Committee of the Whole · June 02, 2026 · Item 12.2
Approve the updated Procurement By-law included as Attachment-1 to report (2026) – 21255 – Procurement By-law Update and that the updated Procurement By-law come into effect…
Main motion under the agenda item Procurement By-law Update - 2026-295
Carried (12 to 0)
12 in favour, 0 against — unanimous
What was voted on
The motion in its exact words, as recorded in the minutes.
That Council approve the updated Procurement By-law included as Attachment-1 to report (2026) – 21255 – Procurement By-law Update and that the updated Procurement By-law come into effect on September 1, 2026.
Moved by Councillor Goller, seconded by Councillor Allt.
How the room voted
In favour (12)
- Allt
- Billings
- Busuttil
- Caron
- Caton
- Chew
- Downer
- Goller
- Guthrie
- Hauser
- Klassen
- Richardson
Who spoke to it
Savan Harsh, Manager, Procurement, presented on the Procurement By-law Update.
What council was given
The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.
- Procurement By-law Update - 2026-295.pdf
Council is asked to approve a rewritten Procurement By-law, replacing the 2018 version, effective September 1, 2026. It raises the threshold for low-value purchases to $50,000 and medium-value to $139,000, formalizes invitation-only bidding for medium-value purchases, and tightens rules on signing authority, reporting, debriefing timelines and sole-source justification. The report also outlines new provincial Buy Ontario requirements for fleet vehicles and infrastructure purchases.
- Attachment-1 Updated Procurement By-law (clean).pdf
- Attachment-2 Updated Procurement By-law (mark-up version).pdf
- Attachment-3 Presentation - Procurement By-law and Buy Ontario Act.pdf
A summary is this site’s description of a document, not the City’s. Open the document before relying on one.
What was said
3,457 words from the meeting recording, transcribed automatically. Times are from the start of the recording.
Read the debate(click to open)
2:18:15and we have Savan Harsh coming down to give us a presentation,
2:18:21and we have one recommendation following the presentation.
2:18:35Thank you, and it's a new face at the podium.
2:18:40So welcome, and I don't think we've seen you
2:18:42present to Council before,
2:18:43so welcome if this is your first time,
2:18:44and the floor is yours.
2:18:46Thank you so much.
2:18:48Good afternoon, Mayor Gatri and member of Council.
2:18:51My name is Savan Harsh.
2:18:53I'm the manager of procurement
2:18:54within the Finance Department.
2:18:58Today's presentation supports the staff report
2:19:01seeking approval of the updated procurement bylaw.
2:19:11The first purpose of today's presentation
2:19:14is to seek council approval
2:19:15for updated procurement bylaw
2:19:18with the bylaw coming into effect
2:19:19on September 1st, 2026.
2:19:22Second, to provide governance context
2:19:25on the city's procurement framework,
2:19:27trade agreement obligations,
2:19:29and why the city cannot apply a broad local preference.
2:19:33Third, to summarize the key update to the bylaw.
2:19:37Finally, to provide an overview of the Bio-Ontario Act,
2:19:41including new requirements for fleet
2:19:43and capital infrastructure procurements.
2:19:53The procurement bylaw is the city's core policy framework
2:19:57for how we acquire goods, services, and construction.
2:20:01It is a control framework
2:20:03for how public funds are spent.
2:20:06Council Oversights sets overall procurement policy
2:20:10through bylaw, approves budget,
2:20:13and provides a high level governance.
2:20:15Staff execution runs the procurement process end to end
2:20:19within delegated authority, manages contracts,
2:20:23and ensures compliance with legislative,
2:20:25trade, and internal requirements.
2:20:28The intent of this update is to keep the bylaw
2:20:32at the governance level
2:20:33and maintain detailed administrative procedures
2:20:36through internal policies, guidelines, and templates.
2:20:42The framework is also saved by,
2:20:47sorry, it's a wrong slide.
2:20:52The framework is also saved by legislation,
2:20:55the city's signing authority structure,
2:20:57conflict of interest requirements,
2:20:59and trade agreements such as the Canadian Free Trade Agreement,
2:21:02CFTA, and Canadian, Canada-European Union,
2:21:07Comprehensive Economic and Trade Agreements, CETA.
2:21:17A common question is why the city cannot apply
2:21:20a broad local preference.
2:21:23Covered procurement under the CFTA and CETA,
2:21:26where applicable, must be conducted through fair, open,
2:21:31transparent, and non-discriminatory processes.
2:21:34A broad local preference can restrict supplier access
2:21:38based on geography and make conflict
2:21:41with trade agreement obligations.
2:21:44The city can still support local and community outcomes
2:21:47through compliant tools such as
2:21:49invitational procurements, where permitted,
2:21:52and provincial directives that apply to specific categories.
2:21:57Bio-Ontario is different from a general local preference.
2:22:02It is a provincial direction for specific procurement categories
2:22:06and requires evaluation, documentation, and prescribed methods.
2:22:18The current procurement bylaw was approved in 2018
2:22:22and is due for a review.
2:22:24Since then, procurement practices, market conditions,
2:22:28technology, internal processes, trade thresholds,
2:22:32and provincial policy direction have changed.
2:22:35Threshold branch marking has been updated
2:22:37to better reflect current market conditions
2:22:40and trade thresholds.
2:22:42Low value limit increases from $35,000 to $50,000,
2:22:47and medium value from $100,000 to $139,000,
2:22:51aligning with the current CFTA thresholds.
2:22:55The bylaw introduces additional flexibility
2:22:58for medium value procurements through open
2:23:00and invitational procurement options.
2:23:03While continuing to prohibit the splitting
2:23:06and structuring of purchases to avoid approval thresholds,
2:23:10procurement requirements, or trade obligations.
2:23:14Governance and authority clarity is improved
2:23:17by aligning procurement approvals
2:23:19with the delegation of financial signing authority
2:23:22and clarifying the separation between the council's governance,
2:23:26governance role, and staff administrative responsibilities.
2:23:31Administrative controls are strengthened
2:23:33through post-emergency procurement reporting,
2:23:36Peter communication controls
2:23:38through the designated procurement contact,
2:23:41debriefing timelines,
2:23:42and stronger documentation expectations.
2:23:45Program improvements to support supplier performance,
2:23:48sustainability, or circular economy,
2:23:51sole source validation, and exemption has been updated.
2:23:56Supplier performance provisions are now consolidated
2:23:59within the Schedule F, allowing the city
2:24:02to further develop a more structured supplier
2:24:04performance program over time.
2:24:13The Bio-Ontario Act provides the legislative framework
2:24:16for the province to issue procurement directives
2:24:19requiring a public sector entities to prioritize Ontario
2:24:24and Canadian goods and services in specified procurements.
2:24:28For municipalities, the municipal
2:24:30by Ontario procurement directive is now in effect.
2:24:35The fleet vehicle requirements apply to municipalities
2:24:38as of April 13th, 2026.
2:24:41The capital infrastructure requirements apply
2:24:44to municipalities as of May 15, 2026.
2:24:48Local boards and municipal service corporations
2:24:50are subject to the relevant requirements
2:24:52as of June 1st, 2026.
2:24:56The directive has two main categories,
2:24:59light duty passenger fleet vehicles,
2:25:01and capital infrastructure.
2:25:04This is not a blanket local preference.
2:25:07It is a category specific, and it requires
2:25:09a process design, vendor evidence, documentation,
2:25:13and records that can support compliance if reviewed later.
2:25:17Staff are treating this as a compliance priority.
2:25:21However, there is a still interpretation issues,
2:25:25particularly around how provincial requirements
2:25:28interact with the trade obligations,
2:25:30federal funding conditions,
2:25:31and different project delivery models.
2:25:35For fleet procurements,
2:25:37the requirements apply to all new purchases or leases
2:25:41of new light duty passenger fleet vehicles,
2:25:44regardless of procurement value and methods.
2:25:48The sequence is to assess made in Ontario vehicle first.
2:25:52If those are not available or operationally feasible,
2:25:55the city then assess vehicle from Ontario
2:25:58vehicle producers, only where those options
2:26:01cannot meet the operation requirements,
2:26:04would the city proceed to other vehicle options.
2:26:08Capital infrastructure procurements are more complex.
2:26:12The requirements apply to all new capital infrastructure
2:26:15procurements, regardless of value,
2:26:17including construction and related major goods
2:26:20and services identified for the procurement.
2:26:23The compliance tool is the domestic supply and chain plan.
2:26:28Beaders identify the origin and value
2:26:31of major goods and services.
2:26:33Depending on the procurement,
2:26:35staff may use an evaluated approach,
2:26:37commitment-based approach,
2:26:38and approved alternative method
2:26:40where domestic supply chain plan is not feasible.
2:26:50The key message is that implementation involves
2:26:53more than simply adding a clause
2:26:55into procurement documents.
2:26:57Capital infrastructure procurements
2:26:59require project by project assessment
2:27:01before the procurement is issued.
2:27:04Staff must determine whether the directive applies,
2:27:08which goods and services considered major,
2:27:10which evaluation or commitment approach is appropriate,
2:27:13and how the final award recommendation
2:27:16remains defensible and compliant.
2:27:19There are also budget and schedule risk.
2:27:22Evaluation outcomes may not always align
2:27:25with the lowest bid, particularly where
2:27:28domestic content requirements affect scoring
2:27:30or award decisions.
2:27:33Supplier capacity, pricing, and project timelines
2:27:36may also be affected as municipalities across the province
2:27:40and other public sector agencies
2:27:42implement the same requirements.
2:27:45There is significant administrative work associated
2:27:48with the implementation, including market research,
2:27:51update to internal documents and tools, and templates.
2:27:56Non-compliance may create oversight and funding risk,
2:28:01including provincial record requests,
2:28:03compliance reviews, and potential impact
2:28:05on grant or funding.
2:28:12Internal implementation guidelines has been prepared
2:28:15to support fleet and capital infrastructure procurements.
2:28:19Templates and tools are being updated,
2:28:22including solicitation language, vendor declarations,
2:28:25domestic supply chain plan templates,
2:28:27evaluation tools, approval records,
2:28:30and reporting documentation.
2:28:32For ongoing updates, staff will continue
2:28:34monitoring provincial guidance and municipal best practices
2:28:38as interpretation and implementation
2:28:40evolves across the sector.
2:28:43In summary, the proposed procurement bylaw
2:28:46modernizes city's procurement framework
2:28:48while maintaining accountability, transparency,
2:28:51fairness, and value for money.
2:28:54The update improves operational flexibility,
2:28:57aligns the framework with the current trade thresholds
2:29:00and provincial direction, and strengthens
2:29:02the administrative and governance controls.
2:29:05Bio-anterior implementation is a significant
2:29:08and evolving compliance requirement,
2:29:11and staff will continue refining internal guidelines,
2:29:14templates, and practices.
2:29:16That concludes the presentation,
2:29:17and we are happy to take any questions.
2:29:21Okay, thank you.
2:29:22Great presentation, very thorough.
2:29:25Any questions or comments?
2:29:26Councillor Goller, Councillor Ciarce.
2:29:28Happy to move the boarder.
2:29:30Okay, do we have a seconder?
2:29:31Councillor Halt.
2:29:32Thank you, Chair Caron.
2:29:34Thank you so much for the presentation.
2:29:36I'm very excited to see the Bio-anterior Act
2:29:39being implemented here.
2:29:41There is the question of the shortages.
2:29:43Could you help me understand how,
2:29:46what is that threshold?
2:29:47At what point do we say this project
2:29:49is going to be delayed because there's a shortage,
2:29:51or we're actually going to go and procure the vehicles
2:29:55or the construction equipment from outside of Ontario?
2:29:58How do we balance that?
2:30:04Through the Chair and Councillor,
2:30:07for Bio-anterior Act vehicle requirement,
2:30:10there is no particular threshold.
2:30:11It applies to all irrespective of procurement type
2:30:15and procurement value.
2:30:18That award decision is based on the two steps.
2:30:22First is assessing based on the market research
2:30:25that any Ontario-made vehicle is available or not,
2:30:31or if it is operationally feasible based on the requirement.
2:30:36If it is not operationally feasible or not available,
2:30:39then assessing that Ontario producers.
2:30:41So there is a particular definition
2:30:43that which company would be falls under that Ontario producers.
2:30:49So if there is only Ontario producer vehicle available,
2:30:53then the second priority would be that.
2:30:56And if that is not operationally feasible or not available,
2:30:59and then only there will be alternative options.
2:31:04Okay, so we have to satisfy that we've checked
2:31:07to see if there is availability locally
2:31:09for Ontario-made vehicles and Ontario-made materials.
2:31:13And if they're not currently available,
2:31:15we don't actually have to wait on the projects
2:31:17or wait on the purchases.
2:31:19At that point, we can actually go outside.
2:31:21Is that correct?
2:31:23Through the Chair, that is correct for the fleet vehicles,
2:31:26but for a specifically capital infrastructure,
2:31:29it is way more complex.
2:31:30It depends on the domestic supply chain plan
2:31:34submitted by the beader.
2:31:35And there are particularly different methods
2:31:39for the evaluation, whether it will be
2:31:42the commitment-based approach or evaluated approach.
2:31:45So based on the proven cell directions
2:31:49and evaluation method,
2:31:50there will be different decision factors.
2:31:53Okay, thank you for this.
2:31:55And through you Chair, one final question.
2:31:57Sinas, this is a new system that we have.
2:31:59Are we going to be working with other municipalities
2:32:01so that we're all having the same systems
2:32:04and the same tracking of the information
2:32:07about where things are available
2:32:09and how we are ensuring that we're actually
2:32:12procuring locally?
2:32:17Through the Chair, we are closely connected
2:32:19with other municipalities,
2:32:21and we are closely monitoring other cities
2:32:24and municipalities approaches,
2:32:26as well as we are reviewing internally,
2:32:30developing the guidelines.
2:32:32As specifically, I would like to note
2:32:34that these requirements are evolving
2:32:37and interpretation and that implementations
2:32:39are still evolving into the across all the sector.
2:32:43And other municipalities and cities,
2:32:45they may have a different approach
2:32:46based on their internal bylaws and internal policies.
2:32:51We are closely monitoring and trying to implement
2:32:55as much as compliant with the proven cell violence.
2:33:00Councillor Klassen and then Councillor Allt.
2:33:05Yes, thank you through you Chair Caron.
2:33:08I have two questions.
2:33:09So I know that the report outlines
2:33:13that there are not any direct budgetary impacts,
2:33:17but it does outline that there are financial risks
2:33:20associated with this.
2:33:23So my question are, do we have any projects
2:33:25that are at risk at the moment
2:33:27and then that we have seen so far?
2:33:32And do we have an idea of the size of the impact
2:33:35for future budgets?
2:33:37Or is this at the moment, we just are unsure?
2:33:42Through the chair, Councillor, currently that impact
2:33:46is unknown.
2:33:47We don't have a particular data,
2:33:49like how much it going to be affected.
2:33:51There is identifies is based on that
2:33:54domestic supply chain plan requirement.
2:33:57And it may affect to that supply chain,
2:34:01available supply chain within the Ontario
2:34:03as across the all sectors and other municipalities
2:34:06implementing the same requirement.
2:34:09So that would affect the supply chain
2:34:11and pricing and availability of the materials.
2:34:15Others can jump in regarding the budget impact
2:34:19of the projects.
2:34:20We haven't identified any particular project
2:34:23as these requirements are pretty fresh
2:34:27and like implemented effective from May 15th
2:34:31and we are still working on the developing
2:34:33internal guidelines.
2:34:35And regarding the budget impact,
2:34:38it's still, it's not identified
2:34:42like how much it will be impacted.
2:34:47Thank you.
2:34:48One more.
2:34:52Just thinking about this, will there be an opportunity
2:34:55for council to hear more about the impacts
2:34:57if any moving forward?
2:35:03Through the chair, I'll take that question.
2:35:05So absolutely.
2:35:06And I think Savins articulated the kind of very context
2:35:10specific in case by case nature of this legislation.
2:35:13And so as we go through procurements
2:35:16that the legislation applies to,
2:35:19we will be identifying whether there are,
2:35:21we're seeing pressures on those budgets
2:35:23and if there's a need to adjust those budgets,
2:35:25you'd see those come back to you
2:35:26through quarterly budget monitoring reports
2:35:29with explanation related to the Bi-Ontario Act
2:35:33as being the driver of some of those adjustments
2:35:36and through the budget monitor
2:35:37or the budget process itself rather.
2:35:42Thank you.
2:35:43And thank you for all of the work that you've done on this.
2:35:45We'll keep an eye out.
2:35:47Great, great questions.
2:35:48Councillor Allt.
2:35:49Just a comment and thank you very much, Chair Caron.
2:35:52Thank you to both Mr. Harsh and to the finance staff
2:35:56for what I consider to be a very concise report
2:35:58that allied all my fears.
2:36:01I had questions written down
2:36:02and they disappeared as I listened to you.
2:36:04Thank you.
2:36:06Thanks for those comments.
2:36:07Councillor Busuttil.
2:36:09Yes, thank you.
2:36:10Through you Madam Chair, I drunk my memory.
2:36:13I believe municipalities do not follow
2:36:15under the broader public sector accountability act.
2:36:18Is that correct?
2:36:22Yes, through the chair, yes, that is correct.
2:36:25Thank you.
2:36:26And so I have a quick question about in the report,
2:36:31it speaks to on page three
2:36:33about the internal approval process for procurement.
2:36:37And you've got circular economy, sole source,
2:36:40a whole bunch of other criteria that you're looking at.
2:36:42So my question is, and it goes to your,
2:36:46the bylaw that's attached on page 13,
2:36:49it's 2.3 point G as in girl and 0.5 circular economy
2:36:55and environmentally responsible goods and services.
2:36:58So my experience with procurement is sometimes
2:37:02it's values laden of what our priority is.
2:37:05And so is in reading this, am I correct on
2:37:09in one particular situation,
2:37:12the priority might be price, circular economy,
2:37:15like does it fluctuate based on the project
2:37:19or is there a framework for decision making
2:37:22that's consistent that so it's about values, I guess.
2:37:28Through the chair, Councillor, thank you for the question.
2:37:32Regarding the circular economy
2:37:33and environmentally sustainability criteria,
2:37:36it depends on type of the project,
2:37:39type of the procurement method that is being used,
2:37:42whether it is a tender or a request for proposal.
2:37:47This update and that language under the procurement bylaw
2:37:51that enables the opportunity for sustainability criteria
2:37:55to incorporate into specification
2:37:58for particular procurement that can be evaluated
2:38:01if it is a type of procurement is a request for proposal
2:38:04where sustainability criteria can be evaluated
2:38:09based on assigned rated percentage
2:38:14that enables to promote sustainability materials.
2:38:18But it depends on the type of procurement,
2:38:20particular thresholds and which particular thresholds
2:38:25of legislation or trade agreements
2:38:27applies to that procurement.
2:38:30Thank you.
2:38:31So when I think about this,
2:38:32these are the basket of our values
2:38:34and dependent on the procurement and what the item is,
2:38:37it may change on kind of the order and the evaluation.
2:38:42Thank you.
2:38:42I also had some questions about risk,
2:38:44but I'll wait for future reports.
2:38:46Thank you very much for all the work on this.
2:38:49Any additional questions or comments?
2:38:51Mayor Guthrie.
2:38:52Thank you, Chair, and through you,
2:38:53can I just pull on the thread a little bit
2:38:56about what you mean by qualified suppliers?
2:38:59And I think my mind is going back to a few years ago,
2:39:03sort of like there was other cities
2:39:06that were wanting to,
2:39:08they had people wanting to bid on different types of services,
2:39:13but they weren't allowed to.
2:39:15So, and some of it was like union based issues
2:39:19and things like that.
2:39:20So are those similar restrictions
2:39:24that we have here as well?
2:39:28Union versus non-union?
2:39:33Through the chair, Mayor,
2:39:37like regarding the qualified suppliers,
2:39:40if that is in procurement process,
2:39:42if we have selected or gone through
2:39:45that supplier pre-qualification process
2:39:48and we have qualified particular group of suppliers
2:39:51for future projects or construction,
2:39:53then subsequent tender or subsequent procurement
2:39:57would be subject to that qualified list of
2:40:01bidders or available suppliers.
2:40:05Okay, so when a project or service
2:40:09becomes available, it gets posted, right?
2:40:11It gets posted on our systems.
2:40:14Only qualified people are able to bid on that.
2:40:19It's not quite open to sort of like for,
2:40:23it's not like a free for all for anybody to be able to bid.
2:40:27Through the chair, it is correct in cases
2:40:30of where we have pre-qualified the suppliers
2:40:34through the pre-qualification process.
2:40:36If it is not pre-qualified
2:40:37or haven't done the pre-qualification process,
2:40:40then it will be posted through that open competitive process
2:40:44subject to that particular thresholds
2:40:47applicable to that procurement.
2:40:50Okay, thank you.
2:40:51And then my next question is,
2:40:55and it's one that I think I just want to ask
2:40:57to just get it out in the public
2:40:59because I think many of us get asked this a lot,
2:41:02which is there's by Canada or on this case,
2:41:06by Ontario, and then it falls to the by local.
2:41:11And sometimes we hear from people that have bid
2:41:17and they are unsuccessful.
2:41:18And they are our local businesses or local trades
2:41:24or they are in Guelph.
2:41:27And yeah, they're not successful
2:41:29for the reasons that are laid out.
2:41:32Can you just tell everybody about how,
2:41:37I think under the municipal act,
2:41:39under these new legislations that we still have to,
2:41:44you know, have in certain criteria,
2:41:46we have to go with the lowest bid,
2:41:49but also with certain criteria attached to it
2:41:52that doesn't, it can't force us to go local,
2:41:55even though we may all want to.
2:41:58I just think it's really important
2:41:59that that gets clarified in the public session here
2:42:03because often we sometimes hear later on,
2:42:06oh, I bid on that or I don't know why I didn't get that.
2:42:09You know, and it, I don't know if anyone recalls,
2:42:12I think this kind of reared its ugly head
2:42:13if I recall corporate history on my, on me now,
2:42:17but I think it was like either an electrician
2:42:20or like a moving company for the old museum.
2:42:23And you know, they, a local electrician
2:42:28or a local moving company didn't, didn't get it
2:42:31and like a Kitchener company got it.
2:42:33And it was like so close like on the, on the amounts
2:42:36and there was a big thing in the paper about it.
2:42:39And everyone's like, oh, why don't,
2:42:40why can't we just support the company
2:42:42that's right here in Guelph,
2:42:43the jobs that are right here in Guelph.
2:42:45So could you explain that in reference
2:42:47to what's in front of us today
2:42:48on how decisions are made in regards to that moving forward?
2:42:53Through the chair, Mayor, thank you for the question.
2:42:56And this is the common questions in the procurement,
2:43:00why we cannot apply this procurement requirements
2:43:04and buy local.
2:43:06It is not this, that straightforward, it seems.
2:43:10It depends on the type of the procurement.
2:43:12Also the legislation requirement
2:43:15and that which trade agreement it falls under too.
2:43:19There are particular thresholds under CFT and CETA
2:43:23trade agreements that require that open competitive process.
2:43:28Also public procurement runs based on that core
2:43:33principles of open, fair and transparent
2:43:37and applying local preference without particular tools
2:43:42like it violates that fairness principles.
2:43:48Still, there are like city can still support
2:43:52the local community outcomes through compliant tools
2:43:55if it is applicable like invitational procurement,
2:44:01maintaining that open fairness
2:44:02and transparency principles of procurement.
2:44:07But as I mentioned that it will be depends
2:44:10on that particular thresholds of CFT and trade agreements
2:44:13which require open competitive processes.
2:44:16And one more thing that I would like to mention
2:44:18about any unsuccessful bidders or suppliers,
2:44:22then they can request the debriefing to procurement team.
2:44:26We have particular process in place
2:44:28where they can request for debriefing
2:44:30and we can provide them for that explanation
2:44:33that is our transparency to provide them
2:44:36how we have conducted procurement
2:44:38and our decisions are based on the transparency
2:44:40and open and fairness principles.
2:44:43Madam Chair, through you,
2:44:45thank you so much for explaining that.
2:44:47I think it was really important to sort of state it out loud
2:44:49that those values of fairness, transparency open
2:44:55like through this process is what makes it ultimately fair
2:45:00with the decision at the end of the day.
2:45:01So thank you very much for letting us explore that a little
2:45:04bit to get it out in the open.
2:45:05Thank you.
2:45:07I think that was really valuable and open
2:45:09because we do hear that as counselors.
2:45:11So thank you for raising that.
2:45:13Are there any comments or questions before we call the vote?
2:45:16We've got a recommendation before us,
2:45:18moved and seconded, anyone against?
2:45:22I'm seeing none.
2:45:23So that is unanimous.
2:45:24Thanks again for your presentation
2:45:26and for the good work being done on behalf
2:45:28of the city of Guelph.
2:45:30Our third item on the agenda this afternoon
2:45:33is something that was pulled from the information items
Automatic transcription is imperfect. Treat quotes as a guide and check the recording before relying on exact wording.
The motion, the vote and the debate come from the City of Guelph’s published record, reproduced rather than interpreted. The document summaries above are the exception: those words were written for this site.