Council Planning · December 10, 2024 · Item 8.2
City Council approve the deconstruction of the Rutherford Conservatory at 37 Christie Lane on the condition that salvageable steel be retained and conserved for future use…
Main motion under the agenda item 37 Christie Lane - Application to Deconstruct a Cultural Heritage Resource - 2024-514
Carried (12 to 0)
12 in favour, 0 against — unanimous
This was one of 3 motions on the same item
In the order council took them. A vote makes sense next to the ones around it.
- 1/3Main motionCity Council approve the deconstruction of the Rutherford Conservatory at 37 Christie Lane on the condition that salvageable steel be retained and conserved for future use…Differs here: …use in a commemorative structure.no recorded vote
- 2/3Main motionEncourage the University of Guelph to retain to the best of their ability as much of the salvaged material from 37 Christie Lane and include and…Carried (12 to 0)
- 3/3Main motionCity Council approve the deconstruction of the Rutherford Conservatory at 37 Christie Lane on the condition that salvageable steel be retained and conserved for future use…you are hereDiffers here: …use in a commemorative structure. That Council encourage the University of Guelph to reuse and salvage to the best of their ability to include and incorporate both limestone and glass into the redeveloped commemorative garden.Carried (12 to 0)
What was voted on
The motion in its exact words, as recorded in the minutes.
That City Council approve the deconstruction of the Rutherford Conservatory at 37 Christie Lane on the condition that salvageable steel be retained and conserved for future use in a commemorative structure. That Council encourage the University of Guelph to reuse and salvage to the best of their ability to include and incorporate both limestone and glass into the redeveloped commemorative garden.
Moved by Councillor O'Rourke, seconded by Councillor Chew.
How the room voted
In favour (12)
- Allt
- Billings
- Busuttil
- Caton
- Chew
- Downer
- Gibson
- Goller
- Guthrie
- Klassen
- O'Rourke
- Richardson
Who spoke to it
Councillor Caron recused themselves due to a declared conflict of interest. Jack Mallon, Heritage Planner, presented. Alex Krucker, Heritage Guelph, presented. The following delegates spoke: Aimee Puthon Betsy Puthon Alex Smith Harry Bakker The following delegates did not speak: Susan Watson
What council was given
The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.
- 37 Christie Lane - Application to Deconstruct a Cultural Heritage Resource - 2024-514.pdf
The University of Guelph has applied to take down the D.M. Rutherford Conservatory at 37 Christie Lane, a pagoda-style glass conservatory recently given interim heritage protection. Staff recommend Council allow the deconstruction on the condition that salvageable steel be kept and reused in a future commemorative structure. Council has 90 days from the complete application to decide, after consulting Heritage Guelph.
- Attachment-1 Property Location.pdf
- Correspondence - Janice Gallant.pdf
- Correspondence - Jason Kalbfleisch, Guelph Chamber of Commerce.pdf
- Correspondence - Rene Van Acker, University of Guelph.pdf
A summary is this site’s description of a document, not the City’s. Open the document before relying on one.
What was said
8,190 words from the meeting recording, transcribed automatically. Times are from the start of the recording.
Read the debate(click to open)
7:54:28because of the risk identified
7:54:29in the Tacoma Engineering Report posed by snow loads
7:54:32on the conservatory structure.
7:54:35As per council's direction at the November 13th
7:54:37council meeting, the notice of intention to designate
7:54:39was issued on November 21st,
7:54:42with solvable steel elements of the conservatory
7:54:45listed as the heritage attribute.
7:54:48Since then, heritage planning staff have been collaborating
7:54:51with the University on a path forward.
7:54:53As part of this application, the University has submitted
7:54:56a report by an engineer who is a member
7:54:58of the Canadian Association of Heritage Professionals
7:55:01that describes a plan for the careful dismantlement
7:55:04of the conservatory, the identification of solvable steel,
7:55:08and the retention of steel for future reuse
7:55:10in a commemorative structure.
7:55:13Heritage planning staff are satisfied that this report
7:55:16aligns with council's direction
7:55:18and anticipate continued collaboration
7:55:20with the University on commemoration
7:55:22of this heritage structure.
7:55:25Thank you, that's all.
7:55:27Okay, well thank you very much.
7:55:29And Alex, did you want to also just say a few words
7:55:33on behalf of Heritage Guelph?
7:55:35And go right ahead whenever you're ready.
7:55:37Thank you, yeah.
7:55:38I'm mainly here as a resource to answer any questions
7:55:43that you have regarding Heritage Guelph meetings to date
7:55:47and the discussions that have happened around this file
7:55:50and to clarify any part of the motion
7:55:52that came out of our recent meeting.
7:55:56That being said, I do wish to provide some context
7:55:59to that motion that is from us before you.
7:56:03So a very brief recap as this has been a long night.
7:56:07The history of this file as it pertains
7:56:08to Heritage Guelph is involvement.
7:56:11So in January, this was identified as top priority.
7:56:16So in July, we received our Heritage Evaluation Report
7:56:19from staff and the Heritage Attributes.
7:56:23Through the research provided at that time, again,
7:56:26as you know, we, this conservatory met eight of nine criteria
7:56:30which is a very high standard to hit.
7:56:36We requested as a committee that staff bring forward
7:56:40a more detailed list of Heritage Attributes
7:56:42at our September meeting and urge staff
7:56:44to continue the conversation with the University
7:56:47on conservation efforts.
7:56:49I will note that there were delegates from the University
7:56:52and the architect at that meeting and to quote them,
7:56:54there was no pressure at that time.
7:56:57They wanted to see the process kind of move forward.
7:57:00So in that September meeting,
7:57:02Heritage Guelph received the revised Heritage Attributes
7:57:05and finding them satisfactory past the motion recommending
7:57:08Council give notice of intention to designate under part four.
7:57:13The University and the architect and engineers
7:57:16were present as delegates
7:57:19and it was at that meeting that Heritage Guelph
7:57:21was informed of their intention to oppose
7:57:25or their opposition to the intention to designate,
7:57:29to not really spend resources on conservation
7:57:32and to ultimately file for a demolition.
7:57:36I just want to be clear though,
7:57:39that as far as Heritage Guelph is concerned,
7:57:42procedurally for that agenda,
7:57:43we were there to discuss Heritage Attributes
7:57:45and provide Council advice with regards to designation.
7:57:50So there wasn't a conversation at that meeting
7:57:52with regards to potential demolition application.
7:57:58We're here as you're well aware to advise Council
7:58:00on whether a building is deserving of designation or not
7:58:05and the OHA does not instruct us to consider site conditions
7:58:09or property owner financial situation.
7:58:14We're simply there to look at the values
7:58:17that that structure has
7:58:19and what attributes contribute to that.
7:58:24In the December 2nd meeting,
7:58:26we discussed the outcomes
7:58:28of the November 13th Council Planning Meeting
7:58:31and received for comments the application
7:58:33to deconstruct and salvage 37 Christie Lane.
7:58:38We were also asked to review Council's direction
7:58:42to limit the part four designation
7:58:46to just consider the salvageable steel
7:58:49as heritage attribute
7:58:51and that the deconstruction for the purpose
7:58:53of future commemoration may be permitted.
7:58:57So just to clarify again,
7:58:59so we have all the pieces together,
7:59:00we received the staff report,
7:59:02the deconstruction and salvage report
7:59:04written by Tacoma Engineering
7:59:06and the university's letter of repurposing intent.
7:59:10But I will note and just factually
7:59:14that the university, nor the engineer or the architect
7:59:17were present at that meeting.
7:59:19So the committee was unable to clarify anything with them
7:59:23before anybody jumps in.
7:59:24I'm well aware that there is no requirement
7:59:27for the university to delegate at our meetings,
7:59:32but we do welcome having them there
7:59:34to have an open conversation about things.
7:59:39So Heritage Golf provided Council
7:59:45with quite a long motion, which is maybe unusual.
7:59:50I think Council should take this as an attempt
7:59:53to try and get as much stuff out onto the table
7:59:58given how fast things have been moving with this file.
8:00:03It may be helpful to take the first three parts
8:00:05of that motion and look at them specifically,
8:00:08not that the others aren't important as well,
8:00:10but I wanna just be very clear
8:00:13for coming from Heritage Golf that fundamentally
8:00:17we do not support demolition or deconstruction.
8:00:21It runs contrary to the outcome of our September meeting,
8:00:25which was establishing that this property
8:00:29meets a high level of criteria
8:00:31and is well deserving of designation.
8:00:38I'll touch on this in a moment,
8:00:40but there's also functionally
8:00:43a bit of an issue with even sort of limiting
8:00:46the heritage attributes to just one,
8:00:49but I'll talk about that in a moment.
8:00:51Finally, we just advise or urge Council
8:00:54to consider providing more time for public input
8:00:58or for the potential alternative solutions
8:01:01that might arise from the public given this file.
8:01:04We did receive a delegation at that meeting from the public
8:01:07and there was a conversation about
8:01:10how going into the November 13th meeting,
8:01:13we had a building that had a high level of criteria
8:01:15that it met, seemed a sure thing for designation,
8:01:19but came out of that meeting with a potential demolition.
8:01:24Excuse me.
8:01:27I just will reflect very simply on the designation process
8:01:31as this might provide some context
8:01:33to again, the motion as before you.
8:01:38When we identify a building
8:01:40as having potential for designation,
8:01:43we do the research, the staff does the research
8:01:46and they did a very good job at that.
8:01:48Out of that research, we learn a rich history
8:01:50of that building and staff have to then
8:01:54condense that down into a statement
8:01:57of cultural heritage value.
8:01:59And it does so by looking at the Ontario Heritage Act
8:02:01and the criteria that are there.
8:02:05Also we have to provide for heritage attributes
8:02:08and those heritage attributes correspond to the criteria.
8:02:12They help build up and make everything tight, right?
8:02:18They are kind of like, I'm amazed.
8:02:20So they're kind of like the bricks or stones
8:02:22to the walls which are the criteria
8:02:24and altogether you have a structure, you have a building.
8:02:31The OHA does not provide
8:02:34really a process for deconstruction or salvage.
8:02:39I mean, it sort of establishes
8:02:41whether or not a building has value or it doesn't.
8:02:45However, understanding how heritage attributes
8:02:48contribute to an understanding of the statement
8:02:50of cultural heritage value does provide some picture
8:02:55or paint a picture for what could be understood
8:02:59in the conversation of deconstruction.
8:03:04I'll just finish off by saying that
8:03:08like Heritage Guelph had to consider
8:03:10and what council now has to consider
8:03:12is does this property have value?
8:03:16What elements of the structure communicate that value?
8:03:20What would be the impact to the value of this property
8:03:23if there are changes?
8:03:25And how do those values that we've identified,
8:03:29how do they change if commemoration moves forward?
8:03:34And what are the realistic outcomes of commemoration?
8:03:39Again, Heritage Guelph is gonna stick by
8:03:42its original intention that this building meets
8:03:46is well deserving of designation.
8:03:50And that all the heritage attributes
8:03:53that were outlined in that September meeting
8:03:55contribute to that understanding.
8:03:58When you start to pull apart individual attributes
8:04:02like those bricks out of the walls of a building,
8:04:05the brick itself doesn't tell you what the building is.
8:04:09It's just a part of it.
8:04:11And if you pull too much of the structure apart,
8:04:14suddenly it begs the question, what is their left?
8:04:17That actually speaks towards a statement of cultural value.
8:04:23I think council should consider what the outcome of
8:04:28identifying just the steel has in the future.
8:04:32I mean, you may be just left with steel.
8:04:37I'll leave it at that.
8:04:39Thank you, Alex.
8:04:41We appreciate it.
8:04:43And we do have some delegations
8:04:45that I've been waiting a long time.
8:04:47So we're gonna kick it off right away.
8:04:50Is Ami Puthan, Betsy Puthan here?
8:04:53I know it's very nice to see some.
8:04:59Some old faces.
8:05:08Hi, how are you?
8:05:09Thank you for waiting.
8:05:11Long night.
8:05:12Yes.
8:05:13You feel like your heritage all of a sudden now.
8:05:15Been waiting so long.
8:05:17So you as well, five minutes for all the delegates tonight.
8:05:20Okay, so you'll hear their chime at the four minutes,
8:05:2230 second mark and please go right ahead.
8:05:24Okay.
8:05:26Hello, Mr. Mayor, counselors and staff.
8:05:29Thank you for having me as a delegate today.
8:05:32I'm here to voice my concern about the proposed demolition
8:05:36of the Rutherford Conservatory.
8:05:39I'm a grad of U of G, a third generation Guelphite
8:05:43and an individual who cares deeply about our community.
8:05:48What is the significance of the structure?
8:05:51The conservatory is one of the remaining examples
8:05:54of the few Pagoda style greenhouses in North America.
8:05:59The structure is emblematic of the U of G's roots in history
8:06:04as Ontario's agricultural college.
8:06:07It is an iconic U of G building that predates the founding
8:06:12of the university as we know it in 1964.
8:06:16U of G's plan.
8:06:18The U of G plans to demolish the structure.
8:06:22In some correspondence, they refer to it as deconstruction.
8:06:27This irreplaceable asset was recently awarded eight
8:06:31of the nine provincially prescribed criteria
8:06:34for determining cultural heritage value.
8:06:39I just learned that few, if any,
8:06:42other Guelph structures have received an eight
8:06:45of nine ranking for their historical importance.
8:06:49As the city of Guelph report notes,
8:06:52this structural asset offers unique design
8:06:56and physical value, historical and associative value
8:07:00and contextual value.
8:07:03This asset is irreplaceable.
8:07:06The proposal to demolish and salvage parts
8:07:09of the skeleton does nothing
8:07:11to preserve the living history.
8:07:15The city of Guelph has endured many regrettable losses
8:07:18through demolition of its historical structures.
8:07:22Example, Guelph's Carnegie library,
8:07:25which at the time of demolition was attributed
8:07:28to financial efficiencies.
8:07:31Can you imagine other world renowned
8:07:34and globally recognized academic institutions
8:07:38demolishing important historic,
8:07:41prominent buildings on their campus?
8:07:45There is a grassroots petition to raise the profile
8:07:49of this demolition plan and comments reflect
8:07:52this sentiment to this historic structure.
8:07:55As well, alumni are posting to social media,
8:07:59their grad picks, wedding picks, engagement picks
8:08:03in front of this glass greenhouse.
8:08:07I urge the leadership of this council
8:08:10and at the university to have the courage
8:08:14to lead the preservation and protection
8:08:18of this important, irreplaceable
8:08:21and historical asset for future generations.
8:08:25I urge the council to refuse the application
8:08:30for demolition.
8:08:32This is a legacy decision.
8:08:35Thank you.
8:08:37Thank you very much.
8:08:38And is there a question as a follow up at all?
8:08:43There isn't.
8:08:43Thank you.
8:08:45You've stayed this long, so stick around to the end.
8:08:48All right, thank you very much.
8:08:51Betsy, come on down.
8:09:01It's odd me being here, but it's very nice to see you.
8:09:04Yeah, nice to see all of you.
8:09:06Yeah.
8:09:07Welcome back.
8:09:08My remarks say good afternoon,
8:09:09but I might have to change that.
8:09:11So.
8:09:14I'll turn it over to you, Betsy,
8:09:15whenever you're ready.
8:09:16All right, well, thank you.
8:09:18And good evening, Mr. Mayor, councillors, staff
8:09:22and community members.
8:09:24My name is Betsy Puthon.
8:09:26I'm a Gua'a Fight, also a University of Gua'a Grad.
8:09:30And I cherish our community and all that makes it special.
8:09:34Thank you for this opportunity to comment
8:09:37about the University of Gua'a's application
8:09:40to demolish the iconic glass greenhouse known
8:09:42as the DM Rutherford Family Conservatory.
8:09:47The glass greenhouse has been a productive community builder
8:09:51for the university.
8:09:53It has brought people together as a classroom
8:09:56for research, as public space, as a fundraising focus.
8:10:01It's listed on the student's favorite campus study spots
8:10:05from this spring even, and is a favorite grad photo setting.
8:10:09This greenhouse is iconic on campus,
8:10:12and the Bacota design is rare in North America.
8:10:17The petition launched less than two weeks ago,
8:10:22with over 1,400 signatories checked earlier today,
8:10:28has brought a lot of comments forward,
8:10:30including people are questioning a building
8:10:34of this significance with its own endowment
8:10:37established by alumni for upkeep and perpetuity.
8:10:41How is it permitted to fall into disrepair
8:10:44and ultimately a state of demolition by neglect?
8:10:48That's the point we arrive at today.
8:10:50It is very important to note, as it has been noted,
8:10:54that a property may be designated
8:10:56under the Ontario Heritage Act
8:10:58if it meets two or more of the nine criteria
8:11:01for determining cultural heritage value or interest,
8:11:05as prescribed under the Ontario regulations.
8:11:08According to the report prepared
8:11:10by this council's own Heritage Committee,
8:11:13the DM Rutherford Family Conservatory
8:11:16meets eight of the nine criteria.
8:11:20It's not surprising that the Heritage Committee
8:11:22recommended that this greenhouse be designated
8:11:25as a heritage property.
8:11:27But let me get to the point.
8:11:29If council won't protect a heritage building
8:11:32matching eight of nine provincial criteria,
8:11:36I really wonder what will this council protect?
8:11:40Demolition of a heritage building
8:11:42that meets eight of nine provincial criteria
8:11:45is just plainly a bad idea.
8:11:49I respectfully remind council
8:11:51that you're the stewards of our history
8:11:54and that this is a gem in our crown.
8:11:57Demolition of historic assets
8:11:59is always an irreplaceable loss
8:12:02to local and national architecture.
8:12:04And in this instance, a loss for the university's
8:12:07founding history in agriculture and food.
8:12:11Similar unique glass greenhouses
8:12:14are being restored in Ontario.
8:12:16The City of Toronto is preserving the Palm House
8:12:20at Allen Gardens, and the City of Oshawa
8:12:23recently restored the Parkwoods greenhouses.
8:12:26And they did not spend $5 million to do so.
8:12:30In closing, this decision is a big responsibility,
8:12:35but with big responsibility comes opportunity.
8:12:39I urge council to seize this opportunity
8:12:42and to protect a treasured asset of our community
8:12:46by denying the university's demolition application.
8:12:50Thank you.
8:12:52Great, thank you Betsy.
8:12:53And is there any follow up for her at all?
8:12:58I do have a question.
8:13:00Sorry to put you on the spot,
8:13:01but you said something about an endowment fund.
8:13:06Do you know any history on that?
8:13:08Can you explain that?
8:13:09When this building was rebuilt in the 90s,
8:13:15it was funded by alumni
8:13:18and the alumni put together an endowment fund
8:13:22which has grown to $800,000.
8:13:25So they do have funds that were intended
8:13:28for the annual and regular upkeep of this building.
8:13:34And under your recollection or your knowledge today,
8:13:38that money is available?
8:13:41Yes, the endowment capital is retained
8:13:44by the university in perpetuity.
8:13:46And they have an investment and release of funds formula.
8:13:50And I'm sure there are always opportunities
8:13:54to make adjustments as things do change.
8:13:57But at this point from what I've read,
8:13:59they have $800,000.
8:14:01And if you think more on money,
8:14:03the university has said it has a million dollars
8:14:07to put towards the demolition,
8:14:09$250,000 to demolish, $750,000 to create
8:14:15some sort of greenscape.
8:14:19So if you do the math is what you're saying
8:14:22and add it all up, I understand.
8:14:24Thank you for that clarity.
8:14:25If I could just add to that,
8:14:26every person that has contacted me
8:14:30has offered to write a check.
8:14:32There is money willing to be spent,
8:14:35to be brought forward to help this building
8:14:37continue to be part of our history.
8:14:40Okay, thank you.
8:14:42Thank you very much.
8:14:44Oh, sorry Betsy,
8:14:45I do have a follow up from council or work.
8:14:49Thanks, Mary Guthrie, through you to Ms. Puthon.
8:14:51Have you had a conversation with the university
8:14:53about the potential use of that endowment fund?
8:14:58The university has not replied to any inquiries.
8:15:02Okay, thank you.
8:15:05We'll ask them later.
8:15:07Thank you for the clarity.
8:15:09You can go for real this time.
8:15:10Thank you.
8:15:12Okay, and is Susan Watson here again?
8:15:19Okay, no.
8:15:20Alex Smith, come on up.
8:15:24And then Harry Baker from the university,
8:15:27Guelph will join us by video as the last delegation.
8:15:30So thank you very much for waiting and go right ahead.
8:15:33Well, thank you for your patience throughout this.
8:15:35Your honor and members of council, or sorry, your worship.
8:15:40Your honor.
8:15:42Your worship members of council and staff.
8:15:45At the November 13th council planning meeting,
8:15:48staff presented a very straightforward report
8:15:51recommending the designation of 37 Kristy Lane.
8:15:55Everything changed when staff advised council that night
8:16:00that creative solutions,
8:16:01including demolition of the building
8:16:03and using the steel elements
8:16:05to build a commemorative structure,
8:16:07could be found if the property was designated
8:16:10and the heritage attributes were limited
8:16:12to the salvageable steel elements.
8:16:16Heritage Guelph and the public had no say in this solution
8:16:19because they had no notice that staff would take that position.
8:16:23Council devised a plan on the fly
8:16:25without the benefit of any council consultation
8:16:29or sober second thought.
8:16:31That plan will leave you with a vacant lot
8:16:35as the designated property
8:16:37and a pile of steel as the heritage attributes.
8:16:42At best, the Heritage Act may permit you to exercise
8:16:48some control over the pile of steel
8:16:50by requiring a heritage permit to change that pile of steel.
8:16:55But the city has no authority under the Heritage Act
8:16:58to require that pile of steel
8:17:01be used to build a commemorative structure.
8:17:04It gets worse.
8:17:07Staff take the position that the university's commitments
8:17:12align with council's direction
8:17:14from the November 13th council meeting.
8:17:17I beg to differ.
8:17:19The university proposes that first of all,
8:17:23the determination of the salvageable steel
8:17:26will be performed by Arlen Otto, their nominee.
8:17:30And second, the any quantities of salvageable steel
8:17:34not repurposed in the construction
8:17:37of the commemorative gardens
8:17:39will be disposed post construction.
8:17:43In other words, the university decides
8:17:45how much steel is salvageable
8:17:48and how much of the salvage steel, if any,
8:17:52gets used in a commemorative garden.
8:17:55These provisions make the designation of the property
8:17:59moderately meaningless.
8:18:01As effectively Ms. Walkie pointed out
8:18:04in response to councillor Orr-Rooks proposed amendment
8:18:07to the motion on November the 13th.
8:18:12The university has expanded a lot of effort
8:18:14and money lobbying for the demolition
8:18:17of one of the most important heritage buildings in the city.
8:18:20It's unfortunate they did not make a similar effort
8:18:23to find ways to save the conservatory.
8:18:27Look for instance at the Palm House in Arlen Gardens
8:18:30which is being restored largely through private donations.
8:18:34The city of Toronto, if you look at their site,
8:18:38is bragging about the effort they're making
8:18:41to save an important public asset.
8:18:44In closing, I would just like to say
8:18:47I recognize the good faith effort
8:18:49made by members of council and staff
8:18:52to find a compromised solution.
8:18:55But in my respectful submission,
8:18:57that solution leaves you with nothing
8:19:01but a designated pile of steel
8:19:04with no leverage to influence
8:19:07what the university does with that steel.
8:19:10In other words, all you have accomplished
8:19:13is to permit the demolition of the building.
8:19:15Thank you.
8:19:17Great, and thank you very much for your take on it.
8:19:20I don't think there's a follow up.
8:19:22There isn't, keep walking.
8:19:24You're good, yep, thank you.
8:19:27And then Harry Baker from the University of Guelph
8:19:30is gonna join us by video.
8:19:45Good evening, my apologies.
8:19:47I'm not sure if my video is working
8:19:49so you might be stuck with audio tonight, so I apologize.
8:19:54Good evening and thank you for the opportunity
8:19:55to speak with you tonight.
8:19:57My name is Harry Backer
8:19:58and I am the Associate Vice President of Physical Resources
8:20:01at the University of Guelph.
8:20:03You may recall I attended with the delegation
8:20:06that spoke at the November 13th Council Planning Meeting
8:20:09where we were pleased that the University and City
8:20:11came to a win-win solution
8:20:13for the DM Rutherford Family Conservatories
8:20:16in the next life cycle.
8:20:18Aligned with the university's plan
8:20:20to honor the history of the Conservatory Council,
8:20:23unanimously passed a motion
8:20:25to designate the salvageable steel.
8:20:27Since that time, the university's worked with our consultants
8:20:30to develop a plan for conservation
8:20:32and outline the next steps
8:20:33to advance our commemorative garden.
8:20:36These materials were shared with city staff
8:20:38that was mentioned
8:20:39and are part of the request being considered today.
8:20:43We're now at stage where we urgently require a permit
8:20:46to begin deconstructing the Conservatory
8:20:48and make the site safe and secure
8:20:50for our community and the public.
8:20:52We're committed to working with the city
8:20:54and being a collaborative partner
8:20:55as we design and install a commemorative garden
8:20:58that will honor the legacy of the building,
8:21:01which is why we are disappointed
8:21:02to see Heritage Gull foot forward
8:21:04a number of motions at its meeting on December 2nd
8:21:06that would jeopardize our plans to make the site safe.
8:21:10Moreover, these recommendations are not in keeping
8:21:12with the letter of Council's previous motion
8:21:14or are they aligned with the collaborative spirit
8:21:16in which Council and the university found a path forward.
8:21:21We're asking Council to support the city staff recommendation
8:21:24and allow U of G to begin to methodically dismantle
8:21:26the Conservatory and remove what is publicly
8:21:29or what is presently a safety hazard.
8:21:32As outlined in our conservation plan,
8:21:35we intend to repurpose the salvageable steel
8:21:37to be reused in a form and quantity informed
8:21:40through a design competition
8:21:41for our landscape architecture students.
8:21:44The competition presents a chance for U of G students
8:21:47to contribute meaningfully to the university's history
8:21:51while exercising their creativity and expertise
8:21:53to determine best way to reuse the salvageable steel.
8:21:57We must start this work as soon as possible.
8:22:00Our independent structural engineers
8:22:01highly recommended we start deconstruction work
8:22:04before winter weather sets in.
8:22:06With snow have already fallen,
8:22:09further delay will not only exacerbate
8:22:11the current safety risk,
8:22:13it will also increase the risk that any materials
8:22:15that we're hoping to save will not be salvageable.
8:22:19The delay of this work in the manner recommended
8:22:21by Heritage Guelph would be contrary
8:22:23to Council's prior direction
8:22:24the city staff's own recommendations.
8:22:27We care deeply about preserving the spirit
8:22:29of the conservatory and maintaining the space
8:22:31as a public garden accessible to all.
8:22:34We're pleased to work with the city to make this a reality
8:22:37but we're discouraged that we seem to be falling
8:22:39at the first stumbling block.
8:22:41This gives us great pausing concerning how we move forward
8:22:44from here especially as U of G is committed
8:22:46to repurposing material from the conservatory
8:22:49and doesn't require a heritage designation to do so.
8:22:53We ask that the council support the recommendations
8:22:55from city staff and work with us
8:22:57to remove the urgent safety risk
8:22:59by allowing deconstruction to start.
8:23:02Our hope is for this to be the first step
8:23:04in our collaborative process to restore the site
8:23:06to the public and realize the next life cycle
8:23:09for some important agricultural or horticultural space.
8:23:13Thank you for your time.
8:23:17Well, thank you, Harry, for joining us in your presentation.
8:23:22Let me just see if there's any questions at all for anybody.
8:23:26So I see Clausson and then Boussatil.
8:23:30So, Councillor Cousin, go ahead.
8:23:35Mr. Mayor to the delegate, thanks for your presentation.
8:23:40I had a question and it kind of relates
8:23:42to previous delegates' remarks regarding alumni.
8:23:48My first question is, has there been an effort
8:23:51to work with alumni to potentially,
8:23:55I know where we're at, the conversations
8:23:58have probably halted, but were there any discussions
8:24:02that you had with the alumni group
8:24:05who initially funded this renovation
8:24:10to potentially continue maintaining it?
8:24:14And then the second part of this question is,
8:24:15is that Ms. Puthon spoke about an endowment
8:24:19to maintain this building.
8:24:21And I was wondering if you could elaborate
8:24:23on what that endowment is, thanks.
8:24:27So I might have to ask you to remind me
8:24:30about the second question,
8:24:31in the first question, our alumni and advancement team
8:24:36did speak with the donor family,
8:24:38the rather first family and other donors,
8:24:41and many of them are alumni.
8:24:43And they understood that the reinvestment costs
8:24:46to rebuild or replicate to conservatory was
8:24:52fairly extensive and really not in keeping
8:24:54with the priorities that the university has
8:24:58for advancing strategic academic and research initiatives.
8:25:03If you can appreciate this,
8:25:04this is a ornamental building
8:25:07that does not have a current academic and or research use.
8:25:13On the second question, on the endowment,
8:25:19my understanding is that the amount
8:25:21that was contributing into this piece
8:25:24is something that could be used
8:25:27for some minor routine maintenance,
8:25:29but as you can sort of see the costs
8:25:33to really sort of at this stage in an annualized process
8:25:37would be about $200,000 a year.
8:25:39And so that endowment would not cover
8:25:43maintaining that building out of pristine condition
8:25:45over a life cycle.
8:25:51Thank you.
8:25:55Thank you.
8:25:56Councillor Boussettil has a question for you.
8:25:59Thank you and through the mayor to the delegate.
8:26:01Thank you for your presentation.
8:26:02My questions were similar to Councillor Klossens
8:26:05about the endowment and the ability
8:26:08to sustain the building going forward.
8:26:11You did say that the building was ornamental in nature
8:26:14and I was surprised to hear that,
8:26:16that there wasn't any historical value
8:26:18that you were referencing.
8:26:23I guess did the university not consider
8:26:26any kind of repurposing and incorporating
8:26:30the historical structure and the historical value
8:26:33into the university of Guelph?
8:26:36So if you recall when President
8:26:39or Interim President Van Aker spoke to this,
8:26:46the investment into this was looked into,
8:26:49but there are other higher impressing priorities
8:26:53that need investment.
8:26:54So I think there was some conversation
8:26:57about the deferred capital renewal and major maintenance
8:27:01within the university is about in excess of $400 million.
8:27:06So when you look at how much is available,
8:27:08if I take it on a square foot basis,
8:27:10that's probably about $12,000 a year
8:27:13towards the conservatory.
8:27:15And if that was readily available,
8:27:17but the need on an annual basis really needs to go to
8:27:22many other buildings that are active
8:27:25for academic and research mission
8:27:28and need to take that priority.
8:27:29So it really is a challenge to look at
8:27:34how the buildings are prioritized.
8:27:40And this one just didn't make the priority
8:27:41for that kind of investment.
8:27:45We have to take a reasonable approach
8:27:47to what's available for funding.
8:27:50And it just doesn't hit the bar.
8:27:56Thank you.
8:27:56My second question,
8:27:57and I wasn't in attendance on the November 13th meeting.
8:28:00So I appreciate you taking the time to expand a bit.
8:28:04The second question is around the metal,
8:28:07the steel structure.
8:28:09Heritage wealth has listed
8:28:11that there are a number of other attributes.
8:28:12Can you comment on why those other attributes
8:28:15were not considered in this construction
8:28:20of some kind of a commemorative structure?
8:28:24Because the wood is significantly rotted.
8:28:34And in looking to rebuild the piece,
8:28:37if you recall, one of the fundamental challenges
8:28:40would be that the use that the building has seen
8:28:46is an assembly occupancy use
8:28:48that requires major modifications
8:28:51to make it life safety systems
8:28:54and energy systems to accommodate an assembly occupancy.
8:29:00Prior, the building really was designed
8:29:03for an agricultural use
8:29:05where there was very limited access.
8:29:08And that isn't the way it was being used.
8:29:12And we need to change that if we're going to do something.
8:29:15And that's why we're talking about a significant amount
8:29:18of investment to rebuild or replicate it.
8:29:24Thank you, that's all.
8:29:27Thank you.
8:29:28And just stick with this,
8:29:29Councillor Downer has a question.
8:29:32Thank you.
8:29:32Through you, Mr. Mayor, the limestone wasn't designated.
8:29:41And I'm just wondering, would that,
8:29:43it would be my assumption that in any landscape design
8:29:47that you would be asking them in the competition
8:29:52to use the limestone, that would be my assumption.
8:29:56I don't know, but I mean,
8:29:57that's such a great material for that type of work.
8:30:01That's a great assumption.
8:30:03And we would leave it to the students
8:30:06to look at how we might reform
8:30:08and utilize that in a design piece.
8:30:12And yeah, it's something that would be left to the students
8:30:16to use their creativity and some of the expertise
8:30:20as to how we would reform it.
8:30:22Okay. And you would work, continue to work
8:30:24with city staff on that?
8:30:27Yes.
8:30:31Thank you.
8:30:34Okay, Councillor Goller.
8:30:37Thank you through your worship to Mr. Piccar.
8:30:43Thank you for being here today.
8:30:46When Councillor Caron declared her conflict of interest,
8:30:49it was because some of the funds were tied to student housing.
8:30:54Could you help me understand what the connection is
8:30:56between the university's potential cost
8:31:03to maintain the rather work conservatory
8:31:08if we were to change our previous decision
8:31:10and how that ties into student housing?
8:31:14I believe the comment that interim president
8:31:17and actor mentioned that, again,
8:31:19as we consider the priorities for the university
8:31:21moving forward in primary academic and research mission,
8:31:25one of the areas as you've seen a couple of announcements
8:31:29where we're really looking towards advancing student housing.
8:31:33And that one is one of the priorities
8:31:35that as we look at where we make reinvestment,
8:31:40that's one of the priorities for the reinvestment.
8:31:44And to be clear, if Council were to change
8:31:49our previous direction and put the university in a position
8:31:54where you would have to maintain the building,
8:31:56that would then eat into your ability
8:31:59to build new student housing?
8:32:01Well, it would certainly make us rethink our decision
8:32:05about the designation and consider all of our options.
8:32:11Okay, thank you for that.
8:32:12Thank you, worship.
8:32:19Thank you.
8:32:20It looks like that might be all of the questions that we have.
8:32:25So thank you very much for joining us tonight
8:32:29and thank you for your presentation.
8:32:31Thank you.
8:32:32We can.
8:32:36Okay, thank you.
8:32:39Okay, so Council, we have a staff recommendation
8:32:43in front of us here for the approval,
8:32:49which is almost like a ratification
8:32:53of what our position was last time,
8:32:55but it's just part of the process.
8:32:57So is there someone that's willing to table
8:33:01the recommendation from staff,
8:33:03which is that City Council approve the deconstruction
8:33:05of the Rutherford Conservatory at 37 Christy Lane
8:33:09on the condition that salvageable steel be retained
8:33:12and conserved for future use in a commemorative structure?
8:33:18Some of you are willing to move that for me.
8:33:22Okay, Rourke, we'll move it.
8:33:24Is someone willing to second it for me?
8:33:26Okay, two.
8:33:28Okay, is there any questions of staff?
8:33:31Alt.
8:33:33Thank you very much, Mayor Guthrie.
8:33:34Through you to City staff.
8:33:36The recommendation before us,
8:33:38I believe arises out of the city
8:33:41having designated this particular structure
8:33:44and it states that the City Council approved
8:33:46the deconstruction of the Rutherford Conservatory
8:33:49with steel and so on being preserved
8:33:54for a commemorative structure.
8:33:56The way that I read this,
8:33:59if we were to reject this, nothing happens.
8:34:04We have not removed the heritage designation.
8:34:07We have not done anything with the heritage designation.
8:34:09We've just done nothing.
8:34:10Is that correct?
8:34:13Through the Mayor to the Councillor, that's correct.
8:34:15Thank you.
8:34:19Thank you.
8:34:20And just as a follow-up then,
8:34:21what would the recourse be of the University of Guelph?
8:34:25Have they indicated what the recourse would be
8:34:27if Council did do what Councillor Allt suggested
8:34:31and we ended up with nothing?
8:34:33What is their next steps of a process?
8:34:37I'm not trying to suggest that you know
8:34:38what they're gonna do, but what is available
8:34:40to them as next steps?
8:34:45As the University alluded to in their presentation,
8:34:48there is still the option to object to the designation
8:34:52to preserve the salvageable steel.
8:34:55The date in which they have to file an objection
8:34:58is by December 20th.
8:35:00So there is still the opportunity that that could happen.
8:35:04And just for clarity to you, Christa,
8:35:06is that just, is that just a filing?
8:35:10We haven't had a lot of these
8:35:10so I'm just trying to understand the process.
8:35:13It's just a filing with the clerk's department
8:35:15or with the planning department
8:35:16and it's registered and then what?
8:35:20So it is a letter that they would submit and file.
8:35:24Then we will be back before Council again
8:35:26to advise them of the objection at that time
8:35:29similar to 106 Carden Street tonight.
8:35:32Council has a decision to keep moving forward
8:35:36with the designation or to change their mind.
8:35:41Yeah.
8:35:43Okay, thanks for the clarity on that.
8:35:44Appreciate it.
8:35:45Councillor Goller, did you have a question?
8:35:49Yes, your worship.
8:35:50Just a process question to clerks.
8:35:53Seeing as Council gave a direction
8:35:55to designate the steel aspects of this,
8:36:00if we were to change that decision today,
8:36:03would that require a super majority?
8:36:06I just, I'm concerned that if this gets voted down,
8:36:09we can just leave it at nothing.
8:36:10But if we were to go back as suggested by Heritage Guelph
8:36:16and actually change our mind on our previous decision,
8:36:19is that possible at this point?
8:36:24So thank you and through you, Mr. Mayor to Councillor Goller.
8:36:28Would check in with staff to see if there's any legislation
8:36:30that we need to be aware of making adjustments
8:36:34to a current designation, but in the clerk's opinion,
8:36:37we're not in the process of a reconsideration at this point.
8:36:41Again, would want to check with staff on any specifics
8:36:44for those designation and the timing of that.
8:37:02Sorry for the delay.
8:37:05So Council could withdraw the notice of intention
8:37:08to designate and when that's where we'd ask clerks
8:37:10if that's a reconsideration of a motion
8:37:13because it's already done,
8:37:14but that is what they could put forward.
8:37:20So thank you.
8:37:21And then based off that information,
8:37:21if that's part of a normal process,
8:37:23that is not considered a reconsideration.
8:37:25Okay.
8:37:26At this point, it's not the normal process.
8:37:29So Council would have to consider that previous motion
8:37:34and if they wanted to change the designation or not.
8:37:42Okay.
8:37:42Okay.
8:37:43That is helpful to understand
8:37:44what the process could be in the next steps.
8:37:46I appreciate it.
8:37:49Thank you.
8:37:51Sorry, I'm not trying to keep anyone here late.
8:37:54My curiosity is because I'm taking this seriously
8:37:57just to be honest with you.
8:37:58So I just, I'm looking at some of the language
8:38:02in the University of Guelph letter
8:38:05where it's indicating sort of like
8:38:08this isn't appropriate under the OHA.
8:38:12This particular issue that was brought up
8:38:16by Heritage Guelph is also not appropriate under the OHA.
8:38:20That type of language.
8:38:22And I'm just wondering
8:38:23from a completely administrative position
8:38:27or almost like a logistical position
8:38:32is those assumptions
8:38:36in that language correct by the University of Guelph
8:38:41where what Heritage Guelph positioned themselves in
8:38:45and did all these different type of motions.
8:38:48Are they out of scope compared to what's allowed?
8:39:00Through the mayor.
8:39:03I would not say that Heritage Guelph's motion
8:39:06does not abide by the OHA as we noted
8:39:10to do what Heritage Guelph is asking
8:39:13Council could withdraw the noid and reissue the noid
8:39:15and that would fall within the bounds of the OHA.
8:39:21However, the motion to do further public consultation
8:39:27that is out of the scope of the committee.
8:39:29And I'm not sure what form that would take
8:39:33or how that would look.
8:39:38And by the way, the autonomy of the Heritage Committee
8:39:42I want to respect that.
8:39:43I wasn't putting that down whatsoever.
8:39:46I just wanted to know are they in or out of the lane
8:39:49that they're supposed to be in?
8:39:51And so I appreciate that answer.
8:39:55It looks like we're bouncing around a little bit
8:39:57but to over to Councillor Holt.
8:39:59Thank you again, Mayor Guthrie through you to staff
8:40:03following this one to its logical possible conclusion.
8:40:07I'm not saying it's going to go there.
8:40:09If we were to vote this motion down
8:40:11and then someone were to bring another motion
8:40:15to remove the Heritage designation,
8:40:18then I understand the university is free to do
8:40:21with this building whatever it wants.
8:40:23So the Heritage designation preserved
8:40:27the integrity of the structure.
8:40:30But there was an understanding that the structure
8:40:32could only be slightly preserved.
8:40:36Certain aspects of it could be preserved for heritage.
8:40:40So we would be doing a disservice to both Heritage Guelph
8:40:44and to any notion of heritage preservation
8:40:48if we kept going backwards on this,
8:40:51I'm presuming from what I'm hearing people saying right now.
8:41:04Through the Mayor to the Councillor,
8:41:05the designation as passed by Council on November 13th
8:41:09ensures the careful deconstruction of the conservatory
8:41:13and the commemoration of the conservatory.
8:41:16So it does fulfill those goals.
8:41:20And then if we were to rescind that,
8:41:23which I have no intention at this point
8:41:25of even considering the university
8:41:28because it is autonomous,
8:41:30has the authority to do whatever it wishes
8:41:31with that building, is that correct?
8:41:34Through the Mayor to the Councillor, that's correct.
8:41:38Thank you for asking that, Councillor Allt.
8:41:40I really appreciate that.
8:41:42Put that in the minutes that the Mayor said,
8:41:45you appreciate Councillor Allt's questions.
8:41:48I appreciate that.
8:41:50And maybe that speaks a little bit
8:41:52to sort of the collaborative approach
8:41:54that the University of Guelph was trying to talk about
8:41:56that's been incorporated really into what we already passed
8:42:00as a motion.
8:42:01So, okay, well, sorry, I'll go to Councillor Busuttil
8:42:05and then to Klosson.
8:42:07And then I'll look to call a vote, okay?
8:42:10Thank you.
8:42:11I wasn't here on the 13th,
8:42:12but I do wanna share some comments that I feel
8:42:17that this historical building,
8:42:19and it's more for me than ornamental,
8:42:21was neglected by the University of Guelph,
8:42:23and I'm really disappointed by that.
8:42:26And especially the alumni,
8:42:29and I'm an alumni twice over as well,
8:42:31quite disappointed by that and that choice of,
8:42:34it was an intentional choice not to preserve the building.
8:42:37I also have to say personally,
8:42:39I don't have a lot of confidence
8:42:41in commemorative structures.
8:42:43I think about Mitchell Farm,
8:42:45and I'm still holding my breath
8:42:46and waiting for the materials to show up
8:42:48and this commemorative structure to show up.
8:42:51So I have very little confidence in that.
8:42:54I know there's gonna be a competition allegedly and so on,
8:42:57but I'm extremely disappointed.
8:42:59This is a building of significance.
8:43:01So that's it for my comments.
8:43:05Thank you.
8:43:06And Councillor Klosson, please, and then Chiu.
8:43:11Thank you.
8:43:12Through you, Mr. Mayor, I did have a question.
8:43:13Just all of the process questions
8:43:16were extremely helpful,
8:43:17but I just wanted to make one point of clarity,
8:43:21just looking at the heritage Guelph motions.
8:43:25They were requesting the preservation of the limestone,
8:43:29which the university delegate did touch upon,
8:43:33but there was also the request to preserve the glass,
8:43:38which in the report is going to be,
8:43:41is gonna be basically put into the landfill.
8:43:45So I'm just wondering,
8:43:46I'm sorry to ask another process question,
8:43:48but at this point,
8:43:52is there any way to preserve those additional materials?
8:44:04Through the mayor to the Councillor,
8:44:06that is not the direction staff were given
8:44:08at the November 13th council meeting.
8:44:11We can encourage salvage of the glass,
8:44:15but we cannot require it.
8:44:19Okay, thank you.
8:44:21Sorry.
8:44:22Oh, sorry, Kim.
8:44:24Sorry, Mr. Mayor.
8:44:26I'm so sorry.
8:44:26I thought you were done, Councillor Clausson.
8:44:28I was just gonna ask,
8:44:30like, what is it appropriate for council
8:44:33to consider a motion to encourage that council encourage?
8:44:38So if we approved this,
8:44:39but then added another motion that said,
8:44:42that council encourage the reuse of the limestone
8:44:48and glass as appropriate,
8:44:52like is that it might not be subject to,
8:44:57you know, the actual legality of everything,
8:45:00but is that something that we could at least add
8:45:03as a separate motion to send a message a little bit
8:45:06that we feel that that's important?
8:45:07I mean, Councillor Clausson could maybe even move that.
8:45:12Yes, council could.
8:45:15Yes.
8:45:16Okay.
8:45:17Councillor Clausson, I'll give you back the floor.
8:45:19I'm sorry, I thought you were done,
8:45:20but there you go, it's all yours.
8:45:22Oh, thank you.
8:45:24I will all send something through
8:45:27in case the motion passes.
8:45:31I will just say, I did feel that our previous decision
8:45:34was a bit rushed by only designating, you know,
8:45:37out of all of the heritage properties
8:45:39that we've designated this year,
8:45:42this one certainly has more heritage attributes
8:45:44than many of the others.
8:45:46And has until recently been functional.
8:45:49And as many of you may have received emails explaining,
8:45:54you know, people got their wedding photos taken there
8:45:56and it's been a special place.
8:45:58And it does have cultural significance to many people
8:46:01in the university and the Guelph community.
8:46:04So I am a bit disappointed that we are where we are.
8:46:09I would really, you know,
8:46:11throw it around those words, collaboration and community.
8:46:14And I really thought that the designation of this property
8:46:20spoke to the collaboration that would entail,
8:46:24like keeping something that is sacred for the community.
8:46:28Like we've learned, we don't know if the university
8:46:32will actually preserve this commemorative garden.
8:46:37So I'll send some wording over to staff
8:46:41to try to at least salvage some of more of the materials
8:46:44if this is to pass this evening.
8:46:47Thanks.
8:46:51Thank you.
8:46:52And I'll just go to councillor Ororque.
8:46:55Oh, sorry, Chu first and then Ororque.
8:47:01Thank you through you, Mr. Mayor.
8:47:04Yeah, I just want to make an appeal to my colleagues
8:47:07here tonight and even the university.
8:47:10Like I came here to this, the city really from the university
8:47:16and most of my time has been spent on campus.
8:47:19So I can just share a little bit about how traditions are made
8:47:23and how spaces are upkept.
8:47:26And like it is unfortunate.
8:47:28I don't think we can go back and do some revisionist history
8:47:30on why the spaces weren't kept up
8:47:34since the renovation back in the 70s.
8:47:38But like I just wanted to appeal,
8:47:41like just to the pragmatic side of council
8:47:43and think there's-
8:47:44Point of order, it was renovated in the 90s.
8:47:47Sorry.
8:47:48Sorry, I stand corrected the 90s.
8:47:53So it's been a long time since the space has seen any ownership
8:47:57from the alum group.
8:47:59And I just think there is a cohort
8:48:02that's coming out of COVID right now.
8:48:04There's the first ones that just haven't experienced COVID.
8:48:09And this would be a really big generational project
8:48:11for the OAC community and for the design school as well.
8:48:17And this is like firsthand learning experience
8:48:20that the students will be able to participate in.
8:48:23And I also would just urge everyone as well
8:48:27to consider the relationship building process
8:48:30that we have here.
8:48:31Because if we don't go with this,
8:48:37it's likely that this will be escalated to an OLT hearing.
8:48:45And I just don't think that's really worth the relationship.
8:48:49And I don't think it's really worth our staff's time
8:48:53and capacity as well.
8:48:54And I just want to urge everyone to consider too,
8:48:57like heritage shouldn't just be preserved
8:48:59for the sake of aesthetics and preservation.
8:49:01I know everyone has their intrinsic value
8:49:07that they see and perceive the space.
8:49:09But the bottom line is the main group
8:49:12that was there in the 90s
8:49:16isn't taking full ownership anymore.
8:49:18And that's just with the passage of time, right?
8:49:21Being the way it is.
8:49:22And there's an opportunity now to have students like myself
8:49:28just create some memories.
8:49:32And maybe there's opportunities as well
8:49:35for the kids to consider Guelph-Home
8:49:38past their time on campus.
8:49:41Because that's kind of the testimony
8:49:43of why the scientists stick around as well, right?
8:49:47I think there's a lot of merit to what's being proposed.
8:49:50And yes, the history of the space being the way it is now.
8:49:58Like it's like, I don't like it either,
8:50:01but there's an opportunity to reconcile that relationship.
8:50:04And I do think we need to show a little bit of goodwill
8:50:09as a gesture to the relationship
8:50:11that we're trying to do better, right?
8:50:15Like the university as well,
8:50:16they've as a whole,
8:50:18they've decided that they're going to do
8:50:24on-campus housing, right?
8:50:25They've made a big announcement this December and September.
8:50:30And there's a lot of intricate planning
8:50:31that went behind that as well.
8:50:33So sometimes it also feels like our concerns
8:50:36aren't being heard from the leadership.
8:50:38I understand that, but there are people
8:50:41within the organization that are taking notice
8:50:44and are very sincere in their posture, right?
8:50:48And I think that we have to assess those relationships as well.
8:50:52And this is just my personal testimony
8:50:54from my relationships with folks
8:50:57that I'm trying to cultivate as a new counselor
8:51:01and as an alum.
8:51:03And I hope maybe that there's some resonance in that
8:51:06here at this chamber tonight.
8:51:08So yeah, thank you for having me there.
8:51:11There's voices on my feelings.
8:51:13I'll just leave it at that.
8:51:15That's okay.
8:51:16Thank you.
8:51:17Thank you very much.
8:51:19Okay, Councillor Cossin, did you want to,
8:51:24can we just take a minute and then we'll go to comments?
8:51:28Yeah, go ahead.
8:51:28Sorry, I'm just adjusting the wording slightly
8:51:32and I'll have it in one minute back to everyone.
8:51:34I'll go to Councillor O'Rourke first then
8:51:37and then we'll just take care of yours to wrap this up.
8:51:39Go ahead.
8:51:40Thanks, Mayor Guthrie.
8:51:41Through you to staff, I'm just curious,
8:51:44why could we not require preservation
8:51:46of the limestone at this point?
8:51:48Why can't we just move an amendment and require it?
8:51:51Why do we have to respectfully request?
8:51:55Through the mayor to Councillor O'Rourke,
8:51:57we can only require what is listed as a heritage attribute
8:52:00in the designation bylaw.
8:52:02So we would have to withdraw the notice of intention,
8:52:06then edit it and then re-issue a new one
8:52:09and restart the 30 day objection period.
8:52:12Gotcha.
8:52:13Okay, understood.
8:52:15Thank you.
8:52:16So I would just like to say,
8:52:17I take no pleasure in tabling the motion.
8:52:20It's a gorgeous building.
8:52:22Everyone would love to save it if we could.
8:52:25And I know there are a lot of people who are of the opinion
8:52:27that we could.
8:52:30The university's report says that even if they were
8:52:34to restore it, it would have a relatively short life cycle
8:52:37of 25 to 30 years.
8:52:40They have the float glass that's broken or displaced
8:52:43in several locations and there's a risk of falling glass.
8:52:46And then they say, you know, so I don't think it's an opinion
8:52:50that they can't restore this.
8:52:52They're saying all three, three,
8:52:54independent structural engineering assessments
8:52:57of the conservatory are aligned regarding
8:52:59the widespread structural issues and have concluded
8:53:02that the conservatory would have to be rebuilt
8:53:05at a cost of over 5 million with annualized maintenance costs
8:53:08of 200,000 to 250,000.
8:53:11And that it's not financially feasible for the university.
8:53:15So I've supported other heritage designations,
8:53:19usually with private developers who have the capital
8:53:22and wherewithal to do something with it.
8:53:27But I'm seeing it black and white on the report in front of me
8:53:31that this is not a feasible project for the university.
8:53:34And so I think it's a gorgeous building.
8:53:38And I think what the university is proposing
8:53:40is sort of their next best option.
8:53:44And that's what I'll support.
8:53:48Okay, thank you.
8:53:49Councillor Klassen, did you send that into the clerks?
8:53:57Councillor Klassen, I think you're muted.
8:53:58Did you send that into the clerks?
8:54:00Yeah, sorry, I just put up my thumb, but yes.
8:54:02Okay, I'm sorry, I didn't see.
8:54:06My adjustment is incorporating a little bit more
8:54:09of the language from the list of motions.
8:54:13So to reuse and salvage to the best of their abilities
8:54:17because perhaps not all of the material will be reusable.
8:54:22So cut it up on the screen.
8:54:25Can we get up on the screen, clerks?
8:54:31Your ward mate is willing to second that for you,
8:54:34our Councillor Klassen.
8:54:35So I'll just read it out loud.
8:54:37Everyone just be aware here,
8:54:39we do need to wrap this up before 12 o'clock
8:54:42because we'd have to do another motion to extend,
8:54:45actually more than that, suspend procedural bylaws
8:54:49and all this kind of stuff.
8:54:50So we do need to wrap this up.
8:54:52So that council encouraged the university of Guelph
8:54:53to retain to the best of their ability
8:54:55as much of the salvage material from 37 Christie Lane
8:54:58and include and incorporate limestone and glass
8:55:01into the redeveloped commemorative garden.
8:55:03You okay with that, seconder?
8:55:04Councillor Goller?
8:55:05Okay.
8:55:07So I'm gonna call the vote on that, okay?
8:55:09Is anyone against that motion?
8:55:13Nobody, okay, so that's unanimous.
8:55:16And so now we're back to the main motion, okay?
8:55:19And I'm gonna call the vote on that one.
8:55:22So is anyone against that recommendation?
8:55:27Okay, so that's unanimous as well.
8:55:30Okay, so thank you and thank you.
8:55:32Thank you to everyone that came by the way and delegated.
8:55:35We appreciate that.
8:55:37There is bylaws in front of us here.
Automatic transcription is imperfect. Treat quotes as a guide and check the recording before relying on exact wording.
The motion, the vote and the debate come from the City of Guelph’s published record, reproduced rather than interpreted. The document summaries above are the exception: those words were written for this site.