Heritage Guelph
June 12, 2023 · 6,900 words of debate
The whole meeting, as text
Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.
Read the full transcript (6,900 words)
0:03Jack, can you hear me? It's Miranda. I can't hear anyone.
0:07Miranda, I think all of our microphones are muted right now. Okay. Yeah, I can hear you.
0:15Okay.
0:53So, I'll just let you know that we have quorum, but we're still waiting on a few members.
0:58Sure, we can wait a few more minutes and time with that.
1:02I think we have everyone here now. So, it looks like we are good to go.
4:28Well, welcome everyone. I would like to call to order the June 12th meeting of Heritage Wealth.
4:33It's been a little bit since we've seen each other, but welcome back to our June meeting.
4:37Welcome to all committee members, staff, and any invited guests who are attending the meeting today.
4:43I will start with our territorial acknowledgement. So, as we gather, we have reminded that Wealth
4:48is situated on treaty land that is steeped in rich indigenous history and home to many
4:53First Nations, Inuit, and Métis people today. As a city, we have a responsibility for the
4:58stewardship of the land on which we live and work. Today, we acknowledge the Mississaugas of the
5:03Credit First Nation of the Anishinaabe peoples on whose traditional territory we are meeting.
5:09And as we move forward into the meeting, I will start with asking if anyone has any disclosures
5:14of pecuniary interest, and if so, if you could please raise your hand.
5:18David? I might probably have one for 331 Clairs Street East. I was one of the authors
5:28of the original cultural heritage evaluation report.
5:35Perfect. And so, Jack, in that situation, what's the process for David just to abstain from commenting?
5:41Yeah, David, if you can turn off your camera and microphone during that item,
5:47and yes, abstain from voting and commenting. All right, thank you.
5:52Thank you. Any others? No? All right, we'll keep going. I know we have regrets today from Kim and
6:01Cameron, but we have quorum, so we're good to move forward. And then the first thing then is if I can
6:06get members to move and someone to second approval of the minutes from our previous meeting, which
6:10dates back to April 11th, 2023. So, if I can have a mover, could you just raise your hand, Jadat,
6:17thank you. And Michael, I'll take you as a seconder if that's okay. Awesome.
6:22All right, so we'll get into things. The only thing... Sorry, we have to vote. Oh, sorry, yes,
6:28all in favor. Amazing. Thank you, everyone. Just move things along, Jack. That's the
6:37goal, apparently. Skipping process. Apologies. All right, so we'll get into the agenda. I will
6:42note that I believe Victoria has some announcements for us later today, and that's the only additional
6:46piece that I have to note. So our first item then is going to be 12 Forbes Avenue.
6:55And Jack, are you speaking to that demolition permit? Yes, that's me. Thank you, Sarah.
7:01So this one's pretty straightforward. The proposed demolition of a non-heritage structure
7:06located in the Brooklyn and called Chill HCD will be considered by council in accordance with the
7:12requirements of the Ontario Heritage Act. The subject property is located on the corner of Forbes
7:18and Fairview. You can see it actually while driving up Gordon Street towards the university.
7:24The lot was severed from 14 Forbes in 2016, and a new house was constructed on the corner of Fairview
7:31and Forbes. According to a 2016 cultural heritage impact assessment prepared for the severance
7:37of 14 Forbes Avenue, quote, the potential built heritage resource and potentially significant
7:44heritage resource on this property is the house. The 1983 garage and link are not considered significant.
7:52So the link that used to be there between the stone house at 14 Forbes and the garage we're
7:57talking about now has been demolished. So it's just the garage now. And staff agree with this
8:05assessment and recommend that demolition proceed. If anybody has any questions or comments, I'm happy
8:12to hear them. It's a quiet morning. I guess we're after noon now. If anyone has any questions,
8:29comments, you're welcome just to unmute and speak directly. Jack, with regard to that garage,
8:38it's my understanding that there is no stone associated with the garage at all. Is that correct?
8:44That's correct. The cultural heritage impact assessment was a little confusing because it
8:51said that stone was used from the old Fergus town hall, but that was for the breezeway that
8:56connected the garage and the house, which is now gone. Gotcha. Okay. That's that was what I suspected,
9:02but just wanted to clarify. Thanks. Thank you. Was there a process that went through for the main
9:13building? Did the heritage wealth have to consider any applications in relation to any of the rest of
9:22the property? I might defer to Stephen for that one who would have handled the heritage permit for
9:28that building. Yeah, Jack, I'm happy to respond. David, I'm not sure I quite understand your question
9:39though. Okay. All right. Is that okay? We're being asked to make a decision in relation to what
9:47I understand is the garage. Was there any other heritage decision making process
9:53done for the other part of this property besides the garage?
9:59Yes. As Jack has referred to already, there was a cultural heritage resource impact assessment
10:04that was required of the property owner to the city and heritage wealth to consider when they were
10:11proposing the construction of the new house. That was actually following the severance
10:17that created the property as well. So that HIA, which was done, I believe by CHC Limited,
10:27it helped in the determination of what had cultural heritage value.
10:32It also helped in the process that eventually led to the approval of the heritage permit for the new house on the property.
10:39Nothing else has been, there's been no decision having to be made then for demolishing anything else
10:48except for the garage. Do you understand that right? That's right. This really just pertains to the
10:55existing wood frame garage, which is really what's left of the buildings that were on site before the
11:03current building was approved through its heritage permit. Okay. Thank you. Welcome.
11:10Any other questions or comments from committee members? Seeing no one in mute or put up their hand.
11:23So we have a recommended motion that I'll read out that the heritage wealth provides the following
11:28advice to the council of the city of Guelph with respect to the proposed demolition of the
11:32accessory structure at 12 Forbes Avenue. The accessory structure is a non-heritage structure
11:37and demolition should be permitted. If we are, if anyone's in favor, I'll need a mover on that.
11:44I see Miranda's hand went up and Jaodat, would you like to be the seconder? Okay. And all in favor,
11:51if you could raise your hand. No one's opposed then because I think I saw everyone's hand come up.
12:00That one was scary. Thank you. And our next agenda item is going to go back to Jack again.
12:06So the heritage designation consultation process. Thanks Sarah. You folks are going to be hearing
12:12my voice a lot today. So bear with me. So this proposed process is staff's response to the
12:18concerns expressed by heritage wealth members at the April committee meeting. Mainly that the
12:24committee only has one opportunity to review designation reports before they are brought to
12:28council for consideration. A designation working group was proposed by members to address this
12:34concern, but the establishment of these groups requires considerable administrative support
12:38by staff. And it was determined that staff do not have the capacity to facilitate a designation
12:44working group and the time required to facilitate a working group. And the time required to
12:50facilitate a working group would result in shifting of work from designation research to
12:56coordinating the committee and would seriously impact the work plan timelines for part four
13:02designation. However, I think we've found a good middle ground to address these concerns.
13:11We have recommended some changes to the consultation process with heritage wealth for
13:16designation. I'd like to emphasize before I proceed that this is a developing process.
13:22Steven, Victoria and I are working on different ways to present research and expedite designations.
13:28For example, today you may notice that Steven's cultural heritage evaluation report
13:34is formatted differently than my own. It's a little shorter and more concise and I think
13:39that's the direction we'll be moving just to help expedite the research and evaluation of these
13:45properties. So firstly, the agenda for heritage wealth meetings will be revised to include a monthly
13:54designation update section. Properties will be presented to the committee
14:01and properties will be presented to the committee twice, once at the research stage,
14:06and again at the recommendation for designation stage.
14:10So we'll have a designation update category at heritage wealth meetings to advise the committee
14:19on the progress of designation research, property owner consultation, as well as appeals.
14:26This will keep all committee members updated on designations and we'll have a tracking table
14:31included in each agenda that we'll update monthly. So secondly, staff will divide designation
14:38consultation with the committee into two phases, research and designation. So for each candidate
14:46property, staff will first bring a cultural heritage evaluation report to the committee that
14:51outlines the historic research conducted for each property and how the property aligns with
14:55Ontario Regulation 56922. This will permit the committee to focus specifically on the research
15:02portion of the designation report and committee members are encouraged to send staff emails with
15:09comments or research suggestions prior to the deadline for the revised agenda. So revised
15:15agendas are the Friday before the meeting. So you've got about nine days to provide us with
15:24supplementary research, but I don't want you to feel like you're limited to those in the,
15:30you're welcome to send us anything you have up until we bring you the full designation report.
15:41So at a later date, staff will bring the full designation report to the committee
15:45and this will identify the property's heritage attributes and whether staff believe it should
15:51be recommended for designation or not. And during this phase, you'll be able to comment
15:57specifically on the heritage attributes and the more legislative side of the designation.
16:06Committee members may also be involved in research tasks in support of the work conducted by
16:10heritage planning staff. This is on a voluntary basis and cannot duplicate the role of unionized
16:16staff as this is a primary job function for heritage planning staff. Committee members may
16:22be involved in the following voluntary tasks. So I had written down familiarization with Guelph's
16:28history, which I'm afraid that might sound condescending, but I really don't mean it to because
16:33I've found that reading the general histories, David Allen or Leo Johnson has really helped give me
16:40a thorough understanding of Guelph and the different neighborhoods and the different stages
16:44of development that really give me a head start when I want to start research on an individual property.
16:52Most significant though, we appreciate your review of the cultural heritage evaluation reports
16:58that we bring to you. You can help us fill in research gaps, review our analysis of land title
17:04abstract information, and help search archives for additional information. So that really goes a
17:12long way in strengthening our research reports. So any supplementary research you're able to give us,
17:18that's always more than welcome. I'm happy to hear your comments or questions about this. Again,
17:26this is kind of we're experimenting here, so expect some changes over the next couple months,
17:32and your feedback throughout this process is definitely appreciated. Happy to take any questions
17:39now. I might just pipe in really quick and just say thank you to the three of you for coming up
17:45with this. I think it helps all of us in our role and especially those that are new to the committee
17:48in understanding a process and maybe speeding up and making things a bit more efficient in some
17:52realms, especially given the provincial pressures that are coming down to heritage over the next
17:56couple of years. So just a sincere appreciation and recognition that there's flexibility,
18:00things are going to change. Maybe they won't change, maybe this is perfect and that's amazing,
18:04but that there is opportunity to revise the process as necessary as feedback comes from all
18:09of us. So just a thank you from me. Any other comments or questions from anyone?
18:15Is this the first effort to do this type of guidelines or previous versions of Heritage
18:2412 had similar efforts of doing this? It's my understanding that this will be the first time
18:31that we're using this sort of consultation process, but I can get Stephen's confirmation on that.
18:41It's really the first time that we've taken on something that would be more like a cultural
18:47heritage evaluation report in stages. So yeah, I think it's new and I think it's a, it makes
18:55sense to talk about cultural heritage value first and then work our way toward. Sarah,
19:11if there aren't any other questions, if I may, I'd like to introduce one of the new faces on the
19:16Hollywood Squares here. Because we're talking about research, I wanted to make sure everyone
19:23gets to know Kayla Anderson. Kayla, I don't know if you can just wave your hand. Kayla's our Heritage
19:31Research Assistant for this summer and I, we're really pleased to have her on the on the research
19:38team to assist. Kayla's, she's a graduate of University of Guelphs, Urban and Rural Planning,
19:44and also has had some experience with, quite a lot of experience with Senator Wellington's
19:49Heritage Register. So we welcome Kayla to the team. Nice to be here, thanks for having me.
20:01Excellent, thanks Stephen and welcome Kayla, nice to see you again.
20:06If there, are there any other questions or comments about the process that Jack
20:10elaborated on? And if there aren't, I'll read out the recommended motion that we have included,
20:19so that Heritage Guelph supports the proposed process for consultation with members on research
20:23and recommendations for designation of properties under part four, section 29 of the Ontario Heritage
20:29Act, and that members support the updates to the agenda as set out in the June 12, 2023 report.
20:36If we're in support of that, if I could have a mover. Thank you and David Weberman, okay,
20:45to be a seconder. Perfect and all in favor. Excellent, any, I don't think there's anyone
20:54to pose because all of our hands are up. Awesome, thank you everyone. Next on our agenda then is
21:00designation updates. And so I believe David, this is where you have your conflict of interest,
21:07either Weberman, so you'll mute and turn your camera off. We'll see you again soon.
21:12All right, so 331 Clair Road, East Cultural Heritage Evaluation Report with Stephen.
21:22Thanks Sarah, I'm just gonna put the information on the screen here. Sarah, can you see the
21:32report itself on the screen? Yep, now we're good, we can see it. Okay, good. I'm not gonna read through
21:40the entire report because I'm hoping that the members have had a good chance to read through
21:45themselves, but I just wanted to touch on some of the highlights and really highlights that are
21:50germane to what the function of the Cultural Heritage Evaluation Report is. So as most of you
21:59will know already, 331 Clair Road, East contains a stone farmhouse that I'd like people to start
22:07referring to it as the James Hanlon Farmhouse. It's listed as a non-designated built heritage
22:14resource on our heritage register and the report that I'm presenting recommends that the James
22:20Hanlon Farmhouse meets four of the prescribed criteria for determining cultural heritage
22:25value or interest in accordance with Ontario Regulation 569-22. As Jack has described and as
22:39I'll reiterate, this report is not about so much the background of what has been discussed with the
22:47property owner in the past, but I felt it was important just to give a bit of a background
22:55on the fact that this property has had a cultural heritage resource impact assessment done
23:01some years ago and which I was involved with as staff, but essentially what we're here today to
23:10discuss is the cultural heritage value, the current property, its physical condition you might say,
23:20but especially its cultural heritage value. So as you're aware, there are three of the criteria
23:28that we need to address and it's my recommendation that the James Hanlon Farmhouse, I say the James
23:40Hanlon Farmhouse because Guelph has other Hanlon farmhouses, so I think it's important to understand,
23:47especially at this point in our research, to understand some of the settler families and
23:54sometimes how diverse and how complicated it is to actually sort out a family tree to
24:03understand who built what when. So the Hanlon family is a good example of that.
24:09So this farmhouse meets criteria one and two of the regulation. It's a representative example
24:17of the Ontario farmhouse form and style that was popular in the second half of the 19th century.
24:25This particular house was built about 1864 in a mix of limestone and granite and it presents
24:33a high degree of craftsmanship in the execution of that stonework and its exterior wood trim.
24:41As I said, I won't read through the entire thing, but I think it's important to talk about how the
24:47James Hanlon Farmhouse meets criteria four of the regulation. The Hanlon family has a long history
24:54in the area and the farmhouse is tied to three generations of that family. So James Hanlon had
25:06built the house in 1864 and this information is clarified by the research done in not only the
25:16title search information, but also the census information. And that's why I've included some
25:23of the illustrations, the data that I've taken a look at for that purpose.
25:30Unfortunately, James Hanlon Sr. died in 1902. He left the house to his son James Jr., who also
25:38unfortunately died in 1906. So really by that time the house was left the Hanlon ownership.
25:47But that's that Hanlon period or the Hanlon ownership period is really what's most important
25:55about this particular farmhouse. It's always important to consider the contextual value of any
26:01of our built heritage resources. They're very often not just in isolation. They are part of some
26:09sort of context, whether it's just simply the street context that it's in as this house is,
26:16or even within the context of a larger cultural heritage landscape. It's my opinion that the
26:22James Hanlon farmhouse is important in defining and maintaining and supporting the historical
26:28character of Clair Road East, its streetscape, and as a vestige of early farming landscapes
26:35of Puss Lynch Township and what is now Guelph. So with that, I'm happy to, I can refer to some
26:43of the illustrations if you like. They're ready on my screen if you want me to share those, but
26:48I'd be happy to take any questions from the committee members. Are there any of the criteria
27:04that stand out more to you than the others? I know it might be three of them, but do you find
27:10that any of them have a higher degree of significance than
27:15as these go? David, I guess what I want to say is that in my presentation, I've identified all
27:31of the criteria that are met by this particular building. I actually believe that all, I didn't
27:41count them all up, but the ones that I've identified, they are of equal importance.
27:46I think in my research, I tend to first determine the physical building or the physical
27:55aspects or features of a building or property. If there's high integrity in its physical
28:04form, that's really important, but it doesn't mean that the design or architectural value
28:10is any more or less important than the historical association that the building may have to
28:16in its background. As I've always said, and this is something that we've talked about
28:22time and again with properties in the Heritage Register, but also even with the properties
28:28that are not listed, but on the cooling inventory, we always need to look to what
28:36contextual value the building on its own, but also as a contributor possibly to a grouping of
28:44buildings or to a whole cultural heritage landscape. Just to reiterate, I think it would be
28:50difficult to determine which is the most important of those criteria that have been met.
29:00Sounds like this was an easy one to recommend because of the different criteria that's met
29:08and that does significantly need to go. I thought first it's enjoyable. I mean, it's easy, yes,
29:19but it's fantastic looking at a farmhouse that's still in such relatively excellent condition
29:27and with such high cultural heritage value. I'm not going to say it's not like every research
29:33project has it just so they're not always easy, but because this property has such
29:40high cultural heritage value, yeah, it's pretty straightforward in my mind. Okay, thank you.
29:50Can I ask a small question? Concerning the usage right now, has it been used by residents as it's
29:58inhabited now? There are people inside the house and what type of function is it serving now with?
30:09Jaudat, the house is actually vacant and has been for some years now.
30:17It has, but it's most recent use has been residential use, single family residential.
30:27Okay, thank you. I had certain issues I raised before, but as you mentioned, it's on a micro
30:34level more than on a micro level concerning the building itself, the contour and the
30:41leveling, the topography and all these issues. So they'll be dealt with later on, right, in other
30:48phases of the study. Okay, thank you very much. You're welcome. Stephen, did you want to take us
31:00through a few of the images that you had or would you like us just to move along? I can if you like,
31:07Sarah. I'll share the content again. I was going to just warn you a bit that once you get me started
31:25looking at pictures of stone farmhouses, it's hard to get me to stop. But I'm sorry, I'm just trying
31:33to move something out of the way on my screen here. Okay, so just beginning with the property's
31:40location, 331 Clair Road East is directly across from Tolton Drive. And in my research, the
31:49another Hanlon family farmhouse, the stone farmhouse was actually located in this area here on the
31:58north side of Clair Road. Big Jack Hanlon was the builder of that house. So the subject property is here.
32:13And these are current photographs that I've taken on site of the property.
32:19So it's the building has been boarded in order to keep it as secure as possible by the property owner.
32:28And it does have a fieldstone tail that's attached to the left hand side of the rear wall when you
32:36see that. The brick chimney is at the very back of the tail is not original. I was going to say
32:43obviously, but sometimes these things aren't aren't obvious. The two stone chimneys at the front,
32:49though, however, I believe are your original gable wallstone chimneys. So
33:00let me know if you'd like me to present more or I can go through the images that were presented
33:07with the report if the committee members like or we could just leave it at that.
33:14I do have a quick question, Steve. And given that it's been boarded up for so long, do you have a
33:17sense of the shape of the interior of the building just in terms of it not being used and opened?
33:25I actually in the I'll flip to this attachment three, which was actually these are actually
33:34photographs that I had taken in 2010, which is the last time I had actually been inside the building.
33:42So I don't I don't know the condition of the inside currently, but it's the photos show
33:52basically two aspects of the interior. And as is as is described in the report, this is the inside
34:00of the front door with the central staircase. And this fireplace is at the very back of the stone
34:07tail or the kitchen tail with what appear to be very old, possibly original
34:15cupboards on both sides of that fireplace. Now, when you look closely,
34:21I'm just going to see you can you can make out a wooden mantle. And I believe that's actually
34:29if not previous, maybe even the original fireplace mantle for that for the tail. There's a yellow brick
34:37fireplace underneath this more modern
34:42textured brick that's been put on in probably the mid 20th century.
34:48So these photographs are meant to just show
34:53but the the building before the boarding of the windows and doors.
35:01Thank you. Welcome. Are there any other questions or comments for Steven on this one?
35:12And maybe Steven wants to stop sharing screen. Thank you.
35:15Can see more people this way. I'd be happy to see this one move forward.
35:23It's been on the list for a long time. Then we'll get right into our motion then. So we have a
35:29recommended motion that the comments provided by Heritage 12 members on the 331 Claire Road
35:34East Cultural Heritage Evaluation Report be provided to staff and council for their consideration.
35:39Do I have a mover? Miranda, thank you. And a seconder. Thank you, Michael. All in favor?
35:49Fantastic. All right, we are good to move on. And hopefully David Waverman will come back and join us.
36:02Fantastic. Welcome back. All right, on to our next one then. It's 131 Ontario Street cultural
36:08heritage. I'm going to close my email cultural heritage evaluation report and this is back to Jack.
36:14Okay, there we go. So thank you all for the opportunity to present on this cultural heritage
36:27evaluation for tight word public school. This I've been working on this for what feels like a very
36:32long time. So I'm glad to see it finally get to the stage. Before I begin, I really want to recognize
36:39the upper grand district school boards contributions to this. They've been a very collaborative
36:44partner in this designation and have helped out a lot with the research. So it's always nice when
36:52we're able to collaborate with the landowners on a celebratory designation like this. So in this
37:00presentation, I'll outline the history of the site and go over how it meets Ontario Regulation 56922.
37:10Located at 131 Ontario Street, tight word public school is composed of a succession of
37:15constructions spanning from 1908 to 1968. But the property has been a location of a public school
37:23since 1878. The history of public education in Ward two, once named St. Patrick's Ward and before
37:31that the East Ward began in 1828 with the construction of a simple one room school house
37:37located approximately at the intersection of Fountain and Neve Streets. This was the first
37:42purpose built school in Guelph known as the Galt Academy and later the Old Stone School and later
37:48the East Ward School. There's going to be lots of names, lots of names and lots of successive
37:54waves of construction in this presentation. So if you get confused, feel free to ask me to
37:59clarify at the end. The location of the East Ward School close to the Grand Trunk Railway,
38:08which reached Guelph in 1856, meant that lessons were frequently disturbed by the loud rail traffic.
38:14A new location was sought and in 1878 a site on Ontario Street was chosen for the New East
38:20Ward School. You'll note that plan 113 is called the John A. McDonald Survey. This is the John A.
38:27McDonald, a mid-century real estate speculator and also Canada's first prime minister.
38:35According to the Guelph Mercury's Building Operations column, the New East Ward School was
38:39designed by Guelph architect John Hull Jr. in the Italian style. It was built of stone with a T-shape
38:46layout and a 36-foot belfry on the north corner. As far as I'm aware, no drawings or photographs
38:53of this school exist in any local archive, so if any of you are able to locate one, please send it
39:01my way. I've really tried to find something, but I couldn't. Rapid population growth in the
39:09early 20th century, especially working class immigrant families moving to the Ward neighborhood,
39:15meant that by 1905 it was recognized that more classroom space would be needed. And by 1907,
39:20the New Ward East School had been demolished and work begun on what would be called St. Patrick's
39:25Ward School. St. Patrick's Ward School was constructed during the tenure of Dr. William
39:35Tytler, Inspector and Secretary of the Guelph Board of Education from 1892 to 1924. Previously,
39:42the first principal of the New East Ward School from 1878 to 1888, so he would have been principal
39:49of the school that was on the site before the current Tytler building was erected.
39:55Tytler was an educational reformer who championed multi-disciplinary education and promoted the
40:01construction of new school facilities across Guelph in the first quarter of the 20th century.
40:08In a 1906 report to the Board of Education, Tytler noted that, quote,
40:13it is now universally agreed the rooms where our children spend such a large share of their time
40:18should be not merely comfortable, well furnished, well heated, and well ventilated, but also as
40:24elegant and attractive as they can possibly be made, end quote. Tytler encouraged the Board to
40:30make schools, quote, not only comfortable and sanitary, but even attractive and beautiful.
40:36Tytler's vision for a new school informed by the progressive education and city beautiful movements
40:41of the late 19th and early 20th centuries is evident in the school's Romanesque revival style
40:46and ornately decorated classrooms. The oldest portion of Tytler public school constructed in
40:531908 is a two and a half story red brick structure upon a rock-faced stone foundation
40:59capped by a steep-hipped roof with two-hipped roof dormers. The street-facing facade is punctuated by
41:05a centrally placed three-story frontispiece, a centered ornamented doorway that is slightly
41:11raised from the rest of the building. And as you can see, the facade has changed very little
41:18in the last 100 plus years. The frontispiece features a gabled roof with stone
41:29copying on the parapet, palladian windows on the second and third floors, and a round arched
41:36entrance with a recessed door and press metal porch ceiling. The tablet above the door reads
41:42Guelph Public Schools, 1878 to 1906, which commemorates the period when the East Ward
41:47school stood on the site. The frontispiece is enhanced with decorative brickwork, including
41:52four terracotta lion's heads that flank the side arches of the frontispiece. The front door is
41:59opened into a large stairwell that leads to the first floor and second floor corridors.
42:04The stairwell was significantly altered from its 1908 form, likely during construction of the
42:09additions to the school in the 1960s. This alteration resulted in an inaccessible balcony
42:15on the second floor in front of the palladian windows. The corridors feature high ceilings,
42:22large wood baseboards, and maple hardwood floors. The classrooms feature large windows,
42:30intricately decorated press metal ceilings and crown molding, maple hardwood floors, wood
42:34wainscotting, and hall doors with large transom windows and original hardware opening mechanisms.
42:43The school represents the first institutional commission of architect William Mahoney,
42:48who was born in Guelph in 1871 and studied architecture in Chicago in 1893 to 1894,
42:55which was a time of great architectural innovation spurred by the 1893 World's Fair.
43:01One of the most significant Guelph-based architects of the early 20th century,
43:05Mahoney designed several notable local structures, including the Woolly St. Andrews Presbyterian
43:11Church, or sorry, in addition to St. Andrews Presbyterian Church, and in partnership with
43:16Aaron Austin, the Royal Theater in 1935. Now, Trappers Alley. However, he's best known for
43:24designing 16 Carnegie Libraries throughout southwestern Ontario. He opened his own office in Guelph
43:30in 1905 and operated under his own name until 1919, when he formed a partnership with Aaron Austin
43:36that lasted until 1931. Mahoney's 1908 design recognized the likelihood of future structural
43:45expansion and utilized what is called the Egg Carton Building Plan, with a central corridor
43:51and flanking classrooms that permitted expansion if the need for more classrooms should arise.
43:57And the continued growth of Guelph's population, especially in the working class St. Patrick's
44:01Ward, necessitated expansion a mere three years after the new school opened its doors.
44:08The school board again hired William Mahoney to design an additional four rooms to the school
44:13in 1912. This addition was designed to blend seamlessly into the original structure,
44:18as it was likely initially designed to be part of the original structure.
44:22So you'll note in the fire insurance plans that the school seems to shrink between 1907 and 1911.
44:30It was really puzzled by this at first, but in his annual report to the Board of Education,
44:36William tightly lamented that it was the school's initially planned to be six room,
44:42and then it was scaled back to be four rooms. So I'm assuming that the initial fire insurance
44:48plan mapped what was originally intended to be built in 1907, and then it reflected what was
44:56actually built in 1911. By the end of the First World War, the influx of industrial workers to
45:03St. Patrick's Ward required further expansion of the school, and William Mahoney, now partnered
45:08with Aaron Austin, was again chosen to design a six room addition. So these are some blueprints of
45:18the 1921 addition that were given to us by the upper grand district school board. It's not very
45:25common to have these when studying old buildings, so it was a real pleasure to be able to review these.
45:33Unlike the Romanesque 1908 and 1912 constructions, Mahoney and Austin designed the 1921 addition
45:39in the collegiate Gothic style, the most popular institutional architectural style of the interwar
45:45period in Canada. The 1921 addition features includes features typical of the collegiate
45:52Gothic style, such as red brick walls with limestone sills, symmetrical facades,
45:57crenellated parapets, and decorative brickwork. When the school was reopened in February 1922,
46:04it was renamed Titler Public School in honor of William Titler. In the post-war period, the school
46:13continued its expansion with an auditorium erected in 1965 and 1966, designed by Guelph-based architect
46:20William Jarrett, and constructed by Guelph-based contractor Angelo Bataglia. Three years later,
46:27a library was designed by another Guelph-based architect, Jack Campbell, and also constructed
46:33by Angelo Bataglia. Both the auditorium and the library were constructed of red brick that was
46:40compatible with the earlier portions of the school. However, both additions were designed in a
46:46utilitarian mid-century modernist style that contrasts starkly with the ornamented Romanesque
46:51and collegiate Gothic constructions of William Mahoney. The library features three narrow floor
46:57to ceiling windows on the south facade with an overhang above the parking lot supported by
47:02steel beams. The gymnasium is a large brick structure connected to the 1908 portion of the
47:08school with a glass-encased ground-level entryway facing Ontario Street, onto the statement of
47:17significance. So I believe the subject property is worthy of designation because it meets five of
47:24the prescribed criteria for determining cultural heritage value or interest. So I think it meets
47:34criteria one because it exhibits design or physical value as a rare example of the Romanesque
47:40revival style of Edwardian educational architecture in the city of Guelph. Additionally, it is the
47:46only elementary school in the city that combines the Romanesque, revival, collegiate Gothic, and
47:51mid-century modernist architectural styles in one structure. It meets criteria four because it has
48:00direct associations with the theme of education and industrialization in St. Patrick's Ward
48:06through the course of the 20th century. Titler's architectural expansion throughout the 20th century
48:13attests to the growth of industry and influx of workers residing in St. Patrick's Ward. It meets
48:23criteria five because it yields information that contributes to an understanding of the St. Patrick's
48:28Ward community. The children of St. Patrick's Ward were educated on this site from 1878 to 2013
48:35and it has continued to serve the community as a meeting place and venue for public events.
48:42Subject property meets criteria six because it reflects the educational ideas of Inspector of
48:47Public Schools Dr. William Titler, the city of Guelph's most significant educational reformer
48:53of the early 20th century. Additionally, the 1908, 1912, and 1921 constructions reflect the
49:00architectural work of William Mahoney, one of the most significant Guelph-based architects of the
49:05early 20th century. Lastly, the subject property meets criteria six because it is important in
49:13defining, maintaining, and supporting the character of the area. Titler Public School is an integral
49:19component of the Ontario Street and Toronto Street scapes and the Ward West cultural heritage
49:26landscape as a whole. Located in the heart of the Ward, the subject property represents one of the
49:31only institutional buildings in the neighborhood and it has a height and massing significantly
49:36larger than most non-industrial structures in the area, making the building a landmark in the
49:42community. So I've outlined next steps here. I'll be presenting a designation report including the
49:55identified heritage attributes at July's meeting and we will then present it to council at a later date.
50:02I'm happy to answer any questions or hear any comments anyone may have.
50:20Thanks for that, Jack. Are there any questions or comments from the committee?
50:32Quiet Monday today. Not a bad thing. Sometimes that's a good thing.
50:39Well, I'll present the motion then if there aren't any questions or comments
50:44for Jack or about his presentation. So the recommended motion is that the comments provided
50:48by heritage Guelph members on the 131 Ontario Street cultural heritage evaluation report be
50:54provided to staff and council for their consideration. Do I have a mover for this motion?
51:00Thank you, Miranda and a seconder. Thank you. All in favour? Seeing all hands up. Fantastic.
51:09And so that carries. And I believe now we're just into our announcements and we will turn that over
51:15to Victoria and maybe a quick note that in announcements we don't have the opportunity to
51:19ask questions or for more broad discussion as I think we were reminded at our in-person meeting
51:23a few months ago. So I'll pass it over to Victoria. Thanks, Sarah. I just wanted to provide an update
51:30on a couple of ongoing projects we're doing. So for specifically the downtown Guelph Heritage
51:36Conservation District, we actually have a project started meeting with our successful consultant
51:43on Wednesday. So we did award the project to Archaeological Services Inc. Their team is very,
51:50very qualified. They've done HCDs all across the province. So we're very lucky to have them with
51:55us for this project. And at this meeting we'll be talking about work plan and scheduling and
52:03obviously when we come to Heritage Guelph with the results of our background research. So
52:10when we get a schedule in place, we'll be able to let you know when we'll be presenting
52:14kind of the study phase of the downtown HCD and also conduct our public engagement. Additionally,
52:23I want to say that the Albion Notice of Intention to Designate is being
52:28considered by Council tomorrow at 6 p.m. So and I did want to say we were able to get in touch
52:35with the property owner. I had a meeting with him last week and it was very positive. So that was
52:43great to hear. So hopefully tomorrow also goes well. And then lastly I wanted to just
52:52give a brief debrief about the Amoxin Identifier event run through our exploring Guelph's roots
53:02series. About 50 people came on June 3rd on the Saturday to Stenciling at the Museum and it was
53:10be a great weather for it. So we were really lucky. And additionally, hopefully this is kind of the
53:15start of a conversation of getting a permanent installation in Guelph. And that's something
53:22that I think will take obviously much longer than setting up a Stenciling workshop. But
53:28that's kind of the hope that this conversation or this event starts that process. And then lastly,
53:36I just wanted to ask a favor, Midi, to give some further thought to kind of what types of sessions
53:43we want to see in the fall. So feel free to email me at any time if you have an idea of kind of what
53:50we're of what you want to see or what topics you want discussed or explored or anything like that.
53:56Just because I'll probably have to start thinking about getting those dates in place
54:02soon. So that's it from my end. And yeah, if anyone has any questions or comments,
54:09feel free to email me after. Excellent. Thanks, Victoria. So that's everything on our agenda.
54:18So I do need to have someone move for adjournment today. Thank you, Michael. And a seconder, Miranda.
54:28Perfect. All right, that's everything. Thanks, everyone. And I believe we may be in person
54:32in our July meeting or hybrid if anyone wants to or needs to join online. So look forward to
54:38seeing everybody in a month. Bye, everybody. Thank you. Bye. Bye, everyone.