Committee of the Whole · July 08, 2025 · Item 11.1

Construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.

Main motion under the agenda item Wyndham Street North and St. George's Square - Preparing for and mitigating construction (DTIRP Phase 1) - 2025-303

Carried (10 to 0)

10 in favour, 0 against — unanimous

This was one of 13 motions on the same item

In the order council took them. A vote makes sense next to the ones around it.

  1. 1/13Main motionNow hold a meeting that is closed to the public, pursuant to Section 239(2)(c) of the Municipal Act…Carried (10 to 0)
  2. 2/13AmendmentDowntown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025…Differs here: …dated July 8, 2025, be approved. That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report…no recorded vote
  3. 3/13Main motionStaff to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events…no recorded vote
  4. 4/13Main motionClauses 1 and 2 of the amendment to clause 3 of the main motion be revised to replace the word 'directed' with 'encouraged'.Carried (9 to 1)
  5. 5/13Main motionStaff be encouraged to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events…Carried (10 to 0)
  6. 6/13AmendmentDowntown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025…Differs here: …dated July 8, 2025, be approved including the following: That staff be encouraged to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to: Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for east reconfiguration or temporary removal to accommodate different uses and events. That staff be encouraged to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to: Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage, Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape. That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025. That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update. That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report…no recorded vote
  7. 7/13Main motionDowntown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.Carried (10 to 0)
  8. 8/13Main motionSequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.Carried (10 to 0)
  9. 9/13Main motionRecommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025…Carried (9 to 1)
  10. 10/13Main motionConstruction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.you are hereCarried (10 to 0)
  11. 11/13AmendmentDelegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment…Carried (10 to 0)
  12. 12/13Main motionAnd that an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.Carried (10 to 0)
  13. 13/13Main motionWherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.Carried (10 to 0)

What was voted on

The motion in its exact words, as recorded in the minutes.

4. That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.

Moved by Councillor Allt, seconded by Councillor Busuttil.

How the room voted

In favour (10)

  • Allt
  • Billings
  • Busuttil
  • Caron
  • Caton
  • Chew
  • Gibson
  • Goller
  • Guthrie
  • Richardson

Who spoke to it

The following staff presented on Wyndham Street North and St. George's Square - Preparing for and mitigating construction (DTIRP Phase 1): Jayne Holmes, Deputy Chief Administrative Officer, Infrastructure, Development and Environment Reg Russwurm, Manager, Design and Construction Stacey Laughlin, Downtown Revitalization Advisor The following delegates spoke: Barb Minett Kevin Polach Charles Nash Council recessed (4:02 p.m.). Council reconvened (4:19 p.m.).

What council was given

The staff reports and correspondence attached to this item. The summaries are written automatically, so you can tell what a document is without opening a ninety-page PDF.

A summary is this site’s description of a document, not the City’s. Open the document before relying on one.

What was said

20,885 words from the meeting recording, transcribed automatically. Times are from the start of the recording.

Read the debate(click to open)

3:13:43construction report there is going to be a presentation in front of us here and

3:13:50and we look forward to that so I got staff are getting into into place so good afternoon Mr.

3:14:20Mayor and Council we're excited today to give you an update on the status of a very significant

3:14:26and impactful project for our downtown replacing and improving the public realm infrastructure

3:14:31in the downtown Guelph is a fundamental component of Guelph's overall long-term sustainable city

3:14:37building vision and this infrastructure investment will support anticipated new growth

3:14:43replace and replace existing and aging infrastructure so how did we get here

3:14:50the downtown infrastructure renewal program otherwise known as D-Turb builds on a vision set

3:14:56out in the second downtown secondary plan completed in 2012 and the 2014 streetscape manual

3:15:04significant effort over the past decade has gone into preparing the city to undertake a

3:15:08generational renewal of municipal downtown infrastructure with intentional and responsible

3:15:15planning the infrastructure that we build today will create a foundation for prosperity sustainability

3:15:21and well-being for this half a century or longer in late 2022 and early 2023 a long list of options

3:15:30was considered through community engagement and by the key internal subject matter experts for

3:15:36Windham Street for the Windham Street environmental assessment a long list of options focused on a

3:15:43number of lanes available for vehicles two or four and the different kinds of accommodation for

3:15:48cycling as well as making Windham Street and St. George's Square pedestrian only spaces with no

3:15:54dedicated car lanes or bike paths based on community feedback and technical input the long

3:16:01list of options for Windham EA was reduced to a short list of options which included two lanes of

3:16:06traffic and different types of accommodation for cycling the option to convert Windham Street

3:16:13and St. George's Square to pedestrian only spaces was not carried through to the short list of

3:16:17options for a variety of reasons including accommodating transit movements through the

3:16:23downtown as well as emergency vehicle movements and resistance from the business and community about

3:16:28impacts to customers and their businesses over the course of 2023 an extensive technical and

3:16:35policy review as well as public engagement and consultation on the short list of options was

3:16:40undertaken this review resulted in the preferred options for Windham Street and St. George's Square

3:16:45being recommended to Council for approval in February 2024 in September of 2024 Council further

3:16:54approved enhanced streetscaping for Windham Street including improved tree canopy flexible streets

3:16:59public seating and paving stones in highlighted areas council also approved direction at this time

3:17:05to expedite the construction with reasonable mitigation measures taken to minimize construction

3:17:11disruption and road closures big green button not working oh got it thanks so council has already

3:17:31made many decisions to guide this project including Windham Street having one lane of traffic in each

3:17:37direction with separated bike lanes and significant pedestrian areas on both sides of the street

3:17:45sorry am i on the wrong this is the right one thank you St. George's Square included including

3:17:51an intersection with minor upgrades rather than the previously approved concept for a traffic circle

3:17:57enhanced streetscaping along Windham Street and in St. George's Square and proceeding with fast pace

3:18:03construction today we are asking council to provide some final direction so that the detailed design

3:18:08of phase one can be finalized and the project can be tender later this year we are asking council to

3:18:14approve the capital implementation plan and how phase one is staged we are also asking council

3:18:20to approve the construction mitigation strategy and we are asking council to approve the concept

3:18:25plan for St. George's Square i would note at this time that the plan being presented for St. George's

3:18:31Square is a concept approval of the concept including the main elements that are being proposed will

3:18:36allow the project team to move to a more detailed design including materials design of elements

3:18:42and choice of street furniture the city's downtown renewal efforts encompass a number of projects

3:18:51that are underway and upcoming these projects are interrelated and the staff are working to

3:18:56ensure that there is synergy between the projects and that they are all advancing towards a shared

3:19:00goal of a healthy vibrant and beautiful downtown for generations over the past decade the city's

3:19:07efforts to revitalize Guelph's downtown has been met with great success we've renewed places and

3:19:13open spaces in our downtown core and attracted new businesses and residents to help mitigate the impact

3:19:20of COVID-19 felt by the downtown businesses residents and visitors we launched new programs

3:19:26and initiatives to support economic recovery and today our downtown remains an appealing destination

3:19:32contributing to the economic vitality of the city to build upon the past efforts and deliver on the

3:19:39compelling vision set through the downtown secondary plan the city is making significant

3:19:44investments in infrastructure redevelopment transportation programs and initiatives over

3:19:50the next 10 years these investments are fueling several projects that are currently underway

3:19:56the overall downtown renewal efforts will transform how the downtown looks feels and

3:20:01functions making it future ready to support the growth to 2051 and beyond we are working toward

3:20:08a common goal of renewing and revitalizing downtown resulting in a vibrant and thriving urban

3:20:14center today we are going to discuss the downtown infrastructure renewal but other projects underway

3:20:19in the downtown include the baker district redevelopment which includes the library the permanent

3:20:25seasonal patio program the downtown waste project the heritage conservation district study the community

3:20:32planning permit system and we've just wrapped up the downtown heights official plan amendment with

3:20:37some design guide guide guidance for tall buildings to come since projects undergoing the

3:20:45since projects undergoing the overarching downtown renewal program are interrelated

3:20:49and multi mutually enforcing a critical component of the work involves ensuring that there is synergy

3:20:55between the projects and that they are all advancing cohesively towards the shared vision of a transformed

3:21:02and downtown and revitalized downtown the downtown infrastructure renewal program as

3:21:09part of the downtown renewal initiative advances strategic themes of city building and people

3:21:14and the economy as it promotes them improving historic places and streets to create new places

3:21:20for gathering and recreation and re-enforces and expands the role of the core as a prosperous

3:21:27attractive and welcoming regional center for residents businesses and visitors alike the expected

3:21:35outcome creates a downtown that supports people and the environment and creates opportunities for a

3:21:40thriving community and a thriving community and economy by enabling private investment in the

3:21:46future the downtown infrastructure renewal work aligns well with the city's growth priorities

3:21:54gulf is doing what it what it takes to create more housing options to create ontario's housing

3:22:00to address ontario's housing crisis as a part of the city's housing pledge city staff continue to

3:22:06undertake work that provides flexibility and make it easier for housing to be approved and more

3:22:11affordable for housing to be built the city's strategic plan directs staff to take action to

3:22:17improve housing supply and this program of work is a significant part of those housing aspirations

3:22:24well with that i will turn it over to reg thank you very much uh deputy cio holmes

3:22:34good afternoon council i'm happy as always to be here and talk downtown infrastructure it's

3:22:40it's what i live and breathe for the there we already accept her council has seen this map before

3:22:49it's become one of our fan favorites it shows the program uh where it applies within the downtown

3:22:55secondary area you know the current focus of our infrastructure program is is that's what is in

3:23:01beige the area is primarily includes the infrastructure north or the railway tracks and the portions of

3:23:07windham and wellington south of the tracks are included to address critical downstream infrastructure

3:23:13needs capacity constraints are are a challenge there the remainder of the secondary plan uh

3:23:20shown in blue will be part of future considerations as we develop plans over the future the overall

3:23:27capital implementation plan that was discussed in the report before you uh sets out the 12 year plus

3:23:34program for the reconstruction of the downtown area in beige uh the program of projects was built

3:23:40based on specific criteria developed early on in the process such as growth enabling and the state

3:23:47of good repair we're already started if you've noticed on wellington street to improve our standard

3:23:54sanitary capacity this is one of our foundational projects to get ready for uh phase one next year

3:24:05question we often get is why is this all necessary at this time well there are two primary reasons

3:24:13one of the key drivers behind the program is our aging infrastructure and i just like to throw up

3:24:17these pictures to remind ourselves the the pictures on the left are a clay pipe in downtown

3:24:23gulf it is you can see it's failing that stuff needs to get replaced as well as the lower right is a

3:24:30picture of ash fault in uh in gulf that road is done structurally deficient it needs to be repaired

3:24:37now we don't have a good picture of a water main break like what we have up in the upper right but

3:24:42our environmental services folks will tell you they've experienced these fun days as well

3:24:48the other key driver is housing intensification uh downtown is core to achieving our housing pledge

3:24:56we need to build the housing enabling infrastructure to welcome the new neighbors to downtown

3:25:05so let's talk more detail about how construction is going to work in the first phase not being

3:25:11uh

3:25:13windom street north so this graphic outlines the limits of phase one uh windom street from

3:25:21far quarry to woowich and it does include all of the st georgia square this construction project

3:25:26is the backbone of downtown infrastructure renewal and includes st georgia square plus the work of

3:25:33several uh important east west intersections so that doesn't have any use so everybody is interested

3:25:45in what will happen when the construction work zone sequencing for phase one will consist of

3:25:53primarily three zones that we think of it i want to emphasize that the work zones will overlap in

3:25:59time and space and may be modified slightly as we put the finishing touches on the contract

3:26:05with the shortlisted contractors the proposed timing at work is starts at the bottom that area in

3:26:12blue is in april to july of next year and includes the card and street intersection at the same time

3:26:22work can commence on the second work zone and that's shown in sort of that green color and could be it

3:26:29under construction starting as early as april 2026 and extending through november 2027

3:26:36this area is from cardin to douglas and includes st georgia square the third work zone is that area

3:26:43north is the st georgia square with the baker park hay being available in late 2026 the downtown

3:26:50and baker district program teams considered various staging options and determined that starting upper

3:26:57windom north of st georgia square in early september 2026 provided the best solution and also provides

3:27:05parking in the area throughout the busy summer season and still enables importantly completion

3:27:11of phase one by the end of october 2027 fortunately we can't give an exact insurance on what work

3:27:20will be done when until we have the contractors details schedule in april of next year our commitment

3:27:26however is to inform businesses and residents as soon as we know the contractor will be incentivized

3:27:34to reopen roads early minimize interruptions the transit movement through the windom mc macdenow

3:27:41intersection and minimize the footprint all while achieving the targeted end date of november 2027

3:27:48substantial performance we should expect some finishing work deficiency repairs and final

3:27:55paving in early 2028 but the idea is there will be no road closures saving except maybe some short

3:28:03term overnight to enable paving and maybe some critical work with respect to our utilities that

3:28:10are important to the reconstruction of downtown as well we are seeing work being done right now by

3:28:16our natural gas supplier to improve their system they are expected to finish up in september

3:28:23along windom and within st georgia square the electrical system requires significant improvements

3:28:32and upgrades that work is planned to start mid september this year just a couple of months away

3:28:40beginning at the south end and working north there's a lot of electrical work required

3:28:45and we're exploring options to expedite the work to minimize the risk to the overall

3:28:51project schedule i wish to highlight a few key points of interest during construction

3:29:02windom street we should expect will be fully closed to vehicular traffic

3:29:06we are also recommending extension extended work hours up to 24 hour operation

3:29:14except from saturdays 11 p.m to 4 a.m mondays and holidays and there will be

3:29:21discretion for our contract administrator to waive those hours based on contractor needs

3:29:28so we also may be modifying these hours slightly based on our discussions with our shortlisted

3:29:35contractors but the idea is that we are planning to have as much time available to the contractor

3:29:41is expected now we are saying they can work 24 hours it will be up to the contractor discretion

3:29:47how they their means and methods to achieve november of 2027 they have this opportunity

3:29:54available to them we are also going to be including incentive and disincentive clauses

3:30:01in the contract to achieve milestones reopen roads as soon as possible and complete on time

3:30:08or even early completion we should expect season of shutdowns during the winter

3:30:16based on conditions and schedules there could be times in january of february where the road

3:30:22is closed but yet there's little work going on just because it's too cold or snowy and it's not

3:30:27economically feasible to reopen the road to make it available now access during construction

3:30:39is one of our key success factors pedestrian access to businesses will be maintained at all

3:30:45times throughout construction again always for those short disruptions that may involve work

3:30:52being done right in front of that store but we'll be talking with and coordinating closely with

3:30:58those business owners traffic disruption is going to be minimized on macdenell street across windom

3:31:05especially to maintain bus access to the guave central station wayfinding and business open signing

3:31:13will be erected maintain and modified as necessary still on the theme of access during construction

3:31:21um so along with pedestrian access to businesses we also we also need to think about goods movement

3:31:27to and from businesses all loading and unloading needs to be coordinated throughout the construction

3:31:33site and that's going to be integral to all the contractor does their work there may be central

3:31:39loading and unloading zones will be established for smaller deliveries larger deliveries will be

3:31:45perhaps coordinated and moved through the site by the contractor

3:31:50on-street parking will be unavailable during construction however ultimate parking at the

3:31:56macdenell parking lot will be provided i wish now to turn it over to stacey to take us through

3:32:04the remainder of the presentation thank you wrench good afternoon everybody so let's talk about

3:32:13construction mitigation over the last few years the project team has been collecting thoughts

3:32:19ideas and concerns in order to develop a comprehensive construction mitigation plan

3:32:24we've been collecting these thoughts ideas um and concerns from business owners from downtown

3:32:29employees, residents, visitors, as well as other municipalities that have recently undergone

3:32:35downtown reconstruction we've connected with the dgba's board of directors as well as the

3:32:40broader membership at their agm meetings in 2024 and 2025 we also recognize that the collective

3:32:47needs of downtown and downtown businesses may change as we get closer to construction and even

3:32:52as we proceed through construction so we also want the construction mitigation plan to have a degree

3:32:57of flexibility so that we can respond to those changing needs above every above everything we

3:33:03learned that many of the local businesses have different needs so we are going to do our best

3:33:07to help mitigate the impacts of construction so that these businesses can continue to operate

3:33:12the construction mitigation tactics that we are proposing fit into four categories construction

3:33:18pace, phasing and staging, communication and information sharing, direct construction support,

3:33:25and the business support plan. Under the category of construction pace, phasing and staging,

3:33:33reg has just provided a lot more information for you but generally includes that expedited

3:33:38construction allowing for those extended work hours, construction staging to reopen streets

3:33:44as soon as possible, facilitating the utility replacement ahead of construction beginning,

3:33:51and including incentive and disincentive clauses for construction to finish on time or early.

3:33:58Under communication and information sharing we are developing an extensive communication plan

3:34:05which is a plan to provide frequent and continuous construction updates so that residents, business

3:34:10owners and visitors to downtown know what to expect in the short and long term. We'll be using

3:34:15tools such as the downtown update newsletter which continues to build the list of contacts,

3:34:21social media, physical signage throughout and surrounding the construction area,

3:34:27sharing information through the dgba as well as a new diggable download web page which includes

3:34:33all of the construction resources. We are also looking to create a construction liaison group

3:34:40or street captains which is a group of people that represent downtown businesses on a block by

3:34:45block basis in order to share information between businesses and the project team and the contractor.

3:34:52This is intended to provide opportunities for two-way communication to disperse information

3:34:57and gather concerns so that issues can be addressed quickly and in a satisfactory manner.

3:35:02A full sum terms of reference for this group will be developed and the group will be established

3:35:07in early 2026. And finally ongoing and continuous communication with the dgba. City staff will

3:35:13continue to attend the monthly board meetings in order to maintain ongoing and continuous communication.

3:35:22Under the category of direct construction supports we are looking to establish a downtown

3:35:27construction office which is a location easily accessed by business owners and the public to

3:35:32get information, coordinate upcoming events or connect with staff to address address issues that

3:35:38come up. We have also already brought on board a downtown ambassador which is a city staff member

3:35:44dedicated to assisting businesses and the public with issues that arise during construction and

3:35:50this person will generally be located in the downtown construction office and on site. The

3:35:55staff member will have authority to take actionable steps to address issues that arise.

3:36:00Complimentary alternative parking as Reg mentioned we are proposing that the McDonnell

3:36:06street lot will provide complementary parking to offset the loss of on-street parking on Windham

3:36:12Street and as budget permits we are exploring complementary parking in alternative locations

3:36:17as well. Wayfinding we are developing a strategy before phase one construction begins which

3:36:25includes wayfinding in and around the construction area directions to parking to businesses and to

3:36:30transit for pedestrian cyclists and drivers. Access to businesses Reg covered this in great detail

3:36:37but making sure that the contractor can help provide access to businesses for deliveries

3:36:42and that from a pedestrian perspective the pedestrian routes to businesses is as easily

3:36:48accessible as possible. Business delivery access plans our downtown ambassador is already working

3:36:54to connect with individual businesses to develop these so these are individual business access plans

3:37:01that will work with the contractor's team to get supplies and goods in and out of businesses.

3:37:08Facilitating quick stops and accessible parking so we're looking to design the end of each

3:37:13side street where it dead ends at Windham during construction to accommodate these things so to

3:37:19accommodate accessible parking to accommodate short-term parking for quick stops as well as

3:37:24pickups and drop-offs as well as solid waste pickup and storage. Enhanced construction safety

3:37:31measures so upgrading the required safety measures such as lighting and hoarding so that it provides

3:37:38a fun and inviting atmosphere. We are exploring a parking shuttle so that this provides opportunities

3:37:45to move people from parking structures to different areas of downtown that are not particularly those

3:37:51that aren't located close to our parking structure. Operational impacts we are working across

3:37:57departments to understand how construction may impact downtown operations so that we can work

3:38:01to mitigate those impacts. This includes transit, downtown maintainers and solid waste collection,

3:38:07parking, Sleaman Center and the Riverrun Center to name a few. And finally the fourth category is

3:38:15the business support plan. This includes a marketing strategy where we'll retain a consultant to

3:38:20develop marketing strategies and campaign for downtown that can also be shared with businesses

3:38:25and key interest holders in downtown reconstruction. We'll provide the opportunity for training and

3:38:31business consulting services. These would be complimentary bookable support services at the

3:38:37downtown offices for business owners and would include topics such as managing cash flow, managing

3:38:43inventory, e-commerce and online online sale support. We're proposing a downtown event grant

3:38:51and this would be intended to provide funding to the DGBA to enhance or add to their current

3:38:57portfolio of events with a goal that enhancing or adding events will help attract people,

3:39:03customers and clients, downtown during construction. This may also include funding to run contests or

3:39:09create other incentives for customers and clients to patronize downtown businesses.

3:39:14Construction information package and checklist, a website and electronic PDF package that is

3:39:20regularly updated with current construction information and resources, enhanced cleaning

3:39:25services, ongoing window cleaning, facade cleaning and sidewalk maintenance as well as dust suppression

3:39:32on an ongoing basis. Construction tours, these would be additional events during construction

3:39:38coordinated with the contractor to attract people to downtown. Looking at reducing the seasonal patio

3:39:45program fee to approximately 50% of the current rate, this is to allow people where there are

3:39:53streets to have patios to still have those during construction with the idea that attracting people

3:39:59during peak construction months is ideal for all of downtown. The construction mitigation strategy

3:40:06will continue to evolve and adapt to the changing needs of downtown. Today we are recommending that

3:40:11council approve the strategy with that understanding. And finally, we move on to the design concept for

3:40:19St. George's Square. In conjunction with the Wyndham Street North right-of-way reconstruction,

3:40:24this provides a logical time to reimagine this important public space in the context of an

3:40:29intensifying downtown. The renewal of this public space is a valuable city-building opportunity

3:40:36to transform St. George's Square into a destination. It will anchor downtown wealth by

3:40:41providing opportunities for business activation space, the self-activation of the space through

3:40:46informal daily use and for use during major events. While this square will continue to allow

3:40:52access for vehicles, it will be promoted, sorry, it will promote increased pedestrian activity

3:40:59and comfortably accommodate all modes of transportation. So we have a fly-through of the

3:41:06concept for you. Let's see if it plays here. So one of the goals of downtown renewal is to create a

3:41:14place for everyone. St. George's Square is the heart of downtown and downtown is the heart of the

3:41:20city. The design concept for St. George's Square that we are presenting stays true to that goal

3:41:26of downtown renewal. With this concept, we want to create a place for everyone. We want the square

3:41:32to be a place that can be used every day of the year with or without programming, meaning it can

3:41:37be self-activated. Maybe you picked up lunch or a coffee from one of our local businesses or maybe

3:41:42you brought it from home, but there's a place for you to sit and eat or enjoy your coffee. Or maybe

3:41:47you're out for a stroll and need a place to rest. There will be a place to do that as well. We also

3:41:52want the square to be a place that can accommodate large community events. The design of the squares

3:41:58and the furnishings within it will be flexible enough to accommodate things like spirit of the

3:42:02season or art on the street. The square also needs to be a place that supports our downtown businesses.

3:42:08The concept allows for future patios that add vibrancy to the square today, as well as other

3:42:13business activation space to support the businesses that surround the square and beyond. With all of

3:42:18those wants and needs, the design concept has to be flexible. The concept that we are asking you

3:42:27to prove today plays off the various landforms and changes in topography that are experienced

3:42:32throughout Guelph. It envisions the square as a public open space designed as an active urban square

3:42:38with an emphasis towards creating a community space for a wide range of events and activities.

3:42:44The layout prioritizes durability and functionality, featuring paved areas, flexible seating, and open

3:42:50spaces that can be easily transformed to accommodate festivals, performances, markets, and community gatherings.

3:42:58This urban space is intended to be an inviting hub for outdoor activities,

3:43:03with ample room for gathering and play, making it a dynamic year-round destination for people of all

3:43:09ages. This is only a concept and in order for council and the public to understand the elements

3:43:15proposed to be included in the square and the design at a high level, the next phase of work

3:43:21will involve getting into the details, designing the individual shade structures, the planters,

3:43:27and how the plazas will be laid out. We'll figure out what elements are included in the area for play,

3:43:32choose furnishings, as well as the specific materials being used for each component.

3:43:37The next phase of work will also include further discussions with the Mississaugas of the Credit

3:43:41First Nation about how the indigenous history of these lands can be appropriately recognized.

3:43:50The most important heritage aspect of the square is the shape itself. The design concept highlights

3:43:56the shape through the use of vertical elements to visually frame the square. The concept also

3:44:01introduces the promenade, which is a band around the square highlighting its shape, as well as

3:44:05providing opportunities for patios and seating. The choice of materials are intended to complement,

3:44:12but not replicate, the materials in the building surrounding the square and within our downtown.

3:44:17We also want to think about the square in the larger context of downtown. The design and materials

3:44:22should signify that it is a special place, but also recognize the relationship between this public

3:44:28space and our streets, which are important public spaces, as well as market square. By using materials

3:44:34that are similar to or that complement the materials used in the streetscape or in market square,

3:44:39we can show that connection to other public spaces. The design we're presenting today accomplishes

3:44:47many things, including its flexible. Let's keep it simple and versatile, allowing for a range of

3:44:53activities to occur in the square. It includes gateway features, so people know they've arrived

3:44:58in a special place. It provides places for people to sit and enjoy the space. It includes large

3:45:05planters to accommodate trees and other plantings, a raised platform for performances and events,

3:45:11and shade structures. It encourages play in the square in a formal area, but also throughout.

3:45:17It continues to include the family fountain, part of the city's public art collection,

3:45:21but moves it to the easterly side of Wyndham Street at the end of Quebec Street. It includes the big

3:45:26heart, which the DGPA debuted during Spirit of the Speed season in 2024. It includes a public

3:45:32washroom in the southeast corner, combined with a building that will provide the mechanical

3:45:37elements required for the family fountain and shelter for the transit stop. It works towards

3:45:42creating flat, usable, and programmable spaces throughout the square and using the proposed

3:45:47planters and steps to assist with the existing grade changes. Overall, the concept for the square

3:45:53has received positive feedback through community engagement. Most importantly, the recommended

3:45:59design concept creates a place for everyone, and we are recommending Council approve the concept

3:46:04so that we can move to the next phase of work, which includes detailed design.

3:46:12And finally, the work that's been undertaken through the Downtown Infrastructure Renewal

3:46:16Program builds on the vision set out in the Downtown Secondary Plan, as well as the

3:46:20Downtown Streetcape Manual. This work, together with other significant projects that have been

3:46:25undertaken or are currently underway, set us up for a renewed, vibrant, and thriving future downtown.

3:46:42I'll sleep on me. Was it too long? I don't know. I was looking at the picture on the screen,

3:46:47and then I saw the title. I was like, questions on my, oh, I think she's done.

3:46:52All right. Sorry about that. Thank you just to ask for their presentation. We do have three people

3:46:59that are signed up to the delegate. And just to give everyone a heads up, I think we'll listen

3:47:04to our delegations if there's any questions. So be it. And then we'll take a break after that. Okay.

3:47:08I think that's a wise decision just to take a moment to take a break. So

3:47:13Bart Minette is here in person. I see you, Bart. Come on down. Kevin, I also see you in person.

3:47:21And Chuck, I also see you in person. So all three of you are here. So come on down. Welcome,

3:47:37Barb. Thank you for joining us. And for all of you, the five minute rule applies, as you've heard

3:47:42before. So it won't be five minutes. Go right ahead. Yeah. Thank you. Good afternoon,

3:47:47Councillors, Mayor and staff. I co-founded the bookshelf in 1973. While searching online for the

3:47:55most updated square design, I tripped on a 200, 200, 2014 draft design. It starts with a section

3:48:03called guiding principles. And the very principle listed is support local business and daily

3:48:10activities. I'm not sure if this is still a guiding principle as some design details do not reflect

3:48:16this. I've worked downtown for over 50 years and have overheard many, many conversations about how

3:48:25people use the downtown. Most often, they say things like, meet you at Capistrano or meet you at

3:48:33Mijira or meet you at the Red Brick or meet you at Buongusto or meet you at Envy's. In other words,

3:48:39business is spawn, activity and community. That is why I hope that you understand how important we

3:48:46are in keeping downtown culture alive and that you understand that our feedback is genuine and comes

3:48:52from experience. My first problem with this design is that it takes space away from any cafe or

3:49:01sidewalk space that might be used by our small businesses. I don't believe that a children's

3:49:07play area is as crucial as helping cafe and restaurant culture. I think that the splash pad

3:49:13at the City Hall is great. I saw examples of it when I walked in today. But all of you probably

3:49:19have experienced the fact that kids don't always like the plastic play spaces engineered for them.

3:49:27Another issue that I find problematic is the fact that outdoor self-cleaning washroom

3:49:32would be more appropriate closer to where the majority of bars are and where the transit hub

3:49:37and train station are located. I have been told that there may be 10 to 15 washrooms

3:49:44in the new library, which people, I'm not exactly sure if that's true, but there will be many

3:49:50washrooms in the new library, which people in and around the square could easily access.

3:49:55My last concern is that this design is quite generic. There is no wow factor, nothing that brings

3:50:02joy and engagement. There is nothing here that citizens and tourists would want to have their

3:50:06picture taken in front of. Two very successful examples of this kind, you can call it public

3:50:13art or installation, are in wealth. One is the begging bar at the Art Gallery of Wealth and the

3:50:19Art Gallery of Wealth and the other is the Griffin statue at the south end of the university.

3:50:25People love these. They dress them, they take pictures in front of them, they remember them.

3:50:31Me, moving the fountain is a big waste of money. Leave it where it is. Use that money and install a

3:50:38public installation, which will make people also say, meet you at the, I don't know, the canoe,

3:50:43the train, the chimney, whatever we happen to be able to create, whatever it happens to be,

3:50:53to turn out being. After all, wealth is a city of artists who either singly or collaboratively

3:51:01could create something that makes its citizens proud. Thank you Barb. Is there any questions

3:51:08to follow up for Barb? Not this time. Christine, yes, sorry, Barb, just one second.

3:51:15Councillor Billings had a question for you. Okay, go ahead.

3:51:20So you, Mr. Mayor, real quick. So you'd like to leave the fountain where it is,

3:51:26and then you would recommend then what, just more beautification in trees in the air and

3:51:32mentions or what Barb? No, I would, I would recommend something that really stands out.

3:51:38I don't know what that is. Like you can use the money that you didn't spend moving the fountain

3:51:45and making some kind of public installation that people would love. Like it could be like a big,

3:51:50huge, bronze chimney swift that kids can climb on, but it's something that's different and something

3:51:56that says take a picture in front of me. Okay, thanks Barb. A drum set maybe?

3:52:08All right. Thank you so much. And next up is Kevin. You're coming down and Chuck, you're in the wings.

3:52:16Very good. You'll be happy to know that my speech writer is on holidays,

3:52:37so there won't be any references to 13th century philosophers this time.

3:52:44Five minutes truly is not enough to kind of devote to everything that staff has presented,

3:52:48so I'm going to confine my comments strictly to the square. I would suggest that staff

3:52:57not approve the recommendation for St. George's Square. I think the square as it's been presented

3:53:07truly is a missed opportunity. I think it lacks imagination. I think it lacks creativity.

3:53:13Essentially, all we've done is we've taken existing pieces of the square and we've just moved them

3:53:19around. Everything's basically been turned this way. The fountain is here, now it's here,

3:53:26the heart's here, now it's here, the performance area is here, now it's here. It really doesn't

3:53:32create what I think would be, and I really hate this word, but that generational change

3:53:38that St. George's Square and downtown Guelph needs.

3:53:43All the existing components that are currently in the square are being repeated, except that

3:53:50we're actually reducing the amount of space that's being devoted to the public performance,

3:53:55like new narrow concerts and all that kind of stuff, by moving it to the Northwest Quadrant.

3:54:00We're reducing the commercially available space that could be used for patios or the such.

3:54:07I don't see actually any allocation for any type of street food vendor space that we currently have,

3:54:14whether it's the existing vendor or something different, but we have added bathrooms and as

3:54:21we've already heard, there's other opportunities I think to create public bathroom use, and we've

3:54:28added a playground, and I'm going to be honest with you here guys. I've come to recognize that in

3:54:33the world there are a lot of destructive forces, and one of them, one of the key ones is children.

3:54:40I've experienced so much damage on my patio, not from anything as far as street people or some

3:54:48of our mentally, it's kids. Kids are the most destructive things, and as things, people,

3:54:56I would honestly question whether I'd put my patio out if it was right beside a children's play area.

3:55:04It would not be something that would add to the experience that my customers are having.

3:55:09Where's the timer, by the way? Oh, here we are. I also just want to touch briefly on

3:55:16a business concept called return on investment. We've been told that there are millions of dollars

3:55:23that are being devoted to this particular enterprise, and we've been told that we've been able to get

3:55:28a few more of those so that we can move from a good plan to a better plan. I'm not seeing the

3:55:35results of that in what's being presented with this concept, and one of the reasons why I don't see

3:55:42the results of that is because one of the core things that drives people downtown are businesses.

3:55:48It isn't what our curbs look like, it isn't what our sidewalks look like. It's actually the commercial

3:55:54businesses that provide the activation for this space, and obviously I'm one of them.

3:56:00My patio takes up roughly 900 square feet, 1.1 percent of St. George's Square. It cost me,

3:56:11I did a little bit of research, cost me about $5,000 all in to build out my patio space.

3:56:17I have a 10-year encroachment agreement. It cost me about $1,000 a year to store it for seven months

3:56:25off season. It cost me $300 a year to set it up, tear it down, and plant some flowers.

3:56:33That's a total investment that I've made of $18,500. That space generates every day between 50 to 150

3:56:45people using it. That's a pretty good return on investment for a very small amount of money

3:56:53being spent. If you'll notice during the presentation that the city provided, in the feedback portion

3:57:02it says that there was concern that existing patios may not fit the new design. The reality is,

3:57:07as option A and option B, they were initially drafted and presented, had absolutely no

3:57:13accommodation for patios. It wasn't even considered by city staff. In the recommended design section

3:57:22that follows, it says areas where existing patios are located were reviewed to ensure that patios

3:57:29could be accommodated in the future. That's a problematic word for me. I'd much rather see the

3:57:37word will. Because the opposite of could is it maybe a could not. Those are my general thoughts.

3:57:46I appreciate you hearing me, Mayor and Councillors. My time is up.

3:57:51Thank you. A follow-up from Councillor Goller. Go ahead.

3:57:55Thank you through your worship. Thank you very much for your presentation.

3:58:00You started by saying that council should not approve this plan. Now, the problem that we have

3:58:05is that unless we approve a plan now, we set back the timeline of the project. Then we're not going

3:58:10to finish by November 2027. One of the other delegates was very clear. Keep the fountain

3:58:17at a focus area that people will remember. Are there changes like that that you see that would be

3:58:23critical and that would make you feel comfortable with us making an approval with some major changes

3:58:29happening tonight? Well, I guess, look, I mean, there's been lots of time to think about this.

3:58:36And that's why I'm really profoundly disappointed that this is what they've come up with.

3:58:40And I think it would be a mistake for council to then say, wow, we don't really have enough time to

3:58:45maybe try something different and to do more public engagement or look at other options.

3:58:51But I think that's, you know, to settle for something that really isn't, you know,

3:58:57something that's going to last for the next 50 years, right? Like that we want.

3:59:03That's why I think right now we're looking at a missed opportunity. There were options that I

3:59:08think that were kind of thrown out there. I had a few myself didn't really translate into any action.

3:59:14But, you know, I think it'd be a mistake to go here. This is the concept. Great. Now we just need

3:59:20to buy some furniture to fill it. I appreciate that. And I do hear, you know, that we have to

3:59:26maintain the space for the public performance, space for the public patios. Is there any other

3:59:32musts that you see that we have to make sure that fit in there from your point of view?

3:59:36Well, I think there's a couple of must nots. Right. Truly, I think you need to give a good,

3:59:42hard look at why we need to put a bathroom there. The square is only so big folks.

3:59:47And we're, like I said, we're reducing the commercial space. We're reducing the performance

3:59:53space. We're introducing something that doesn't really need to be introduced in this area, public

4:00:00bathrooms. Do we really need to take up the real estate that we're taking up with by moving the

4:00:06fountain to where it is? I don't know. Right. I mean, those some of those things are design

4:00:09choices. I'm not going to get too fixated on that. Listen, I threw out the idea a few years ago about,

4:00:16you know, creating, you know, if this is a public space, if this is something that the public,

4:00:22we have actually a public monument that gets absolutely no usage whatsoever, except for one

4:00:30day a year. And that's our cenotaph. It's parked in a completely inaccessible, unusable part of

4:00:37our city that would have actually made a quite a great focal point in the square had we considered

4:00:43moving it there and actually celebrated the history of what Guelph is and the people that

4:00:50served on our behalf and died on our behalf. I don't know why that didn't go anywhere. I don't

4:00:56sure how far it went, but so there were ideas. There are things that could be done. Yeah.

4:01:02Thank you so much, Kevin. Appreciate it. Thank you, Worship.

4:01:05Thanks. And just to follow up from Councillor Alton, please.

4:01:08Thank you very much, Mary Guthrie, through you too, Mr. Pollock.

4:01:12I guess I'll preface it by saying what would Spinoza or Kant like, but the real question,

4:01:18I'm going to challenge you a bit. Over the last 18 months, I would say, I certainly received many

4:01:25complaints about people using the street as a bathroom and in particular in that area. And now

4:01:31I'm hearing you saying it's the wrong place for a bathroom. And I'm trying to figure out how to

4:01:36balance those off. And I will ask staff the same question because I've heard this note twice.

4:01:40How do I balance that? Yeah, I mean, that's a great question. I mean, to be honest,

4:01:47one of the ideas again that kind of popped in my head is that we do have a place that's

4:01:51colloquially you are colloquially termed PLE. There is retail space that's available that is

4:01:58very hard to rent in there. Could that be considered by the city to convert into public

4:02:04bathrooms? It's still accessible to the square. It's a little bit out of public view as far as

4:02:12like there is a bathroom, but to be something that's still be very accessible, it's something that

4:02:18could be considered. The TD building is currently completely vacant. Could the city explore taking

4:02:28some of that space and putting public bathrooms there to remove it off of the street into a

4:02:34building seems to be a much more preferable option than to stick it in the middle of a public space.

4:02:42Thank you. I do appreciate that. As I said, I will ask staff about it. And I do take solace

4:02:47in the notion that staff did say this is a conceptual plan and there's flexibility. Thank you.

4:02:55Thanks Kevin. Thank you so much for your delegation.

4:03:00Chuck, you're coming down on behalf of the DGBA and whenever you're ready, go right ahead.

4:03:12Thank you. Mayor Guthrie, council and staff, some of the things I'm going to say are repetitive,

4:03:19but then rather than piecemeal it and get all messed up, I'll just flow through it.

4:03:24My name is Charles Nash and I'm here representing the DGBA in the 423 businesses in our downtown.

4:03:30I'm here today to share some concerns with regards to the plans for St. George's Square.

4:03:35These concerns have been shared with staff over multiple engagements and information sessions.

4:03:43A little bit of context. I think it's widely agreed that downtown is our best tourist attraction

4:03:49and we have expressed and even overexpressed that to maximize that tourist attraction, St.

4:03:55George's Square needs to be flexible for programming and events. This encompasses and includes all

4:04:02fixtures, components and furniture. Four areas of concern. The playground. A playground no matter

4:04:11what size in front of RBC, NAR jewelry, play with clay and Capistrano is not appropriate.

4:04:18Capistrano and play with cray, play with clay's patios need to remain intact and full. It is not

4:04:25only essential to their business models, but creates traffic to the square, which in turn

4:04:30supports other businesses surrounding them. It is vibrant outdoor features like these that bring

4:04:37people downtown, not playgrounds. Square is all over Europe, are where family and friends gather

4:04:44and kids play. They have no playgrounds or no playground equipment, yet kids thrive, run and

4:04:51play there. If parents are bringing their kids down for a dual purpose, we already have an amazing

4:04:58splash pad and ice rink for that. Further, the proposed rubberized surface that is proposed for

4:05:06that playground area will eventually tarnish, be dirty and grimy and unattractive in a couple years,

4:05:12like all others we have witnessed in other cities and other areas. Lastly and most importantly,

4:05:20a playground is not flexible space needed for programming and events. A playground,

4:05:30I'll leave it at that, secondary concern, washrooms. It is highly unfair for those businesses that have

4:05:39to have a structure suddenly pop up in front of them, blocking their signage and star fronts,

4:05:44after being in place for many years. There is no need for a washroom to be in front of any retail

4:05:50in the square. It is an obtrusive and unobtractive and does not add to the beautification of our

4:05:56downtown. Places like Elora have one. While successful, we should keep in mind that Elora does

4:06:03not face some of the challenges that we face. While intentions may be good, outcomes can be

4:06:10quite different. We think it is worth asking the questions. Why are social services washrooms closed

4:06:17and why am I told that the washroom in front of City Hall here is often closed?

4:06:22It might be more prudent to put a washroom near transit and the nightlife as opposed to

4:06:27into the middle of our square and our retail space. Space, as Kevin mentioned, which is quite limited

4:06:33and quite valuable. Secondly, or finally with regards to the washroom, if it is a must,

4:06:44it should be put and placed in a more discreet location.

4:06:51Third area of concern is the fountain. There are many and various positions on the fountain,

4:06:57specifically as whether it should be moved or not at a cost of $40,000.

4:07:04There is, however, consensus on how unattractive the concrete slab and surrounding part of the actual

4:07:11art is. That concrete slab has no element of adding beautification. And if it is going to be moved

4:07:21or left in place, we might want to redesign the actual fountain part of it to reflect

4:07:27of more of a beautiful and attractive downtown that we are all seeking.

4:07:33The second area of consensus that we find from the DGBA is that the footprint of the fountain

4:07:39is too big, it's taking up too much space. That could be used for more programming and additional

4:07:46seating. Fourth area of concern is overall design. Given that we are about to designate the entire

4:07:54downtown of Heritage District, the overall design does not seem to embody or capture or tie into

4:08:00that in any way. Design feels and looks contemporary, cold, and maybe even institutional. We think the

4:08:09elements and component structures should blend more with our heritage designation. In conclusion,

4:08:17and finally, more elements. I'll let you do your last line, okay? Your last delegate, but just

4:08:21grab it right up for us, okay? More elements, components, and features do not necessarily make

4:08:26it a better design or a better square. Rather, the quality of those elements and features being

4:08:32enhanced and done as well as possible will. Thank you. Great. Thank you, Chuck. Is there any follow

4:08:41questions for Chuck and the DGBA at all? Okay. Oh, Councillor Billings, did you have your hand up?

4:08:53Through you, Mr. Mayor. So the takeaway is the heart, the fountain, leave it where they are,

4:08:59yes or no? Well, that has mixed, mixed feelings. The one thing that's been recognized about the

4:09:11heart is that where it is, if you've ever had a chance to drive up Quebec Street, it looks absolutely

4:09:18phenomenal where it is. I would say the representation of moving the fountain is 50-50, whether to

4:09:27leave it there or move it where the heart currently is. There's also some opinions that vary that,

4:09:36you know, the fountain's public art, why does it even have to be downtown in the square at all? It's

4:09:41taking a valuable real estate. Maybe a more appropriate spot would be in front of the library.

4:09:49So really, it's a tough question for me to give a yes or no answer to. Okay. So the downtown

4:09:58board's position with respect to what's in the report about, again, where the fountain is, so the

4:10:03north side, that's enough area for, quote, these large events. I see this space as being small.

4:10:12So downtown board would know what kind of events work, don't work. Is that truly enough space?

4:10:18Because in the package, there's all these planters and such. So the question is, is that really viable,

4:10:25usable space where the fountain is located currently? Could it be made viable and usable

4:10:32space? Absolutely. Is it now? It's limited. As the design is showing right now, it's limited.

4:10:41Well, where the, no, where the fountain is now, I guess the DGAB's position, if we had to lean

4:10:47when, where the other would be to save the $40,000 and leave the fountain where it is,

4:10:52but reduce the footprint, the size of the footprint. Okay. Thanks. Great. Is there anything else for

4:11:02Chuck and the DGBA? Not at, oh, sorry. Yeah, Councillor Chew. Through you, Mr. Mayor. So I'm just

4:11:14giving through some of the other options that we have at hand, just in terms of the programmable

4:11:21elements, like the top priority is the patio spaces and having more, as shown in some of the other

4:11:28options would be preferable. Is that right? Yeah, I think, you know, we also have to consider

4:11:33programming and future events. DGBA's added a lot of events downtown and I think you'll see those

4:11:39events continue to get added. So those components don't seem, you know, some of those shaded

4:11:46components that in our opinion are too modern, could be done with different materials, maybe

4:11:53cobs at woods and stuff that tie into more of a heritage feel, but they don't, they don't appear

4:11:58to us to be movable and flexible. We don't know what's going to come in the next 50 years or what

4:12:03we'll need as far as space goes. But as Kevin pointed out, St. George's Square's overall design,

4:12:12as it is now, is not ideal and there's not, it's not a big space. So that real estate is very

4:12:19valuable and so that space needs to be as flexible as possible. Okay, thanks. Thank you, Councillor.

4:12:30That looks like that's it as well. Chuck, thank you very much. I appreciate it.

4:12:36Okay, as I mentioned in advance, those were our three delegations. There was some correspondence

4:12:41also attached. We are going to take a break. It just makes sense to do that. It's 402 right now.

4:12:47We're going to come back here at 4.15. Okay, so about a 15 minute break and then we'll,

4:12:53we'll move on and make decisions from there. Okay, thank you very much. Okay, everybody,

4:29:36I'm going to call the meeting back to order. Thank you to our online colleagues for jumping on there.

4:29:46Let's give it 30 seconds. Okay, everybody. I would like us to consider, if you would mind us,

4:30:17moving into a closed session just very quickly to discuss a couple of matters that have come up

4:30:24and it does have to do with real estate, either acquisition, disposition, and I'd like us to

4:30:31handle that right away if you don't mind. And I was wondering if the clerks can put up on the screen

4:30:36what section we would need under the municipal act to allow us to do that. And it's that the

4:30:42council of the city of Guelph now hold the meeting that is closed to the public pursuant to section

4:30:47239 to see at the municipal act regarding a proposed or pending acquisition or disposition of land by

4:30:53the municipality or local board. And this is in relation to the Wyndham street north and St.

4:30:58George's square preparing for and mitigating construction report that's in front of us.

4:31:04Councillor Corrine, would you be willing to move that? Thank you. And Gowler would be willing to

4:31:09second that. And I can explain as soon as we get in as quickly as possible and come and to come

4:31:15back out as quickly as possible for the public as well. So I'll call the vote on that. If you

4:31:20is there anyone against that? No? Okay, if we could please move into closed right away, that would

4:31:26be wonderful. Thank you. Just waiting for my colleagues online to turn on their camera for us,

5:00:09please. Also a motion to have the rest of our meeting outside. Is it just me? Sticky in here.

5:00:28Okay, I'm going to call the meeting back to order out here. From a summary perspective,

5:00:32we had a discussion on what we went in camera for, which was under the municipal act under

5:00:38acquisition and disposition of land or properties. And we did give direction to staff in regards to

5:00:47that matter that we discussed back there. Okay. With that, we're going to come back and thank

5:00:53you to our delegations. And now we have six motions that are in front of us as the recommendations

5:00:59from staff. And that is the starting point, definitely where we should be at.

5:01:04Councillor Allt has agreed to move it. I'll give the floor to you and then-

5:01:08By all, I don't have a seconder yet and I do have some questions for staff.

5:01:12Bousatil will second it so it's on the floor and you have the floor.

5:01:15Thank you very much. Mayor Guthrie, I have about six questions for staff

5:01:20arising from their presentation and from some of the presentations of the delegates.

5:01:26The first perhaps five minutes. The first one, I was wondering if staff could perhaps provide

5:01:33some commentary on what has been heard from the delegates and perhaps address concerns

5:01:38such as bathrooms, usable space, scheduling of usable space and the need for us to actually begin

5:01:44to tender contracts at some point. Through you, Mr. Mayor. To Councillor Allt.

5:01:55So with respect to the public washroom and the need for a public washroom,

5:02:00the design responds to the direction that Council provided in September of 2024

5:02:04to incorporate a self-cleaning washroom into phase one of the downtown infrastructure renewal work.

5:02:11So that's what it responds to. We did choose the location within St. George's Square,

5:02:16the southeast corner of the square because it's an area where sort of it's the least programmable.

5:02:22It's sort of tucked to the side of the square. Plus, we know that it is a permanent type

5:02:28structure that's not easily moved. So we've combined it with other permanent structures

5:02:33that we no need to be there, which include the sort of closet or small building that will

5:02:39incorporate the mechanical portions of the family fountain as well as the shade structure or the

5:02:46structure that provides shade for the transit stop that is in that location. So that is why

5:02:54A, we have a public washroom in the square and B, why we've chosen that location in the square.

5:03:01The other components of looking at where you locate a public washroom, as we presented to you

5:03:07last September, is it has to be in an area that's easily visible so users can find it,

5:03:12but also that there's that general amount of natural surveillance that can occur.

5:03:17We do all know that there's sometimes other activities that happen in public washrooms that

5:03:21are not as desirable. And so by having it out in a space that is visible and easily surveilled

5:03:29by people passing by, by law enforcement, by Guelph police, it helps to deter from those

5:03:35other activities that are happening. So those are the reasons behind why we chose the location

5:03:41for that public washroom. As one of the staff could provide other details on issues associated

5:03:46with tendering and so on, I don't know whether that's possible at this point.

5:03:54To Councillor Alton, so yes, as you heard throughout the presentation, you know,

5:03:57key to this work is the state of good repair for the infrastructure, the housing enabling

5:04:00infrastructure, and the need to get that work tendered by this fall. So we're targeting October

5:04:05tender so that we can hit next year's construction season in its fullest. And so any changes to

5:04:10designs are going to need to be considered as we move that tender forward. Anything that comes

5:04:14past that time can be managed, but it does potentially come with added cost premiums.

5:04:20Thank you. Now, I did hear staff say that this is quote only a concept. So the question becomes

5:04:25on such things as bathrooms and any design. I hear that you're saying that the bathrooms are

5:04:32somewhat affixed with other designs as well. What latitude do we have to actually modify those?

5:04:42Through you, Mr. Mayor and Councillor Alton. The location of the washroom is somewhat fixed. I

5:04:47think there's room to sort of tweak and shift it in that general location, particularly when we get

5:04:54the underground infrastructure in place. We don't want to think about putting that in one location

5:05:00and putting the bathroom there and then shifting the location to a new spot entirely and potentially

5:05:05having to rip up our brand new square. So that would be one of the place, one of the elements

5:05:11of the concept that is less flexible to move. Okay, thank you. Moving on from bathrooms. I heard

5:05:18from one delegate that there's concern about removing space for vendors. And I think the

5:05:23reference was to perhaps the hot dog vendors and so on. Are we in fact looking at removing

5:05:30space for vendors from that particular area of St. George's Square?

5:05:37Through you, Mr. Mayor and Councillor Alton. We haven't identified a specific location for a

5:05:42food cart. However, it is something that we do want to include. And when we work through final

5:05:48details and have all of the grading information, that would be when we would consider where that

5:05:52food cart could be located. Because as you can imagine, most food carts need a fairly flat area

5:05:59if they're cooking food. Nobody wants that to roll off the grill. So we are, that is top of mind

5:06:05or in the list of priorities for us to consider where the food cart locations could be in the

5:06:11redesign square. Okay, another question that's a corollary I think was existing patios may not

5:06:17fit design. And I think that's almost self-evident. But I was wondering if you could remark on the

5:06:23long-term viability of patios in that area. Through you, Mr. Mayor and Councillor Alton. Yes. So

5:06:29we haven't included private patios in our concept design. But what we have done is made sure that

5:06:35there is space in front of businesses where there are patios existing today so that those

5:06:41businesses could choose to have a potentially reconfigured patio. Maybe it's a slightly different

5:06:49size. Maybe it's a slightly different configuration. We've used the word could because we didn't want

5:06:54to say will or would because that is a business's choice whether they want to pursue the patio. It's

5:07:00not whether we want to take away that opportunity. It's whether the business chooses to pursue a patio

5:07:05or not. So that is the reasoning behind the word could that we used. And I think the delegate heard

5:07:11could as something that would perhaps prohibit it. Moving on to some of the construction issues.

5:07:19There I think there's only one one-way street in downtown right now. Is there a projection that

5:07:24Douglas Street will be now a two-way street? Through you, Mr. Mayor. During construction,

5:07:33especially when the upper window Mary has worked on, Douglas will have to be made two-way

5:07:39for a period of time and the parking will come out. The anticipation that would go back to one

5:07:44way in the future. Okay thank you. The McDonnell Street lot was made reference to in the presentation.

5:07:51So I'm going to ask the dumb question. Which one? The Parkade, the open lot or is it both?

5:07:58It would be the open lot between Wyndham and Norfolk. Okay thanks. I heard about new unique

5:08:05incentives to come downtown. I'm going to ask about some of the old incentives to come downtown.

5:08:10We have a Christmas parade art on the street, a jazz festival. We also have Guelph's 200th.

5:08:15Are we developing contingencies to ensure that these will be successful over the next few years?

5:08:21Likely elsewhere? Through you Mr. Mayor to Councillor Allt. We have been working with our

5:08:27special events team here at the city to work with our event organizers to think starting last year

5:08:33to think about how their events could be accommodated downtown whether it's and maybe not the exact

5:08:39same location but another location downtown. So we have been starting those conversations thinking

5:08:44about how the events that we have now could still be accommodated downtown. The last question is one

5:08:51about the 24-hour construction. There are people that live downtown. Are we creating contingencies

5:08:58to address residents whose sleep will be disrupting? Through you Mr. Mayor. We don't have specific

5:09:09plans in place for that. However there will be a lot of communications on when they would be used.

5:09:15I don't expect contractors to go 24-7 on a regular basis. It would be as needed to catch up. It's

5:09:22more of a schedule compression tool more than it would be all the time. Thank you very much.

5:09:32Thank you. Councillor Goller and then Busatil. I see you as well, Kate.

5:09:37Karan. I'll put everyone down. Thank you for your worship to staff. Thank you for your presentation

5:09:45and thank you for getting us here. It's exciting to be at this point in the process.

5:09:52My first question is when we say concept, how flexible is that concept? I heard the mentioned

5:09:59when Councillor Lourd asked about the washroom. He said it's pretty much going to be there.

5:10:03So what is their flexibility on and what is their not flexibility on?

5:10:09Through you Mr. Mayor and Councillor Goller. There's flexibility on things like the size of the

5:10:14planters, the location of the planters. We can reduce or shift those types of things. Number

5:10:20of shade structures, number of plaza seating areas. Those are all types of things we can

5:10:24take direction from council today on and make changes. Again, moving into detailed design,

5:10:31that's when we start to pick out the specific, the design of the shade structures. What are the

5:10:35materials for the shade structures and all those types of things. But if there are things today

5:10:40that you'd like moved or reduced or increased, having providing specific direction today would

5:10:46be very helpful and then we can incorporate that into the detailed design. I'll just add to that

5:10:54through the Mayor to Councillor Goller. So in general, anything that you put above ground,

5:10:58we have to think about what is required underground to service it. Anything that goes underground is

5:11:04typically earlier on in your construction cycle. So you'd want to make sure that that's accounted for

5:11:12and put in beforehand. And so when we're talking about the movement, moving of the washrooms,

5:11:18once that servicing is in, there's only so much flexibility that you have. If you don't want the

5:11:25washroom in that location or any washrooms, then we just abandon it. That would be the worst case

5:11:29scenario and that's your money sunk. What we don't want is a situation where we've already started

5:11:35building things and putting things back together and now you want to put something else in and we

5:11:39have to re-dig it. So that's where you start to get some of those increased costs. So again,

5:11:43Stacey at Ms. Lachlan mentioned that the earlier we can get direction on where you might want some

5:11:50of those fundamental elements, the more we can put those into the tender and they won't become

5:11:56change orders afterwards. Okay, perfect. Thank you very much for that clarification.

5:12:02Help me understand why are we moving the fountain? Through you, Mr. Mayor to Councillor Goller,

5:12:09we do have to move the fountain during construction. So it will be removed, stored,

5:12:16and then it will be brought back to the square. So whether we bring it back to the exact same

5:12:21location or move it, the costs will be incurred. The reason that we chose to change the location

5:12:29is because it became clear through community engagement that it's an important part of the

5:12:34square for many, many wall fights. It was mentioned over and over and over that there's an expectation

5:12:39that they see it in the square. So we wanted to highlight the fountain as it is important to many

5:12:46members of our community. So as you drive up Quebec Street, you'll be able to see that fountain and

5:12:50that was why the location, the new location was chosen. Other reasons, when we changed the function

5:12:57of the street, adding the parallel parking and the bike lanes and all of that, it's going to be,

5:13:02it's not going to conflict, but it's going to be very close to where the fountain is today. So putting

5:13:05it right back in the same location is probably not feasible. And finally, when we're thinking

5:13:11about the square and the ability to accommodate events, one of the thoughts was that the westerly

5:13:17side of Wyndham Street, you can easily create, have that space closed for pedestrian use only,

5:13:23still having Wyndham function for things like emergency services or transit, and have a fairly

5:13:29large event on the westerly side. We also are creating opportunities for the entire square to

5:13:34be closed and a pedestrian only space. But the fountain on the westerly side sort of reduces

5:13:40the opportunity for that. So there were all those thoughts and ideas behind changing the location

5:13:45of the fountain. That is very helpful. Thank you. Is there opportunity to improve the quality of the

5:13:54materials for the base of the fountain at this point? Through you, Mr. Miranda, Councillor Goller.

5:14:00So the base materials, I believe, are sort of just poured concrete. So we will have to

5:14:07recreate that base through this process, working with the designers and working with experts on

5:14:14public art. And I don't know if Ms. Evans is here if she wants to jump in, but that is something that

5:14:19it will have to be sort of restored and replaced the basin of the fountain when we relocate.

5:14:24Okay. So to be clear, it doesn't have to be poured concrete. It could be something else

5:14:29when it comes back. I would have to rely on our public art experts on that. But my understanding

5:14:37is that it should be restored in the same way that it exists today. Okay. So if we wanted that to be

5:14:43different, we'd have to give you direction today to consider improved materials.

5:14:49So through the mayor to Councillor Goller, I'll jump in and Ms. Evans, if she thinks she needs to

5:14:53contribute anything, can come down beyond what I'm about to say. So just for the family fountain,

5:14:59is actually a couple of different pieces. It's the original sculpture that was commissioned and

5:15:03done in 1985. And then the frog was added later. But in totality, it exists as a public art entity,

5:15:10as donated by those who raised the funds at the time. And so there's two things that we need to

5:15:18be respectful of. One is that it is an art piece. But the second is that there is an agreement with

5:15:24the donors who donated that sculpture in 1985 and who have expectations in terms of our

5:15:32respecting what it was envisioned to be. And so I do think that there is, that there are both of

5:15:39those really important components. And I would say respecting what the intention of the donors was

5:15:46is something that council needs to be very conscious of, because it was something that was

5:15:51designed to appear the way that it does. And those donors, there were specific agreements

5:15:57when the city agreed to take that into our public art collection.

5:16:01That is helpful. Thank you. Is there a way for us to find a way to increase the programmable

5:16:08space? So we mentioned moving planters around. Do you need direction today to actually have

5:16:14more programmable space, more open space for things like patios, for events, for concerts?

5:16:19And you mentioned that there are businesses that today have patios. What about the business

5:16:25that opens up next year, the new restaurant that replaces one of the storefronts?

5:16:33Through Mr. Miranda, Councillor Goller, certainly if Council wishes for there to be more open space

5:16:37or programmable space, we're happy to take that motion or that direction from Council. And then

5:16:42through the detailed design, revive the plan or refine it to provide that.

5:16:47Okay. Thank you very much. My last question on this is the focal point

5:16:55that the DGBA put in that part and it's gotten a lot of love over the last few months since it went

5:17:01up. Is there an opportunity to put something else that will really become a focal point of the

5:17:08downtown? Through you, Mr. Mayor. So there's opportunities for sure. So from where we are

5:17:17now at the concept plan to detailed design, I would say that's kind of where we get into

5:17:22those fun details. Identifying where there's public art or how we're going to sort of honor the

5:17:29indigenous history of the lands and that opportunity for the wow factor that maybe you

5:17:35was talked about. One of the ideas for the play area was is that some sort of a almost more like

5:17:43public art? Is it some sort of public installation that can also be climbed on, can provide that

5:17:48opportunity for play without looking like a traditional play structure? The idea is being

5:17:53considered as a chickadee because the black cap chickadee is our bird, the qualf's birds. So those

5:17:59types of things. So I think there are opportunities for sure to include public art or those focal

5:18:05points or those types of things as we move from the concept to the detailed design. And I guess I

5:18:10would always add subject to budget implications. Of course. And will that detailed design be coming

5:18:17back to us or for public engagement? Through you, Mr. Mayor, the detailed design is not

5:18:25planning to come back to council. It will go out for public engagement. We are aiming to go out

5:18:32this fall for engagement on sort of the 90% design for Windham Street. And we are hoping to

5:18:39include things like tactical urbanism so that people can understand the components of the square,

5:18:46see things, feel things, touch things when we do that engagement in the fall. Okay. Okay.

5:18:52Through you, Roshan, my last question. Why are we including a playground in this space?

5:19:00Through you, Mr. Mayor. So we did hear overwhelmingly through our community engagement,

5:19:05whether it was at pop-up events. So when we were at things like Ribvest or street festivals and

5:19:12those types of things, that people wanted opportunities for play in the square. At our public open

5:19:18houses, we did hear it's important to have places for children to do things. And we want to think

5:19:24about this play area or playground, not so much as like your traditional neighborhood park, but

5:19:29again, that opportunity for something that looks pretty cool in the square. The rubberized surface

5:19:35is again, reducing risk in case of falls. We can explore different colors for that to make sure

5:19:41that it's not sort of so out of character with the rest of the square. If those were the types of

5:19:46things, we can explore the shape and the size of that area for play. But again, based on what we

5:19:54heard from the community at every single event, that is why we included the play area in the square.

5:20:01Thank you for that, Your Worship. There are some motions I'd like to move. I don't know if it now is

5:20:07the time. Okay. Separate motions, Councillor, or are they amendments to what's on the floor?

5:20:14They are separate motions. So maybe once we approve these, but without those motions,

5:20:19I would not be supportive of motion three to support the...

5:20:24If it's okay with you, why don't I go through... I have three more on my list for questions.

5:20:31Four, do I hear five? And when I get the questions out of the way, then before we go to do any voting,

5:20:39I'll come back to you to decide whether we split them all out, vote them on differently,

5:20:44amendments, additions. Is that okay? Okay. So we'll just stick with questions, but I promise

5:20:49I'll come back to you for anything that comes out for more motions. So I've got to go to Boussatil

5:20:56and then Kate and then Koran and then Richardson. Thank you. And through the mayor, thank you for

5:21:02the presentation. Some similar questions to Councillor Rodrigo Gowler. The playground, is this

5:21:10dedicated park space, park land? I know you said it's not a neighborhood park.

5:21:17What is it? Through you, Mr. Mayor. No, it's not like park land dedication, because it is already

5:21:24a public square. So in our downtown, we think of park land more as urban squares. So it is...

5:21:32The whole urban square is just that, an urban square. And this is just one element within the

5:21:37square itself. Thank you. And that leads into my second question, is just from the experience of

5:21:42City Toronto, urban buildup in, you know, infilling and then realizing there was no space for pets,

5:21:49for dogs, things like that. And they created on Front Street the dog fountain next to the

5:21:55flat iron building and so on. What kinds of consideration, because we're going to have

5:22:00intensification downtown, people are going to have pets and so on, what kinds of consideration

5:22:05in the squares and the spaces have been considered? Through you, Mr. Mayor. We did think about

5:22:14people with dogs downtown. And that was one of the, specifically one of the reasons why we didn't

5:22:20include a lawn area or turf area in the square. As has been mentioned many times, the real estate

5:22:26that's available in the square is tight, especially when we want to accommodate all of these things.

5:22:33So we don't believe that St. George's Square is the appropriate place for you to bring your dog

5:22:40to relieve themselves or play. And that we have other opportunities sort of closer to the edges

5:22:46of downtown, where that would be more appropriate. Thank you. My other question is about the sculpture,

5:22:53you know, the wow, the focal point. Was there any consideration to, in addition to what exists

5:22:58right now, having non-permanent rotating art? And again, you know, I think about the waterfall at

5:23:05Church and King Street, you know, it's a permanent installation and then they've got a rotating,

5:23:10you know, honoring different artists and things like that. Was there any consideration of that?

5:23:17Through you, Mr. Mayor, discussion about public art is the next phase. So establishing the concept

5:23:24for the square and then into the next stage in terms of detailed design and then finding budget

5:23:29for public art is the next, is the next phase. So yes, we've had preliminary conversations about

5:23:36how public art might be incorporated into the space, but any details, we haven't had those

5:23:41conversations yet. Thank you. My last question, I know DCAO Holmes answered this in the last

5:23:46presentation, but you know, the amount of detail design that's gone into the streets

5:23:53escape and the improvements and the upgrading of the sidewalks, you know, making it easier for

5:23:59people to get around. My question again, and I need to hear it again, is will there be made

5:24:04intentional efforts to improve accessibility for, you know, as part of the older adult strategy,

5:24:10as part of accessibility, where reasonable, you know, grades and so on, you know, the grading

5:24:16to the one step that can you just again, I need to hear it again, please.

5:24:22Through you, Mr. Mayor, yes. So similar to how we've treated the proposed streetscape for Windham

5:24:28Street, we are proposing those flat curbs. So to reduce the number of steps, we are also dealing

5:24:34with the grade that falls across the square actually in two different directions. So one of the

5:24:38things that the designers have been working with is trying to make sure that grade creates as many

5:24:43as flat spaces and deal with that grade in a way that is accessible. So certainly we are looking

5:24:48at that. And then in terms of places to sort of rest, if you need a place to stop and rest,

5:24:54that has been top of mind for us, like both through formal seating and informal seating

5:24:59opportunities as we design the square. Thank you. My final similar theme is it is the municipality's

5:25:06responsibility as the sidewalk, not the front entrance of a building. Can you just clarify,

5:25:12where do we stop in terms of our design and our responsibility?

5:25:18Through you, Mr. Mayor, in downtown that is a sort of complicated situation.

5:25:23The true answer is at the property line. And sometimes that is right at the building face.

5:25:28Sometimes it's a little off. For the most part, it's building face to building face. It would

5:25:32be the general answer in a lot of our downtown areas. Thank you. That's all, Mr. Mayor.

5:25:39Great. Thank you. And I'm going to go to Karan, then Kate, then Richardson.

5:25:48Thanks. Actually, I think most of my questions have been addressed. It was about event space.

5:25:57I don't want to get too specific, but I did hear that that alternate locations are being

5:26:03considered for the bicentennial given the timing of the construction. Yet this is the most

5:26:10significant largest civic event that we will ever be having for another 100 years when we're all

5:26:17long gone. And I look back at previous events and they've all been held downtown. I'd appreciate a

5:26:24few more details about what can be accommodated and what kind of civic space. I know it's not

5:26:31specifically related to this project, but I just need to hear that there's an equivalent civic

5:26:37space that can accommodate large events that would be considered. So through the Mayor to

5:26:45Councillor Caron, we're certainly in just in the conversations about what the bicentennial will

5:26:50look like. But specifically, Market Square is a space that we would still look to use through

5:26:56the construction period, as well as our other civic spaces, both in the downtown core,

5:27:01as well as other park spaces. So I think we're looking at a mix for the bicentennial of

5:27:08larger events where we would use some of those civic spaces and also smaller scale community

5:27:12events that we could do throughout the city. But we do have a number of facilities and we want to

5:27:19look to activate Market Square throughout the construction period, including for the bicentennial,

5:27:24because we want to continue to support the downtown and encourage people to come downtown.

5:27:28And so Market Square is, I would say, probably the best option that we have right in the

5:27:33downtown core through this time period. Okay, thanks. So St. George's Square and Market Square,

5:27:41in our downtown secondary plan, we have modeled a pedestrian alley to link the two squares together

5:27:48through that central kind of open space that is currently parking lots. Can I assume by this plan

5:27:55that that idea, that concept is now gone. It's been completely eliminated from the conversation.

5:28:07Through you, Mr. Mayor to Councillor Caron, that is not a concept that we're pursuing with

5:28:12Wyndham Street reconstruction. I think there might be opportunity to look at it in the future,

5:28:17but I think there are challenges with it in terms of property ownership and those types of things.

5:28:21But because phase one deals with Wyndham Street specifically, we haven't dealt with those details.

5:28:29Okay. Third question is, I know we debated a lot all the different types of tree options and tree

5:28:37survival was a huge concern of council when we talked about good, better, best. Do you remember

5:28:42all those exercises of tree wells? I understand that that's more of the design phase and as Ms. Holmes

5:28:51underlined that the infrastructure underground will determine the kind of infrastructure we can

5:28:57put above ground. Can you talk about where we landed on the trees? Certainly through you, Mr.

5:29:09Mayor to Councillor Caron. We are proposing a combination of the large planters as well as

5:29:15soil cells throughout phase one in order to be able to get the appropriate soil volume for trees

5:29:21to grow large. So it's going to be a combination and when you see when we're ready for the 90%

5:29:27drawings, you'll see that combination of approaches to trees. Great. Thanks. And then my last is a

5:29:35comment, not a question. Absolutely our delegates were spot on about downtown being a place to

5:29:42draw people to support business. But downtown is also a place where people live and it's a

5:29:49neighborhood and it's a community outside of the business function. And so I wholeheartedly support

5:29:57the bringing children downtown and having a place structure. We want families not just to come to

5:30:03shop and to eat and dine, but families to live downtown and I think the idea of bringing a place

5:30:10structure into that space is brilliant. So thanks very much. Thank you. Kate, please.

5:30:20Thank you through you, Mr. Mayor. First off, I wanted to say I love it. I think it's really

5:30:25great. I hadn't considered moving the fountain initially, but I think that was a good idea.

5:30:33I agree with Councillor Caron statement like we want to downtown be family friendly, families

5:30:38contain children and people are going to be living downtown. I know that when my daughter was smaller,

5:30:45I would specifically choose to shop at places that had options for her to play and I wouldn't be

5:30:51dragging her to the splash plaid to go back into stores afterwards when she was soaked. So it would

5:30:57be great to have a non wet option for children in the downtown. Do we have any projections on

5:31:04families and children with the amount of potential residences that might end up living downtown?

5:31:12Through you, Mr. Mayor, to Councillor Caton, I don't know that we have specific projections or I

5:31:18don't certainly have them at my fingertips. I can check in with our planning staff and

5:31:23whether they've made any predictions or understanding what we know about the future or what we can

5:31:31guess about the future, we can check and send that information back to you by email if we have it.

5:31:37Thank you. Mr. Mayor, I too have an addition or amendment or however you'd like to

5:31:44set it up. So when you're going around to that, please let me know.

5:31:48Yeah, for sure. I'll go to Guller and then after that, right to you. Okay.

5:31:51Thank you.

5:31:52Yep. Richardson.

5:31:56Thank you. Through you, Mr. Mayor, and I'm going back to the washroom thing.

5:32:01One of our delegates did speak that there was going to be a number of washrooms in the new

5:32:05library and if we have a number of washrooms in the library and a number of washrooms at our

5:32:09social services buildings and in the Quebec Street Mall, do we actually need another washroom

5:32:14downtown? So I'd just like your opinion on that.

5:32:17Through you, Mr. Mayor, to Councillor Richardson, when we came forward last September with the

5:32:23report on public washrooms in Guelph, the research that we did with Guelph Lab definitely concluded

5:32:30that yes, we need a public washroom that's accessible 24 hours a day, seven days a week

5:32:36in downtown. So it was based on that information and that research that Council included the

5:32:42direction to have a public washroom in phase one of downtown infrastructure. Thank you.

5:32:50Thank you. Billings.

5:32:54Through you, Mr. Mayor, I did want to go over the fountain location again because you mentioned

5:33:01that there's not enough space where it currently is located. Well, is the concept plan to scale?

5:33:07Because it looks like there is enough space. I mean, you're saying that's a large event space,

5:33:14but yet it can't hold a fountain. So when I look at the concept plan, there is room to leave the

5:33:20fountain where it currently is. So I don't understand your comment that there's no space.

5:33:27Through you, Mr. Mayor, to clarify for you, Council Billings, I didn't say there wasn't

5:33:30enough space for it to stay there. What I did say was that with the new layout of the road,

5:33:35which will include one lane of traffic in each direction, parallel parking,

5:33:39bike paths, furnishing zone, those get located very close to the existing location of the fountain.

5:33:48And then the other component of that is if we wanted to create the westerly side of Windham

5:33:56Street as an area for larger events, with having that in its current location inhibits that ability.

5:34:04So there is room there if you want to change how we're proposing that the square functions.

5:34:12Okay. And then through you, Mr. Mayor, timing of construction. So originally, when we all heard

5:34:19it was going to be 26, 27 for Windham Street, I wasn't woo-hoo because of the bicentennial.

5:34:26And then later on in our agenda, we have the bid for the Memorial Cup, which is 2027.

5:34:33So wasn't that long ago, we were thinking the construction downtown on Windham was going to

5:34:39take a very long time and Council decided to shorten it. So even though I think your answer

5:34:45is going to be no, is it possible instead of doing the construction on Windham 2627 to push it

5:34:54back after the bicentennial? And maybe if we win the bid for the Memorial Cup?

5:35:05Through the Mayor to Councillor Billings. No, that is not possible.

5:35:09That's totally unfortunate.

5:35:11Okay. What about the timing then with during the presentation when Reg was talking about,

5:35:20okay, so Windham is going to start then the, so I'm not talking 2026 on the lower portion,

5:35:27but north of St. George's Square. Most of the construction is then starting north of

5:35:34St. George's Square, or you're going to rip up all of Windham, and then the major construction is

5:35:40north of St. George's Square. Can you just help me out? Meaning, is there any opportunity to have

5:35:48the south of St. George's Square not under construction with respect to the bicentennial?

5:35:59Through you, Mr. Mayor. There's going to be significant scheduling issues to have the

5:36:06the square or south open for the summer of 2027. It's not impossible, but we'd have to

5:36:16create the right costs and incentives to the contractor to make it happen. It will come with

5:36:21a premium. Right now we're approaching it as a flexible opportunity for the contractor to plan

5:36:28their work accordingly. We have given them the opportunity to work on Windham Street

5:36:33throughout 26 and 27, saving except not start not closing upper Windham until September 2026.

5:36:42Within that timeframe, we're offering incentives to them to minimize their road occupancy space,

5:36:50but we haven't dictated anything to them. If we do wish to dictate something to them and make

5:36:55something happen, that comes with a cost and may or may not be feasible, depending on how far

5:37:01long we want the road to get. I do expect streetscaping to carry on well into 2027.

5:37:10Okay, and then I still want to go through you, Mr. Mayor, back to Mr. Gamer with respect to,

5:37:15but what if the construction didn't start on Windham until, say, August 2027? Is that not an option?

5:37:26Yeah, through the mayor and the council of billings. One of the main reasons I'm saying it's not an

5:37:30option is because the state of good repair aspects and housing aspects. So the infrastructure is

5:37:35way past due. The risks are substantial with the passage of time. So from a professional

5:37:40engineering perspective, it needs to be replaced as soon as possible. We've been working for several

5:37:46years to align everything as much as possible. And the sequence in order of events is outlined in

5:37:52that very detailed capital implementation plan. And so I would just say we're well past the idea of

5:37:59making adjustments to that. Okay, because I was only asking for a pushback of a year.

5:38:06Okay, also the concern which I heard from downtown was the construction, staging location

5:38:15at St. George's Square. Is it not possible to move that? Maybe even to the parking lot

5:38:25that Councillor Corm is talking about, like in order to keep Quebec there and Windham open?

5:38:37Through you, Mr. Mayor. One of the benefits or one of the ways that we can expedite construction

5:38:43is by having that staging in St. George's Square. So it keeps the materials there.

5:38:48If we move the staging area to a different location, we can't guarantee that we're going to meet

5:38:53that expedited construction schedule. It will be, we will work with the contractor when we have them

5:39:00on board to sort of see if we can reduce the impact of the construction staging on the square.

5:39:04But right now we want to provide that flexibility so that we can do construction quickly, so that

5:39:10we can have materials there so they're not delays with not having materials and all of those types

5:39:15of things. I'm not sure which other area you were talking about where we could have construction

5:39:21staging, but if it's the MacDenell lot, that's where we're thinking about having the complementary

5:39:26parking to offset Windham, but also where we can have deliveries and those types of things.

5:39:31No, it was further up Windham. That's that's where I was thinking, like any other location

5:39:38north of St. George's Square, if there was a location there for the staging

5:39:44so that we could keep that that intersection open. The, I think you're referring to the area that was

5:39:49formerly the Windham Street parking lot, and that is part of Baker District, so not currently an option.

5:39:55Not an option at all. Like there's no other location. This is what you're saying.

5:40:07As we were saying, we're trying to give the contractor the most flexibility and reduce our costs.

5:40:14We got to give them opportunity to use the square for staging so that they can plan their works and

5:40:19means to make that happen. One of the incentives we are going to use is a occupancy space. They will

5:40:27essentially rent the square from us. So on a square meter basis, and that will be their incentive

5:40:35to minimize the amount of space they're using in the square. So if they feel it's worth it to them

5:40:43to use that square for staging, they will pay that fee. If they don't feel it's worth to them,

5:40:49they will just shrink their amount of fencing they put up, and that space then is available to

5:40:57for the public's use up until when the contractor needs to actually undertake the reconstruction of that area.

5:41:04Okay, and then last question to you, Mr. Mayor, the mitigation plan.

5:41:08So we have the McDonnell parking location, but what about Market Square? So there was a bullet

5:41:16point, oh well, you'll look at other alternatives. Well, why not Market Square? If we're going to have

5:41:20more events in this timeframe with respect to Cardin Street, why don't we just state Market

5:41:26Square as well? Parking.

5:41:29Through you, Mr. Mayor and Councillor Billings, other alternatives that we were looking at were

5:41:35other parking structures or parking lots that we currently have. So if we can provide parking in

5:41:42Market Parkade, not Market Square, that's one of the things that we would.

5:41:47I meant Market Square, Parkade.

5:41:50Certainly that is one of the options that we are looking at. We have heard from the community and

5:41:56the business community that options that are further north would be desirable to look at,

5:42:01because that's sort of the north, northly part of downtown, maybe doesn't have as much parking

5:42:05available when we take the on-tree parking off Wyndham. So that's why we're still exploring

5:42:10other options. And again, it is a budget implication in terms of the construction mitigation

5:42:15budget for this project and offsetting lost revenue for parking operations.

5:42:24Okay, thanks.

5:42:28Okay, I thought it was it for the list. I just ask a couple of questions myself and then we can

5:42:34come back to you, Councillor Gower, and I haven't forgotten about you, Councillor Caton either.

5:42:41I really need to understand the clarity around the wow factor. I guess we'll call it that.

5:42:48So is the wow factor being decided today, or is the wow factor coming with the detailed design

5:42:59work that's coming later? To you, Mr. Mayor, I would suggest that the wow factor comes with

5:43:07all of those details when we get to the detailed design. Like what are the shade structures going

5:43:11to look like? What's the visual impact that all of that's going to have? Now, if you were looking

5:43:16for a wow factor of a huge new monument or something equivalent to like the family fountain,

5:43:22that would have to come today if Council was looking for something like that.

5:43:26But I think the way that we move from concept to detailed design and final design, that's where

5:43:32you're going to really see the elements of the square kind of pop and give you that wow.

5:43:37Okay. I'm just wondering about the flexibility question of the entire area.

5:43:47And I've seen in some other cities where they have the planters and the benches and such,

5:43:54which we certainly want, but they're actually movable. So you know how we have those big,

5:44:03huge planting gray pots and you can still get some pretty big trees from there.

5:44:10Are we, when we look at the concept design that you've provided in this report and the fly-through,

5:44:17are you suggesting that a lot of those areas where there's flowers and trees and stuff like that,

5:44:27that those will always be permanent? Or can some of those be changed so that they are movable?

5:44:35So that you can actually remove three or four of them and all of a sudden you have a massive

5:44:41space. You can push them to the perimeter and you have a massive space for events and you can kind

5:44:46of push them back. Just wondering how flexible the planter positions are. To you, Mr. Mayor,

5:44:53there are a combination of planters. So there are some smaller that would be movable. However,

5:44:58probably the larger ones that have sort of are more natural shaped, those would be permanent.

5:45:04And in order to get the soil volume that you need to grow the larger trees, which was one of

5:45:11Council's desires, we need them to be large and they would not be movable. If they are trees that

5:45:18have the underground component like the soil cell component, they are also not movable. So in the

5:45:24concept there is a combination. The smaller planters are more for like plants and flowers and those

5:45:30types of things and they would be movable. If the larger planters are something that you're interested

5:45:36we did note in the report that one of the comments was can we streamline them or

5:45:40you know create more open space. So that is one thing that we are already looking at through

5:45:44detailed design. Whether we sort of modify the shape or sort of pull them a bit more to the

5:45:49edges, that is one thing that we are already looking to do through detailed design.

5:45:54Okay. So that would be the next phase. Okay. Okay.

5:46:04I guess I'm asking a question that's maybe out of sync because maybe it's the detailed design part,

5:46:09but you said you're not coming back to Council. So I'm just just wondering, it's never been

5:46:14mentioned kind of out loud here, but one of the things that I heard a lot about was the crown,

5:46:21the crown that used to be in St. George's Square. Is there any throwback to

5:46:29to a crown that could ever come back to St. George's Square?

5:46:34To you Mr. Mayor, it was mentioned a few times through community engagement about the crown.

5:46:39It is not a direction that we have proposed to take in terms of bringing back the crown,

5:46:45certainly not hanging over the intersection or anything like that.

5:46:50One of the considerations is that as we think about

5:46:54honoring the indigenous history of the lands, that may or may not be seen as being in conflict

5:47:00with it. So that's a consideration for us as well. Okay. There's differences of opinion on that from

5:47:06many members, so that's fine. Okay. And on the bathroom side of things, other than the standalone

5:47:16proposed infrastructure, is there a also an opportunity for other avenues or other exploring

5:47:25other opportunities for bathrooms that staff would ever be willing to undertake if something became

5:47:32available? To you Mr. Mayor, absolutely. And I think that was part of Council's direction last

5:47:37September to continue to look for other opportunities as well. So this would be one opportunity should

5:47:43Council continue to decide that we want it in the square, but we would continue to look

5:47:48at other opportunities through future phases of downtown infrastructure, but also just as a matter

5:47:53of good practice. Okay. Thank you. And finally, I just wouldn't mind hearing it out loud here. What

5:48:00is the problem with coming back to Council with the detailed design elements? You're going out to

5:48:10the public, you're doing the engagement, no one's pushing back on that, but you're going to come to

5:48:16some conclusion on the wow factor of the detailed design, but it's not coming back to us. So just

5:48:24wondering what's the what would be the issue of process if that were to come back to Council?

5:48:32To you Mr. Mayor, it is essentially one of timing for us to tender this project in October.

5:48:39We would need to be back to you in September and if we were going to be to you in September,

5:48:44we would need to be writing that report right now. We are happy to keep Council informed,

5:48:50to share information with Council and invite you to come out to our public engagement or share

5:48:56that same information with you at the same time, which is something that we typically do. But in

5:49:00terms of meeting Council report timelines, we wouldn't be able to make the October tender.

5:49:07So the risk there is that if we have to add it on as a change order, we are talking about probably

5:49:14increases to the budget for that. So there wouldn't be any option of Council saying,

5:49:20look, we would allow you to skip the Committee of the Whole in September, but we would like to see

5:49:26something to us at the Council meeting in September. That's not doable between today and the end of

5:49:33September for something like that. To you Mr. Mayor, if you would like us to come back,

5:49:41that's just time that we are spending putting a report together to come back to Council and to

5:49:46what end. If we are going to be contemplating changes at that Council meeting again, that puts

5:49:51us in a spot where we are going to be getting behind on the tender documents. And I can't

5:49:59express enough how important it is for us if you want us to meet those timelines associated with

5:50:05getting the work done in the downtown that we get that tender out in October. And the more we can

5:50:10get in that tender, the better the pricing is going to be, the less uncertainty there will be for

5:50:15the contractor, and the better off we'll be in terms of trying to get that project underway. So

5:50:22there are implications not only with the construction schedule, but as you heard, there's other reasons

5:50:27why we're doing the work as soon as we can is also because we've got state of good repair issues

5:50:33with some of the servicing in the downtown that we have to address sooner rather than later. So

5:50:40anyway, so I think we were trying to come up with a way of being able to go back out to the public

5:50:45for the wow factor, the detailed design part that we would be able to, that you would trust that we

5:50:52would try to address all your concerns the best that we can. As you've heard, there's lots of

5:50:56different opinions about what makes sense for the downtown, what people like, what people don't like.

5:51:02And we're, as we always do, we try to take all of that into account when we're coming up with the

5:51:08final design. Okay, I appreciate that. Okay, well, we have the regular motions already tabled,

5:51:17and I promise that I would go to Councillor Goller first. So, Councillor Goller, I'll let you explain

5:51:23kind of how you want to walk us through. I think you've run it by staff, so go ahead.

5:51:27Thank you through your worship. And my wardmate, Councillor LaCosta, has put in a lot of work

5:51:35working with staff on these motions, listening to the DGBA and to many of our ward two constituents

5:51:41that have written to us. I'd like to move the following as amendments to motion number three.

5:51:48And I'll ask the clerk to please bring those up on the screen.

5:51:54So, once again, these are amendments to item number three, which is to approve the design

5:52:01for St. George's Square. The first one is that staff be directed to include flexibility

5:52:05in the design of St. George's Square to allow for present and future seasonal patios and community

5:52:11events, including by not limited to considering that side furniture such as benches, chairs,

5:52:17waste receptacles are designed and located to allow for easy reconfiguration or temporary removal

5:52:23to accommodate different uses and events. Number two, that staff be directed to integrate more

5:52:28natural materials and design elements that reflect the heritage and character of our

5:52:33downtown into the final design of St. George's Square, including by not limited to the use of

5:52:37stone, wood, other natural finishes were feasible, including the use of limestone in the city's

5:52:44salvage material storage. Also, to incorporate the heritage inspired features such as signage

5:52:50of arch that shares local history and indigenous stories, gateway features such as low stone

5:52:56walls or planters that tie the space to the downtown's historical context, planting and

5:53:01landscaping with native species that soften the surfaces, brick or stone paving patterns that

5:53:06reflect traditional streetscape. And number three, that staff provide council with final design updates,

5:53:15which include a new main design image that can be used when sharing and telling the good news

5:53:19story about the redesign of our downtown and present the design details through future public

5:53:25engagement and online resources before the end of 2025. Number four, that staff report back on

5:53:31budget impact if applicable associated with clauses one and two via either the 2026 budget monitoring

5:53:37process or the 2027 budget update. Can I ask for a second there on these motions? Okay, Richardson,

5:53:47thank you. All right, so what we're going to do is we're going to come back to number one and number

5:53:53two. We're going to just deal with the amendment on number three that's been tabled right now,

5:53:58which is what you just outlined. Okay, is there any questions on the amendments? So sticking

5:54:05only to the amendments, okay? Alt and then Kate. Just a point of privilege. I was wondering if I

5:54:10could please have that up on screen. That was a multiple. Could we vote on these separately? I think

5:54:37I'm probably in favor of them all, but this is such a big beautiful bill, as said down south,

5:54:45that I think I want to be careful. Oh, man, I was going to say something funny there, right?

5:54:52All right, so I will go, oh, sorry, Kate, Kate had a question. Sorry, go ahead, Councillor Kate.

5:55:00I was going to ask the same thing that Councillor L just did. So, okay, perfect.

5:55:04All right, so throw those back up on the screen there for me clerks and

5:55:11I will go through each one. Okay, so I'm going to call the question on one, which includes 1A,

5:55:20and I'll do that now. So, is there anyone against that? Okay, nope.

5:55:29I have ordered, Mr. Mayor, if you don't mind. Sure, go ahead.

5:55:32Just have a question of staff on these motions. I believe they're in order. I just, it seems like

5:55:40Council is giving direction on the detail design. I thought we were working on a concept plan here.

5:55:46Seems very detail oriented on what Council expects to see and I would expect those inputs to come from

5:55:53the public as well. So, I don't want Council to be speaking over what staff might hear from the public.

5:56:02When we go into detail design saying, well, Council's already given us direction on all these things

5:56:06because there's a lot of direction here and there's a lot of detail. So, I just wanted to

5:56:10make sure we're complimenting staff's work on public engagement. If these motions could come forward as

5:56:17Council desires or, as I said, Council input or, but I don't want this to be,

5:56:23I don't want this to be a fixed motion whereby Council staff have no flexibility when it comes to

5:56:27public engagement. So, I don't know if that's a question of staff or if that's a question of whether

5:56:37or not these motions need to be changed, the language to, as it's input from Council, but not

5:56:42direction from Council. All right. Thank you. Okay. Let me just control and manage what's happening

5:56:52right here. Okay. So, we were right in the middle of a vote. I didn't call the vote as past or not.

5:57:01So, you cut me off just at the right time. So, let me go to staff to answer your question. I think

5:57:10that's the best point of what we should do right now. How is staff viewing these directions,

5:57:18because that's what they are, at this time compared to or versus the detailed design

5:57:25stuff that's coming in the fall that's DC talked about.

5:57:29To you, Mr. Mayor. So, these are the kind of things we would be looking at anyway as we go

5:57:35forward in detailed design. I take Council Gibson's point with directed, the word directed,

5:57:41because we are taking input from the public as well. So, we would take this as input as long,

5:57:49along with the direction, some of the input that we got from the public as well. So, perhaps

5:57:54just reflecting on what Council Gibson said, perhaps the word directed might be a bit strong.

5:58:01Yeah. So, instead, you would rather have it as

5:58:06staff consider including flexibility in the design. I'm just making it up as I go here,

5:58:14but instead of direct, it's consider that staff consider this, that staff consider that.

5:58:19Is that what you're saying? Through you, Mr. Mayor. That makes sense. Yes.

5:58:23Okay. Sorry, Council Gibson, you have the floor. Just a friendly amendment to the mover.

5:58:27Just swap the words from clause one and two to maybe be encouraged,

5:58:32that staff be encouraged to include, that staff be encouraged to integrate.

5:58:36That just, that leaves the space for the public to have their input and it's not a formal direction

5:58:41of Council, but it's an encouragement. I don't know if that's something that the mover would

5:58:46need. I would need someone to second use it. Okay. I heard lots of people come together here.

5:58:53I'm going to pick Bousatil. I know there's lots, but Bousatil, because she's lonely over there,

5:58:58everybody. She's sitting all by herself on this side of the room. So, I'm going to let her do

5:59:02the second error for, so we are amending an amendment. Just remember everyone, we can't go

5:59:08further than that. Okay. So, we have an amendment on the floor to amend the amendment and it

5:59:15basically will structure the wording to substitute some of the wording of direction to encourage.

5:59:22It's so I'm just looking to make, so I'm just looking to clerks to make sure they've captured

5:59:26that and Council Gibson, I'm so sorry, you have the floor. Go ahead. I cut you off.

5:59:31I think it captures the, the essence I was talking about if you just take the word direct,

5:59:36direct it out and put in the word encouraged. That'll, that just creates the space for everyone

5:59:41to get along and give the room. Okay. And so, I'm just waiting for clerks just to validate that and

5:59:50maybe I can hear from them. Yes, Mr. Mayor. We've got that ready to be changed. Should,

5:59:56should the amendment pass? Sure. Yep. And so, here's the new wording everybody.

6:00:06So, that staff be encouraged to include, etc., etc. Consider the site furniture or such as,

6:00:13and then number two, that's that be encouraged and a to a and b is all flowing from the words

6:00:22encouraged. And what's number three there that staff provide Council with file design updates?

6:00:31I'm sorry, it's cut off because of the wording and these things are gone. So, I can't see the

6:00:35bottom. Can the clerks read out what the bottom is? The clause three, Mr. Mayor reads that staff

6:00:40provide Council with final design updates, including a new main design image that can be

6:00:44used when sharing and telling the good news story about the redesign of our downtown

6:00:48and present design details through future public engagement and online resources before the end

6:00:52of 2025. And then the clause four that staff report back on budget impacts, if applicable,

6:00:57associated with clauses one and two by either the 2026 budget monitoring process or the 2027

6:01:04budget update. Okay. Thank you. So, what I'll do is I'll just ask if there's any questions now

6:01:12of council just on the amendment of the amendment to the word and to the word changes of encouraged.

6:01:18So, anyone have questions on that? Councillor Coller, I encourage you to ask some questions.

6:01:23Comments allowed, your worship. Okay. I encourage my council colleagues not to support this.

6:01:29This is the last opportunity for Wolf City Council to move motions on this because we will not have

6:01:35this come back to us for the decision. I've listened to my constituents. I've listened to the downtown

6:01:42Wolf Business Association. I further concerns about the lack of dedicated, flexible space.

6:01:49When we say we're encouraging staff, that could come or go and it will be taken

6:01:55along with every other bit of feedback that we get. This, I believe, is what we should be doing at

6:02:03this point, given direction for there to be flexibility so that we can ensure that this

6:02:09could be used for a concert, for a festival downtown, for the Wolf Jazz Festival, for other events.

6:02:17If staff are encouraged to consider, they may feel that other feedback provided by the public

6:02:24trumps this feedback. So, that is why I would ask that we give direction rather than encourage at

6:02:30this point. Okay. So, just before I call the vote on the amendment, because I just want to try to

6:02:36bring us together, I don't want to be pitting people over the words and stuff. I want us to try to

6:02:41unite. So, I heard from Stacey that in regards to this whole thing, that it is kind of the work that

6:02:52you were doing anyways. I'm sorry, I don't mean to dumb it down that way, but can you just confirm

6:02:59for that, that you're taking Council's encouragement seriously, even though the word

6:03:06direction isn't there, and that it's embedded in your work plans, and probably what the outcomes are

6:03:11going to be regardless. But I don't want to put words in your mouth. I think it's important

6:03:16that we hear from staff that what you are actually going to maybe follow through on,

6:03:21whether this was tabled or not. To you, Mr. Mayor, we would absolutely be taking Council's

6:03:29encouragement seriously. We have outlined in the report that one of the things that we are doing

6:03:35between now and the detail design is looking to streamline the size and location of those planters

6:03:40to create more open space. So, it does say in the report that we are doing that already. So,

6:03:46whether the word is encouraged or directed in this motion, it is something that we are doing already.

6:03:53Well, thank you. Okay, Councillor Gauri, I'm circling now. I'll give you the floor,

6:03:58but then I want to call the votes. Okay, go ahead. Thank you through your worship. Before,

6:04:01and our questions and answers, I was told by staff that Council needed to give direction at this point

6:04:07if we wanted to have flexibility for future restaurants to have patios or for future

6:04:13events to happen in the downtown. And without this explicit direction,

6:04:17that I mean, that's what I heard maybe half an hour ago that they were looking for. Now,

6:04:22we're given an encouragement instead of a direction. So, that's my concern.

6:04:28I'm just going to go back to staff because I don't think Councillor Gauri is wrong. I think I

6:04:33heard a little bit of that too. In fact, when I had a discussion with you guys yesterday,

6:04:37I heard that the moment to give direction was today. So, can you just kind of make everyone

6:04:43feel comfortable then about where we're sort of hearing some of the differences in that before

6:04:49we take the final vote? Yeah, I think to you, Mr. Mayor, I think being specific about what Council

6:04:55wants to see, that was what we meant by providing clear direction, whether the word is direct or

6:05:01encourage. We are going to take it seriously and consider it through the detailed design process

6:05:07so it was being clear about what Council wants to see. That's what we'd like today from you,

6:05:14so that we can take it away, do that work and get to that end date. Okay. So, with that, I think

6:05:21I'd like to just call the vote. I'm just going to say a very quick comment here. We can get bogged

6:05:26down with these words. I am trusting staff that they are taking this seriously, whether the word

6:05:32is direct or encourage. I also know that we can also talk about this at the end of the month if we

6:05:37have to, but I just think this would be, this is such a large project for us. I feel like it'd be

6:05:44very nice if we could sort of had some sort of sense of unity around some of these things as we

6:05:49move forward around this. So, I prefer direct myself, but for the sake of sort of unity around it,

6:05:57I'm going to just say, let's go with the word encourage because I want as much as a strong

6:06:03vote of that and confidence in staff that they're taking that direction or that encouragement away.

6:06:08So, let's call the vote then on the word encourage versus the other direction word.

6:06:14This is the amendment to the amendment. I'm going to call the vote on that now as anyone against.

6:06:20Okay. Just Councillor Goller. Okay, so that passes. So, now I'm back to the amendment as amended.

6:06:29And so, we, and I was about to go through those individually.

6:06:34Yeah. So, can we have them all back up then? So, Councillor Alder has indicated that he's actually

6:06:47pretty comfortable now with the way things are. It might not need to be parceled out each individual.

6:06:52Is anyone else on council wanting to make sure it's done one at a time or now with the amendment,

6:06:59are we comfortable with actually just passing this as it is? Okay. So, I'm going to call the vote

6:07:05then just as this whole amendment. Okay. I'll do that right now as anyone against.

6:07:11Nobody. Okay. So, that's unanimous on that one. Thank you. So, now that's number three as amended.

6:07:18Now, I need to go back to the number one, the number two, the number three. And I would like

6:07:24those all on the screen for me, please. Sorry, did I hear somebody? Oh, Kate, sorry, your hand is up.

6:07:37Go right ahead. Thanks for your answer, Mayor. Oh, I know what you're going to do. You're going to

6:07:41encourage me. Do you want me to add mine in? Because I think that it would be complimentary in the list.

6:07:49Yes. You know what? No, I'm just going to add yours as an additional at the end. I will go through

6:07:54all of these. Then we'll add yours at the end as the icing on the cake. Okay? Sounds good.

6:07:59Okay. Thank you for reminding me. So, let's go here with number one. I will call the vote on

6:08:05number one. Is there anyone against the implementation plan? All right. That's approved unanimously.

6:08:15The number two is the sequencing for phase one with Wyndham Street North reconstruction,

6:08:21including the extended working hours as outlined. Also to be approved, I'll call the vote on

6:08:25that. Is anyone against number two? No. Okay. I would like that across the whole city, by the way.

6:08:32Anyways, number three, that the recommended concept plan for St. George's Square is outlined in the

6:08:38report dated July 8th, 2005, be also approved as amended. And of course, it's as amended because

6:08:44of all the amendments we just did. Very quick comment from me. I'm still feeling very uncomfortable

6:08:51a little bit with where we are. Please don't take that at any disrespect. I am feeling very

6:08:55uncomfortable with kind of where we are at. I'm going to vote for it today, but I am going to work

6:09:00with staff and just listen a little bit more to some other voices around, including my colleagues,

6:09:06as we get to the end of the month. I just feel like I'm concerned about the wow factor a little bit.

6:09:13So, I just want to kind of drill down on that a bit more between now and the end of the month.

6:09:16But I am going to support it at the committee level here. So, with that, number three, I'm calling

6:09:21the vote on that. Is anyone against? Okay, just Billings. Okay, thank you. That passes. And number

6:09:31four is the mitigation plan as outlined and have that be approved as well. So, I'll call the vote

6:09:38on number four. Is anyone against number four? Nope. Okay, that's great. And five is all around

6:09:44the delegated authority for staff during the whole program. I'll call the vote on that.

6:09:51Anyone against that delegated authority? Nobody? That's great. And that includes the seasonal patio

6:09:57program, parking rates and fees and encroachment agreements. I'm so sorry, it's cut off. Is there

6:10:03anything more? Sorry, it's cut off on my screen. What is number six? Mr. Mayor, number six is that

6:10:09an amending bylaw be brought forward for approval at the July 22nd, 2025 City Council meeting.

6:10:15Okay, perfect. I'll call the vote on that. Is anyone against that amending bylaw coming forward

6:10:19at the end of the month? Nobody. All right, so we waited through that. Thank you very much to staff.

6:10:27Appreciate it. And to the voices that have come and delegated and will continue to talk about

6:10:31this the rest of the month. Okay. Thank you. Now we are going to do Councillor Caton's final motion,

6:10:40the icing on the cake. I have to be very honest with you. The clerk just reminded me. I forgot

6:10:47so I tried to save myself there, but I kind of forgot. So I'm very sorry.

6:10:51Because if Councillor Caton throw up your your motion for us. Thank you through you, Mr. Mayor.

6:11:01I'd like that whenever possible, the sidewalk height and slope should be raised to increase

6:11:06front door accessibility to buildings. So I think this is the icing on the cake.

6:11:11I'm having wherever we can. I know it's not possible for all buildings, but reducing those

6:11:20issues that the stop gaps would eventually reduce in this area when we have a chance to do a big

6:11:26infrastructure project like this. It's always great to increase the accessibility for everybody.

6:11:32And I know that staff think about these things all time. I just wanted to call it out.

6:11:38Thank you. Thank you. This is the right timing in my opinion. So thank you. It's seconded by

6:11:43Alt. I hope that's okay. And then Alt just has a quick question. Thank you very much,

6:11:48Mayor Guthrie. Through you to staff, I was wondering if I could just get a quick comment

6:11:52on this. This seems straightforward and reasonable. It provides you latitude.

6:11:57Through the mayor to Councillor Allt. Yes, as Councillor Caton mentioned,

6:12:00this is something that we would be doing anyway. We have been working to make sure that we reduce

6:12:05some of those height issues throughout the downtown. Appreciating the fact that

6:12:11Councillor Caton is realising that we do have some great issues in the downtown.

6:12:16So it's not going to be possible in all cases, but we're certainly going to try our best.

6:12:21Thank you very much. Thank you, and caller.

6:12:24Thank you. And through your worship to staff. So that I'm clear for this direction to be

6:12:31realized, what would be the approach and the concern that I've heard from several of my

6:12:39more senior constituents is that it is difficult for them to navigate when sidewalks slope down

6:12:45for a driveway and slope back up. And it makes it difficult for people to get, navigate those

6:12:52changes in greater than a sidewalk. So would this be direction be telling you to go up and

6:12:57down on sidewalks? Cutting through you, Mr. Mayor. Against caller, we would avoid such

6:13:03situations that would exasperate an accessibility. We don't want to solve one problem and create

6:13:09another, right? So our accessibility committee and the end is involved with the design. And we,

6:13:17as Councillor, Deputy CAO Holmes mentioned, we are already taking the opportunity to make

6:13:23sure that all our grading is accessible where possible. But we, there is a limit to how steep

6:13:30you can make it drive those ramps as well. Okay. I appreciate that. Thank you. Thank you,

6:13:34worship. Thank you. Look, it's good that you are doing this, but this kind of drives it home

6:13:41publicly that we want it. It's nothing, no harm in that. And I would just say that when I went

6:13:47with some of the DGBA members and Councillor Claus and to King Cardin, and we had that tour of their

6:13:53whole street, they specifically talked about this, that during the project they made things more

6:13:59level at all of the store entries as best as they could. And many of the store owners

6:14:06really appreciated that. Yeah. So this is the opportune time to do it. So it's good to drive

6:14:10it home here. So I'll call the vote on this. Does anyone against? Unanimous. Thanks, Councillor

6:14:17Cardin. Okay. We are done this. And we are going to head into a five minute break. And then

6:14:27Councillor Allt is, I'm sorry, Chair Allt is going to just take over for the final item,

6:14:33the Guelph Storm 2027 Memorial Cup bid. So five minutes and we'll take care of that. Okay. Thank

6:14:39you. Thank you very much. Welcome to the Consented Agenda for Public Services. We are now into

6:20:03overtime. The goal is the switched ends. We're facing off for the Memorial Cup with our elbows up.

Automatic transcription is imperfect. Treat quotes as a guide and check the recording before relying on exact wording.

Check this against the City’s official minutes

The motion, the vote and the debate come from the City of Guelph’s published record, reproduced rather than interpreted. The document summaries above are the exception: those words were written for this site.

See the rest of this meeting