a couple of them have asked within the scope
3:21:58of what the city is doing or can do,
3:22:01where does senior housing fall into that in terms of,
3:22:05I know there's a very long list of long-term housing
3:22:09and I do acknowledge that the city does work
3:22:12through the Elliott and that there was some beds added
3:22:16in the last year or so,
3:22:17but if you can tell me within this body of work,
3:22:19how does senior housing fall into this?
3:22:24Through the mayor to the councillor.
3:22:25So senior housing has two elements.
3:22:28So it's the licensed facilities, such as the Elliott.
3:22:32And then, I think some of the questions we've heard is,
3:22:35what are we doing to promote senior housing
3:22:37that's not licensed?
3:22:38So as we've shared even earlier today, we can't people's own.
3:22:42So it's an apartment typically,
3:22:45and whether it's geared towards students
3:22:46or geared toward seniors or geared toward families,
3:22:51for us it's just an apartment,
3:22:54which is the difficulty that I understand
3:22:58we're hearing in the community.
3:23:00Certainly we would encourage private developers
3:23:04to bring that forward,
3:23:06but we have not seen those in recent years come forward.
3:23:12Thank you for that.
3:23:14I understand that in terms of the non-licensed housing,
3:23:18but we have seen that a lot of people are coming to build
3:23:21student housing in Guelph, and I'm very grateful for that.
3:23:24In terms of that long-term care facilities,
3:23:27the city does have one,
3:23:28but is there anything we can do to encourage
3:23:30other long-term care facilities to come
3:23:33and set up shop in Guelph?
3:23:35Do we have tools to encourage that type of development
3:23:38to come to the city?
3:23:44Yeah, through the mayor to the councillor,
3:23:45so we don't have any specific tools for that.
3:23:49I know in the past few years,
3:23:51earlier maybe four or five years ago,
3:23:52we had a couple of proposals
3:23:53that have not come to fruition.
3:23:55They were proposals potentially on contaminated sites
3:23:57that are a problem,
3:23:59so we have seen proposals come forward,
3:24:01but they've not been built at this point in time.
3:24:04Okay, thank you for that.
3:24:06So, following along the questions of Councillor Bustatilo's
3:24:10question about the community housing,
3:24:13as we put out these explorations of city land
3:24:17and underused land and co-locating land,
3:24:22would that co-location,
3:24:24as well as looking at affordable rental housing,
3:24:27would we consider a co-location
3:24:29with new long-term care facilities,
3:24:32thinking of the 900 plus people in Guelph
3:24:35that are waiting for long-term care housing?
3:24:42So, through the mayor,
3:24:44I guess I would really look back at the policies
3:24:47that Council has endorsed at this point,
3:24:50and so we as staff are very much focused
3:24:53on the affordable housing strategy
3:24:55that has just been approved.
3:24:57If the long-term care beds
3:25:01or whichever other type of maybe housing
3:25:05falls into that affordable range in terms of price,
3:25:09then we are absolutely in,
3:25:12would be considering that type of development.
3:25:15Just specifically to your question about long-term care,
3:25:19the province is involved in the allocation
3:25:21of the licenses for those beds.
3:25:23And so there is a bit of a nuance there too.
3:25:26I understand that Guelph does have, not the city,
3:25:31but Guelph geographically,
3:25:33does have beds licenses that are yet to be built.
3:25:37And so that's an avenue that staff
3:25:40and others continue to have conversations
3:25:45with about next steps in that sense.
3:25:50Well, thank you for all this work.
3:25:51I really appreciate it,
3:25:52and I'm very excited to see all these developments.
3:25:54Thank you.
3:25:55Thank you.
3:25:56Thank you.
3:25:58I'm so sorry, I know it's Alton Karan.
3:26:00I just can't remember what order it was.
3:26:02I'll go Karan first, and then I'll go to Alton.
3:26:06Thank you, Mr. Mayor.
3:26:07And I joined my colleagues
3:26:08in applauding this presentation
3:26:10and all the work we're doing.
3:26:12You know, a few years ago, we as a council, as a group,
3:26:16as we were strategic planning,
3:26:17we were unanimous in our resolve
3:26:19that we were going to be the council of housing,
3:26:22and we were going to move forward.
3:26:24The housing agenda like was never done before.
3:26:27And then we delegated so much to staff.
3:26:30And then we don't often see in the public
3:26:34how much is really being done behind the scenes.
3:26:36This presentation, I think, is really timely
3:26:39as we head into 2026 at the end
3:26:41of our kind of strategic planning window.
3:26:44So my questions are related to,
3:26:47I like to have data as we're moving forward,
3:26:50and we've done a number of things.
3:26:51And in the list of the suite,
3:26:54the ecosystem of changes that we've made,
3:26:56whether they've been in politics on us,
3:26:58or whether we've followed our own planning advice,
3:27:03or whether we are best practice leaders in the province.
3:27:06There's a number of different things that we're doing.
3:27:09How are we measuring the success of each item?
3:27:12So is there something that we're doing
3:27:14that has led to a higher percentage of building starts
3:27:18and others that are just not working or not impactful?
3:27:24That relationship with our home builders
3:27:26and our development partners and in the community
3:27:29is essential to getting that feedback.
3:27:31So I wonder if you could talk just a little bit
3:27:32about how we're evaluating each one of those measures
3:27:35so that we can be doing the right things moving forward.
3:27:45No, no, who's tonight?
3:27:51Through the mayor to Councillor Caron.
3:27:53In terms of reporting, there are several ways
3:27:56that we will be reporting on measures of success.
3:27:58So the first is we do report
3:28:00through our housing accelerator fund.
3:28:03We do report on that and some of that reporting
3:28:05captured in this semiannual housing report.
3:28:08Also, as mentioned, we're doing our first annual
3:28:12housing affordability strategy,
3:28:14monitoring and implementation report,
3:28:17which does have indicators of success included in that
3:28:22for each of the actions there.
3:28:25So that will be upcoming in July,
3:28:28where we will start to get a baseline of information on that.
3:28:32And then I may hand it over to Ms. Wauke.
3:28:36So we'll, sorry, just to parse that out a little bit.
3:28:40So we'll be able to see how each action is impacting.
3:28:42So for example, our community planning permit system,
3:28:45did we get say a 40% increase in those zones
3:28:48compared to the rest of the city?
3:28:49I'm just trying to ensure that as we allocate resources
3:28:53to advance our housing agenda,
3:28:55they're reporting our resources to the right actions.
3:29:02Through Mayor Guthrie to Councillor Caron.
3:29:04So for that indicator and for many of the other indicators
3:29:07in the housing affordability strategy,
3:29:09it will be looking at the number of units
3:29:11that have been brought online or affordable units
3:29:13that have been brought online
3:29:15due to the particular action that is being measured.
3:29:20Great, that's what I'm looking for.
3:29:25Advocacy, I'm wondering,
3:29:28I know that we've used AMO,
3:29:32we've got our various associations that we've worked through.
3:29:37I'm just wondering how this council
3:29:38can be a little bit stronger in advocacy,
3:29:41not only on behalf of our home builders
3:29:43and our developers on behalf of our community and our staff.
3:29:46And I wonder, I've got a potential motion
3:29:49to add to this report receipt to ask the province,
3:29:55through the mayor, for a two year moratorium
3:29:59on all legislative changes under the Ontario Planning Act
3:30:02that impact our land use planning resources,
3:30:04our staffing and our responsiveness.
3:30:07We have spent so much staff time responding to changes
3:30:11that it's slowing down.
3:30:12We're hearing this from our development community,
3:30:16is that we have to respond to every legislative change
3:30:19and then we have to wait until we're in compliance.
3:30:22So instability in regulations
3:30:27is impacting our development community
3:30:30and being able to move forward on projects
3:30:32where they had a set of rules and then the rules change.
3:30:35I think a two year moratorium will go a long way
3:30:37in getting that regulatory stability back.
3:30:41And I'm just wondering what our staff think
3:30:43that council could make a statement to that effect.
3:30:49Through the mayor and a councillor, Karan,
3:30:51thank you for your comments.
3:30:52And certainly I think 444 Ontario municipalities
3:30:56would agree that it's been a really challenging environment
3:30:58for a lot of years.
3:31:00I think realistically, and of course,
3:31:02it's to the will of council,
3:31:03we have very strong advocacy priorities
3:31:06through the advocacy strategy that council endorsed.
3:31:08And that allows the intergovernmental team
3:31:10to sort of prioritize our limited resources
3:31:13and be moving towards delivering action
3:31:15that advance files in our community.
3:31:17And so certainly a secondary message
3:31:20for us every single time we meet with them
3:31:22is the impact that legislative change is having.
3:31:24I think though we also have to sort of balance that
3:31:26with what we hear this government signaling
3:31:29and they are returning to work quite shortly
3:31:33to the legislature and we're expecting
3:31:35quite a busy spring session.
3:31:38And so I think when we think about the messages
3:31:40that are in front of them right now for us,
3:31:42our priority messages are around achieving some of the things
3:31:45that enable us to get shovels in the ground,
3:31:47get housing built and ensure that we have infrastructure
3:31:50that we can maintain and afford to maintain
3:31:55for our community, right?
3:31:56With all of the changes that we have seen
3:31:58and continue to expect on development charges.
3:32:01So to the will of council, whether you'd like us
3:32:05to share that message in some formal way
3:32:08on your behalf about the instability this is providing,
3:32:11but realistically when we look at the environment
3:32:13that they are telegraphing for the spring,
3:32:15we're certainly gearing up for another busy season of change.
3:32:19Yeah, thank you for that input
3:32:20because I did just send a potential motion
3:32:23and Mr. Mary you can have it put on the floor
3:32:25whenever you think it's appropriate.
3:32:27But I do think a statement on the regulatory instability
3:32:31is needed before any major changes,
3:32:36even if they're already planning those major changes,
3:32:38I still think a statement is needed
3:32:39because it is affecting our development community
3:32:43and they're telling us that.
3:32:44But my last question has to do with,
3:32:47and you alluded to it in your presentation,
3:32:49Guelph is not alone.
3:32:50We all of our GTA neighbors are struggling
3:32:54with the same competition for staff and resources,
3:32:58the same economic formula, labor and materials.
3:33:04So my question has to do with in comparison
3:33:07to our neighboring municipality.
3:33:11Are you hearing from me?
3:33:12I know you work with planners across the region.
3:33:14So this is directed to our planning staff.
3:33:17Are we seen as leaders?
3:33:18Are we following best practices?
3:33:20Are there other ideas, policies
3:33:25that you're seeing among your colleagues
3:33:27that you think might work in wealth
3:33:29that you'd like to bring forward to have us review
3:33:32or are we leading the pack?
3:33:34And others are looking to ask for leadership
3:33:37and best practices.
3:33:42Through the mayor to the councillor.
3:33:44So I think it's a bit of both.
3:33:45So, I think we had brought in three units as of right
3:33:48before the province mandated it to municipalities.
3:33:51So we were definitely ahead of that.
3:33:53The CPPs were definitely ahead of the curve on that one
3:33:57and the five units reports that's coming back
3:34:00for some further direction at the end of Q2.
3:34:03So in some areas we're leading,
3:34:05but we also talked to our municipal counterparts
3:34:07all the time, probably on a monthly basis
3:34:10to talk about what they're doing,
3:34:11how they're moving things forward.
3:34:13We have exchanges for even for our heritage
3:34:17and try to address the heritage register.
3:34:18We had the city of Toronto staff up here
3:34:20to look at what we're doing.
3:34:22Today I shared insurance rates with the chief planner
3:34:26and Kitchener and said, here's a cheat sheet.
3:34:28We've already done the work, you can use it.
3:34:29So we definitely share as we can
3:34:34and are looking at what we can do to impact
3:34:38the number of housing units
3:34:39and the potential in Guelph as quickly as possible.
3:34:42And if you again refer to that roadmap
3:34:44that was attached to this and one of the attachments,
3:34:46there's a lot.
3:34:47It's pretty full, that one page infographic.
3:34:50So this council has brought forward a lot of policies
3:34:54and recommended a lot of work
3:34:55that is actually improving our supply as we go forward
3:34:58and making sure Guelph is housing ready.
3:35:01Great, thanks.
3:35:02Final comment is just to applaud you Ms. Locky.
3:35:05You and your team have been on a roller coaster
3:35:08for four straight years
3:35:09and you kept motivated and inspired
3:35:12and keep getting the work done.
3:35:13So thank you so much for this report.
3:35:15I think it's a testament to the leadership you and your team.
3:35:19Great, thank you.
3:35:21And to councillor Alters,
3:35:24I think the last one that wanted to speak at least,
3:35:26and then we can get to,
3:35:28I know councillor Bruce-Auto wants to move her seat
3:35:29and we can talk about something else
3:35:31if you need to as well.
3:35:32So councillor Alters, please.
3:35:33Thank you, Mayor Guthrie, through you to staff.
3:35:36And I think the first two questions that I have
3:35:39are to move Walke.
3:35:41And Ms. Walke, you had mentioned that the Ontario mayors
3:35:44have established a consistent framework
3:35:47for, I believe it is for reporting on housing permits
3:35:52and development.
3:35:55Could you explain why they've done that
3:35:58and how that helps?
3:35:59Does it help to refute disinformation
3:36:02about cities obstructing development proposals?
3:36:13Through the mayor of the councillor.
3:36:14So some of the reporting metrics
3:36:16that have been agreed upon
3:36:18are really to have a consistent framework
3:36:21across the big city mayor region.
3:36:25We report to the province as planning departments
3:36:28every quarter as well,
3:36:29but it's to ensure that we're all talking the same thing.
3:36:32And we can share that information.
3:36:33So the metrics are intended to align municipal reporting
3:36:37so that we're sharing the same information.
3:36:39Okay, and in the interim or in the immediate,
3:36:43is it apparent that municipalities are consistent
3:36:47in their approaches to permits
3:36:49and to the requirements for building
3:36:53as a consequence of this?
3:36:59Through the mayor to the councillor.
3:37:02So the Ontario big city mayors set out the framework
3:37:05for which we report on into them.
3:37:06So I think our reporting is consistent that way.
3:37:10And then our building permits that we report on annually
3:37:14are a number of permits issued
3:37:15and then CMHC captures starts.
3:37:17So again, that's the discrepancy in permits and starts
3:37:20because we don't necessarily control when starts happen.
3:37:23So there are some discrepancies in the system
3:37:25but we're trying our best to work
3:37:27within the frameworks that we have.
3:37:30And thank you because that does lead
3:37:31to the next part of this question.
3:37:33And it's the yet to be built corollary.
3:37:38We have talked in the past of the number of approvals
3:37:41that we have made that are not yet started
3:37:46and there's two things about that.
3:37:47What are we looking at that have not yet
3:37:50put shovels in the ground?
3:37:51And are we able to please provide information
3:37:55to the public about how far back some of those go?
3:38:01Yeah, through the mayor to the councillor.
3:38:03So we did have on our housing website at one point in time
3:38:06kind of that list of long lead times.
3:38:11We identified additional ones
3:38:13in our servicing allocation policy recently,
3:38:16those that are 10 years and older
3:38:19and how do we get those moving based on historical numbers?
3:38:23And then in July of every year,
3:38:26we bring forward the annual growth monitoring
3:38:28and affordable housing report.
3:38:29And in that report, we provide an update
3:38:32on our short-term housing supply,
3:38:34how many units we have ready.
3:38:35And we often highlight those that have been sitting
3:38:38for a long time or those that are not quite ready to go.
3:38:42So we do report on it in a couple of different spaces,
3:38:45especially those that are longer
3:38:47with the servicing allocation policy
3:38:49that was recently approved.
3:38:51Staff are reaching out to all of those
3:38:54with approvals that are 10 years and older to start.
3:38:56That's our first stop.
3:38:58And to see what we can do,
3:39:00we also have our development advisor
3:39:01who has been meeting with everyone
3:39:03who has a project that is two years or more and older
3:39:06and has not yet been built.
3:39:07So to ask those questions on why they haven't been built,
3:39:11as was alluded to in the presentation,
3:39:13there are a lot of factors that are slowing housing down
3:39:16in the market right now,
3:39:17but we are actively talking with those developments
3:39:20and those property owners to see if they can go forward.
3:39:24Yeah, I appreciate that clarity.
3:39:25Because if I recollect,
3:39:26we're looking at about 6,000, I believe, in Guam.
3:39:29But if I'm wrong,
3:39:30I would certainly like to be corrected on that.
3:39:34I think it's important that we do identify
3:39:36that there are economic factors
3:39:38that are beyond the control of the city
3:39:40that have led to housing slowdowns
3:39:42that we just don't have any control over.
3:39:46If I'm wrong in any of that,
3:39:48I'm quite happy to be corrected.
3:39:50There is another question as well, however,
3:39:52and that's the unallocated water, wastewater capacity.
3:39:56I'm hoping I understand that correctly.
3:40:01So in practical terms, what does this mean?
3:40:04Does it mean that if we have limited capacity
3:40:06in some areas of the city,
3:40:08are we shifting focus to other areas of the city
3:40:11to capitalize on our capacity to actually build elsewhere?
3:40:16And are there ramifications of that,
3:40:19both in budget for infrastructure
3:40:21and also in the potential for approvals in certain areas,
3:40:26not necessarily getting made
3:40:28because we're reaching our threshold of development
3:40:32very quickly.
3:40:36Through the mayor to the councillor,
3:40:37also on the first part of your question, councillor,
3:40:39the city system is built for a certain level of resiliency.
3:40:42And so it's not so much that we focus on one particular zone
3:40:45versus another in terms of the available supply in that way.
3:40:49And so the systems are all interconnected,
3:40:52but there are limitations maybe in certain local areas
3:40:54with respect to pipe sizing, for example,
3:40:56and capacity in that manner.
3:40:58Ultimately, the master plans
3:41:00and the sort of longer term forecast that we have
3:41:02do identify supply up to certain population
3:41:05and employment job type thresholds.
3:41:07And so you see those in those 2031, 2041 type horizons.
3:41:11And then with respect to the sort of unlocking
3:41:14of other areas in the city,
3:41:16you're right in that the capital prioritization framework
3:41:19that the city has as we bring the 10 year capital plans
3:41:22to council each year does put things in an order
3:41:25and that's to sort of balance out the idea
3:41:27that there isn't an unlimited amount of financial resources.
3:41:30And so we do have to go in an order
3:41:32and in that order, we're focusing on things like downtown,
3:41:35for example, as a top priority.
3:41:37And then we're moving into the other areas of the city
3:41:39as the resources and processes allow.
3:41:43And thank you.
3:41:44So, and please again, correct me or inform me of this,
3:41:49is it conceivable that some of these approvals
3:41:52that we have done that are sometimes even 10 years old,
3:41:56could are we in a position where they might have
3:41:59to be rescinded because we have to focus
3:42:01on infrastructure elsewhere?
3:42:05Through the mayor to you, councillor Alton,
3:42:07I think what you're getting at is the sort of new use
3:42:10or lose it policy that was recently approved at council.
3:42:12And certainly the spirit of that is that you cannot hold
3:42:16that water capacity for an indefinite amount of time.
3:42:19And so part of that is to encourage people to move forward,
3:42:22to build it's a housing crisis we want units built.
3:42:25And if not, we can't continue to hold the water capacity
3:42:27for others who may be ready to move forward.
3:42:32And thank you.
3:42:33That was very clear.
3:42:33Finally, I do want to thank everyone who has presented.
3:42:37I think it's quite clear that wealth is moving forward
3:42:42as best we can, despite the impediments that are put
3:42:45in place by such things as changing legislation,
3:42:48which in many respects is actually a consequence
3:42:51of developers wishing it.
3:42:53So thank you to everyone who is present and has presented.
3:43:01Okay, thank you so much.
3:43:04I have no one further.
3:43:05I know councillor Boussatou is willing to move receipt
3:43:08and downer is willing to second receipt of this as well.
3:43:12We can at least get that out of the way.
3:43:14I'm not sure where councillor Keran is trying to go
3:43:18with if there is another matter there,
3:43:19but let's at least call the vote then on the receive.
3:43:23I'll do that now.
3:43:25Is there anyone against that?
3:43:28Okay, so that's unanimous as well.
3:43:31Now, councillor Keran, you mentioned you might want to try
3:43:34to bring something forward, but I'm not sure based on
3:43:38the answers from our intergovernmental staff
3:43:40or approved advocacy policy and direction that we have,
3:43:45are you wanting to still try to do something
3:43:47or do you want your statements just to stand?
3:43:51Or I just, I want to leave it up to you.
3:43:53I'll give you the floor.
3:44:02We're gonna have to find the mute button.
3:44:04I did hear the answer from the intergovernmental
3:44:06that more advocacy is always appreciated,
3:44:09especially at the political level.
3:44:11And I compliment Miss Sales like,
3:44:13we are doing the advocacy at the staff level through AMO.
3:44:17We, but we've never made a statement as a council.
3:44:20And I think I've sent a potential motion to the clerks.
3:44:25I anticipate that there may be changes coming
3:44:28to the planning act and I think it would be beneficial
3:44:31to go on record as educating the minister and the premier
3:44:39that when these regulatory changes happen,
3:44:43it affects our ability to do good land use planning
3:44:49because we're strained for resources staffing
3:44:52and it affects our ability to respond to change.
3:44:55So I do think that a letter would be timely
3:45:00as the new session opens and that our position
3:45:04on the stresses that we're under
3:45:06should be communicated to the province
3:45:10on behalf of the city.
3:45:13So I would move that if I have a seconder.
3:45:16It looks like Councillor Alta, you question or seconding?
3:45:22Both.
3:45:25I'll second that.
3:45:26I have a comment.
3:45:29Okay, go ahead.
3:45:30You have a comment.
3:45:32I'm quite happy to support this
3:45:34because I think it does point out
3:45:36that there have been massive changes that have occurred
3:45:39that for all intents and purposes have meant
3:45:42that we're not able to stand in place
3:45:44and address issues effectively
3:45:47when changes coming at us at infinitum.
3:45:51And I will support it despite the fact
3:45:53that there is one concern that I have
3:45:55that there may be legislative changes
3:45:58that we might wish to have.
3:46:00I think the intent is precisely what Councillor Caron has said
3:46:03is to give us the consistency that we need
3:46:06to put the buildings in the ground.
3:46:10Yeah, thank you, Councillor Alta.
3:46:12And I know that Miss Sales wants to jump in
3:46:17from an intergovernmental advocacy lens
3:46:19and then I'll come back to us.
3:46:22Go ahead, Jody.
3:46:23Through the mayor, just an administrative point
3:46:25on the draft motion.
3:46:27Our past practice has not been to send a copy of the motion
3:46:31when it's sent to AMO.
3:46:32We don't often copy all of the member municipalities
3:46:35that can be administratively burdensome
3:46:37for our clerk's department.
3:46:39And so AMO shares it with this board
3:46:41and escalates it as appropriate
3:46:44or connects with our intergovernmental staff
3:46:45for more information about the specific item.
3:46:48So there may be a friendly amendment there for housekeeping.
3:46:55Okay, we can circle back to that.
3:46:58So any more questions before comments at least
3:47:00before we maybe correct that?
3:47:03Oh, okay, Councillor Downer.
3:47:05Yes, I'd love to support something like this,
3:47:09but I do have that concern that there's advocacy going on
3:47:18that could impact changes in legislation
3:47:22to the Planning Act.
3:47:24And it's not just going on in Guelph,
3:47:26it's going on across the province.
3:47:28And some of these, if he's listening,
3:47:33his polls aren't quite as good as they used to be,
3:47:36this may, there may be an influence.
3:47:40And if we do something like this,
3:47:41we could be shooting ourselves in the foot.
3:47:44So I would rather Councillor Kerron take this motion away
3:47:51and maybe finesse it a bit more onto the moratorium
3:47:56on changes that could impact such and such
3:48:00and such and such is what I would prefer.
3:48:03So I can't support it in this current wording
3:48:06and it's come to me rather suddenly too.
3:48:09So but I would, if something was more finessed around
3:48:15that it was to do with some of the negative impacts,
3:48:17but I am concerned because we do,
3:48:20we could be finger pointing at us for,
3:48:23if some of the advocacy that's going on
3:48:28is helpful to municipalities.
3:48:33Okay, thank you.
3:48:36If you don't mind, Councillor Kerron,
3:48:38can I just jump in with my comments
3:48:39because then you can wrap them up
3:48:40whether you agree or disagree with them
3:48:42and then you can have the final say, okay, perfect.
3:48:44Or you can correct some of that little administrative thing
3:48:46as well that Jodi brought up.
3:48:49Yeah, this is, I totally understand.
3:48:53In fact, I've said it a million times
3:48:55about how these drips and drabs of changes
3:48:58that come all the time.
3:48:59I mean, we're all united on that.
3:49:02So I'll stop there on that part.
3:49:04The problem is exactly what Councillor Allt said.
3:49:10So there is the potential to have legislation come
3:49:14this month that could look to set up publicly owned
3:49:18and publicly run utilities to help lower development charges
3:49:25across the entire province for housing
3:49:28for water and wastewater infrastructure.
3:49:31So like why would we, why would we want to pass a motion here
3:49:36that stops potentially something that might be good?
3:49:40So I think we have to be very careful
3:49:44on sort of the broad based wording,
3:49:47which is where Councillor Downer I think is right
3:49:49to bring up that issue.
3:49:51The net has been cast so wide here
3:49:55that it to a fault, it may touch on actual policy
3:50:01or legislation that actually might be good.
3:50:05And we yet don't even really know it's coming.
3:50:08And of course we have our normal process with staff
3:50:10that identify through the register, you know,
3:50:14every single bill that comes forward and whatnot.
3:50:17The other thing that I would just say is
3:50:21the flip side to what Councillor Caron is asking for
3:50:25is something that actually many municipalities
3:50:29and organizations and developers
3:50:31and whatnot has been looking for.
3:50:32And what I mean by that is instead of drips
3:50:34and drabs coming out, just make 30 changes
3:50:40and get it all done at one time
3:50:42so that certainty is done for the future.
3:50:46So this thing could go either way,
3:50:50but I can just tell you right now by, you know,
3:50:52we've had legislation, I'll give you an example.
3:50:55We've had legislation, I would say in the most part
3:50:57that has really tied up our staff 100%.
3:51:00That's not even questionable, 100%.
3:51:02But there has been some where it's been good legislation.
3:51:06Like for instance, between Minister Clark
3:51:10and Minister Calandra for housing,
3:51:13they reinstated the ability for us to collect
3:51:17development charges to go towards capital
3:51:20master plan studies.
3:51:22They reversed that.
3:51:23That was a legislation that was reversed.
3:51:25So to just say that we want a moratorium for two years
3:51:28and I don't know why two years was picked,
3:51:30why not one or why not five?
3:51:33It just seems like this is on the fly.
3:51:35It's not scoped properly.
3:51:40And I'll just tell you right now,
3:51:41I find it difficult to do advocacy work
3:51:45and these types of things do not bode well
3:51:49when the advocacy work that we're actually trying
3:51:52to focus on is being done.
3:51:55So my preference to the mover,
3:51:56because again, she's not,
3:51:58Leigh Ann, I'm sorry, Councillor Caron's not really,
3:52:01she's speaking in the right way.
3:52:04Like don't get me wrong.
3:52:05Like she's speaking in the right way.
3:52:07But this is too much on the fly.
3:52:11It's not encapsulating the context of what we're in
3:52:14and what we're about to probably get.
3:52:17And so I would rather it be removed
3:52:19and brought back at another time
3:52:22where it's scoped more properly.
3:52:23Because I cannot, we shouldn't be doing this today.
3:52:27I'll be blunt.
3:52:28I don't think we should be doing it today
3:52:30the way it's been tabled.
3:52:32That's my opinion.
3:52:33I'll turn it right back to the mover
3:52:35and then we can determine whether or not
3:52:38want to move ahead with this,
3:52:39with the changes or not.
3:52:40Up to you.
3:52:41Go ahead, Leigh Ann.
3:52:42I'm the Councillor Caron.
3:52:43Thanks, Mark Guthrie.
3:52:44And I always appreciate the input of my colleagues.
3:52:47It was on the fly because the slide related to advocacy
3:52:51that our staff presented talked about
3:52:54the progress that was being made
3:52:55and how there were other opportunities
3:52:58for advocacy moving forward.
3:53:00So it was in response to that.
3:53:02And as you said, the focus of this motion
3:53:07was specifically related to the impact
3:53:10it's having on our staffing,
3:53:12the competition for resources
3:53:15and how responsiveness to change
3:53:17is actually slowing down housing.
3:53:20But I would agree with the commentary that's been made
3:53:22that the way it's phrased and the scope
3:53:25maybe isn't clear enough for us to be able
3:53:27to compose a letter at this time.
3:53:29And I will withdraw the motion
3:53:33and I'll come back at a later time
3:53:34with a more defined scope
3:53:36so that our wealth's voice is being heard.
3:53:40But specifically our voice is being heard on matters
3:53:43that are relating to our ability
3:53:45to get shovels in the ground in this community.
3:53:48Great.
3:53:49Thank you.
3:53:50And there's just so you,
3:53:51because you're not in the room,
3:53:52like people are saying, including me,
3:53:54yep, yep, great, great.
3:53:55So there's heads nodding.
3:53:57There's very positive feedback in the room
3:53:59as you're speaking on that.
3:54:01Let's try to work together on that with you
3:54:04and get a unanimous vote on something that can come forward
3:54:07whenever the right timing is there, okay?
3:54:11Perfect.
3:54:12So if there's nothing more than this item
3:54:15as the presentation is done, am I good everybody?
3:54:18Yeah, okay.
3:54:20Thank you again to staff.
3:54:22That's great.
3:54:23We are at our bylaws.
3:54:25And so Councillor Booth,
3:54:29oh, I thought we would do bylaws and then,
3:54:31and then we can,
3:54:33because there's nothing in closed
3:54:34that will impact the bylaws.
3:54:36So I'm okay to do the bylaws, right?
3:54:37Yep, okay, good.
3:54:38So Councillor Boussatile will do the bylaws
3:54:40and then we'll head back into a closed session quickly, okay?
3:54:44Councillor Boussatile, please.
3:54:45Thank you.
3:54:46And through the mayor, that bylaws 202621213,
3:54:5021219, 21221, 21222, 21224,
3:54:56be approved subject to subsection 284,
3:55:00subsection 11, four of the municipal act.
3:55:09Okay, thank you.
3:55:10And just one more,
3:55:11just one second here if you don't mind.
3:55:13I think clerks, do you have another motion?
3:55:16I'm sorry, that was tabled.
3:55:20Not tabled, sorry.
3:55:21That was ready to go about Brownfield.
3:55:26You didn't get that?
3:55:28Okay.
3:55:31Councillor Goller,
3:55:32because I remember you indicating
3:55:33that you wanted to move that.
3:55:35Can I, I'm very sorry.
3:55:36I forgot to, there was an email that was sent out
3:55:40a week and a bit ago.
3:55:41Maybe a week ago in regards to directing staff
3:55:46to consider to look into the Brown,
3:55:47to the reconstituting and reestablishing
3:55:51and looking at the Brownfield grants.
3:55:53I had sent that to all of council.
3:55:57Councillor Goller, I believe you did mention to me
3:55:59that you would be willing to move it
3:56:02and Councillor Keran would be willing to second it, I think.
3:56:06If I recall, sorry, I'm going on the fly.
3:56:08I know we've just done the bylaws.
3:56:10Do I have permission here to just tie this motion
3:56:14for us back to the presentation that was just done?
3:56:18Because that's where it was good to land.
3:56:20Do I have, does anyone go to challenge me on that?
3:56:25No, okay.
3:56:26So do we have the motion that's ready to go?
3:56:28I'm sorry, I forgot about that.
3:56:30Yeah, okay, just give us a moment, okay, everybody?
3:56:43Just over to, through to the clerks.
3:56:47I just flipped you a copy.
3:57:04And so just as the clerks was looking to bring that up,
3:57:07this was something that we were looking to see
3:57:12if there would be council support
3:57:13to move forward on with staff.
3:57:16Because we're talking about housing,
3:57:18we're talking about incentives for housing,
3:57:20we're talking about removing barriers for housing.
3:57:24We have had successful programs in that realm in the past.
3:57:29One of them that we can maybe look at
3:57:33is in regards to Brownfield grants
3:57:36that have been used in the past
3:57:38to help accelerate and build housing.
3:57:42So with it being tied to the Housing and Guelph
3:57:462025 annual report, we felt it was important
3:57:49to bring that forward at this time.
3:57:51So clerks is ready.
3:57:54Is it okay to put up on the screen, Councillor Gowar?
3:57:57Okay, and then Councillor Gowar,
3:57:59if you don't mind reading it out for us.
3:58:02Thank you, your worship, for bringing this idea forward.
3:58:04I'd like to move that staff be directed
3:58:06to explore next steps to reestablish
3:58:08the Brownfield Community Improvement Plan
3:58:12and to report back to council in early 2027.
3:58:16Great, thank you.
3:58:17And I think I tried to do it justice in my preamble there.
3:58:21Is there anything staff want to add to that?
3:58:23It's been moved by Gowar and Koran.
3:58:28Anything to add before I call the vote?
3:58:30Terry?
3:58:31To your manager, we've got three just that staff
3:58:33are in support of the idea here.
3:58:34We can certainly get this work done
3:58:36within the timeframe that council has identified.
3:58:39And we do also have past success with this program
3:58:42in terms of unlocking housing.
3:58:43So it's definitely something worth looking into
3:58:46from our perspective.
3:58:48Great, thank you.
3:58:49Okay, is it okay if I call the vote on that then, everybody?
3:58:52Okay, I'll do that now.
3:58:53Is anyone against that direction?
3:58:58Nobody?
3:58:58Okay, that's unanimous as well.
3:59:00Nothing but unanimous here today, it's good.
3:59:02Okay, so I'm very sorry about that little mix up there
3:59:05and thanks for letting us go back
3:59:06to make sure that was captured under that item.
3:59:09And the bylaws are now done.
3:59:11So we do need a motion now to go back into,
3:59:17oh, so we didn't even do the bylaws yet.
3:59:19Oh, good, so actually I did it right
3:59:20before we did the bylaws.
3:59:22Good, so moved by yourself, seconded by councillor Downer
3:59:25for the bylaws.
3:59:26Anything on the bylaws, anybody?
3:59:29Nothing, I'll call the vote then
3:59:30as anyone against the bylaws.
3:59:33And that's nobody, so that is unanimous as well.
3:59:36All right, now for real this time,
3:59:38I do need a motion to move back into closed session.
3:59:41I do have to read it all out one more time.
3:59:44So it's under land use planning and legal considerations
3:59:48as per section 239, 3.11 of the municipal act
3:59:52regarding a meeting held for the purpose of educating
3:59:54or training the members.
3:59:56How's there's gonna move that for us?
3:59:58Clausson is gonna second it for us if that's okay.
4:00:02And I will call the vote, which is anyone against
4:00:05moving back into closed session
4:00:07for that educational purpose.
4:00:09There is nobody against that, that is unanimous.
4:00:12We will meet very quickly in closed session, everybody.
4:00:15Thank you very much.
4:22:21All right, thanks everybody.
4:22:22I'm gonna call the meeting back to order.
4:22:24We did just come out of closed session
4:22:26that we went into earlier.
4:22:27It was only under the one item titled land use planning
4:22:31and legal considerations for a council education session.
4:22:36As I already stated earlier,
4:22:38nothing has changed in regards to my summary.
4:22:40We did get educated on these issues.
4:22:44There was no directions, no decisions being made.
4:22:47We just received information
4:22:49from that perspective of education.
4:22:52And with that, that is my summary.
4:22:54And so now I'm looking for a motion to adjourn
4:22:59and Boussatil and Hauser are gonna do that for us.
4:23:03And I'll call the vote is anyone against?
4:23:07Nobody.
4:23:08Okay, thanks everyone
4:23:09and have a great rest of the day.
4:23:11Bye-bye.