Council Planning · November 12, 2025 · Item 4.1
Statutory Public Meeting Report regarding a proposed Zoning By-law Amendment application submitted by GSP Group Inc.…
Main motion under the agenda item Public Meeting for Proposed Zoning By-law Amendment application and Council Decision on endorsement of revised Urban Design Master Plan for 55 Baker Street and 152 and 160 Wyndham Street North, File: OZS25-016 - 2025-510
Carried (13 to 0)
13 in favour, 0 against — unanimous
What was voted on
The motion in its exact words, as recorded in the minutes.
That the Statutory Public Meeting Report regarding a proposed Zoning By-law Amendment application submitted by GSP Group Inc., on behalf of Baker Street Development Inc. (Windmill) to facilitate the development of two mixed-use towers (with proposed building heights of 17 and 19 storeys), containing approximately 401 residential dwelling units with ground floor commercial, and underground and podium parking on the lands municipally known as 55 Baker Street, 152 and 160 Wyndham Street North and legally described as Firstly: Part of Lots 73 and 74, Part of Burying Ground and Part of Lane at the rear of Lots 73 and 74 (AKA Parklane), Closed by CS31228, Plan 8, Parts 1, 2, MS80255, Designated as Parts 6 and 7 Plan 61R21815, City of Guelph, and Part 4 61R21815, S/T & T/w ROS557919 and ROS573090; Secondly: Part Burying Ground, Plan 8 and Part Lane through Burying Ground, Plan 8, Closed by MS80255, Designated as Parts 6 and 7 Plan 61R21818, City of Guelph, from Infrastructure, Development and Environment dated November 12, 2025 be received. That City Council approve the Revised Urban Design Master Plan for the Baker District Redevelopment as shown in Attachment-7 for the reasons outlined in this report.
Moved by Councillor Klassen, seconded by Councillor Goller.
How the room voted
In favour (13)
- Allt
- Billings
- Busuttil
- Caron
- Caton
- Chew
- Downer
- Gibson
- Goller
- Guthrie
- Hauser
- Klassen
- Richardson
Who spoke to it
Lindsay Sulatycki, Planner III, Senior Planner, presented on the Proposed Zoning By-law Amendment application and Council Decision on endorsement of revised Urban Design Master Plan for 55 Baker Street and 152 and 160 Wyndham Street North. The following delegates spoke: Caitlyn McCarthy Megan Torza Hugh Handy Jeremy Reeds Council recessed for call-in delegates. (5:09 p.m.). Council reconvened (5:12 p.m.). There were no call-in delegates.
What council was given
The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.
- Public Meeting ZBA Decision on Endorsement of revised UDMP 55 Baker St 152 and 160 Wyndham St N - 2025-510.pdf
Combines a required public meeting on a rezoning request for 55 Baker Street and 152 and 160 Wyndham Street North with a decision item. GSP Group, for Baker Street Development Inc. (Windmill), proposes two mixed-use towers of 17 and 19 storeys with about 401 apartments, ground-floor shops, and underground and podium parking. Council is asked to receive the planning report and to approve the revised Urban Design Master Plan for the Baker District.
- Attachment-1 Location Map and 120 metre Circulation.pdf
- Attachment-2 Aerial Photograph.pdf
- Attachment-3 Existing Downtown Secondary Plan Land Use Designations and Policies.pdf
- Attachment-4 Existing Zoning, Zoning By-law (2023)-20790.pdf
- Attachment-5 Proposed Zoning, Zoning By-law (2023)-20790.pdf
- Attachment-6 Proposed Conceptual Site Plan.pdf
- Attachment-7 Revised Urban Design Master Plan.pdf
- Attachment-8 Staff Presentation for Public Meeting.pdf
- Correspondence - Charlotte Lewington.pdf
A summary is this site’s description of a document, not the City’s. Open the document before relying on one.
What was said
9,939 words from the meeting recording, transcribed automatically. Times are from the start of the recording.
Read the debate(click to open)
16:30Urban design master plan for 55 Baker Street and
16:34152 and 160 Wyndham Street
16:37North we're gonna have
16:39Looks like our own planner Lindsey's gonna come up with a little bit of an update through a presentation and
16:45Just a few coming forward that have signed up in advance on
16:50This property so I will turn it over to you Lindsey. Thank you very much
16:55Good afternoon, Mayor Guthrie members of council staff and members of the public who are here in person or watching online
17:08Today I will be presenting the statutory public meeting report for the proposed zoning by-law amendment and a staff
17:15recommendation regarding council endorsement of the revised Urban design master plan for lands
17:21Municipally known as 55 Baker Street 152 and 160 Wyndham Street North
17:26This zoning by-law amendment application was received for the subject lands from GSP group Inc. on behalf of Baker Street
17:33development or windmill
17:35To facilitate the development of two mixed-use 17 story and 19 story towers containing approximately
17:42401 residential dwelling units with grand floor commercial and underground and podium parking
17:48The subject lands are located on the south side of Woolwood Street between Baker Street and Wyndham Street North
17:57The subject lands are approximately 1.08 hectares in size and have frontage along Park Lane
18:05Baker Street Wyndham Street North and Chaplain
18:08The north portion of the subject lands is vacant and the south portion is under construction with the city's central library
18:14Proposed as part of the Baker Street redevelopment project
18:17This site was previously subject to a zoning by-law amendment which was approved by council in December of 2023
18:28The previously approved design included two 15 story towers with two levels of underground parking two public squares and a future
18:35Development block at the north end of the site intended to be stacked townhouses
18:41Since the approval of the zoning by-law amendment in 2023 the applicant has progressed their development plans
18:47Which has resulted in modifications to the building design
18:51During this time the city completed a downtown height study and this study resulted in official plan amendment 106
18:57Which was approved by council on April 8th 2025 and subsequently approved by the Ontario land tribunal
19:04in august of 2025
19:06OPA 106 changed the permitted height for the mixed-use tower portion of the site from a maximum height of 15 stories to 24 stories
19:15The revised design includes two towers connected by a podium bridge on floors 2 to 4
19:20The proposed north tower is a 17 story mixed-use building
19:24With grand floor commercial space fronting Wyndham Square off Wyndham street and residential units on the grand floor and on floors 3 to 17
19:32A total of approximately 204
19:35Residential units are proposed within the north tower including a range of studio one bedroom and two bedroom units
19:42The proposed south tower is a 19 story mixed-use building with residential and amenity spaces located on the grand floor and floors 5 to 19
19:51One potential commercial space is also like located on the grand floor adjacent to the library urban square
19:57One level of underground parking is proposed with three levels of podium parking on floors 2 through 4 the south tower will include approximately
20:06197 units including a range of studios one bedroom and two bedroom units
20:10The underground and podium parking garage will exclusively serve the residents of the development
20:15A total of approximately 205 car parking spaces are being provided for residents
20:20And long-term bicycle parking is being provided in the underground parking garage as well within a room at grade
20:26One indoor bicycle parking space will be provided for each residential unit within the proposed development
20:32Outdoor bicycle parking will be provided to serve visitors of the site
20:37While the subject application applies to the entire site
20:40No changes are proposed to the library portion of the development, which is currently under construction
20:45Two public squares were also included as part of the proposed development
20:49And are being designed in conjunction with the two towers the portion of the site containing the library and public squares
20:55Will remain in the city's ownership while the private portion tower of the site will be purchased by windmill from the city
21:05The subject lands are designated as mixed-use one in the downtown secondary plan
21:09permissible uses within this land use designation include retail and service uses
21:14multiple unit residential buildings such as apartments and townhouse dwellings and institutional uses
21:19The mixed-use one land use designation requires the creation of active frontages by locating retail service and entertainment uses on the grand floor buildings
21:27Within this designation the zoning by-law is what establishes maximum and minimum
21:33setbacks from the street to help frame and animate adjacent streets
21:37Building heights as approved through official plan amendment 106 are permitted to be a maximum of 24 stories on the mixed-use tower portion of the site
21:45The subject lands are currently zoned a site specific downtown one dash 28 zone
21:54These site specific regulations within this zone were approved by council in December of 2023
22:00The purpose of the zoning by-law amendment application is to establish further site specific zoning regulations and the zoning by-law through a site specific
22:11downtown one zone
22:14In addition to previous site specific regulations approved in 2023 additional site specific regulations proposed include
22:21To permit a building height of 24 stories outside of the protected view corridor
22:26Whereas table 9.4 section 9.3
22:30C requires compliance with schedule b dash 4 in the zoning by-law
22:34Which outlines a building height of three to six stories on the northern and southeastern portions of the site and five to 15 stories on the central and southwest
22:41Western portions of the site
22:43To permit a floor plate length to width ratio of 1.9 to one for the north tower
22:48Whereas the site specific zoning by-law permits a length to width ratio of 1.8
22:55To one for the north tower
22:57To permit an above ground transformer to be located within a sight line triangle
23:02And that section 9.4 point 2a
23:05One of the zoning by-law not applied to the site or only applied to a podium of any building within the downtown exterior finishes overlay
23:13As shown on schedule b6
23:15Whereas the zoning by-law requires exterior facades to include coarse masonry and or materials which replicate coarse masonry
23:34So with the submission of the zoning by-law amendment the applicant also submitted a revised urban design master plan
23:40And in accordance with the policies of the downtown secondary plan the applicant prepared an urban design master plan for the baker district redevelopment
23:47Which was approved by council on july 21st 2021
23:51In consultation with staff the applicant has submitted a revised urban design master plan to reflect refinements
23:57To the proposed built form and circulation of the baker district redevelopment
24:01These refinements are the result of continued project evolution in response to market dynamics and implementation considerations
24:08Planning landscape planning and urban design staff have reviewed and provided comments
24:12On initial changes proposed to the urban design master plan
24:15And the applicant has worked closely with staff over the past several months to address comments provided
24:22Staff are satisfied that previous comments have been addressed and recommend that council approve the revised urban design master plan
24:28Further design and technical details will be addressed at the site plan approval stage
24:32The baker district is a mixed use redevelopment in Guelph's downtown core being advanced through close collaboration between the city of Guelph and the developer
24:40The revised urban design master plan continues to
24:43To represent both the public and private components of the project with recent updates focused primarily on the private development parcels
24:50While design details have evolved the project remains aligned with the city's downtown secondary plan and urban design objectives
24:58And both the architect and planning consultant for windmill will be providing further details of the revised proposal and revised urban design master plan in their presentations
25:10So next steps and staff review
25:11So the next steps for the zoning by-law amendment application will include a full review of the application
25:16And documents submitted in support of the application
25:19Once the application is reviewed and all issues are addressed a report from infrastructure development and environment will with a recommendation
25:27Will be considered at a future meeting of council
25:29So if there are any members of the public who wish to be informed on any revisions or decisions on this application
25:35Please provide your full name and contact details to planning at guelph.ca
25:40And that concludes my presentation
25:45Thank you very much appreciated
25:47I think because we do have some delegations we'll jump to them as normal and then we'll see if there's any questions at the end
25:53uh, and so with that I'd like to call up katelyn mccarthy from
25:58Uh windmill development group who is coming on down
26:02Hugh handi from gsp group is here in person and is in the wings
26:10And because this is uh, both a public and decision meeting it's 10 minutes right now no more than 10 minutes
26:16If you don't need it no problem if you need it no problem
26:19But you'll you'll hear a chime at the nine minute 30 second mark, which is your 30 second warning and then if um
26:26If you get to 10 minutes your mic gets cut off. So don't let it get there. Okay. All right. I'll turn it over to you. Go ahead
26:36Thank you. Uh, good afternoon. Mayor guthrie members of council staff
26:40And those joining us in person and online
26:43My name is katelyn mccarthy. I'm an assistant development manager with windmill developments
26:47And i'm excited to be here today to present the baker district development as part of the statutory public meeting for the zoning by-law amendment
26:56um as mentioned by mayor guthrie and
27:00Lindsay uh, oh, sorry
27:04I'm joined in person by megan tortsa our architect from dta h who will also be providing a delegation
27:10And hugh handi our planner who will also be presenting
27:14Um, I'm joined online by jeremy reeds the president of windmill developments and also in person by
27:20charlotte louington from gsp group and joe zlee from wsp our transportation engineer who are available to answer any questions
27:26Um
27:29As mentioned as well, we don't plan on taking full 10 minutes each with our delegations and we'll be using the same slide deck
27:36So we'll be happy to answer any questions together with the help of our colleagues after hugh's presentation
27:45Um, I'll start quickly by sharing a bit about windmill developments and what we do
27:49Windmill has over 20 years of experience as a real estate development firm and from the very start we have been driven by sustainability
27:56We really prioritize creating communities that are environmentally and socially sustainable and that informs the way that we design and build our projects
28:04One of the ways that we do that is through the one planet living framework that i'll discuss more in one of my upcoming slides
28:12Uh, but first just to highlight the development that we're discussing today
28:16The bigger district is located in downtown gulf and it will be a mixed use development featuring residential and retail space
28:22Along with two public squares that will integrate with the new gulf public library. That's under construction at the south end of the site right now
28:32Like the city of gulf and windmill the baker district has a heavy focus on sustainability and is actually only the second one planet living endorse community in canada
28:41I'd also just like to take a minute to mention that the baker district has been a long-standing joint effort between windmill and the city of gulf
28:48And we're really appreciative of the collaboration with the city including the planning department with lindsay
28:54And many other members of staff who are helping to bring this community to life in the heart of downtown gulf and we look forward to that continued collaboration
29:05So one planet living which i mentioned previously is a holistic framework for sustainable living that was created to help people live
29:12happy and healthy lives within the finite resources of our planet
29:16The framework is guided by 10 principles that are designed to drive innovation and
29:22Encourage action beyond just ticking a box
29:29So at the baker district will embody all 10 principles of the one planet living framework
29:35But some of our main and most impactful initiatives include being a zero carbon building per the canada green building council
29:41And this means that there will be no fossil fuels used on the project and all building systems will be electric
29:47Which will also contribute to the city of gulf's goal to be net zero carbon by 2050
29:53We will have a high performance building envelope assembly with high efficiency windows that will contribute to an overall highly energy efficient building
30:02And 25 of parking will have electric vehicle charging installed while the remaining 75 will be EV ready
30:09We will also be using sustainably focused materials and fixtures on both the interior and exterior of the project
30:15And finally we will use an extensive transportation demand management plan that promotes multimodal transportation
30:21including ride share transit cycling
30:24And to encourage
30:26Excuse me less carbon intensive transportation methods
30:33Now understanding the need for affordable housing in the current market and in an effort to support the city of gulf's affordable housing goals
30:40windmill has recently increased the target for affordable housing at the baker district to 30 percent from the 12 percent that was
30:48proposed in the previous application
30:50And currently we are using the definition of affordability from CMHC
30:55Which could result in up to 120 affordable housing units of the 401 rental units that are proposed at the site
31:06And finally just to provide some background on why we're here in front of you today
31:12in 2021 an urban design master plan for the site was approved by council
31:16And then following a couple of years of design exploration a zoning by law amendment was
31:21Requested and approved by council in 2023
31:25In the following years design efforts on the baker district continued as the market began to shift
31:30leading windmill to explore alternative design approaches including
31:34parking solutions
31:36Changes to the structure and building envelope as well as different phasing strategies
31:41And all of these explorations were informed by our new construction manager van mar
31:47Then in june of this year we presented the revised design at a public open house at the
31:53main gulf public library
31:54Where we received lots of positive feedback from members of the community
31:58Then in september of this year we submitted a revised urban design master plan and new zoning by law amendment to facilitate the new design
32:07For the baker district that you'll see today
32:10Uh, and I'll now pass it off to our architect megan torza from dth to discuss the revised design and urban design master plan in more detail
32:18Thank you for your time
32:23Thank you. Just before you switch. Did you are you just are you sharing the 10 minutes then I just wanted to make sure
32:28No, okay, so you're good then
32:31Okay, and we do have other people here council the main councilmates that are online
32:36That are here to also answer specific questions at the end
32:39So maybe we can just hear them because it looks like it's all planned
32:42So we'll hear them all out and then maybe we can do the questions at the end after
32:46After the applicant is finished all of their
32:49Their presentation. Hi, we'll start the timer for you now
32:52Go ahead. Mr. Mayor
32:54Hello, everyone. My name is megan torza. I'm an architect and partner at dth
33:02So the revised plan in front of you today and captured in the urban design master plan
33:06Uh shares many commonalities with the previously submitted and approved plan
33:12But also a few differences. So the differences include the heights of the towers
33:18From 15 story towers with only underground parking to a 17 story north tower and a 19 story south tower
33:26With the inclusion of some above grade parking
33:31So we continue to have one level of underground parking
33:34But using some portions of the podium above grade to accommodate parking as well
33:40And we are also as uh, katelin just mentioned increasing the volume of
33:45affordable housing units to 30 percent
33:48And there's also a much more aggressive
33:53opportunity and
33:54Ambition to increase the accessible housing units within this development. Well, but beyond beyond and above the
34:01OBC requirements
34:03Still relevant to the project are its ambitions to create a compact walkable
34:10and enriched public realm
34:12and a contributor to the life of downtown gwealth
34:16To provide landscaped open spaces that benefit the entire downtown not just the residents of this development
34:24And animated frontages on all blocks to bring life to the street eyes on the street and more life
34:31to the downtown core
34:36So as katelin mentioned, we submitted our
34:39urban design master plan revision in september having
34:42submitted a draft to staff earlier in the summer and receiving their comments and integrating those comments in the draft
34:52And as mentioned, we are focused on the baker district site
34:57flanked by windom street north baker street park lane north and chapel
35:03And this of course is the site already of the construction of the library
35:07Which is well underway and slated for opening next year
35:12The massing of the new baker district as I mentioned is two towers
35:1617 and 19 stories connected by a bridge at levels two to four
35:21And integrating what used to be known in our previous udmp as the townhouse lands
35:27integrating a portion of podium
35:29residential uses and parking
35:32Along the north side of the block
35:40So the configuration of buildings is not dissimilar to what we have seen before in the previously submitted urban design master plan
35:46The key difference being the connective bridge between the north tower and the south tower
35:51That forms part of the podium and allows for the above-grade parking
35:55As well as shared amenities to span between the two towers
36:00The relationship of the buildings to the urban square is proposed remains the same
36:05So windom urban square facing windom street north is flanked by a podium of the north tower that contains retail uses at grade
36:14Residential uses above an amenity terrace that overlooks windom square brings eyes onto that piece of public open space
36:22And library urban square, which is at the south end of the block
36:26Flanked by a retail space at grade within the south tower
36:30Residential units above providing eyes onto that
36:32Uh open space
36:34There have been improvements to the nature of the landscape in between those two urban squares including baker court
36:41And also improvements to the way in which vehicles enter and are accommodated on the site, which i'll go over in a minute
36:51So windom urban square in more detail, uh windom urban square is now a non stratified public open space
36:58So there is no parking below windom urban square, which is an improvement over the previously submitted plan meaning
37:05The trees that we plant the the landscape that is provided has no impediment to grow to its full and maximum height within this zone
37:14It is also the place where we are integrating stormwater management strategies including a landscape swale to take overland flow of stormwater
37:23A great deal of native plantings as well as the opportunity for public art
37:27And even patio space flanking the retail uses at grade that are within the podium of the north tower
37:37Baker court is uh in the center of the block
37:41And is the location of the two residential lobbies of the private portion of this development
37:47So both the north tower and the south tower have lobbies that face onto baker court
37:52And baker court provides the location of pickup and drop-off convenience
37:57short-term parking for
37:59residents and visitors to the site
38:03It also provides vehicular access to the adjacent parcel of land on windom street that has a parking lot that we are required to provide access to
38:12That's 146 to 150 windom street
38:16And it allows vehicles to enter and exit the site safely for residents to
38:21Provide a pickup and drop-off in a convenient manner
38:24And also allows vehicles to enter into park lane north where the ramp access and loading access are all provided
38:34Cycling circulation is also accommodated through baker court and i'll show you that in more detail in a in a future slide
38:43And of course baker court also supports safe pedestrian access both from windom urban square to baker street
38:50As well as windom urban square south to the library urban square. So we are providing
38:56uh pedestrian crossing markings and the appropriate
38:59public realm connections to allow for pedestrians to move all the way through the site in a safe manner
39:08And library urban square is the south end of the block
39:11Flanking the library as well as the retail space at grade within the south tower
39:17And there is again similar to windom square seating planting
39:20and places for gathering
39:25Access and loading have been reconfigured to focus
39:29Entirely within the park lane north area of the site. So on the northern block
39:35There are two ramps one ramp closest to
39:39Woolwich is
39:41For the underground parking which is about a hundred unit a hundred spaces underground
39:45There's a second parking ramp that takes you to the above grade parking
39:49Also from park lane north and the loading is now consolidated within one interior loading dock
39:56Off of park lane north where garbage pickup and drop off moving
40:00Etc will all be housed. So in the previous iteration that was being proposed as an outdoor loading
40:06Configuration we have now integrated it into the podium of the building
40:12Cycling circulation is provided through baker court to windom square
40:18It proposed as part of the walkway just north of the county of wellington building. So safe
40:24Safe cycling route between baker street and windom street through that connection
40:31There is bike parking below grade for all residential units as well as at grade sheltered bike parking below the
40:39Bridge connecting north tower to south tower and within windom urban square as well as library urban square
40:48The building massing does adhere to the built form requirements of the city of guelph including
40:55Tower step backs above the fourth floor
40:59Tower separation of 25 meters
41:02An appropriate separation of podium residential units as well to flanking buildings and streets
41:13And the uses as previously described there is a
41:16predominance of residential use on the on this property indicated in yellow in these diagrams
41:23retail and residential uses at grade
41:27With parking kind of concealed in between or sandwiched in between and that parking is
41:32Proposed to be screened architecturally so that it is indiscernible from the residential uses adjacent
41:39And using the high quality materials that are required within podium developments here in the downtown
41:45The library in blues at the south end of the site of course a really massive and an important public asset
41:51and amenity spaces for residents are also
41:54strategically located
41:56flanking urban squares as the rooftop I mentioned
41:59Overlooking windom urban square
42:01But also within the top floor of the bridge that connects north sour tower to south tower
42:06As well as the rooftop of that bridge are all amenity areas for the residents
42:14And finally the building materiality that continues to be proposed is a language of brick masonry cladding on the
42:20exterior of the podium portions of the building
42:22It's also the cladding of the library
42:25And the tower portions of the development will be a simple punched window
42:30cladding typology
42:32intended to be a quieter and subdued language relative to the rich
42:37articulation of the podiums
42:39And with that that concludes my presentation and I look forward to your questions. Thank you
42:46Thank you very much
42:48Did you want to take questions or do you want to talk first Hugh and then we'll do questions at the end?
42:54Okay, yeah, come on. No, no problem. Go ahead and start whenever you're ready. Thank you
43:06Thank you, uh, mayor guthrie members of council
43:09staff ladies and gentlemen
43:11My name is Hugh handy and I am a land use planner and vice president at gsp group and here on behalf of windmelt
43:18I move that forward. Yes. Thank you
43:30I'll deal now with the zoning bylaw amendment application that is part of the
43:37Proposal that's before you again some of these details. We've already highlighted
43:42I'll deal with the north tower first and then the south tower
43:46The proposed development consists of the two towers again connected by a podium bridge at two and four
43:52The north tower is slightly less at 17 stories
43:57The idea of commercial space fronting on to windmills square and off windmills street
44:03And then the residential units
44:06On the ground floors
44:07There's one level of underground parking and then the rest in the podium of the second floor
44:13There's a total of 204 units in this building and as we've talked about a range of studio one and two beds
44:20And the idea of this project again and the units are intended to be purpose built rental
44:28The south tower again will be slightly higher and the first just to remind of what lindsay said 15 stories were both before you in
44:372023
44:38This is a 19 story so it'll step down as you head north
44:44again
44:45Provincial potential commercial space is also located in the library urban square
44:51Again one level of underground and then parking in podiums floors two to four
44:56179 residential units are proposed again similar mix and again just to reiterate purpose built rental
45:05The residential amenity space
45:08Megan has touched on this but there'll be some
45:11In the north and south towers for both residents of the buildings
45:16Again on the podium bridge
45:18an indoor amenity space
45:20Ground floor of the south tower will have overlooking baker court and second floor of the north tower overlooking the square
45:29In total about a hundred
45:31Thousand square meters of amenity space is provided to the residents
45:37As mentioned, the big part of this is the city spaces to complement the towers the windom square will
45:44animate off of windom street and sort of draw you in
45:48from windom into those spaces
45:51Library square we see it as a as sort of spilling out from the library
45:56Engaging in that so that as you're kind of walking through the development there'll be different spaces unfolding
46:02and then baker court will be the
46:05Pedestrian as well as cycling and as Megan mentioned
46:09Having vehicles in and out as well
46:14Um, I think I've touched on this but again
46:17Podium parking and underground parking is part of the revised design and that was a big part of how we were going to
46:23Integrate at this bicycle parking
46:26Is also part of this secured bike room
46:30And as well as visitor parking at grade as well the planning framework
46:38Lindsay has touched on
46:40it's in a major trans station area the mixed use one and
46:45Through 106 opa official plan amendment 106 it allows up to 24 stories
46:53the
46:54d1d dot 128 was the previous zoning and
47:01That is being what I would say tweaked
47:04Through our zoning by-law amendment application that is before you
47:10In terms of building height we have
47:13Kept with the 24 stories as permitted in your
47:18Zoning by-law update
47:21We as you'll note we are at 17 and 19
47:25We felt it was appropriate to implement the 24
47:28We're in for site plan approval at the moment at 17 and 19
47:33But should anything change through that process or be tweaked we felt it was appropriate to
47:39Use that the floor plate length again as we've gone through detailed design
47:44There's been some things that have changed on the north tower
47:48And we think this is actually a design improvement that warrants the
47:52difference in
47:53Tower floor plate length to width ratio. So that's what I would call a tweak
48:00the site plan
48:02Through site planning the site triangle at the north end of the site. So this is where it would come off of baker
48:08Onto the site
48:09There is a small transformer box that we need to accommodate there
48:13And that's the reason for that regulation
48:16And then the exterior finishes
48:19this it relates to
48:21Trying to ensure that along your major corridors in the downtown that there is
48:29Materials that reflect that downtown in historic nature
48:33There is some as I said some tweaking that we require on there
48:36but as megan has indicated through the presentation the intent is to
48:41Showcase a building that fits really well and has the tower sort of fading into the into the into the sky
48:49so
48:50With that I think that brings our conclusion or our presentation to a conclusion
48:57I'd be happy to bring
48:58Caitlyn and megan back up to be here to answer any questions that council
49:04May have on the application. Thank you. Okay. Thanks. You and thank you everyone else that
49:09That has come forward. Let's just start with some questions and we'll get right to it. I'll I'll go to the screen first
49:16Caitlyn and a karan, please
49:21Thank you through you mr. Mayor
49:23Um, I thought I saw and please correct me if I'm wrong on the presentation that
49:29um
49:30Only the bachelor and one bedrooms were going to be considered for the affordable units
49:36Is that was I reading that properly?
49:40Uh through you your worship to the counselor. Uh, I I'm not sure Caitlyn. Do you want to come up on that?
49:49Yeah, I might as well come down
49:56through you mayor Guthrie
49:59The actual units that will be considered affordable won't actually be defined at this time that will come at the time of sale
50:05Or I guess rental
50:07So I can't confidently say whether it will be the one bedroom or the
50:12studio units that will end up being affordable
50:15based on the cmhc definition of affordable and the
50:20Rental rate of those units. That's how it's worked out in our plans
50:25But again, that will be determined at the time of sale. Uh, Jeremy, I don't know if you wanted to speak further to that
50:33Yeah, sorry, I assume everybody can hear but just let me know if you can't uh, no, I agree with Caitlyn. Uh, there's no
50:40Current allocation to say these units first of those units will be the affordable units
50:45A lot of it depends on
50:48In a for sale scenario versus a rental scenario the cmhc programs that are available at the time which
50:54I think everybody can appreciate or
50:56ever changing and evolving with the new federal government, but
51:00There's no plan to say one unit is specifically affordable versus another
51:05at this time
51:07Great and through the mayor, I just wonder I love hearing that there could be more than the 15 accessible. I was
51:13Trying not to clap on the screen for that one. Um, and I was just wondering when would you have more information about that?
51:21To know for sure how many
51:23I could jump in on that right now. We're currently
51:28designing to hit
51:2921 percent accessible and a lot of it ties into the cmhc financing programs that are available
51:37I do say that hesitantly in the sense of we're designing to that right now
51:41And it is very much subjective based on whether those financing programs change as a result of build canada homes and the federal government initiatives, but
51:50We've been working very closely with the cmhc as well as hick through bch engagement team to
51:58Ensure that we're aware of what those programs evolve to so that we're ready to adapt as needed, but
52:04Currently that is the design that we're working within
52:08Great, thank you very much. I think it's a fantastic development. So
52:13Happy that you're moving forward with more floors. Hopefully
52:16Thanks
52:18Thanks, councillor caitin and councillor Caron, please
52:21Great. Thank you. Through you, mr. Mayor. I'm sorry. Rick follow me original proposal that there was
52:28additional underground parking
52:30and
52:31Now the parking that is in the podium levels has increased the height now. I also recognize there are additional
52:38Permissions that have come through other
52:40I mean pieces of legislation and changes to city policy
52:44Um, the elimination of the underground parking moving it into the podiums is
52:51It was not the best urban design solution
52:54Was it related to specifically the site conditions or was it it was it was a financial
53:01cost sentence to
53:03Move it to a life-threat
53:10Through you, mr. Mayor
53:12Oh, sorry
53:14Through you, mr. Mayor
53:16Yes, it is related to the site conditions. Um, the seasonal high groundwater level
53:23Was resulting in
53:25permanent dewatering of the underground parking in the previous scheme, which uh,
53:30is obviously
53:32cost prohibitive so
53:35The move to shift parking above ground
53:40Solves that issue and therefore allows us to increase our affordable housing
53:46Provided in the development. Okay
53:48So that confirms that for me. Um, the county parking lot behind the county social services building
53:55Is that set of fence location or is there going to be some permeability?
54:00Or pedestrian through the site from the park where you come into the church areas? Is that going to be
54:08Spends for that
54:11Through you mr. Mayor to the councillor the county parking lot is fenced
54:17There is a screen proposed between the baker district and that parking lot
54:23There is however a pedestrian walkway as part of the library design that runs along the north edge of the library property and does
54:32Emerge onto the very northern end of chapel lane
54:37So
54:38There there would be a pedestrian route into the county parking lot
54:42But the county parking lot is a private parking lot. It is a regulated
54:47use area and therefore
54:50It was not
54:51articulated as being of interest to allow for
54:54massive amounts of pedestrian circulation through that site
54:58So we have pedestrian circulation along the north edge of the county property
55:02Which is where there is currently a walkway, but not
55:07Full porosity between the baker district and the county lot
55:10Okay, thank you for that and the only reason I asked that question is anyone's not really
55:14part of the decision where we move today, but
55:18It I understand the challenge of limiting where you can come up with
55:23Active transportation linkages within your development have been designed around this
55:29Have it
55:31Impediment
55:33Which may or may not change in the future, but it's good for me to be able to keep that secret
55:38um, the since the wind studies were last done and I'm asking this to be confirmed
55:46The we've had new development on the armistry
55:51That has added height had but there've been
55:55Have you packaged you new
55:58Wind studies since new development has been added
56:03Through you, mr. Mayor. Yes, we actually have a full
56:07Quantitative wind study underway by RWDI right now
56:10We submitted a preliminary qualitative wind study
56:14with the udmp zoning bylaw amendment and the quantitative study will be submitted with the site plan applications
56:21Okay, thanks. And my last question
56:24And it's an I've always been impressed by your
56:28organization's commitment to the one
56:31finite living concept and the sustainability this and design of this building and its
56:36its mechanics and its materials
56:39Has always been something I've been looking forward to seeing
56:42come to fruition
56:45And are you still committed to this being a net zero carbon development?
56:51Through you mayor Guthrie. Yes, the development will be net zero carbon per the Canada green building council
56:58So we're pursuing certification through CAGBC
57:01And that means that the development will have no combustion and use entirely electric systems
57:08Thank you. I think that that adds to the affordability for future residents and I want to commend you on that commitment
57:15Thanks, uh, councillor cost and then alt
57:20Yes, um, thank you for the presentations
57:23Um, I I really do like the urban design master plan changes and some of the the materiality particularly around
57:30Making connections to the arts and indigenous um our indigenous communities and I'm I'm curious to see how that may play out
57:37Um further down the road
57:39Um
57:40Councillor Caron did touch on one of my questions which was with regard to the county's parking lot touching the development
57:50And my question is for you and perhaps this will be a question that I ask later to staff
57:55Which is is there a way to work with them?
57:57integrate that in a way that is both functional and
58:01um
58:03Inducive to the type of change that we're trying to make to this area
58:07We're trying to move away from a surface level parking lot Baker district was was a parking lot and and I'm curious
58:13And I know that this is a conversation that has been had in the past
58:16But I'm I'd like to continue to talk about it if that's uh, if you could speak to it a little bit that would be helpful
58:25Thank you through you mr. Mayor to the councillor um
58:30Windmill and the their design team do not have any power over the county of wellington's property
58:37Nothing that we are doing as part of the Baker district prohibits the county from changing their approach to their parking in the future
58:45Uh, and there is as you I think infer great promise and potential for more
58:52interesting and
58:55Perhaps contributing uses that could happen there
59:00So the
59:02landscape that we have along the east side of our development in the in the area of the county of wellington
59:09includes
59:11A provision for a visual screen that's that provides a visual separation between the two uses
59:19In future if the county of wellington changed their approach to their site that screening could potentially be taken down
59:29There are some grading realities to our site
59:34relative to the county of wellington that um
59:37Suggest or that mean that there isn't always a zero slope or zero step relationship between the two properties
59:45But it's certainly not
59:47Outside of the realm of possibility that further connections could be made longer term
59:52But early in the design process, um, there were discussions with the county and the solution that you see presented in the urban design master plan
1:00:02continues to be the solution that is acceptable to
1:00:07And reflective of the conversations within that relationship
1:00:12Okay, thank you. I appreciate that and I'll ask it again later to staff
1:00:17My next question was with regard to the podium. Karon and I are on the same page
1:00:21Um, I looked at the the design and I'm not sure if I quite understand functionally
1:00:27What baker street will look like? I think I saw some images of the windows and then where exactly will the podium?
1:00:34um
1:00:35for the parking
1:00:37Look out to on baker street
1:00:42so starting from the north if we can imagine
1:00:46The northern portion of the building is a three-story
1:00:50Arm, let's call it that stretches north towards the park lane north, uh and baker intersection
1:00:57That arm includes grade related
1:01:02An accessible ground floor units with front doors onto baker street
1:01:07So a full line of residential units animating the streetscape with front doors along that line
1:01:14The second story of that three-story arm is a layer of parking
1:01:21And it provides access to the south tower which has a higher volume of podium parking in levels two to four
1:01:29So it is at the kind of pathway to get to the above grade parking
1:01:35Goes along the north end of the site at the second story
1:01:38The third story of that three-story arm is again residential
1:01:43So there are two stories of residential one story of parking in the northern third of the site
1:01:52The tower of course of the north tower is all residential. There's no parking in the tower
1:01:58And so the the language of the podium portion of the north tower as it
1:02:03Emerges near Baker court
1:02:06Will be represented as if it is all residential
1:02:11Even though there is a one layer of parking going through at an intermediate
1:02:17level two
1:02:19the bridge
1:02:20Is parking at level two parking at level three
1:02:25A gym amenity potentially
1:02:27Or some form of amenity at level four and a rooftop terrace at level five
1:02:33So it has an opaque portion
1:02:36Lower down which is where we have also suggested there might be a public art installation facing Baker on that portion of the bridge
1:02:43And then at the amenity level there would be a large
1:02:47Opening or window of some sort to allow for the users with the amenity to look out onto Baker
1:02:51And of course the rooftop terrace would also
1:02:54Be seen from from the ground you'd see some
1:02:57planting and things like that
1:03:00And then within the south tower
1:03:02Ground floor is all again residential uses grade related with front doors onto Baker street
1:03:11Second floor third floor and fourth floor are parking
1:03:15And they are screened behind a masonry cladding
1:03:18within the podium and we think we can do that in a way that will be
1:03:26appropriate and
1:03:29Compatible with the language of the residential
1:03:32openings within the podium elsewhere in the development
1:03:36And then the tower is above
1:03:39and so
1:03:40At grade as a pedestrian you always have active animating contributing uses against you as you walk from north to south along Baker
1:03:50The two residential lobbies also are like at the corners of Baker court at so you'll you'll walk past front doors of
1:03:57Residential units then you'll walk past the lobby then you'll cross across Baker court another lobby and then more residential uses
1:04:04And at the very south end is the proposed retail unit that faces onto library square
1:04:10so all the way along it would be
1:04:12a comfortable and and kind of residential character
1:04:17and the the parking that is above will be screened from view
1:04:21And integrated into the podium language
1:04:26Thank you. That was an excellent description
1:04:29Um
1:04:31I I was visualizing. I don't know if you could tell I was visualizing at the entire time
1:04:35You might have lost me a little bit on one of the the north tower pieces, but I think I got there
1:04:41Uh, so thank you for that and I also in my mind was thinking it's a parking sandwich
1:04:47So
1:04:49Appreciate that. I have another question with which is with regard to the
1:04:55um retail commercial uses on onto windom
1:05:00Windom
1:05:02court
1:05:04park
1:05:05Sorry urban square urban square urban square. Um
1:05:09I see that it's on an angling, you know, you know angles into sort of the invites you to kind of enter into the Baker district
1:05:17I'm just wondering I know you you spoke about the one unit on the library side
1:05:21How many units do you anticipate on the windom side?
1:05:28Through you, Mr. Mayor to the counselor. Uh, the moment I think we're showing
1:05:32Something like five retail units. There's a larger unit that faces directly onto windom urban square
1:05:39And then a series of smaller units along the walkway that connects windom urban square to Baker court
1:05:45and the idea at the moment is that you know, um some variation in scale
1:05:50might be appropriate and
1:05:53conducive to bringing
1:05:55businesses and retailers to the site
1:05:58But the the demising of those retail units. I think is subject to change
1:06:03depending upon the uh, the market conditions and who might be interested in coming
1:06:08But the design of that walkway between windom urban square and Baker court also
1:06:13There is a canopy proposed along
1:06:16Above all of those retail entrances. There are there a signage proposed that you would see as you go
1:06:21So to to improve the the way finding and visibility of the retailers
1:06:26From windom street just to encourage that that movement into the site
1:06:31And then once you're in Baker court, you would see
1:06:36One of the amenities that we are considering at the northeast corner of the south tower is actually a
1:06:42Co-working amenity. So that would also be visible at the termination of that little walkway
1:06:47So there'd there'd again be more more activity to be had in Baker court through that amenity
1:06:54Thank you, that sounds interesting and like it's a new shopping district and my last question is
1:07:00You know that we're ripping up windom street
1:07:02to accommodate
1:07:04new build and and and this development
1:07:07So
1:07:08With that in consideration, what is your timeline for construction?
1:07:15through you mr. Mayor
1:07:18Currently our timeline to shovels in the ground are is going to be dictated by the approvals process
1:07:25So our amazing design team is moving as fast as they can. We're we're pushing full steam ahead on the design
1:07:32So the site plan application that we've we've just submitted a pre-constation application last week
1:07:37That's really where we have our eyes set on our kind of next step and and that will dictate when
1:07:43We're looking to get shovels in the ground
1:07:45Um, I think another piece of that is the federal funding availability
1:07:51um
1:07:52So that's to be seen
1:07:54Um, but at a high level I would say right now we're targeting early 2027
1:08:02Okay, thank you and and one more chair if you just just with it opened a new question
1:08:09Okay, I do have time
1:08:12Okay, my
1:08:14What do you when do you anticipate to know more about the federal funding?
1:08:20Uh, I can jump in there if that's okay. Um
1:08:25It's an ever-evolving cycle right now unfortunately. Um
1:08:31Current understanding from most, uh, real estate developers and government is that most of the standard programs are going to stay in place and function as they are
1:08:43Uh, build Canada homes for anybody that is falling along with it is a new
1:08:48Call a crown corp entity that's being stood up and it's in the process and
1:08:53Most of their employees are part of hick
1:08:56so it's still
1:08:58I'd say week by week evolving right now
1:09:00We were expecting that more information would have came out of the federal budget that would have provided more clarity
1:09:07uh, unfortunately, it's
1:09:10Kind of two steps forward one step back in the sense of some information keeps becoming available
1:09:14but there's still no certainty or clarity of what that will look like and how it functions but
1:09:20We're currently intending to and most other, uh
1:09:26Developers in the for-profit and non-profit space are all focusing on the aspect of expecting the standard programs to be there
1:09:33and it's just whether they improve or get better so
1:09:37we remain hopeful and
1:09:39We have constant conversations with CMHC as well as bch
1:09:44To ensure that we're active in those conversations
1:09:49I would say we are a leader in the space and a lot of the innovation and sustainability initiatives that align with it
1:09:54So we're trying to be part of those conversations as much as we can
1:09:59Okay, thank you
1:10:02Councillor Allt of all your questions been asked
1:10:05I wish that were true. Thank you very much mayor Guthrie. Um, and through you to
1:10:10particular delegates, but before I do first of all, I would like to thank windmill for being a very important part of downtown
1:10:17revitalization, I think that that needs to be stated that it is it really is the impetus in many respects for
1:10:23What we're doing moving forward
1:10:25First question actually is is one uh for um, mrs. Fortsa
1:10:29And it's an education question as much as anything else and I apologize if it sounds pejorative
1:10:34But the question is why is affordability a con an architectural concern?
1:10:39That implies to me that there's a qualitative difference that's being addressed and I'm hoping you can explain that to me
1:10:48From a design side, I'm not sure that affordability is a concern
1:10:53We're designing all of these units in an equal manner with equal durability and considerations
1:11:00appropriate for rental tenure
1:11:02So, uh, they need to be durable. They need to work things. Can't break all the time because the the obligation to fix it remains with the developer
1:11:12and so
1:11:14affordability in that in that regard is not a is not a concern
1:11:19I think there is a bigger affordability, which is just the realities of
1:11:24affording to be a developer in this day and age
1:11:26and affording to build and so many of the revisions that have happened over the course of the last few years have been very
1:11:34sensitive to
1:11:35How do we continue to uphold the sustainability ambition of this project while actually being able to deliver it
1:11:44And actually being able to rent units at an affordable price point in a meaningful amount of units. So
1:11:52The pro forma is informed by the ambition for affordability
1:11:57But it does not imply
1:11:59or require
1:12:02Some units to be designed in a different way than others
1:12:05I appreciate that because when I saw saw one of the slide deck there. I thought
1:12:11This isn't this isn't adding up your answer was fine. Thank you
1:12:15Um, but related to that as well
1:12:16There was reference to amenities and I don't know to whom this is addressed
1:12:21But I'm presuming the amenities gymnasium the uh,
1:12:24live work office spaces and so on
1:12:27Our user pay is that correct?
1:12:32Sorry, uh, Jeremy, I don't know. Maybe if you can speak to that. I don't I don't think they are
1:12:37To be paid at all. It'll be provided to the residents. Okay. So every resident. That's great. Thanks
1:12:43um, a more difficult question
1:12:45I don't know if anybody can answer this one is that
1:12:48In the downtown there is a dearth of schools
1:12:52We we just don't have them and I am concerned about intensification and
1:12:57um a um a young population moving into
1:13:01These buildings. So I'm kind of uh concerned. What is the projected market? Are we looking at families? Are we looking at
1:13:09empty nesters? Are we looking at a broad spectrum of individuals who would be and families that would be living there?
1:13:17Uh, through you mr. Mayor um at a high level what our understanding is right now is that uh, the building would be
1:13:26um split between empty nesters and potentially students
1:13:30So, uh, we aren't we aren't really considering families at this time and I think that's reflected in the unit mix as well. Um
1:13:38Obviously that's still to be seen, but that's how how we've anticipated it so far
1:13:42So clarification we're talking about post secondary students. Sorry. Yes. Okay. Thanks. Thank you very much
1:13:49All right, is there anything more at all?
1:13:53All right, I have just one question for you
1:13:56because I happen to see
1:13:59one of my old neighbors here who happens to
1:14:02Could be living across the street from you
1:14:04Uh, and I didn't talk to them, but I would imagine maybe one question would be
1:14:09um, how are you going to from uh
1:14:13usability perspective maintain
1:14:16Sort of the construction and the roadway and the access and stuff like that to people across the way respect the people across the way
1:14:23during construction and whatnot
1:14:28Jeremy are you able to speak to that? That's a bit out of my wheelhouse
1:14:32Yeah
1:14:34To be honest, I'm asking Jeremy is how are you going to be a good neighbor? Yeah, uh, so every time you work through
1:14:43Call it the construction cycle and van Mar has been great to date
1:14:47in the pre-con phase, but
1:14:49Always work with them to understand a the city as well as the site constraints and then ensure that there's a plan in place of how that will
1:14:58Effectively function throughout that construction cycle part of it is the site staging and how you just move through the site in this development cycle
1:15:06but
1:15:07it's one of those things that we always
1:15:09focus
1:15:10a lot on
1:15:12The detailed plan for that phase and as well as the engagement with the city and then any neighboring sites to make sure everybody understands how that's going to function
1:15:21And make sure it's well communicated and articulated
1:15:23I think the most important aspect of this in success on any pass site that we've done as well as any good developers
1:15:31Open lines of communication and engagement through that so that people are aware of the process and how it's happening
1:15:38Okay, that's great. Thank you
1:15:40There's no further questions here for us
1:15:42So we appreciate your team coming up and being with us and we'll bring it back to us and just a few minutes
1:15:47I just do have to ask to see if there's any
1:15:50Anybody else that would like to comment on it?
1:15:53Or if someone wanted to call in so thank you again
1:15:56And is there a number that's going to pop up on the screen as well? Let me see if I can remember 519837
1:16:045603
1:16:075198375603 we'll just wait a few moments to see if there's a call in and while we do that
1:16:13It does anyone else in the audience need to speak to this item?
1:16:17No
1:16:18Okay, we'll just wait a few minutes here. Okay. Okay. We've had no one call in at all. So it's back to us
1:19:20council
1:19:21Uh, you know how this works. I need someone
1:19:25Maybe I'll go to the downtown
1:19:28counselors first. I might I don't want to pressure you but do you want to do want to table the
1:19:33approval
1:19:36Okay, okay
1:19:37Colosson and Gawler
1:19:39Make sense and then is there any questions for staff?
1:19:42Okay, Colosson
1:19:45Yes, thank you through you mr. Maric staff
1:19:48um
1:19:48My first question is like a bit of a circle back on the question that I asked the developer which is with regard to the relationship with the county
1:19:57and this development is there
1:20:00Can you speak with them again?
1:20:03with regard to integrating that parking lot into this development in a way that is
1:20:08seamlessly
1:20:09Seamless and with regard to the function that the new functions of the area
1:20:20Through the mayor to
1:20:21counselor Colosson so the county was circulated as part of this development application and also back in 2023. So I believe
1:20:30um, the architect's response was accurate in terms of that there have been numerous discussions at an early stage and the design
1:20:37accurately represents discussions with the county to date. There's been
1:20:41um, we haven't heard from the county
1:20:43um, through our recent circulations
1:20:46um
1:20:46But the design doesn't preclude any future integrations should the county plans change
1:20:56Okay, thank you. Um, appreciate the current state
1:21:01I
1:21:08I'm gonna stop there. I have other questions, but I I need to sit on this one for a second. Sorry
1:21:17That's okay
1:21:19It looks like there's nobody else though. So you might
1:21:22it's
1:21:23Everyone's stare at counselor Colosson
1:21:29Your dear wardmate saving you counselor Guller your worship through you to staff
1:21:36Could you help me understand the one request from the developers about the transformer box that is on the on the view
1:21:42Could you help me understand? You know, what are we looking at in terms of the?
1:21:48The the concern of the view being blocked by that
1:21:52By the utility box
1:21:55Uh through the mayor to counselor Guller
1:21:59Um, that's something that we're gonna have to talk with zoning staff because I don't believe
1:22:03Section 4.6. We did include it in the report, but section 4.6
1:22:08Which deals with the sight line triangles doesn't actually apply to the d1
1:22:12zones. Um, so
1:22:15We'll have to take a closer look through our formal zoning review, but
1:22:19It usually is in other areas with regards to having like a
1:22:23Just so the sight line triangle isn't obstructed for and blocks of view of vehicles entering or exiting a site
1:22:29Okay, okay. I really appreciate that. Thank you
1:22:32Thank you worship
1:22:33Okay, counselor Colosson. Oh, you're good now. Okay
1:22:36perfect
1:22:38All right, I think we're okay counselor busitil and then I'll call the vote
1:22:42Yes, thank you and just uh through the mayor to the staff. I was really surprised that there were no family kind of
1:22:49Units being considered, you know, my my mailbox is full of
1:22:53You know, the
1:22:54Families are outgrowing our cities and and the outflow of families
1:22:59Can you explain that to me when you're having conversations?
1:23:03About the type of units that we really need for families in the city
1:23:11Through the mayor to the counselor. Um, so this is the proposal that the applicant has put forward
1:23:15I think we through pre con applications
1:23:18Um through multiple projects through the city, but we do always encourage applicants to provide
1:23:24Um, you know, three bedroom units two three bedroom units. This one is proposing. Um, I think bachelor is one and two bedroom units, but
1:23:33um, we also don't the zoning bylaw doesn't zone for families. So
1:23:39Um, you could possibly still get
1:23:41This uh some different, you know, parents with children in two bedroom units
1:23:46It's really up to up to the developer
1:23:48But we do always encourage larger units because we know there is a need but we we can certainly have further discussions with the developer on this
1:24:00Thanks. I saw some heads nodding as well. So I appreciate that
1:24:04All right, I'm going to call the vote everybody
1:24:07on both the receive and approval of this
1:24:11and uh
1:24:13I'll just say a quick comment
1:24:15Uh, a lot of people have been waiting for this to just to be done
1:24:19Right. So I really appreciated. I forget who it was. I think it was you councillor crossland that asked the sort of how quickly
1:24:26Could we get going here? And I I appreciate the answer
1:24:29Oh, it's uh, it's how quick the city can help with you know, site plan stuff. I can guarantee you they're ready to go
1:24:35Okay, so I just uh, I think we would love to see those shovels in the ground as soon as possible
1:24:40And I think the shovels in the ground as soon as possible might even help you with the federal
1:24:44sort of ping pong that's happening around
1:24:47Build Canada homes and the other programs that are there. I know exactly what you're talking about
1:24:52I think the quicker you can get in and get that certainty is actually a plus for you. So, um
1:24:58You know getting more people living in our downtown is is what we want as a vibrancy and and I think just having construction in that area
1:25:06end for once
1:25:07would be also a good thing as well and uh, so
1:25:11Uh, we wish you all the best and thank you very much for for coming forward with this
1:25:17With that, um, I'll call the vote who's is anyone against
1:25:23Okay, that's unanimous. Thank you very much. Appreciate it
1:25:28Okay council we're moving on to the next thing
1:25:31Which is just the arthur street on street parking item that I put on to the um onto the agenda for a quick discussion
Automatic transcription is imperfect. Treat quotes as a guide and check the recording before relying on exact wording.
The motion, the vote and the debate come from the City of Guelph’s published record, reproduced rather than interpreted. The document summaries above are the exception: those words were written for this site.