Committee of the Whole · February 03, 2026 · Item 9.1
Guelph City Council approve the Water and Wastewater Servicing Allocation Policy attached as Attachment-1 to this report. That Guelph City Council delegate authority for the administration…
Main motion under the agenda item Water and Wastewater Servicing Allocation Policy and Bylaw - 2026-61
Carried (12 to 0)
12 in favour, 0 against — unanimous
What was voted on
The motion in its exact words, as recorded in the minutes.
That Guelph City Council approve the Water and Wastewater Servicing Allocation Policy attached as Attachment-1 to this report. That Guelph City Council delegate authority for the administration of the Water and Wastewater Servicing Allocation Policy to the Deputy CAO of Infrastructure Development and Environment. That Guelph City Council approve the Water and Wastewater Servicing Allocation Bylaw provided as Attachment-2 to this report and give effect to the delegation of authority.
Moved by Councillor Goller, seconded by Councillor Caton.
How the room voted
In favour (12)
- Billings
- Busuttil
- Caron
- Caton
- Chew
- Downer
- Gibson
- Goller
- Guthrie
- Hauser
- Klassen
- Richardson
Who spoke to it
Nectar Tampacopoulos, General Manager, Environmental Services, Wayne Galliher, Division Manager, Water Services, and Krista Walkey, General Manager, Planning and Building Services, presented on the Water and Wastewater Servicing Allocation Policy and Bylaw.
What council was given
The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.
- Water and Wastewater Servicing Allocation Policy and Bylaw - 2026-61.pdf
Council is asked to approve a policy and bylaw setting out how the city hands out limited water and sewer capacity to new developments, and to delegate day-to-day decisions to the Deputy CAO of Infrastructure, Development and Environment. Provincial law allows municipalities to adopt such a policy, and the city's Official Plan requires servicing capacity be confirmed before development is approved.
- Attachment-1 Water and Wastewater Servicing Allocation Policy.pdf
- Attachment-2 Water and Wastewater Servicing Allocation Bylaw (2026) – 21193.pdf
- Attachment-3 Water and Wastewater Servicing Allocation Policy - Staff Presentation.pdf
- Correspondence - Lisa Schuett.pdf
- Correspondence - Jonathan Rodger.pdf
- Water and Wastewater Servicing Allocation Policy and Bylaw - 2026-61 - Additional Slides.pdf
A summary is this site’s description of a document, not the City’s. Open the document before relying on one.
What was said
9,031 words from the meeting recording, transcribed automatically. Times are from the start of the recording.
Read the debate(click to open)
2:09:22we have our water and wastewater servicing allocation policy which is is a very timely
2:09:29discussion based on what I've heard from staff and and the media about what's happening with the
2:09:34city of Waterloo so I'm really looking forward to the presentation and the discussion so over to you
2:09:40thank you very much so good afternoon Chair Klassen and committee of the whole
2:09:44my name is Nectar Tampacopoulos and I'm the general manager of environmental services
2:09:49uh today we're going to be presenting on the water wastewater proposed service allocation
2:09:55policy for your consideration and review uh with me today to provide a short presentation
2:10:01are Ms. Christo Walki general manager of planning and building and Mr. Wayne Gallower general manager
2:10:07sorry divisional manager of water services great thank you very much Nectar and good afternoon
2:10:24Chair Klassen and members of committee to begin in sharing some background on the report before
2:10:30you today my first slide here essentially bill 185 the cutting red tape and building more homes act
2:10:39was essentially released by the province in 2024 and received royal assent in the Ontario
2:10:43legislature in June 2024 this act aimed to fast-tracked housing development by streamlining
2:10:49approvals cutting bureaucracy and amending 15 Ontario statutes to meet the goal of building
2:10:551.5 million homes by 2031 through the statutes revised by the act use it or lose it servicing
2:11:02provisions were introduced under the municipal act to encourage more housing sooner and provide
2:11:06municipalities with tools for added water and wastewater servicing capacity management should
2:11:11approve developments not proceed to construction in a timely fashion specifically the ability to
2:11:16reclaim capacity holdings of aged approved development and reallocate these service the
2:11:21servicing capacity to shovel ready development furthermore change to the acts identified that
2:11:27local servicing decisions made under council approved servicing bylaws including use it or
2:11:32lose it provisions would not be appealable to the Ontario land tribunal these revisions introduced
2:11:38through bill 185 are in alignment with the city's official plan specifically section 6.1 6.14 and
2:11:466.15 which speak to the needs for adequate servicing or to permit development defining a
2:11:52process for servicing allocation and the land types that allocation would be applicable for
2:11:58I'll now invite Christa walkie our GM of planning and building services to speak to our next slide
2:12:07thanks Wayne so managing growth approvals and servicing needs are becoming more complex
2:12:13from bill 185 60 17 we could go on and other recently regulatory changes that were implemented
2:12:21by the province as well as provincial density changes to our official plan which is our growth
2:12:26management document examples of these include allowing three or four units as a right on properties
2:12:33to allow more housing on an individual property basis this was not planned in our servicing
2:12:40systems and has not been accounted for so we need to ensure that we are accounting for that
2:12:45and tracking it in our systems changes by the province to our density in specific areas of
2:12:51the city such as GID as well an additional units that come forward to this council on individual
2:12:59planning applications for more density that is proposed that is proposed by individual
2:13:04proponents on applications as well as more recent changes to development charges and
2:13:09collection requirements delaying payment and timing of two from building permit to building
2:13:16occupancy thus delaying revenues needed to construct new servicing infrastructure to support
2:13:22future community growth taking into account all of these challenges it's important for the city to
2:13:28maintain a proactive approach to tracking servicing capacity and its existing servicing commitments
2:13:34to best manage our available servicing capacity further continued tracking of our servicing system
2:13:40flows and understanding the pace of development best informs the city of infrastructure timing
2:13:46investments not only to the the larger playlists but to our linear infrastructure as well making
2:13:53the most of our available servicing capacity also includes allocating capacity to those who are
2:13:59shovel ready and as you'll see in the last bullet point we have 176 units that are in
2:14:05registered plans of subdivision that have been there for more than 10 years no permit pulled yet
2:14:11we have 1158 units that are in draft approved plans for more than 10 years and again not
2:14:19advanced to the next step we also know we have 6000 units that are short-term supply so by tracking
2:14:25this better and ensuring we have allocation for those who are shovel ready will better position
2:14:30us to bring housing on quicker and faster back to me great thank you so much christa
2:14:43as discussed with members of council during the may 2025 water and wastewater servicing
2:14:48capacity council workshop the amount of the city's water and wastewater servicing capacity is approved
2:14:53by the ontario ministry the environment conservation and parks and is defined in the form of
2:14:59certificates of approvals or permit to take water amongst other regulatory tools and defines
2:15:05what is a finite volume of servicing in 2025 environmental services and planning and building
2:15:12services staff undertook a project to develop a detailed water and wastewater tracking model
2:15:17to account for servicing capacity allocation on a plant basis through the comparison of current
2:15:22system servicing demands versus what are planned planning and building approvals
2:15:29that we expect to join our system in time through ongoing planning work
2:15:34looking to the city's permitted water supply wells and wastewater treatment processes the model as of
2:15:39year end 2024 identified 16,474 meters cube per day in water servicing capacity and 4,805 meters
2:15:48cube per day in wastewater servicing capacity specifically for in water and the number that's
2:15:54stated there is to note that essentially this does include what is an operational contingency
2:16:01as recommended through the waters there the council approved 2022 water supply master plan
2:16:07which comes to account for what our resiliency needs and our operations when wells may need to be
2:16:11taken offline for what is required maintenance or shut unplanned critical failure of infrastructure
2:16:17occur to support the anticipated growth of our city's water services and wastewater services
2:16:22capital project managers continue to pursue new permits to take water as well as design and construct
2:16:27new servicing capacity in accordance with both the 2022 water supply master plan update and wastewater
2:16:33services master plan or wastewater and biosolids master plan plant capacity based projects of
2:16:41significance that council may recognize from ongoing reporting are the clife water treatment
2:16:46plant again starting construction in 2027 the water resource recovery expansion phase one
2:16:54starting in 2026 as well as the Guelph test well environmental assessment and northeast
2:17:00northeast Guelph test well environmental assessment it's important to note that at this time no
2:17:11council approved water and wastewater servicing policy exists to direct the city's servicing
2:17:16allocation processes in absence of this policy staff see risk to both proponents in the city alike
2:17:22for proponents significant financial and time investments are made to gain planning approvals
2:17:27but serving out servicing allocation is not currently formalized until the time of development
2:17:31agreement approval uh under past processes this could mean that servicing allocation is still at
2:17:37a risk until the time in which a development agreement is executed and creates um you know let
2:17:43that potential risk of execution for the proponent for the city the lack of a robust capacity
2:17:48management system could lead to overallocation of servicing capacity creating the need to halt
2:17:53development allocation approvals and may even introduce level of service impacts to existing
2:17:58customers further servicing capacity and commitment tracking is essential to understand
2:18:03future servicing needs and ensure ensuring the timely budgeting for construction of new
2:18:09infrastructure both on the plant and linear basis in looking to our process to develop the policy
2:18:20here before you today essentially we employed what was a two-phase process through the first
2:18:26phase in May 2025 staff released through the have your say engagement platform a 30-day survey
2:18:33essentially seeking from community stakeholders interest and support for common terms of municipal
2:18:39servicing capacity bylaws as well as seeking suggestions as to what would be best in class
2:18:44municipal policies to consider when forming our own local policy based on stakeholder requests
2:18:51through uh phase one uh from there an interdepartmental staff team with representatives of economic
2:18:57development and tourism engineering and transportation services planning and building
2:19:01services and environmental services worked to develop what was a plain language policy which
2:19:06was then released on september the 22nd for a 30-day public review through have your say
2:19:11which ended on october the 23rd coming from phase two feedback revisions to the policy were completed
2:19:19and a follow-up meeting held with grant highlands home builders association to discuss their comments
2:19:25share revisions completed to the policy since that that was shared through public engagement
2:19:29as well as share the revised policy that would be coming to council through our reporting
2:19:35similarly at this time following the initial engagement in 2025 staff had brought forward
2:19:39the draft servicing allocation policy and report to the economic development and tourism advisory
2:19:44committee of council and planning environment and water advisory committee of council in january
2:19:492026 to discuss changes from the policy coming from phase two of the engagement and plan next
2:19:55steps and bringing this policy to council coming from this both respective council advisory committees
2:20:00received the report and provided endorsement of the draft water and wastewater servicing
2:20:04allocation policy at their respective meetings of january 12th and 13th as far as what we heard
2:20:15through the engagement process request to clarify the scope of capacity checks in the past we may
2:20:21have looked at individual services but through the new process we're looking to validate both on
2:20:26the plant from a water and wastewater standpoint as well as in the system from a water and wastewater
2:20:30standpoint that capacity works in all those circumstances costs or questions of cost of
2:20:37capacity check i would note that more simplistic capacity checks can essentially be completed in
2:20:43house under limited costs whereas higher volume or more complex checks may involve engagements of
2:20:50external engineering consultants who oversee management of our detailed water and wastewater
2:20:54services linear models to complete the checks and those costs would essentially flow through to
2:20:58proponents as far as the work needed to complete those requests in support of their applications
2:21:04the first draft of our policy came to mention the need for independent servicing agreements
2:21:09however through further discussion with legal services on this matter and looking at feedback
2:21:13received through the engagement it was determined that ascension independent servicing agreements
2:21:18would not be needed and that essentially through the modernization of some of our development
2:21:23agreements looking at site plan and subdivision that the lapsing provisions and the capacity
2:21:29holds would be noted through those respective processes through this in turn we were well
2:21:35questions around the lapsing period lengths proposed through the policy and when the clock
2:21:39would start on these respective processes looking to planning applications versus approved
2:21:45applications that are moving head to construction and suggestions were provided as well on the
2:21:51process criteria and future instruction to proponents as far as supporting making those
2:21:56extensions lastly we also received some feedback from the builders association
2:22:03associated just with the narrative around capacity at the city itself and again reflecting that you
2:22:10know the city is open for business although our capacity holdings may be finite for council's
2:22:22awareness just to overview some key terms under the policy itself key to the whole policy itself
2:22:28is early engagement we want to speak to proponents early understand what their the project is what
2:22:32their servicing needs are and provide an early indication that we're in a place to support the
2:22:36project under the policy there are two different types of checks both an informal and a formal check
2:22:45the formal check process is a is essentially a application put forward by the proponent
2:22:51looking at support again of what is a planning application once we've completed that check
2:22:57that would hold the capacity as required for the planning development for 48 months within our
2:23:01model as they progress towards what is an approved application uh spoken to previously capacity
2:23:08checks do have costs and it is based on the scope of those respective capacity checks under the policy
2:23:14you'll also note what is a community economic development investment proposal hold this is
2:23:20looking at our our competitive process between us and other jurisdictions and looking looking to approve
2:23:25or attract new business locally and ensuring that while we're having those discussions that
2:23:31there is a respective hold around the servicing needs for those business again to ensure we can
2:23:36facilitate that from a reputational perspective and continuing those discussions as part of
2:23:42approval of a site plan subdivision or building permit again the capacity hold would be put against
2:23:48that project reaching that milestone for what is a 36 month lapsing term to be defined through the
2:23:53respective agreement those who are reaching the end of a lapsing term either under what is you know
2:24:04development of a planning application or an approved application have the ability to request
2:24:09extensions again if they're unable to deliver within either that 36 or 48 month window through
2:24:18these extensions requests these would come to the gm of planning and building services again the
2:24:24circumstances would be that the lapsing period would have been met for either process without
2:24:30seeking an extension that would be the circumstance under which we'd seek to potentially reclaim that
2:24:35capacity beyond the extension request there is also an appeal mechanism under the policy
2:24:41and through the report today we are seeking council support to delegate authority to the deputy
2:24:46ceo of infrastructure development and enterprise to essentially administer that appeal process
2:24:51furthermore under monitoring and reporting under the policy shared there would be an annual report
2:24:56to council embedded within the existing growth management report to share with council what is
2:25:02our unallocated servicing capacity to inform you in your decisions okay so just looking to next steps
2:25:22beyond the terms of the policies next steps to enact and support administration will be as follows
2:25:28procedurally we'll be seeking approval of the enacting bylaw which will be completed at a
2:25:33future meeting of council and the copy of that bylaws included as an attachment to your report
2:25:37today as discussed within the report following bylaw approval planning and building services will
2:25:43be working to notify stakeholders with age planning approvals over 10 years in age of the lapsing
2:25:48periods requirements of the policy and use it or lose it policy provisions with the intent of
2:25:52looking to reclaim or reallocate servicing capacity holds associated with these projects
2:25:57if not reaching substantial performance in 36 months from the time of notice
2:26:02instruction is being developed to support stakeholders in developing and submitting
2:26:06extension requests and appeals as defined are the policy staff are working to put these in
2:26:11place currently and hope to have them on the web for future instruction and proponents by the end
2:26:15of q1 lastly staff are working to update the initial version of our plant tracking model
2:26:22with most recent customer demands as well as approval and commitment information coming from
2:26:28planning approvals within 2025 I'll now pass thing back to Krista for the final slides great thank
2:26:39you aene so before closing today I just wanted to provide some focus to a continuous improvement
2:26:44in our development process coming from this policy so it is customer focused engaging customers
2:26:50early on their servicing needs and conforming our ability to service and support their project
2:26:56is key to our project throughout the life cycle of an application from pre consultation meeting
2:27:01through to development approvals and then again when a development is ready to move into site
2:27:06plan approval and is getting ready for shovels in the ground we have embedded in the policy notice
2:27:11requirements for an app when an applicant is meeting the end of their hold on allocation
2:27:18so that we can have further discussions on timing of construction and potential extensions of that
2:27:23allocation hold if they're working towards getting toward a permit in the ground capacity
2:27:29tracking for decision makers we're ensuring that our tracking systems are robust to maintain where
2:27:34we stand at capacity holdings so we can inform available capacity decisions and making timing
2:27:41for budgets for infrastructure upgrades and to bring forward more servicing capacity when it's
2:27:46needed transparency this process is transparent it provides stakeholders with a transparent and
2:27:54consistent approach by which capacity allocation is administered maintaining our service resiliency
2:28:01maintaining throughout our capacity tracking and management systems the need needed surplus capacity
2:28:06for routine operational asset management as well as emergency events which may occur
2:28:12and best management of capacity so this allocation tool will give us a tool in which
2:28:17capacity can be reclaimed from those age developments and relocate reallocated to shovel ready developments
2:28:24who are prepared to advance a project or a housing related project today so in the in the council the
2:28:36staff report you'll see resolutions that we are asking council to support today first that they
2:28:43approve the water and wastewater servicing allocation policy as in attachment number one to
2:28:48this report and that the city of gulf council delegate authority to the administration of the
2:28:53water and wastewater servicing allocation policy to the deputy CEO of IDE currently mr. gayman at
2:29:01the end of the end of the table and that the city of gulf approve our water and wastewater servicing
2:29:08bylaw and that is an attachment too and with that i will turn it back to mr. tampa tampa coplas to
2:29:15wrap us up so thank you very much for the presentation i think it's important to also thank the staff
2:29:29that were working on this it was very challenging it was a long road to get here so thank you to them
2:29:33and i think we also need to acknowledge as we did the external stakeholders who are willing to
2:29:38engage us in our outreach and engage us in our engagement and for the feedback they provided
2:29:44those were good discussions they were fruitful discussions and as was mentioned those will continue
2:29:50just to close it out wealth is a groundwater community and we all know that and there are
2:29:56challenges with groundwater communities that other communities with large great you know lake surface
2:30:01based water don't have and when we looked at putting these three recommendations together
2:30:08around allocation policy whether it's water that's needed to maintain our current max level demands
2:30:16whether it's allocated water that's already been allocated to developments whether it's future
2:30:21and allocated water whether it's water that we require as a buffer to ensure we do our operations
2:30:26and maintenance to ensure that we're able to meet our emergency repairs and requirements as needed
2:30:31it's important to track those and the way i kind of look at it there are business decisions that are
2:30:36made and the way we create allocation or we create capacity in the system is through capital budgets
2:30:45so the capital budget that's been approved for water wastewater for this year and beyond is really
2:30:51meant to increase that capacity for future development for future growth for future investment in the
2:30:57city and in order to be able to make those decisions we need to provide you with the data
2:31:03that you need to be able to make those decisions and how you allocate those budget dollars for capital
2:31:09facilities and upgrades and improvements with that when we look at the recommendations again
2:31:19we we kind of look at
2:31:23where's the positive coming out of this what's a good story because there's a good new story coming
2:31:27out of this it isn't about whether or not someone loses capacity if it's 10 years or more the good
2:31:34news is the council has approved budget the good news is there is capacity out there and we have
2:31:39capacity going forward for the next 10 years what we're building to bring business into
2:31:43gulf to bring development into gulf to allow the community to flourish the good new story i think
2:31:49is and when we're looking at our external stakeholders and mr galler mentioned it the city
2:31:55is open for business i think what the what we're showing putting these recommendations together
2:32:02is that uh external developers external business owners want to bring business to gulf
2:32:09want to help develop and grow the community want to revitalize and vitalize the community further
2:32:15they can trust in gulf because we are working together as a business partner they can trust in
2:32:21gulf because we're looking at data that can allow us to create intelligent business decisions
2:32:29i think they can trust in gulf that they can come and invest in development invest in business
2:32:36invest in industry have all those secondary impacts that employment and that kind of investment has
2:32:42in the city and we can ensure that the capacity that they are looking for the capacity that we've
2:32:49allocated the future capacity that's unallocated that when they're shovel ready when they're ready
2:32:54to dig when they need that capacity it will absolutely be there for them and that's what
2:32:59these recommendations allow us to do so on that note i will close it out and open the florida questions
2:33:09thank you mr tampocopolis and mr galler and miss walkley for your presentation
2:33:16um we have uh three recommendations and i i had a hand up from councillor Goller for questions
2:33:24and i'm also wondering if you'd like to move the recommendations yes chair class and i would
2:33:28love to move the recommendations and i see councillor Caton would like to second so they're
2:33:34now on the floor and i'll pass it back over to you for questions thank you so much chair class and
2:33:39uh to staff thank you so much for the report and for all the work that has led up to this point
2:33:44um we did have two pieces of correspondence attached to to this that raised some concerns and i was
2:33:51wondering if you had a chance to review them and if you could speak to to the concerns raised in
2:33:55those two two letters or or if you wanted me to to sort of highlight some of those and walk through
2:34:01those uh through the chair to councillor Goller i'll get started and assume that there may be
2:34:11others who want to speak to this as well um certainly coming from phase two we made a
2:34:17a point to essentially meet with the grand highlands home builders association
2:34:21and discuss the policy there um in addition essentially other questions that we had received
2:34:28through the have your say report we had positioned those and provided direct response as well so
2:34:34i guess what we had heard through the process and and similar to my slide was you know seeking a
2:34:40little more detail around what the extension process would be and uh coming to you know categorize
2:34:47and help coach what those applications may be in the future um we acknowledge that with today's
2:34:53an action of the policy the soonest that we'd be using those extension clauses was three years down
2:34:57the road so um obviously we have some time to again uh implement those have some discussion with
2:35:04the community and uh as well as we you know start to operational operationalize this policy
2:35:10implement this and other changes as we move ahead um beyond this again i talked a little
2:35:16bit around the narrative uh that again was a concern to some of the stakeholders that we had
2:35:21spoke to uh felt that there was just a challenge with some of the mixed messages around work around
2:35:26water were finite based and what type of water do we have to grow within our community so um
2:35:31heard that loud and clear and essentially can understand as we talk of uh servicing into the
2:35:37future and being opening for business and i think the added transparency of communicating what we
2:35:41have for an allocated capacity that these things are coming forward uh beyond this there were some
2:35:47concerns just simply i think looking at the 36 month period that once you have a planning approval
2:35:53and looking again to is this an adequate amount of time to essentially reach completion of my
2:35:59development uh i know through this again from a planning services perspective there was talk of
2:36:04right sizing applications to ensure that again uh we have capacity that we're managing between
2:36:11various parties and various interests um however you know looking to a large uh legacy type application
2:36:18where the intent would be you know over 20 years we're doing so many per year um it makes it challenging
2:36:24if you're committing to you know something over that time frame and then you know working with others
2:36:29again who may have smaller scope projects and you know have a smaller implementation window so
2:36:36um i'll start there and maybe open things up to chris if there's anything else you might like to offer
2:36:41no okay um thank thank you for that i think that that is very helpful um one of the the concerns
2:36:48that that comes to mind uh was the the fact that we don't have a report listing exactly the water
2:36:54capacity at this point but i believe that that's coming in the next couple of months so because
2:36:59this is going to be you know three years before we start enforcing would there be any any benefit
2:37:05or any value to council actually waiting to see the report before approving this policy um through
2:37:15the chair to councillor Goller um as discussed in in my report i guess you know there there is risk
2:37:22present in absence of what is an enhanced process at this time um maybe if i could ask the clerks
2:37:28we did prepare some information that didn't get into the report some additional slides here today
2:37:32that we can bring up um i'll start with the water side of things and my colleague tim robertson here
2:37:39we can speak to wastewater if we can start with slide one please um so the following graph itself
2:37:47comes to define for council i think two things that are important um okay yeah i'm sorry that
2:37:54you're seeing this for the first time but happy to explain it and discuss it further uh essentially
2:37:59the blue lines that you see are what is what is contingency or resiliency based holds within our
2:38:05operation understanding that essentially you know in our planning of systems we have to look at our
2:38:11largest source being offline and looking to the community beyond that to say you know just because
2:38:16we're taking something offline we don't want to see an impact with the customer or with servicing
2:38:21demands within the community so that blue line represents the hold within operations to ensure
2:38:25that again the changes and maintenance that need to happen in our system have adequate capacity
2:38:30to do that the red line represents what is an allocated uh capacity that's available for growth
2:38:37at this time and essentially the uh the orange line that you see there and the figures on top of it
2:38:43represent the years of growth that are remaining um to the point where we construct and implement what
2:38:49are new sources of water supply so um i guess the growth management report for 2025 will be coming
2:38:56ahead for council's information in the near term i understand uh at this time based off staff's figures
2:39:02and looking at what our 2020 what is 2025 we anticipate about 6.3 years of growth and that
2:39:08is based specifically on what is the uh the average goal of the growth management plan of 947
2:39:15residential units per year so i guess a couple things that council may want to consider just
2:39:21with this in mind that um you know water services managing leakage within our system is significant
2:39:27we want to keep that down that means that our capacity goes further so again this would assume
2:39:31that we're managing our losses at current levels um beyond that this is a residential only forecast
2:39:37so we respect that industry is part of the mix as well but based on new industry that comes to the
2:39:42city and service and commitments that may come around this again that may make accelerate what this is
2:39:48but generally essentially we're looking at uh you know 6.3 years with remaining capacity
2:39:54your next new source that will be onboarding is the klythe water treatment plant which will complete
2:39:59design this year and be implemented between 28 and 29 uh thereafter you see gulf southwest which
2:40:07i know is an ea and not a permanent source at this time but um thereafter as we're able to
2:40:13implement a klythe you can see there's just about 8.4 years of growth remaining giving us some more
2:40:19time as well to onboard that next next source this would be something that we take a look at again
2:40:24on a year-to-year basis because we're getting our planning information our commitments
2:40:28understanding the changes in flow things like peak demand as our community grows
2:40:33to validate what is our unallocated capacity and you know stage those future infrastructure
2:40:39investments through the budget accordingly to ensure that again from a capacity standpoint
2:40:44things are ongoing and we're not seeing stops and starts perhaps if we could see slide two now and
2:40:51Tim will allow you to speak to the wastewater side of things
2:40:54sure thanks Wayne good afternoon council I'm Mirgothry uh three years here class and then to
2:41:01council Gullar so a bit less intricate than the water one but uh essentially I guess is some
2:41:08we want to give this slide to provide some confidence so we we know what's going on um you know
2:41:14well we need to build ahead of when capacity is required of course um this the flows that you
2:41:20see here and the flows we build to is everything that comes to the city uh industry commercial
2:41:27residential mother nature with rain and precipitation as well so we always have to is a slightly
2:41:32different look at it than than we do in our water team um we've always been aiming through the master
2:41:39plan to be ready for additional capacity by end of 2028 um this little bit of buffer and and those
2:41:49it's not an exact sign so um through council support we've got some great investment happening
2:41:55at the facility shovel breaking the ground this year on one of the major projects um all four
2:42:01projects if I can take you back to last May we had a bit of a workshop in here for that
2:42:07still on on target to be completed by end of 28 which will put us in good stead to apply for
2:42:14re-rating for the capacity to take us through to uh at least thousand and thirty eight of this moment
2:42:20through the master plan that'll happen between 28 and 38 will determine on what the next phase
2:42:26to expansion is so always staying ahead of it uh I guess you know what we've heard today obviously
2:42:32we there is a restriction on a limitation potentially on water so is always water right we have to
2:42:37make sure we we're staying well ahead of that and we are we're also looking for business so
2:42:42hope that helps uh provide some confidence uh yeah it is it is quite helpful to see that and it
2:42:48could we just go back to the previous slide so that I understand the um the red line that you're
2:42:54presented Mr. Agala heard the um sort of the the um yeah the unallocated capacity is that the unallocated
2:43:01capacity considering all the applications that are being held so the moment that in three years time
2:43:07when this policy comes into effect will that change because we will be freeing up um capacity
2:43:13that is always otherwise tied up by developments that are not being built through the chair to
2:43:20Councillor Goller that's correct and that's what our plant model does that we've spoke of in the
2:43:25report so essentially as we form these commitments it's shown as an intermold and capacity that's
2:43:30held um and I think yeah again through our our May workshop there was a question that had come
2:43:36from Councillor Busuttil as well saying we may allocate a certain volume but is that volume the
2:43:43performance of that built form when in place so moving ahead certainly we'll be monitoring as to
2:43:49when something comes from an application to what is a constructed environment and becomes build
2:43:55demand in our system such that we're not double counting you know those investments at the end
2:43:59of the day but as well we're able to you know sharpen the accuracy of our tool and time as we
2:44:05come to see um again the projected versus what's the actual performance of the building
2:44:11or developed site into the future thank you very much thank you chair class and I
2:44:18I hope we can approve this here and at the end of the month I think it's very important to
2:44:22monitor groundwater allocation so that we we can approve with more certainty down the road thank you
2:44:29thank you Councillor Goller uh Councillor Caiten and then Mayor Guthrie please
2:44:36thank you very much um I think this is great I think especially
2:44:41due to the recent announcements in Waterloo and how they had to stop permits um because
2:44:49they've run out of water pretty much uh this is really prudent to do um I also like how
2:44:57it encourages groups that do have permits out to get shovels in the ground because
2:45:05it's kind of a first come first serve we have a max capacity you know get your stuff built because
2:45:12if someone else builds faster you may not get to and um I was just wondering about one part of it
2:45:19because when I was reading through I didn't see anything about a use case for um folks who have
2:45:29approvals for developments that are in a zone like maybe they've under done for the the zoning
2:45:37level um and then they go to the committee of adjustment and they are able to go up to a
2:45:42certain height like maybe we've rezoned since then we've had a lot of times now we're building heights
2:45:47have just gone up and up and I didn't see anywhere in there that the water servicing plan had to be
2:45:57reviewed if they go to the committee of adjustment because I figured there could be depending on
2:46:02the situation quite a big gap in what they were approved for and what their study showed
2:46:09was necessary versus going to committee of adjustment. Yeah through the chair to to Councillor Caiten
2:46:17so committee of adjustment one of the tests is does it conform to the official plan
2:46:22and that is a test which they have to meet the committee of adjustment so they can't as a right
2:46:27through the committee of adjustment increase their density they can change a height they can change a
2:46:32side yard but they can't increase their density so the density is calculated in our official plan so
2:46:37as far as what that site is planned for we already have that captured um if it's a large
2:46:43development and they go to committee of adjustment for some variances to a side yard or parking or
2:46:49bike parking whatever it may be they still would have to go through the site plan process and then
2:46:55that's where again the allocation policy comes in and they would be captured with that you know at
2:46:59site plan you have 36 months to to move from site plan process to to building permit so we would
2:47:05have captured it and a lot of times they go through the development approval process in which they have
2:47:1048 months before they get to site plan um so it would have been captured at that point in time as
2:47:17well so I do think we I am confident that we do have it covered off great thank you so much thank
2:47:25you Councillor Caiten Mayor Guthrie thank you and through you Madam Chair and uh to staff I just uh
2:47:34I just wanted to try to understand something maybe just rephrased if so I can try to understand it a
2:47:39bit better but Councillor Goller asked about the main kind of water report that's coming in a little
2:47:47bit and I'm wondering why we're not waiting for that to influence what's in front of us now
2:47:57and if there's do you think that that might influence whatever the outcome of that report
2:48:03is to this or no uh are we going to be surprised to find out new information in the other report
2:48:09that then may impact this and so I just wondered if you could just uh lay that out for me a bit better
2:48:20I'll once again start it through the chair to Mayor Guthrie uh essentially the growth
2:48:26management report that'll be coming forward to council in March that speaks to commitments and
2:48:30again as per the policy we would seek to define at that time available capacity in the system
2:48:36um that is the same information that essentially we shared um I apologize for walking those slides
2:48:42in but the slides that we talked about today it's essentially the same information that council
2:48:47will receive uh in one or two months time okay I appreciate that and then my final question
2:48:55just through you Madam Chair to staff is uh maybe it's to Krista maybe just from a planning
2:49:02perspective um you know concerns that are out there that you know development large larger
2:49:10scale developments occur in phases and um it's dependent on the market uh as we all know that
2:49:18right now um so uh that that developers are going to have to jump through hoops every few years or
2:49:27they lose it and then they've got to like come back again when them and I'm just I'm concerned that
2:49:36that the policy isn't taking into effect the market that could fluctuate up and down
2:49:43um where developers are ready to put shovels in the ground and then they've lost the capacity to
2:49:48do that and I think that the policy states that there actually is a pretty good time frame of
2:49:56years and there's some discretion actually allowed within the policy to staff as well
2:50:02can you just state that for the public record so that that you know that can kind of be put to
2:50:08rest somewhat that even in these longer term larger scale developments that are in phases
2:50:16that there's that workability um as Nectar said we're open for business uh to try to make sure that
2:50:24the policy isn't so restrictive that really developers would would come you know butt up
2:50:30against that sort of this policy to make it unattainable to move on to put the shovels in
2:50:36the ground for the next phase through the chair to to America three so yes so the policy has built
2:50:44in extension requests and uh we will take a take a look at those when they come in and if a subdivision
2:50:50application or a site uh multi-phase to site plan application is coming in and they're you know
2:50:55actively kind of continuing to move forward and you know you've got four years from your
2:51:01zoning or plan a subdivision approval to get to a site plan and then you've got another three years
2:51:07after that so you kind of have seven years if you're coming in with a development application
2:51:11and if it's moving along and we absolutely recognize things in phases we have the allocation
2:51:16committed for that development and if they're continuing to to move phase by phase um then we
2:51:22will extend the allocation to that site um if they don't move and we you know we talked about
2:51:29having a plan 1987 there's some locks that have not yet moved forward um that has not demonstrated
2:51:37that commitment that they're ready to move forward but we're going to be reaching out to those those
2:51:41folks and it might hopefully spur a few more to come on which would be great for for the city
2:51:46but yes there's extension provisions and we would see that happening and as Mr. Gallagher
2:51:53said we have capacity in the system right now so we will you know we'll take a look at that on
2:51:58on every application as we move forward and we do expect there will be a significant amount of
2:52:03extensions as we move as we move forward this but it really helps us track the the allocation to
2:52:10make sure that we're making investment decisions when we need to make investment decisions and
2:52:14that we have a really good good handle on the capacity as we change processes but yes lots of
2:52:20capacity available and I see a lot of extensions happening delegated through through the DCO
2:52:26great thank you and I'm very just to ask one more question thank you through you is there anything
2:52:31that's thought of kind of a grandfathered in um or the existing sort of applications the existing
2:52:38developments that are sort of in the works a little bit um that are moving and trying to move
2:52:44along but then the market the housing market is what's impacting them it's not it's there's no
2:52:49lack of effort to try it's just that they've sold nothing for pre-sales and so when the market
2:52:57rebounds they're ready to go so my my question is kind of twofold is there kind of grandfathering
2:53:02in of the stuff that's already in the works and there's effort being made um and also how onerous
2:53:10if this policy comes through is it going to be for a developer to have to come and sort of ask
2:53:15permission you know from a speed of doing business or the speed of the market will it be onerous on
2:53:21them or are they going to be able to get the permissions and go fast I just see uh DCO game in
2:53:27this hand up yeah thank you through you chair class and to the mayor and and so the sort of
2:53:33theming of some of the questions tonight really this policy is is prudent management of the water
2:53:37system council as owner of the water system making those decisions to to ensure that Guelph is
2:53:44poised for growth development investment the things that we've been talking about tonight
2:53:47but part of the idea behind the administrative piece of this is that delegated authority so
2:53:52that we can move at the speed of business this is not about grinding anything to a halt this is
2:53:56about making sure that we're being responsible on our allocations and so that it's transparent and
2:54:00everyone understands exactly where they are in the rules and in the playing field and so that we
2:54:04can keep moving forward at the right speed so that we can see Guelph grow thank you mayor
2:54:13got three and staff I have up two hand three hands that have gone up in order that I saw them was
2:54:19Gibson Bucitil and Karen Koran yeah thank you um through you chair 100 what mayor got three just
2:54:27said we don't want to be stymie and growth and we want to encouraging them but I do want to
2:54:33counterbalance that with like I've heard this from staff but I've also seen this myself
2:54:39when it comes to property and very sophisticated developers you know god bless them they're really
2:54:45good at what they do but a vacant lot with no development plan no no zoning and no site plan
2:54:53approval is not as valuable as a lot that is pre-zoned and site plan is finished and then
2:55:01you're prepared and then you can sell it I've met developers out in western Canada that specialize
2:55:06in this they take over vacant lot they get it zoned they get it serviced with a site plan and
2:55:11then it's ready for market real market and that sometimes takes time so I admit that that happens
2:55:17but what we don't want is for developers with the ability to get it to the zoning get it to the site
2:55:23plan approval and then be able to bank it for 10 15 years knowing that it's a really great savings
2:55:30account for them because it's only appreciating over time I'm not I'm not accusing anyone in Guelph
2:55:35doing that I'm just saying that is kind of a prescription for why we're seeing this policy so
2:55:41I appreciate that from staff it's a delicate balance we don't want to be stymie growth
2:55:46we don't want to be stymie activity but we do have to nudge some of these files along so thank you
2:55:54no question there Councillor Gibson I apologize I should have made it clear it's a statement thank
2:56:01you thanks Councillor Boussotel please yes thank you and through the chair to the staff
2:56:08in the presentation you talked about accessory units and there are the accessory units that we
2:56:14know about and the ones that we don't know about so my question is uh is whether or not the staff
2:56:20are concerned about or is it significant the unknown significant unknown accessory units
2:56:28and that I have some more questions through the chair to the Councillor so I guess for
2:56:37unknown ADUs um I guess if they were unknown we'd be following our process so we do
2:56:44search warrants we do proactive enforcement when we hear about them but certainly there there may
2:56:49be some illegal units out there but we do our best to ensure that we're aware of them and bring
2:56:54them into a conformity we we do would would think that would be very small number would not impact
2:57:01the scale of this proposal thank you that's what I was looking for and through the chair my second
2:57:07question is about in the I think it was a schedule one at the bottom talks about institutional
2:57:13and I know I emailed you Christa about this so my question is about servicing do we hold back
2:57:20servicing for things that are growing community we know we'll need a hospital schools more recreation
2:57:28facilities um given that we know that it takes a long time to get ministry funding or approvals
2:57:34and things like that uh and those are things of a public benefit and I have a supplementary question
2:57:43yeah through the through the chair to the Councillor so one of the provisions that we
2:57:47have set out um in the policy framework is to make those extension provisions for for servicing
2:57:55we know a hospital can take 10 years um four years for zoning amendment and three years for site plan
2:58:01is seven but we know it can take up to 10 years to get through the ministry process and schools
2:58:05are very similar to that so one of the the criteria for extending services and the extension of the
2:58:11allocation is to comply with the OP and we have a section in the OP that is complete and healthy
2:58:17communities which is to provide local services and public service facilities including affordable
2:58:22housing and schools uh so we do feel that the policy addresses uh those uses and as we you know
2:58:28know a school is coming on or a hospital is coming on to ensure we have that capacity so uh yes we do
2:58:34feel that the policy allows for it and extension requests if they're if they're in a process but
2:58:39get delayed at a provincial level as well thank you and your comments dovetail into my next question
2:58:47the policy talks about you know first come first serve you know get to the trough first kind of thing
2:58:54but you also talked about a balanced community um and so if applications come in is there is there
2:59:02a priority in in approvals of we need the hospital we need this uh is there kind of that screening
2:59:16through the chair to Councillor Bustel um there isn't necessarily a screening process
2:59:22uh but like any other applications that come in or come into the city um it's not
2:59:29first come first serve does sound maybe not the best way to put it but the reality is as the
2:59:35applications come in those are the ones that we process those are the ones that we work through
2:59:39and as they proceed we assess whether or not there's capacity that we can allocate to them as they
2:59:46start the planning process there's capacity allocated to them so really it is to some degree
2:59:51first come first serve that being said again there's opportunity for us to look at applications
2:59:58that are coming through there's opportunity for us to gauge our capacity going forward
3:00:03there's opportunity to look at what we want to deal with that capacity so to some degree it is
3:00:10first come first serve but that being said there's always the chance to look at other industry or
3:00:16anyone who wants to come in and gauge the level of readiness and gauge the capacity that we have
3:00:22to allocate to them thank you thank you Councillor Bustel Councillor Caron please yes thank you um
3:00:32my question actually has been answered but I wanted to comment that I'll be absolutely supporting
3:00:37the the recommendation um because you identified that there's there's actually a risk not only to
3:00:43the city but a risk to the developer in an uncertain and unstable market they could make
3:00:49significant progress on an application and then find out after expending all of that
3:00:55that the project can't proceed because of water capacity so I think this is you know this there's
3:01:00there's there's a nice balance to why we're doing this it's not just for the benefit of the city it's
3:01:05also for the benefit of of the project leaders and developers who who need that certainty so
3:01:12thanks for bringing it forward thank you for those comments Councillor Caron I have two questions
3:01:19if you will uh unless there's somebody else who I didn't see a sneaky hand go up so I'll go ahead
3:01:24um I did have a question we we referred to it a couple of times which is the which is Waterloo
3:01:30and the issues that they've been having with their water supply I was just wondering if we could we
3:01:35could share that with the public what what those issues are um and and the situation there uh to
3:01:46the chair um I don't think it would be appropriate for staff to speak to what's happening with our
3:01:54partners I don't know if we have a full assessment of what's actually going on other than you know
3:02:00what's been shared with us publicly or through our peers
3:02:06yeah what if yeah if I if I could just build a little bit um I guess as part of
3:02:14we've been watching this situation with interest as well uh their staff's understanding and it was
3:02:19published as part of an agenda for the Region of Waterloo I believe about two weeks ago that there
3:02:23was a third party review um of the the circumstances and the issues within the system we could certainly
3:02:32share that with Council if you don't have it already for subsequent information from today
3:02:38okay thank you um and then finally my question is with regard to Council's role in in in water supply
3:02:48um it's just it's it's something that I mean I think that it's we know our we know our fiduciary
3:02:53responsibilities to the community but I specifically like get asked ask you to elaborate on our role
3:03:00for maintaining our water supply for current and future growth uh back to the chair as we look at
3:03:12design standards from the Ministry of the Environment Conservation and Parks certainly as we look at
3:03:19water systems and the health of water systems it's having adequate water for growth or the unknowns
3:03:26that come along with that and it's I guess some best practice materials that certainly look to
3:03:31you know at least a horizon of three to five years that we can say we have adequate water for our forecasted needs
3:03:38um I think this information and and what will come through the growth report annually to inform
3:03:44Council of where we stand as far as available capacity both to ensure resiliency of our system
3:03:50as well as to support our our open for business objectives with the public
3:03:56this will supplement the information that we're sharing with you annually around the water system
3:04:01and the performance of the the system um and the various aspects as far as providing water supply not
3:04:08just domestic needs but looking at fire supply and all those things again that are part of the mandate so
3:04:14I think this is a healthy complement to the information that you're getting and allow you as the system
3:04:19owner and the main decision maker again to make informed decisions with respect to investment in
3:04:25the system and understand where we stand from a more detailed basis thank you for that answer and
3:04:34thank you for the respectful discussion that happened and I would like with that to call
3:04:41the vote if that's okay and I nobody's asked me to separate them so I'd like to call them all
3:04:48together so is anyone opposed to the three recommendations from staff um that it passes
3:04:58unanimously and I just want to thank everyone uh for the discussion and we will be moving on to 11.2
3:05:07I'll just give staff a couple of seconds and thank you again very much um with your