Skip to main content
Jon Christensen
All meetings

Committee of Adjustment

May 11, 2023 · 7,198 words of debate

The whole meeting, as text

Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.

Read the full transcript (7,198 words)

0:01Good afternoon, Gleif. I'd like to call to order the May 11th hearing of the Committee of Adjustment for the City of Gleif.

0:07This hearing is being held in a hybrid format with attendees appearing in person or remotely and is being live-streamed and recorded.

0:15Please be advised that public hearings form part of the public record and the words, images of

0:25those participating will be recorded and posted online.

0:28I've confirmed with the Secretary-Treasurer that we have a quorum to proceed.

0:34Before I outline the hearing format, I wish to speak to an application that's listed on the agenda

0:39if you wish to speak to an application that's not listed on the agenda and have not submitted a request in advance of the hearing.

0:47Please call the number displayed on the screen now, which is 519-822-1260

0:56extension 2524. That's 519-822-1260 extension 2524.

1:05And you'll receive instructions on how to participate.

1:08A final call for delegations will be made as each application is called.

1:13The agenda for this hearing has been posted online at golf.ca forward slash c-o-f-a.

1:21I'll remind all committee members and staff participating in the hearing to please mute your microphones when not in use.

1:28Applicants will be unmuted when their application is called.

1:32I'd also like to share the hearing format we will be using to navigate through each application.

1:39Each application will be called by the Secretary-Treasurer and the call-in number for those wishing to speak to an application

1:47will be displayed on the screen.

1:49Afterwards, the applicant will be given an opportunity to add anything further to their application to a maximum of 10 minutes.

1:57If you are an applicant and have nothing further to add, then you can simply say so.

2:03The committee will then be able to ask questions of the applicant or staff.

2:10After that, we will hear from members of the public who wish to comment on the application.

2:15Please note that all comments should be addressed through the chair.

2:21Please also avoid repeating any comments already stated by others and focus on adding new information.

2:28Comments are limited to 10 minutes or less.

2:32Any members of the public who have submitted a request to speak prior to the hearing will be the first invited to provide comments.

2:39For those watching the hearing online, if you wish to speak to an application and have not submitted a request in advance for the hearing,

2:50please call the number displayed on the screen now.

2:54For those attending the hearing in person, you will also be given a chance to come forward to the podium and address the committee.

3:01Once all comments from the public have been heard, the applicant or staff will be given the opportunity to respond to comments.

3:09Finally, the chair will turn to the committee for a motion and deliberation as we vote on the application.

3:15When the committee is making a decision on an application, the chair will be asking the secretary treasurer to conduct a vote by roll call.

3:24The secretary treasurer will call each member's name and each member will respond if they are in favor or opposed to the motion.

3:32And the chair will announce the result of the vote.

3:38If you wish to receive a copy of the decision on an application, including information about the appeal process, you must submit a written request.

3:51A written request can be made by contacting staff using the contact information shown on the screen.

3:58To receive a copy of the decision, please email cofa at gulf.ca with your name, the file number you're interested in.

4:08Please note that owners and applicants automatically receive a copy of the decision.

4:17Our first order of business is the First Nations acknowledgement, which I will read.

4:23As we gather, we're reminded that Guelph is situated on treaty land that is rich in indigenous history and home to many First Nations, Inuit, and Métis people today.

4:35As a city, we have a responsibility for the stewardship of the land which we live and work.

4:41Today, we acknowledge the Mississaugas of the Credit First Nation of the Anishinaabe people whose traditional territory we are meeting.

4:51Committee members, I will first ask if there are any pecuniary interest. If so, please raise your hand.

5:01Seeing none, I will ask for a member to move and second approval of the minutes.

5:09Move by member Goodfellow, seconded by member Sayre. All those in favor?

5:16And I believe that is carried.

5:20The next item on the agenda is the election of a vice chair for 2023. And for that, I will turn it over to our secretary treasurer. Secretary treasurer.

5:31Thank you, chair. So due to a vacancy in the position of vice chair, we do need to conduct an election to fill that position of its time.

5:40So I would like to invite a motion from the floor to appoint a member as the 2023 vice chair, effective immediately.

5:52Move by member Smith.

5:53I would like to nominate member Sayre for the role of deputy chair.

6:02Do we have a seconder?

6:05Member Goodfellow, thank you.

6:13So I'll now call the vote. For those in favor, please raise your hand.

6:21Thank you. And I think I believe that's everyone that carries chair.

6:28Thank you. Congratulations, member Sayre.

6:30And the next time we meet in person, I'll congratulate you in person, but congratulations over the internet.

6:40Okay. Thanks very much. I'm looking forward to working with you.

6:44Thank you for stepping forward.

6:48At this point, I'll turn the agenda over to our secretary treasurer to call for the first applicant.

7:00Thank you, chair. The first file is a dash 28 slash 23.

7:08That is variances to permit reduced side yard setbacks for proposed second story addition to existing residential dwelling

7:16and reduced setbacks for existing sheds greenhouse and deck.

7:20At 107 Ontario street.

7:24If you wish to speak to this application, please call the number shown on the screen.

7:30I'll just bring that up now. Sorry.

7:40The number is 519-822-1260 extension 2524.

7:47When your call is received, staff will provide instructions on how you can delegate remotely by phone.

7:52This is the final opportunity to call in regarding this application.

8:05Do we have the applicant here or online?

8:13The applicant is coming in online, chair.

8:15Thank you.

8:45Good afternoon. Welcome to the committee of adjustment. Could you state your name for the record, please?

8:51Yes, through the chair. My name is Emily Stahl and I am the owner of 107 Ontario street.

8:58Thank you. And can you tell me if as per the planning act, the sign was posted for the application?

9:06Through the chair. Yes, it was posted.

9:09Though I understand a member did visit our property later earlier today.

9:13I was under the impression that the sign should have came down yesterday prior to delegations ending.

9:19And so I do apologize for that. It was posted, reposted back up as soon as we were notified of the air.

9:26Thank you. That's good to hear.

9:30So you have 10 minutes to address the committee and stay tuned for any questions.

9:36Yeah, thank you. I have no further additions to add, Mr. Chair.

9:43Okay. At this point, I will ask if there are any members of the public, either in the auditorium

9:49or online who would wish to speak to this application.

9:57Not sure. I can confirm there are no registered delegates and there are no call-ins for this application.

10:02Okay. Thank you. Committee members, let me turn to you and see if you have any questions for the applicant.

10:13I'm seeing none. So at this point, I am going to entertain a motion from the committee on this.

10:21Committee members, do I have a motion? Member Goodfellow.

10:28I motion to approve.

10:31And we have a seconder. Member Spears.

10:36Is there debate or discussion upon this motion? Seeing none, I will turn it over to our Secretary

10:46Treasurer to call the vote. Thank you, Chair. Committee members, please indicate your vote

10:52by responding in favor or opposed to the motion, which is to approve the application.

10:58Chair Smith. In favor.

11:02Member Goodfellow. In favor.

11:05Member Hamilton. Member Pike. In favor.

11:12Member Sair. In favor.

11:16And Member Spears. In favor.

11:19That carries, Chair. Thank you. Your application has been approved and you're free to leave the

11:27meeting if you wish. May we have the next applicant? Thank you, Chair. The next application is file

11:47A-29-23 and that is variances to permit reduced front yard setback for proposed second story

12:01addition to existing residential dwelling and increased exterior stairs projection into the

12:07front yard for 70 Lyon Avenue. Thank you, and I see someone is on the video. Is that correct?

12:19No, that's correct, Chair. The applicant is attending by video.

12:24Welcome. Can you state your name for the record, please? I'm sorry you're muted. Yes, hi. Can you hear me? Much better.

12:38Yes, hi. I'm a little doosome architect and agent for the owners of 70 Lyon, Christie and

12:45Christie Pollard and Chris Ligori. And can you tell me if the sign was posted as per the planning

12:54act? Yes, as per the planning act, it was posted May 1st. Okay, thank you. And as with all applicants,

13:04you have 10 minutes to address the committee, so please feel free to do so when you're ready.

13:10Thank you, Mr. Chairman and committee members. We're asking for two variances.

13:18First variance is a front yard setback of 4.76 meters versus the allowable

13:266 meters. And a second variance to allow for exterior stair to the lower level.

13:32We're requesting that it encroach into the front yard setback of 2.7 meters versus the allowable

13:435 meter encroachment into the setback. If we could pull up drawing a 012 and I can walk you through

13:57the reason for our request. Drawing a 012, please. That is the proposed segment. Yes, there we are.

14:20The dark gray area is the footprint of the existing house,

14:28ground floor footprint. If we can zoom in to that footprint, thank you and maybe even a little

14:54farther if you can. There's some dimensions on the front yard and slide to the right a little bit.

15:01Yeah, thank you. That's good. So the dark gray area is the existing footprint of the house.

15:09170-year-old stone farmhouse and there is a dashed line on top which is the proposed

15:21second story footprint. We're proposing to remove the existing second story and replace with

15:28a new second story and that new second story encroaches into the allowable front yard setback

15:40by 1.24 meters leaving a request for a front yard setback for that second floor of 4.76 meters.

15:50If you zoom in a little closer to the front yard dimensions, it can get really quick. Yeah,

16:01there we go. You can see the existing front yard setback is 3.86 meters. That's at the closest

16:10corner to the property line and then further west or up in this diagram is the setback of

16:224.76 meters going to the corner of the second floor and there's a little triangle

16:29of area of the second floor that encroaches into the front yard setback of our proposed second floor

16:36construction. That's the reason that we're requesting that reduction on the required

16:47front yard setback. And secondly, you can see on the site plan there is a stair

16:53coming from that elevation. That is a stairwell to enter the basement level of this structure

17:05and in order to allow for a door to open outwards and have enough landing when the door is open to

17:12be able to move through into the space, we're requesting to be able to encroach into the

17:18front yard setback by a dimension of 2.74 meters. Those are there are two requests.

17:26There has been a staff report. I believe that you've all received staff's recommended approval

17:34for the variances. We have also been in deliberation with heritage planning. Heritage staff have no

17:41concerns with the requested variants. Engineering services, they agree with the recommendations

17:47of planning and building staff as well as building services have no concerns.

17:53If I guess at this point, if you have any further questions, be happy to answer.

18:03Thank you. I'll turn to the committee and see if there are any questions for the applicant.

18:09Oh, before I do that, excuse me, are there any members of the public who would wish to comment?

18:15Or ask questions.

18:17Chair, I can confirm there are no registered delegates and no delegates online.

18:22I don't see anyone in the gallery. So I will circle back and ask my colleagues if they have

18:30any questions for the applicant. I do have one quick question and that is the recommended

18:43conditions. You've read those and you're in agreement.

18:49Correct. I have read and we are in agreement.

18:53Awesome. Thank you very much. If you want to stand by, we will go into committee and discuss this

18:59further. Committee members, I'm looking for a motion. Member Hamilton.

19:07I move approval with the conditions.

19:09Do I have a seconder? Member Goodfellow. Do we have some discussion? Seeing none, I will turn it

19:19over to our secretary treasurer to make the, pardon me, ask for a vote.

19:27Thank you, chair. Committee members, please indicate your vote by responding in favor or opposed

19:31to the motion, which is to approve with the listed conditions. Chair Smith.

19:37In favor. Member Goodfellow.

19:39In favor. Member Hamilton. In favor. Member Pike. In favor. Member Seher. In favor.

19:51And member Spears. In favor. That carries, chair.

19:55Thank you. Your application has been approved and you're free to leave the meeting if you wish,

20:01or if you want to stay tuned for more excitement, you're welcome to as well.

20:05Thank you very much. And thank you committee. And also thank you for all of your time

20:10doing this, doing this work. It's much appreciated by, by our owners and also the design community.

20:19Thank you. Thank you. I would like to now ask the secretary treasurer to call the next applicant.

20:32Thank you, chair. The next application is a dash 30 slash 23 variants to permit reduced

20:39side yard setback for proposed addition to existing attached garage at 77 Metcalfe Street.

20:46And if any applicants are any delegates wish to speak to this application, the number

20:51will be shown on screen. And that number is 519-822-1260 extension 2524.

21:02Thank you. Do we have the applicant? I see my notes say on video. Is the applicant available?

21:19Yes, I'm here. Welcome. Can, hi, are you doing this just by voice or are you going to turn your

21:28video on? Oh, sorry. Yes, that's okay. There we go. Okay. Welcome. And thank you. Can I ask for your

21:46name and your relationship to the application for the record, please? Yes, I am one to duck and I

21:53am the owner of 77 Metcalfe Street in Guelph. And was the sign posted as per the planning act?

22:02Yes, the sign was posted on May 1st and is still presently up. Great. Now you have 10 minutes

22:12to address the committee. So please take your time. I just wanted to thank you for considering my

22:20request. I am in agreement with the two conditions that you have outlined of being 4.57 meters in

22:31depth or not to exceed, I'm sorry. And it is only one story in height. And I have no further comments.

22:43Okay. If you want to stand by, I'll ask committee members if they have any questions.

22:51Seeing none. No, it doesn't appear to be. Then I will seek the advice of the committee. Do we have

23:02someone to move this application? Remember, good fellow. I motion to approve the application with

23:13condition as noted. Thank you. Do we have any discussion on the motion on the floor? Seeing

23:24none, I will turn it over to secretary treasurer for a vote. Thank you, chair. Committee members,

23:32please indicate your vote by responding in favor or opposed to the motion, which is to

23:37approve with the recommended condition. Chair Smith. In favor. Member Goodfellow. In favor.

23:44Member Hamilton. In favor. Member Pike. In favor. Member Sayer. In favor. And member Spears. In

23:54favor. That carries, chair. Thank you. Your application has been approved and you're free

24:01to leave the meeting as long as you don't turn all our power off. Well, I want to thank you very

24:07much for your time and support. I appreciate it. Thank you very much. You're welcome. Thanks again.

24:21I've just been informed that I have fallen down on my duties and that we did not have a

24:29seconder for that motion. So that motion does not carry. I need to have a seconder. Member Hamilton.

24:41I believe member Hamilton is seconding that and I guess we have to circle back for a vote.

24:47I thank you, chair. I can conduct that vote by roll call or we could do my show of hands at your

24:51discretion. May we show hands? All those in favor. That carries, chair. Thank you. Thank you. My

25:00apologies to the committee. At this point, can we have the final application? Thank you,

25:17chair. The final applications on the agenda tonight are for B6 slash 23 and B7 slash 23 consent to

25:27create sanitary easement for 64 and 68 Queen Street. Thank you and welcome. I see it's nice to see

25:38someone in person. Can you state your name for the record, please? Yes, it's Jamie Laws from

25:45Van Hurt and Survey and it's the applicant. And you're the applicant I take. Yes, I'm dealing with

25:58this is being going on for a while, this application. So Charleston Homes Limited.

26:03And was the sign posted as per the planning act? Yes. You have 10 minutes to address the committee.

26:09Okay. So this application, many members and chair,

26:16this was an approved severance a part of the conditions of the severance on Queen Street,

26:23the three properties. The engineering design, there was an existing sanitary easement that was

26:32found that ran from 72 lion to the to the west onto one of the subject properties.

26:41And part of the engineering design was to create this easement in favor of 72

26:49over the subject lands, two of the subject lands. And that's that's why we heard it create this

26:55easement. Well, thank you. That was concise. Committee members, do you have questions of

27:04the applicant seeing none? I'll entertain a motion. Oh, I'm sorry. Are there any comments or

27:18questions from the public? I see none in the gallery. Are there any online? Sure. I can confirm

27:25there are no registered delegates and no delegate requests online. Thank you. At this point, I will

27:32turn to committee for a motion. Oh, before I do, there are listed conditions. Are you in agreement

27:40with the conditions? Yes. Okay. Thank you. Committee members, do we have a motion? Members

27:47say or yeah, I move to approve this application subject to the conditions set out in the stats

27:55comments. Thank you. Do I have a seconder? Remember good fellow? Do we have discussion on the agenda

28:04item seeing none? I will turn it back to the secretary treasure for a vote. Thank you, chair.

28:13Committee members, please indicate your vote by responding in favor or opposed to the motion,

28:18which is to approve with the recommended conditions. Chair Smith in favor. Member good fellow in

28:25favor. Member Hamilton in favor. Member Pike in favor. Member Sayer in favor and member Spears

28:38in favor that carries chair. Thank you. Your application has been approved. At this point,

28:52we have no further applications, I believe secretary treasure. However, we do have a

28:59presentation from planning staff about the comprehensive zoning bylaw changes and an

29:05update on the official plan. So I will turn it over to I see Abby Watts for her presentation. Welcome.

29:17Hi, thank you. So yeah, my name is Abby. I'm the project manager of the comprehensive zoning

29:25bylaw review that recently went to council for approval on April 18. Trista, are you

29:33changing the slides or am I? Okay, so just I don't have a slide on official plan amendment 80,

29:45but I'll just briefly speak to that piece. So official plan amendment 80. We received a decision

29:54from the province a week before the 18th. I don't have the the date in my in my mind. And basically,

30:04official plan amendment 80 was the city's municipal comprehensive review, which updated our growth

30:10plan targets to 2051. So we were working concurrently on the new zoning bylaw at the same time that we

30:19were working on official plan amendment 80. So the new zoning bylaw doesn't incorporate any changes

30:25that were brought about through OPA 80, or any of the provincial changes that happened through that.

30:32So that will be a future zoning bylaw amendment that will come forward to council.

30:37So back to the zoning bylaw piece. As I mentioned, council approved the comprehensive zoning bylaw on

30:46April 18. This new bylaw totally repeals and replaces the existing 1995 zoning bylaw for all

30:54lands within the city. Notice was mailed on April 27, meaning the last day of appeal is May 16 at

31:044 p.m. So we will know next week whether we have appeals to work through on that on this bylaw.

31:11Until that time, both of the bylaws are in effect. So we have the 1995 zoning bylaw and the 2023

31:19bylaw until we are able to resolve any appeals or scope the appeals down to site specific properties.

31:28So what that means for development and minor variances is that any proposal

31:34has to conform to the 95 and the 2023 bylaw. And so you'll probably be seeing some applications

31:42if you haven't already that do that. So section 1.3, or maybe just to back up,

31:51my presentation today is really about what's new and changed in the new zoning bylaw. So

31:58regulations that we didn't previously have, I'm just going to highlight those for you.

32:03And then some revisions to existing regulations. I know sometimes we know the 95 bylaw so well,

32:09so there might be small tweaks that I'm just going to point out to you. There'll be an opportunity

32:14to ask questions at the end. And then obviously you can reach out to me at any time if you have

32:19additional questions about the new bylaw. So section 1.3 of the new bylaw is transition provisions.

32:28Essentially this section expires two years after the effective date of the new zoning bylaw. So

32:34that's the April 18th date. Transition allows for existing applications submitted before April 18th

32:42to continue to comply only with the 1995 zoning bylaw and not have any of the new 2023 regulations

32:49applied to it. So for building permits, that means anything that we accepted before April 18th can

32:55continue to apply with the 1995 bylaw for a maximum of two years. For minor variances,

33:03anything that was granted before April 18th has to apply if a building permit is required. They'll

33:10need to apply for a building permit within those two years to make sure they maintain

33:15the permissions that were granted. And generally, minor variances to the 1995 bylaw aren't carried

33:21forward indefinitely in the new zoning bylaw. So after the two-year transition timeframe, any of

33:29those previously granted decisions will become legal non-conforming or legal non-complying. So

33:36if someone had a side yard variance to add an addition, they wanted to expand that addition a

33:43little bit, they'll be back at the committee of adjustment to request that in the future.

33:50And then site plan is a little bit more complicated, but generally follows the same

33:55principles. There's a maximum of two-year transition period, but one site plan approval

34:02is granted. There's a 90-day requirement to get a building permit. And then there's also some

34:07additional built-in time for multi-phase developments. So up to five years when there's multiple phases.

34:18General provisions and parking is probably the large amount of committee of adjustment

34:24applications that you see. So I'll kind of go through some of these standard regulations for you.

34:33So additional residential dwelling units. This is an amendment that we made in 2020 to permit

34:43the additional residential dwelling unit within the primary dwelling and then one in a

34:47detached structure in a rear yard or a side yard. So this section was just revised to align with Bill

34:5423 changes, which allows two additional residential dwelling units within the primary

34:59dwelling. So for a total of three within the main building, or one within the main building and one

35:05within the detached structure. We also made an amendment that allows basement apartments to

35:11have three bedrooms. So previously that was two, but they are allowed to have three. Any

35:19other unit located on upper floors or in detached structures are limited to two.

35:26And then council amended the proposed bylaw on April 18th to eliminate the maximum

35:32size of detached ARDUs. So previously there was a requirement that they couldn't exceed 80 square

35:38meters and that's no longer the case. However, they are still limited to 45% of the gross floor

35:45area of the house as well as 30% of the yard. So there are still some limitations to the size,

35:51but larger lots might exceed the 80 square meters in the future. Home occupations,

36:00these regulations have been revised. So the permitted size has changed. It's now that they

36:07can't exceed 25% of the gross floor area of the dwelling to a maximum of 50 square meters.

36:14They are now permitted within accessory structures. So that previously wasn't the case.

36:20And they're also permitted in additional residential dwelling units. So if the home owner of the

36:27primary dwelling, dwelling unit builds an ARDU and they want to have a home based business,

36:33they can occupy the ARDU with their business. We've really simplified the parking. So hopefully

36:39if you were getting a lot of variances for home occupation parking requirements, it's pretty simple

36:46now. Basically one for the home occupation. If you have a staff member, an additional parking

36:53space, and then if you have clients coming and going an additional parking space. And we've

37:00updated the regs to now allow medical professionals and make that clear. Medical professionals is

37:07defined, but it is limited to one practitioner per lot. No employees and no other home occupations.

37:19Fences, these regulations have been revised actually in response to minor variance applications.

37:24So we've addressed sort of the corner lot issue where your front door might face your exterior

37:32side yard. And then your technical front yard, which is actually what people consider their side

37:40or backyard, the only like area of their yard that they have. We've updated it so you can have a fence

37:46that's taller in that yard in line with the exterior side yard requirements. So hopefully that addresses

37:53some issues and you'll see less of those applications in the future. So we also have new

38:03complementary uses. So this wasn't previously in the 95 bylaw. And this aligns with the land use

38:10designations of employment and institutional uses. So complementary uses are listed within the

38:16permitted use table. And they're not employment or institutional uses. They're usually like

38:25restaurants or daycare centers, things like that. And they're permitted within a multi-unit building

38:33in combination with a primary permitted use for that zone. Shipping containers, these are brand

38:42new regulations as well. So we're now defining what a shipping container is. And essentially

38:49they're permitted as outdoor storage within employment and service commercial zones. And

38:55then there's a series of regulations. Essentially outdoor storage has to be in a rear yard or side

39:01yard. It has to be screened. Can't be located within parking spaces or fire routes, things like that.

39:10Shipping containers aren't allowed to be stacked. They're not permitted on residential

39:14or mixed use properties on a permanent basis. And then there's some additional permissions to

39:23use them within a storage facility use, you know, that would obviously go through a site plan

39:27application. They're permitted in parks for recreational programming as we have some of

39:32those within our existing parks today. And then we've introduced some temporary uses for them as

39:38well. So residential properties and construction sites can have them for a limited amount of time.

39:45So people sometimes want to put a shipping container in their driveway to do home renovations or

39:50something like that. So permitted but time on a based on a time limit. And then we've also

39:56permitted them as an occasional use. So on a mixed use site or a commercial parking lot,

40:05this would allow sort of pop up sort of markets and different innovative ideas.

40:11But again, on a short term time basis. And then I know we get a lot of questions too about

40:18using them as a construction material, kind of putting them down in a rear yard as a shed or

40:23something like that. And so when they're converted to a building or used as a construction material,

40:31they're no longer considered a shipping container and they would have to comply with these own

40:35standards for that type of building. So if it's a building that they're proposing or a detached

40:42structure, they would have to comply with those regulations and get applicable building permits.

40:50So parking, generally parking has been updated city-wide. So every use has been examined

40:57and updated. We've updated our accessible parking requirements as well to align with the

41:03AODA requirements provincially. We've expanded our bicycle parking space requirements city-wide.

41:10Previously we just had those downtown. And we've incorporated new parking space design and location

41:16requirements. So that's making sure that bicycle parking spaces are actually accessible and usable

41:23located close to pedestrian access access doors and things like that. We've also incorporated

41:30electric vehicle parking space requirements, which is brand new. And we have new vehicle

41:36service station drive-through facility and car wash regulations as well. So this is mostly dealing with

41:43setbacks from residential properties where drive-throughs can be permitted on a property

41:49and then stacking space requirements as well. So we've incorporated a new parking adjustment

42:00areas. This is brand new to the bylaw. So we have a parking adjustment area that reduces the minimum

42:07requirement and adds a maximum, overall maximum requirement within our intensification areas.

42:14So those are our nodes and intensification corridors throughout the city. So I've got a

42:21map there that shows how to identify when a parking adjustment area applies to a property.

42:27You'll see the RH7 is the zone and then in brackets is the PA. And so that means that the

42:32parking adjustment applies on this property. In all other areas of the city, the last column of

42:39table 5.3 provides the general parking rate. Parking space dimensions have been updated.

42:52Oh, sorry. So first we've introduced compact parking space dimensions. So

42:5715% of the required parking spaces are able to be a little bit smaller.

43:03And that's brand new. And then we've revised the existing parking space dimensions

43:08for apartment buildings, mixed use buildings, stacked town homes, and all non-residential uses.

43:16So it kind of consolidates the exterior interior requirement to 2.75 by 5.5. Today it's exterior

43:26is 2.5 by 5.5 and interior is 3 by 6. So just minor changes, but things that you might see

43:36at the committee with applications. We've also introduced a minimum attached garage size. So

43:43this is for single semis and townhouses. Today we require a space to be 3 by 6 meters. But the 2023

43:53bylaw introduces an overall minimum of 20 square meters. And this is to accommodate

44:00the city's standard garbage bins. It becomes a bit of an issue with town homes when there's nowhere

44:06to put them, but right in front of your garage because you can't navigate around your building.

44:17Residential driveway widths have been updated. Council made some changes at the April 18th meeting.

44:27So typically we were maintaining that 50% lot frontage with the proposed bylaw.

44:35And that's essentially stayed for single detached dwellings. However, semi-detached dwellings were

44:42increased to 60% of the lot frontage and town homes are 65% of the lot frontage. So adding a

44:50little bit more width, but not necessarily the two car side by side that could fit within that space.

45:02And we've introduced accessible driveway widths. So as far as we can tell, this is probably one of

45:08the first bylaws in Ontario to address accessible driveway widths. And it's really the semi-detached

45:15in townhouses that have the essentially one car driveway. This is to allow an accessible vehicle

45:22to use those driveways and widen them slightly. So this allows type A accessible parking space,

45:32which is 3.4 meters wide. And then it incorporates an access aisle, which is 1.5 meters. And this is

45:39to allow accessible vans that have the side lifts to operate on a property and ensure that,

45:45you know, for human rights and whatnot, there's no additional application required for this type of

45:51driveway in the city. And we have brand new requirements for residential garage widths.

45:59So it is 50% of the lot frontage generally aligns with the driveway width permissions.

46:09And this is to address the built form that has garages across the entire frontage of a property

46:18and a door principal entrance sort of around the side. So we want to see proportional garage widths

46:25with a front door facing the street. So land use zones, basically every property in the city has a

46:34new zone. So you won't see any 95 zone symbols in the new bylaw. And this aligns with our official

46:42plan land use designations. For residential or maybe just generally, every land use

46:54has starts off each section starts off with a permitted use table. So similar to what we have

47:00in the 95 bylaw, just a bit different format. So you can see we have the list of permitted uses

47:05and then the zones along the top row. And then the P indicates where the uses are permitted.

47:12And then any additional regulations associated with those uses are in brackets next to it.

47:21And just to highlight some new regulations for the low density residential zones,

47:26we now have principal entrance requirements. So that's the front door facing the street.

47:31Maximum garage widths, as we talked about, garage location as well. So citywide,

47:39there's a maximum garage projection. Can't be more than two meters beyond the front wall of the house

47:46and in line with a front porch. We allow a mix of uses within our RL1 and RL2 low density zones.

47:53So we don't have a strictly single detached dwelling zone or a semi detached dwelling zone

48:00anymore. There's a mix of uses permitted in all of those zones. Average lot frontage and setback

48:08requirements, which are in map 66, those are still maintained. We just don't call it map 66 anymore.

48:14It's an older built up area overlay. And there's new regulations for the elevation of the principal

48:21entrance for on street townhouses. And so one of the biggest changes to this bylaw is that we've

48:29eliminated exclusionary zoning, as I mentioned. So now we allow up to three units

48:36for every property within the low density designations with RL1 and RL2 zones.

48:43This can be in the form of apartment buildings, on street townhouses and triplexes.

48:50So there are some exemptions for these lots. They're standard residential lots. So they're

48:56exempt from providing visitor parking, bicycle parking, EV parking, and barrier free parking.

49:03There's a new regulation that requires 35% of the lot to be landscaped area. And then generally,

49:11they just have to comply with all the setbacks, building height and requirements in the RL1

49:16and RL2 zones. So essentially the same requirements for a single would apply to a triplex.

49:26And we've introduced some new built form regulations. So generally the zoning bylaw

49:33prezone sites for the maximum height and density of the official plan that was in effect at the time.

49:40And with doing that, we granted a lot more height and density permission. So we wanted to incorporate

49:46built form regulations to make sure that there was adequate transition to adjacent properties

49:52in lower density zones. So these typically apply to medium and high density or mixed use sites.

50:00So you'll see new things like maximum length of buildings, building step backs,

50:05floor plate sizes, tower separations, minimum first story height, active entrance requirements.

50:13So a door every few meters to access the building. We have angular plane requirements,

50:22maximum setbacks and minimum first story transparency. So those are all new things that

50:27you might come across in your applications. I mentioned overlays. So a lot of the existing

50:36overlays have been carried forward. Most of them are in the downtown area around protected view

50:41areas and heights and things like that. So those are all incorporated. We have a few new overlays.

50:48The Brooklyn College Hill Heritage Conservation District is an overlay that limits the height

50:54within that area. And then we have new well head protection area overlays, the Hanlon Creek Business

51:01Park overlay and low density greenfield residential overlay. And we have new online mapping that

51:10incorporates all the overlays. So it's much easier to access this information. I just have a picture

51:15here of the older built up area. So you can kind of just look up your property, apply all the overlays

51:22and see what applies to each property. Holding provisions. Most of the, well all of the existing

51:33holding provisions from the zoning bylaw have been carried forward unless they were lifted during the

51:37review period. A new holding provision you're going to see a lot when you're looking at the maps,

51:42but likely not through applications at C of A is H 12. And so this is where any height and density

51:50permissions have been added. And it requires the H to be lifted prior to development to ensure

51:56there's adequate servicing available on the site. And we still do have a number of site specific zones

52:04in the bylaw. We tried to delete some where there was redundancy, but anything that was approved by

52:11council within the last five years or was the result of an OMB or OLT decision has been carried

52:17forward. And that is just sort of a picture of our new mapping. We have all new maps. The PDF

52:28versions are available at the end of the bylaw. But again, we have the online interactive mapping,

52:33which is a lot easier and user friendly. So for implementation, we are currently working on an

52:42interactive version of the bylaw. It's there's a lot of pages. It's hard to get around. But once we

52:47get the interactive version up and running, it's much easier. There's links that you can jump around

52:52in the bylaw. And it's much more user friendly. We've updated the zoning bylaw with the amendments

52:58that council made on April 18. And those actually have just gone live on the website. So now when

53:06you go to the zoning bylaw page, you'll see a link to the 1995 zoning bylaw and a link to the 2023

53:11bylaw. So everything is available online. And we'll just wait until next week to see if we have

53:16any appeals. And that is the end of my presentation. Thank you very much. That's very informative. I

53:25wonder if any of my colleagues have any questions for you, if you don't mind answering them.

53:30For sure. I don't see any. Oh, sorry. Member Spears, go ahead. Not yet, but we're working on it.

53:53Yeah, that's the plan. It will be up to date soon.

54:02I was just informed your mic wasn't on. So it wasn't part of the record. But

54:07I think Abby heard you. So we'll just go ahead from there. I do have a couple of questions if my

54:14colleagues don't have any more. You mentioned the what is the ARD use? And there's my understanding

54:24from your presentation is there's no size cap. It's just based on the percentage now. Is that correct?

54:32That's right. But the percentage does provide an overall cap. Yeah. Right. I do recall we had,

54:41I'm going to say two years ago, we had a question about exactly that. It was quite a large lot.

54:47And that's why it came to us. Okay. And in your, you were mentioning the compact parking.

54:57And I wasn't clear what that was involved. Is that just in multi unit residential?

55:03Yeah, that's right. So it's 15% of the required parking spaces can be slightly smaller in those

55:09situations. And the last question I had was attached garage widths, but you didn't mention

55:16carports. Is that something that has changed? No, carports have stayed the same.

55:22That's all I had. Anyone with anything else? I don't see our members online with anything.

55:31Thank you very much. That was awesome to get that background. I'm hopeful that it'll make our

55:37workload a little less. So I appreciate your all your work and your colleagues on this issue.

55:49I see that we also have two items that the secretary treasurer needs to list under staff

55:55announcements. Thank you, chair. There are a couple items to note. The first item is an update on

56:02membership vacancy on the committee. We're pleased to announce that city council on April 25 2023

56:09pointed Richard Pike and Russell Spears to the committee of adjustment for the 2023 to 2026

56:14term. Both members, as you can see, have joined the committee for their first hearing today.

56:18Well, let me say that I'm glad that the holding was taken off for applications to

56:29committees and that we have a full complement. So again, welcome. And I trust that you'll find

56:36what we do here important and enlightening and that you'll commit the appropriate amount of

56:42time and education to it. Then look forward to your participation. So welcome.

56:48I'd also like to add that sorry, was there anything else? There is one further announcement,

56:56chair. The second one is but today as listed on the agenda is that an appeal to the Ontario

57:01Land Tribunal regarding minor variance file a dash 19 slash 23 for 201 on my road south has

57:09been filed by the applicant. This application was refused by the committee at the April 13th,

57:142023 hearing and the appeal has been afforded to the Ontario Land Tribunal.

57:20Thank you. And I just as the chair, I would like to emphasize that something the clerks

57:26office has asked. And that is if any of my colleagues have not yet filled out the

57:34online questionnaire, I encourage you to do so. And that has that date, I think has been extended

57:40to the 16th. But you would have received a email to that. At that all entertain a motion to

57:53motion to close the meeting. Member Goodfellow. And member Hamilton has seconded that all in

58:05favor. We are adjourned. Thank you committee members for your attention this evening.

58:11Okay, thank you.