Special Council Meeting - Budget

October 30, 2024 · 1 recorded decisions · 23,848 words of debate

Decisions

The whole meeting, as text

Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.

Read the full transcript (23,848 words)

0:16Good morning everybody

0:19It is Wednesday, October the 30th and we are here for a special council meeting or

0:26Our budget presentation. Thank you very much for for joining and

0:33I might have I'm pretty sure I have official regrets from counselor Klossin

0:39Okay

0:41So we'll see if anything else comes with that, but I just want to make sure that's noted for the record

0:46And with that, let's stand if you're able, please as we recognize our national anthem

0:51Great. Thanks everyone. Just a moment of silent reflection as we continue. Great. Thank you

2:32And for our indigenous territorial acknowledgement as we gather let us take time to reflect on the privilege to live and work here in Guelph

2:40The city built over rich indigenous histories

2:43We're guests here and we should reflect upon the responsibility to care for this land the people who live here today and the generations to come

2:50If our actions today can move us towards reconciliation, we should take pause

2:55We make those decisions with intention and gratitude

2:57This place we called Guelph is served as traditional lands and a place of refuge for many peoples over time

3:03But more specifically the Anwarak and the Honoshoni

3:06This land is held as the treaty lands

3:10Excuse me and territory with the Mississaugas of the credit first nation

3:14And Guelph lives directly adjacent to the Haldemann track and is part of a long established traditional hunting grounds for the six

3:20Nations of the Grand River many first nations Inuit and Métis peoples who have come from across Turtle Island called Guelph home today

3:28Thank you. Is there any disclosure of pecuniary interest or any general nature thereof?

3:34Seeing and hearing none

3:37We are right in to our presentations. We have several staff that have

3:44prepared to walk through this portion and

3:47Lucky for our new our new CAO Tara Baker. You are first up on the list. We will turn it over

3:55To you. Okay. Thank you and good morning everyone and and yes, it's really happy to kick off today's agenda

4:13In a different chair than I've been in with you for the this process for the last the last eight years so

4:22So today

4:23Staff will present the draft 2025 budget update the first confirmation year in our four-year budget

4:29Covering 2024 to 27 the multi-year budget is not a set it and forget it approach

4:35It's a tool that allows us to set a clear financial roadmap to

4:40Progress towards the vision outlined in our strategic plan

4:43It makes us more resilient to the various factors outside of our control

4:48That impact our city budget and it allows us to better manage financial risk in the long term

4:53The multi-year budget was built on and informed by the collective priorities

4:58Articulated by city staff council and the broader Guelph community

5:03These priorities are reflected in our strategic plan

5:06Guelph's community plan the results of our community satisfaction survey and the feedback we receive through ongoing engagement with residents

5:15businesses and community partners on various city projects and initiatives

5:19Our shared goal is to balance servicing the community's current needs which are complex and evolving

5:26With the need to plan and prepare for future growth

5:29This is the driving force behind our multi-year budget process

5:33In other words the multi-year budget doesn't limit our ability to adapt to change rather it creates a more accountable and transparent environment

5:40To handle the change each year our multi-year budget process continues to improve and mature

5:46With that said the 2025 budget update represents a significant change from what was previously presented through the multi-year budget

5:56There are three key pieces of direction from the mayor and council that underpin the budget update

6:01First in february a mayoral direction was issued instructing staff to revise the budget to ensure a property tax impact

6:07Of no more than 4% distributed proportionately between the city the local boards and our shared service agencies

6:14Secondly the update focused on prioritizing the city's needs to balance strategic priorities

6:19With affordability pressures and then finally as part of the multi-year budget process

6:24Council approved direction to staff to bring back a fully funded 10-year capital plan of forecast through the 25 budget update

6:33This direction informed the preparation of the budget before you today

6:40Guelph's budget includes all city services plus the specialized service delivery

6:45services delivered by seven local boards and agencies

6:48As listed before you knew this year budgets for city services and the agencies will be considered separately

6:55Today and throughout the month of november. We will be focused just on the city service budget

7:01This portion is presented under the strong mayor budget process and represents approximately two-thirds of guelph's total budget

7:09The local boards and shared services budget will be considered separately on january 22nd under the previous council approval process

7:17historically

7:18And represents approximately one-third of guelph's total budget

7:22The final budget will be reflected on our website in late january following that process

7:32During the development of guelph's 24 to 27 multi-year budget

7:35We focused on investments that support our core work and meet community needs

7:39Finding ways to mitigate tax impacts while ensuring we continue to deliver services as expected was the top priority

7:46These overriding themes continue to remain relevant for the budget update

7:50A primary focus of this budget is affordability for the community

7:54The budget update process focused on the needs of balance moving strategic priorities forward

7:59Uh in this fiscal environment

8:01This process included prioritizing both new investment proposed in the in the adopted budget as well as

8:08existing services in the base budget using the same criteria

8:13Housing was also prioritized by advancing investments that enable and service growth. We know we need more housing in guelph

8:20We have committed to 18 000 homes through the housing pledge by 2031

8:24And as the city were primarily responsible for facilitating housing supply

8:29Mainly in the private market by regulating land use and building standards through policies and incentives to make development possible

8:37The budget update maintains investments for enabling housing

8:40We're actively working to enable growth in our community at an accelerated rate

8:45This includes infrastructure like water pipes sewers treatment plants stormwater catch basins and roads

8:51These are the core city services that need to be in place before any homes can be built

8:57After homes and businesses are built and new new people and jobs arrive

9:02The city delivers many core services

9:04To those people and businesses that are relied on every day

9:08services like transit waste collection road maintenance bylaw enforcement and so much more

9:14These are the services that help make guelph a great place to live work and play and need to be maintained through responsible and sustainable funding

9:21And so with that i'm going to invite general manager jody sales to present the next section

9:33Thank you, ceo baker as everyone here is aware the city's resources are not unlimited

9:38The past few years have seen an unstable

9:40Inflationary environment and we've heard from residents through our satisfaction survey that the costs of living and affordability are everyday challenges for many in our community

9:48Inflation has impacted the city's costs and capital inflation continues to be higher than target

9:54At the same time the social challenges we are experiencing in a post pandemic environment

9:59Particularly an increase in the number of people experiencing homelessness and struggling with substance use have increased

10:05And there is a fundamental imbalance in the supply and demand for housing

10:09These issues are connected and they are challenges that go well beyond the city's borders

10:14Guelph cannot solve these issues alone

10:16Partnership and collaboration with other levels of government are local boards and shared service agencies the development community

10:22And others is needed and is a top priority for the city's leadership

10:26As this budget was updated tough decisions were required

10:29This budget continues to advance the goals of the strategic plan and as you will and you will hear more about that from deputy ceo

10:36clackbush in a moment

10:37But it is important to recognize that while we have prioritized investments in housing

10:41There are areas of the strategic plan where we have delayed and reduced investment of resources

10:47This means that progress on some areas of the strategic plan will take longer to achieve

10:52At the same time the goal is to ensure that the areas of highest priority continue to move forward

10:57And of course we will continue to provide council with an annual update on our progress related to the strategic plan in mid

11:042025 full details of investments in the 2025 budget update are available on our website

11:12In march the city's leadership team met and provided input into the development of a prioritization framework for the 2025 budget update

11:20This framework was used to assess 2024 paused investments new 2025 investments and proposals for disinvestment as we worked to achieve the budget

11:29target

11:30This framework was important for us to enable us to make consistent

11:34Transparent and defendable prioritization decisions

11:37This framework focuses on five factors the creation of new housing units

11:42prioritizing the services required to create more housing in our community

11:46meeting legislative and regulatory

11:48requirements

11:50prioritizing investments the legislative and regulatory environments include requirements including maintaining standards and emergency service response

11:58health and safety and minimum wrote winter road maintenance standards

12:02risk

12:03prioritizing investments where disinvestment or deferment would carry a high or very high level of financial regulatory or public risk

12:11impact to the public

12:13prioritizing where possible

12:15investments where disinvestment is deemed to have a significant impact to residents based on existing service levels and expectations

12:22And finally the future guelph strategic plan

12:25prioritizing items that meet the above criteria and

12:28Additionally demonstrate the ability to advance the goals of the future guelph strategic plan in a measurable way

12:36Achieving the city's proportionate share of the target was complex with many considerations along the way

12:41as ceo baker noted the 2025 budget confirmation

12:45Process began in february with the release of the mayoral direction

12:48As always staff have taken a collaborative approach working with leadership across the organization to meet the direction provided by mayor and council

12:56This year we assembled a new budget focused team of senior leaders that met weekly from march through september

13:01To consider options to make decisions that became recommendations to the mayor for inclusion in the draft budget

13:08An early decision was to pause and review all 2024 investments that had impacts in 2025

13:14Against our prioritization framework. This included 2024 capital projects that had operating impacts in 2025

13:22And new 2024 staff positions which were phased in over two budget years

13:27Further the increase for tax supported capital funding was reduced

13:30An assumption was made that this level of increase in capital funding would also be fixed for the duration of the capital budget and forecast

13:38Having these assumptions in place set a critical foundation of funding that streamlined the capital budget adjustments

13:44And ensures that we will not need to revisit it in future future multi budget multi-year budget cycles

13:51The operating budget underwent various stages of review and prioritization

13:55This began with a review of historical trends and expenses and revenues compared with the budget and identified adjustments accordingly

14:02Using the prioritization framework paused capital and operating investments were considered

14:07Resulting in decisions to unpause or defer each item

14:10Finally staff were asked to submit service reduction proposals for each service area

14:15Those proposals were considered by the senior leadership team and prioritized through the framework to balance the remaining savings required

14:22To meet the city's share of the budget target

14:25From a capital perspective every capital project in the 10-year budget and forecast was evaluated against the prioritization framework

14:32This was a significant undertaking that included cross departmental collaboration and validation of priority rankings

14:41To get the capital plan that is presented to you today

14:45capital prioritization rankings

14:47Were validated by the city's capital steering committee and adjusted according to the feedback that was received

14:53The reserve forecast and debt strategy were updated in this final review stage

14:58Through this process we have achieved a lot. We've met the affordability target outlined in the mayoral direction on the budget

15:05We've presented a fully funded 10-year capital budget and forecast

15:08We've fulfilled the city's commitment to the housing pledge. We've maintained our high priority assets

15:14We've leveraged existing grant opportunities and left room for future grants to help mitigate tax increases

15:20We've made significant investments in revitalizing the downtown area and we've continued our progress towards our environmental goals

15:27Through ongoing investments in transit electrification and active transportation

15:32I would now like to welcome deputy c.a.o. Blackbush

15:40Thank you miss sales and good morning everyone

15:43Over the following four slides i'm going to provide you with some highlights for each service area about what has changed within the budget

15:53Some highlights of work within the c.a.o.'s office

15:56Advocacy remains an important priority as we navigate continued legislative change and complex challenges related to community safety

16:03health and well-being and housing for our most vulnerable residents

16:08In early 2025 council will see an updated advocacy plan aligned to the well future ready strategic plan that further advances this work

16:18To continue to move capital work forward and balance affordability

16:21The city is leveraging alternative funding mechanisms such as inter reserve fund borrowing debt and grants

16:28We also remain committed to continuous improvement innovation and progress reporting

16:34This all supports our culture of data driven decision making at the city

16:39This budget also continues to invest in policy work that supports initiatives across the housing continuum

16:47Under corporate services in support of the overall people and culture plan

16:52We have committed to identifying opportunities that were highlighted in the employee engagement pulse survey

16:58The implementation of the service simplified strategy continues in this budget

17:02As we track the results of implementation to date

17:05We have taken the opportunity to adjust our focus to ensure it will meet the needs of a customer focused

17:11performance driven and digitally enabled workplace culture

17:15This includes aligning the timing of onboarding new services with the process review and technology improvements that need to go along with it

17:23Technology improvements have been prioritized ensure those that move housing related projects forward and form the foundation for future improvements

17:32Such as the centralized data management system

17:35This will support the data integration and connection for all future system improvements. So it needs to come first

17:44Within infrastructure development and environment the capital budget is going to be discussed in more detail later

17:50But as an overall approach we prioritized infrastructure renewal as part of the review of the 10-year capital budget

17:56Assets associated with higher risks and those directly associated with new housing development were maintained in the budget

18:04This will support continued delivery of high priority services

18:07While lower priority services could experience interruptions resulting from asset condition

18:14Through maintaining staffing levels and process improvement initiatives, we are accelerating development application review times

18:21In respect of our environmental goals, we continue to invest in fleet and transit electrification to support the continued reduction of gulf's carbon footprint

18:30And downtown renewal remains the priority in this budget

18:34This includes reconstruction work on downtown streets as part of the 10-year capital budget

18:39As well as the baker district construction project in the new main branch library

18:45And under the area of public services

18:48Progress continues with the south end community center, which is on schedule for completion in 2026

18:55Two pilot projects are included in this budget for transit

18:59Youth who have a registered on your way card will be able to ride transit free after 5 p.m

19:04On weekdays and all day on weekends and holidays

19:08This provides an opportunity to gain long-term transit users

19:12Additionally seniors who have a registered on your way card can ride transit free all day on thursdays and provides a cost free option to help seniors get around

19:22Staff will report back to council about program uptake and provide a recommendation on whether these two programs should be considered for permanent

19:30Implementation ahead of the 2026 budget confirmation process

19:34The 10-year capital plan continues to invest in paramedic services to meet response time targets

19:41And we also continue to look for areas of improvement across our business lines

19:45Including targeted improvements in culture and recreation

19:48Fire operations and parks which are all included in this budget

19:52Now i'd like to welcome acting city treasurer odwire to share more about the operating budget update

20:03Thank you deputy c a o clack bush and good morning mayor and council

20:14Can you tell me

20:16Thank you

20:18Several adjustments to the 2025 operating budget have been made and are being presented to you today

20:25We've summarized these adjustments in the categories that you can see on this slide

20:29Base budget or inflationary adjustments operating impacts from capital

20:34growth

20:35service enhancements

20:36service reductions and capital funding

20:39We will provide an overview of what is included in each category on the next few slides

20:49Something has gone wrong

21:14sure

21:16Yes

21:23Thank you very much. I'll flip to the next one. There we go. Okay. We're back on track

21:28The budget update includes base and inflationary changes from the previously adopted budget with a few key highlights

21:34Continuing the approach taken through the multi-year budget process staff reviewed historical trends for expenses and revenues compared with the budget

21:43Made adjustments accordingly

21:45This included increased revenues in parks culture and recreation

21:49Guelph transit solid waste land ambulance parking finds and the city clerk's office to reflect current sales volumes

21:57increased short-term interest reduced printing and consulting and software maintenance costs

22:02Inflationary expense increases have been included for utilities facilities and equipment maintenance medical supplies and software licensing fees

22:12Other base budget adjustments included the 50 phase in of costs of positions added in 2024

22:21operating impacts from capital including

22:24Include operating investment for guelph transit to provide a new express bus service from guelph central station

22:30to the guelph conestoga college campus

22:33operating investment to service paramedic shifts added in 2024

22:38investment in software licensing and replacement

22:41An incremental cost to maintain road right of way due to growth

22:45The phase in strategy for the new main library and south end community center have both been updated as a result of the baker library grant

22:53And now align further budget increases to 2026 when both facilities are expected to open

22:59Several other adjustments were made also made through the timing of operating impacts as capital budgets were prior capital projects were

23:07prioritized and moved throughout the forecast

23:12Growth investments in the budget update reflect the 50 phase in of growth related operating budget investments from 2024

23:20That were required to maintain our current service levels to our growing community

23:25This included staffing costs for the housing pledge and other planning legislation changes

23:30paramedic shift expansions and a human resources compensation coordinator

23:35New this year administrative support was added to support council and executing their services to residents

23:41administration support was included in the second year of the 2024 paramedic master plan was deferred

23:51Service enhancements represent investments built into the budget that increase our service levels to our current and future guelph community

23:59This category includes increased inclusion supports for recreation programming and a parks electrician to support maintenance and operation of new parks

24:09infrastructure as well as extending the season for current infrastructure

24:13Funding for in-year council decisions was also incorporated

24:16Including funds to support online voting for 2026

24:20maintenance funding for the drill hall building and additional parking ticket revenue from the administrative penalty system approval

24:28Finally two transit pilot programs were included to allow youth to ride free on weekdays after 5 p.m

24:34And all day on weekends and holidays and seniors to ride free one day per week

24:42The budget update also includes service reductions totaling 3.6 million

24:48Of this 1.5 million was already included in 2025 during the multi-year budget for the blue box transition

24:56An additional 2.1 million in service reductions are proposed spanning all areas of the organization

25:03That isn't this is not an easy conversation to have and there will be differing perspectives on each of the services proposed to be reduced

25:10deferred or eliminated

25:12However, it is important to review and assess the services currently being provided to the community

25:18And evaluate those in comparison with the prioritization criteria used to evaluate new investment

25:25What we want to focus on is the process and approach for making these recommendations

25:30Each department reviewed their services and provided proposals for reduction

25:36These proposals were evaluated against the prioritization framework that

25:41GM sales talked about

25:44And looked at the impact of the reductions on creation of new housing units meeting legislative requirements

25:50risk of disinvestment or deferment

25:53Impact to the public and alignment with the future guelph strategic plan

25:57This was an organization-wide exercise and it included tax rate and reserve funded initiatives

26:07The capital budget is funded through annual transfers from the operating budget to capital reserve funds

26:13This category had the largest dollar value increase in the 2025 adopted budget at 10.1 million

26:20And represented a tax levy increase of 3 percent, which by itself exceeded the city's proportionate share of the 4 percent target

26:28As part of the multi-year budget significant increases were built into the budget for capital funding

26:34Including phased in catch-up inflationary adjustments

26:37A continued increase to funding for infrastructure renewal to work toward closing the asset management funding gap

26:44And funding for projects supported under the 100 re and service enhancement strategies

26:49In the budget update the increase for tax supported capital funding was reduced by about half to just over 5.1 million

26:57We will talk more about this later during the capital and reserve funding sections of the presentation

27:05Through the multi-year budget the city has set assessment growth revenue assumptions at 1.15 percent of the base budget per year

27:12Assessment growth revenue is allocated proportionately with 67 percent distributed to the city services

27:19And 33 percent to local boards and shared service agencies

27:24actual assessment growth revenue for 2025 will be confirmed and updated in the upcoming weeks

27:29Based on the most recent update received this past week. There is a high likelihood that we will be meeting the budgeted target

27:39In 2019 the city and guelph general hospital discussed the hospital's urgent capital expansion needs

27:45Identifying three projects totaling 45 million

27:49The hospital requested a 10 investment from the city over five years

27:54In the 2020 budget the city council approved a 4.5 million dollar investment over six years

28:00Council funded the first three years of this investment from the tax out operating contingency reserve

28:06This funding method is not recommended to continue as tax contingency reserves have been exhausted over the planning process

28:14The commitment ends in 2026 with budget adjustments planned for 2027

28:20The guelph general hospital investment is in addition to the city's 2.63 percent proportionate share of the 4 target

28:27You can find more detail for each of these categories in the operating budget update tab on the website

28:36The tax supported corporate excuse me. Sorry

28:39Pardon for the interruption. We've just noticed there's an issue with the live stream

28:43So I'm just going to ask for a quick two minute pause so that we can make sure that that live stream is up

32:21Through you mr. Marin for all members of council. It looks like there is

32:24A

32:25Error affecting the live streaming system right now

32:28So I might just ask for more like five to ten minutes while we work to correct that

32:33No problem. Why don't we uh

32:36Go for a timmies run or something

32:38Um, okay. Why don't we say this? Uh, we'll come back for 9 45

32:44Okay, we'll just have that buffer and if there's any changes we'll do that

32:48But we'll just everyone can at least have like a 15 minute break. Okay

32:54Thanks

33:10Through you mr. Marin my apologies for the delay, but we do have the live stream up and running and can start the meeting again

33:15Whenever you're ready and we've got quorum

33:18All right, just just in case there's councillor joining online. I know councillor Caton was uh,

33:23Maybe just like a 30 second heads up when we'll call the meeting back to order

33:42All right, perfect

33:46So we were at a chart there it is

33:49Um, and so yeah, I'll turn it back over to you and we're good to go. I mean, I just asked out of curiosity. Was that a

33:56An internal issue or was that an external issue external? Yeah, okay

34:01Yeah, yeah, so we don't have to fix it. Okay good. Okay, shanna. Go ahead

34:07Okay, thank you very much. Uh, so moving on to talking about the tax-supported contingency reserves

34:12Um, the reserve balance target for this group of reserves is 8 to 10 percent of annual combined operating revenue

34:19These revenues help mitigate unexpected impacts phase in unexpected or significant cost increases that cannot be avoided

34:28This group of reserves were drawn upon quite significantly throughout the multi-year budget for these purposes

34:33And continue to be in the 25 budget update

34:37As you can see from the chart the balance in this group of reserves is expected to remain below the target range from 2025 through to

34:442028

34:45Notable items supported through the contingency reserves in 25 to 28 include

34:51Facing in the county social services

34:542024 budget increase with total costs of 4.3 million

34:58Over 2025 and 2026 projected to be supported through the tax-supported operating contingency reserve

35:05Use of the contingency reserve to support the provincially funded portion of paramedics expansion in 26 and 27

35:12Because of the one-year lag in provincial funding increases

35:16Facing in expense increases in corporate building maintenance employee benefits fuel and utilities over multiple years

35:24Funding for the two guave transit pilot projects and the second year of the two-year commitment for physician recruitment funding from the ontario health team

35:33And finally an earmark for potential and as of right now unknown impacts on paramedic services

35:40From the closure of the supervised consumption sites

35:43Also incorporated in this budget update are inflows to the contingency reserve totaling 1.7 million over 25 to 27

35:51From adjustments to increase

35:54Increases in short-term investment income

35:57We used interest rate forecast information to estimate the amount of short-term investment income that is over and above the long-term expected rate of return

36:05And adjusted the revenue in the operating budget directing the increase to the contingency reserve to help support these phases

36:11in items

36:14This will be monitored closely as interest rates continue to change frequently

36:19The bicentennial enhancement events planned in 2025 to 20 27 at a total commitment of 905,000

36:27Have been removed from the budget update due to the operating contingency reserve funding status

36:33We reported to you in the second quarter budget monitoring report that a 500 000 negative variance was projected for tax-supported services in

36:41the future

36:43This projection will be updated in the q3 budget monitoring report

36:47But we have included a preliminary earmark for the 500 000 deficit coming out of the contingency reserves at this time

36:54Staff have also continued to recommend through the budget companion report that future tax-supported operating surpluses

37:01Be directed to restoring contingency reserve balances as a top priority

37:05To reduce the city's vulnerability to unexpected events and restore the flexibility to smooth future tax-supported budget impacts through the use of reserves

37:18The city's second largest revenue source after property taxes are the collective water wastewater and storm water utility rate revenues

37:26These revenues are charged based on a user fee model

37:30These are critical housing enabling services that have significant capital asset inventories that are both aging

37:36And in need of upsizing to meet guelph's increased population and jobs targets

37:41Similar to the property tax review and prioritization

37:45The 2025 budget update included a rate review with updates based on the outcomes of the prioritization process

37:52Base budget and inflationary the base budget and inflationary category includes adjustments for increased volumetric revenues due to higher consumption

38:01In water and wastewater and updated revenues to reflect the current equivalent residential units being billed for storm water

38:09Operating impacts from capital in 2025 include investments in the arco site trail networks

38:15forest health invasive species management and security upgrades

38:19Resourcing for improvements to the wastewater closed circuit television and hydraulic cleaning program were moved to 2026

38:26Growth impacts in 2025 include investments to implement the master plan and groundwater flow model

38:34Service reductions totaling 750,000 are proposed for utility rate-supported services

38:40In alignment with the prioritization criteria described as part of the tax-supported section

38:46This increase in cap the increase in capital funding has been reduced by 900,000 as part of the 25 budget update

38:54Mostly due to a reduction in capital transfers for the brownfield renewal strategy

38:59Growth revenue for additional volumetric and equivalent residential units for growth throughout the city was also budgeted for

39:10This slide shows the city percentage increase and dollar value impact on the utility bills for an average three-person household

39:17The adjustments described on the previous slide for 2025 update have reduced the impact of 5.36 percent

39:24for 2025 or an increase of four dollars and 82 cents per month

39:29In addition to the city services fee the grand river conservation authority is funded through the utility rates

39:35And their budget will be considered in january as part of the local boards and shared service agencies process

39:45The non-tax supported contingency reserve balances as a group are healthy in 2024 and exceed the target balance

39:53This chart includes the rate supported contingency reserves as well as contingency reserves for parking and courts

40:00The major drawdown on these reserves in 2025 is for the implementation of in-house utility billing

40:07The source of increases to the balances in the utility rate supported contingency reserves are operating budget surpluses

40:14Which are not included in this picture

40:16A small year-end surplus was projected for non-tax supported services in the second quarter budget monitoring report

40:23And that will also be updated as part of the third quarter report

40:30So moving now into the capital budget

40:33I'd like to start off this section of the presentation by offering a bit of historical context about the capital plan and how we got to where we are today

40:44Over the last several years, we updated our official plan prepared and received approval for the claire malt v secondary plan

40:52updated the comprehensive zoning bylaw and updated all of the major service delivery master plans

40:58Last year as we prepared for the multi-year budget

41:01Staff across the organization did a significant amount of work to get all of the capital projects

41:06associated with those master plans in the capital budget

41:10That in and of itself was a very significant milestone

41:14For the first time we had a clear long-term picture of what we aspired to accomplish

41:19In comparison with the funding we would have to achieve that

41:23And so and we could see that there was a big gap

41:26All of the service delivery master plans that come to council do so with the caveat that the pace of implementation will be dependent on the

41:33availability of funds to implement them

41:36We did as much work as possible to defer some items last year within the budget within the time we had

41:42But we ran out of time to get to a fully funded capital budget and forecast

41:47So that is the place from which the staff recommendation for the motion that you see on the screen was born

41:52And it was approved unanimously by council

41:56In the coming slides, we will delve into the details of that motion

41:59What capital projects are proposed to move forward and how we will impact our how that will impact our two top capital priorities

42:07Maintaining a state of good repair and building the infrastructure to enable housing

42:13And we will also talk about the funding side of that equation how much money we have to do it

42:18As we move through the next section of the presentation, I would offer this for consideration

42:24Although a significant amount of capital projects have been re-sequenced or deferred

42:28Doing all of those things within the next 10 years was not a realistic plan

42:33Even with the significant tax increases that were proposed last year through the multi-year budget for capital

42:39And now we have a new starting place for the next 10 years an ambitious fully funded capital plan

42:45built on conservative increases for tax-supported capital funding and maximizing the tools that we have available

42:52Including inter-reserve fund borrowing and debt

42:55This does not mean that we are here today to set it and forget it for 10 years

43:00And it does not prevent council from doing more if there's an appetite to increase funding for capital in future budget cycles

43:07As we move through the years in the plan, there will be regular updates based on the receipt of grants

43:12legislative changes actual

43:15actual dc collections

43:17Actual project costs as more detailed design plans are developed and so on

43:22There is more work ahead, but we are starting from a realistic and achievable place

43:30First we wanted to ensure that we are all on the same page about what it means to have a fully funded capital budget in forecast

43:37The budgeted capital project expenditures are funded from several sources and we have listed the main ones on this slide

43:45property tax supported capital funding

43:48Rate supported capital funding

43:50development charge and other dedicated growth revenues

43:53federal and provincial funding programs and grants

43:56dividends from gulf junction railway and gulf municipal holdings, ink and debt financing

44:03We take a long-term approach to funding capital and in reaching a fully funded capital budget in forecast

44:09The objective was to have a positive balance in all capital reserve fund groupings by 2034

44:14While minimizing cash flow pressures through the 10-year forecast, we have accomplished that objective

44:21More information about the capital reserve funds and debt strategy will be provided later on

44:26But for now the important thing to know is that there must be enough funds from those sources to pay for the capital project

44:33Expenditures as well as the principal and interest payments when debt financing is used

44:37Less money going into the capital reserve funds means we can do less capital work

44:45With that understanding we now want to talk about capital revenues specifically tax and non-tax supported capital funding

44:53As part of the multi-year budget significant increases were built into the budget for capital funding

44:58including a phased-in catch-up of inflationary adjustments

45:02um a continued increase to funding for infrastructure renewal to work toward closing the asset management funding gap

45:09and project and funding for projects supported by the 100 re and service enhancement strategies

45:14To meet the mayoral direction for a tax levy increase of no more than 4 percent

45:19The increase in tax supported capital funding was reduced by 5 million in 2025

45:25To understand whether or not you have a fully funded capital budget in forecast

45:30Assumptions about how much funding will be available over time are required

45:34Staff's working assumption that underlies the reserve forecast is that capital funding will continue to increase

45:40at about the same overall tax levy impact for each year from 2026 to 2034

45:46As is included in this budget update

45:49This was a critical decision that provided the foundation for the capital prioritization work

45:54And this assumption will be revisited through the next multi-year budget cycle

45:59The following key assumptions were also built into this forecast

46:03The increases in the tax supported transfer for the gross strategy to support the creation of new housing units by funding

46:10and charge revenue losses were maintained

46:13Funding for infrastructure renewal would be protected as much as possible

46:18given the city's known and increasing

46:21infrastructure backlog

46:23The service enhancement brownfield renewal and 100 re funding envelopes were reduced to accommodate the growth and infrastructure renewal increases

46:31As much as possible within the constraints of prior of the prioritized capital budget and forecast

46:37And rate supported capital funding remains largely unchanged overall

46:42The level of debt will also remain at approximately the same level as what was presented in the multi-year budget last year

46:49The result of these assumptions is just over 240 million dollars less in overall tax supported funding

46:56Available in the 10-year capital budget and forecast period compared with what was presented in the multi-year budget

47:02While non-tax and debt financing remains about the same

47:09The previous slides provide you with context for the starting place for capital prioritization

47:14We had less capital funding and debt capacity than we needed to support the capital budget and forecast that was developed for the multi-year budget last year

47:23And then we cut tax supported funding further to meet the 4 target increase and to have a stable base for future years

47:30This required decisions to be made on what capital investments could fit within our fiscal capacity in the 10-year period

47:38To support this a prioritization framework was built based on the budget priorities presented in the april

47:442024 budget confirmation planning report and those that jody presented early earlier today

47:50The capital prioritization criteria is outlined on the slide

47:54And it was applied to every capital project in the 10-year capital budget and forecast

47:59With each project being assigned a rating of one for lowest priority to five for highest priority

48:05An example of a project rated a five would be the downtown infrastructure work

48:09With is both which is both housing enabling infrastructure in a priority development area as well as high priority state of good repair

48:18The results of this work is a balanced 10-year capital budget and forecast that includes high priority capital projects

48:25That are medium or high priority state of good repair

48:28housing enabling infrastructure in priority areas

48:31mandated or legislated projects

48:34projects eliminating safety concerns

48:37And projects with a grant commitment or specific funding source

48:41And lower priority capital projects have been slowed within the 10-year period or deferred outside of the 10-year period

48:49These projects are lower priority capital projects aimed at maintaining a state of good repair

48:55housing enabling infrastructure outside priority areas

48:58amenities that support a growing community

49:01And service enhancements without a grant commitment

49:08The 2025 capital budget includes a capital investment of 197.5 million

49:14over the 10-year capital budget and forecast period from 25 to 20 34

49:20capital expenditures total 2.3 billion

49:23This slide shows the capital budget and forecast that was included in the multi-year budget in blue

49:28In comparison with the 2025 budget update in orange by year

49:33There has been a reduction of almost 1.1 billion from the same period through the multi-year budget

49:39Although this may be a reduction

49:41We are still making huge investments in capital with the yearly average budget being

49:46232 million or almost double the annual average of what we have seen over the past few years

49:54This is another view of the prioritized 10-year capital budget, which is 60.1 percent infrastructure renewal projects

50:0225.8 percent growth related capital and 14.1 percent service enhancement

50:08This breakdown is very comparable with the overall picture by category that was included in the multi-year budget and forecast last year

50:15Through the update the infrastructure renewal category has increased by half a percent with the reduction mostly from service enhancement

50:25When looking at the same information by program of work

50:28We can see that the breakdown is similar to the breakdown in the multi-year budget

50:32The pie on the left shows the percentage for each program of work in the 2025 budget update

50:38And on the right the percentages from the multi-year budget

50:42In the 2025 update 42 percent of the budget is focused on the transportation network

50:47Which includes linear water wastewater infrastructure within the road network

50:52Bridges and structures traffic management and active transportation

50:57This is a slight decrease from the relative proportion of this work in the multi-year budget

51:0224 percent is being invested in water management, which includes water supply

51:07Water resource recovery and storm water a small increase proportionately from the multi-year budget

51:13Parking and transit services is the third largest program of work with 14 percent of the 10-year investment being focused here

51:21The majority of this is for the transit network and includes the wealth transit and fleet services facility

51:27And other investing in canada infrastructure program or isip funded projects

51:32And this program has slightly decreased due to an overall reduction in the budget for the transit and fleet facility

51:40While the proportional share by program of work has not changed significantly from the multi-year budget over the 10-year period

51:46The period from 2025 to 2028 does see a shift toward water management

51:52And the transportation network programs heavy with asset state of good repair work and housing enabling infrastructure

51:59Now I will welcome deputy ceo trevor lee

52:12Thank you. Mr. Dwyer corporate plans programs and technology make up 3 of the 10-year capital budget

52:19This is a 10-year investment of 60.5 million with over 60 of this program being an investment in technology initiatives for critical corporate applications

52:28hardware and software

52:30Investment also includes asset management condition assessments and the collection of asset inventory data to support lifecycle maintenance practices and decision making

52:40It also allows for continued advancement

52:42Of the contaminated site program including work to improve historical landfill properties and the fountain street parking lot to protect the environment

52:50Adhere to regulatory requirements and reduce the contaminated sites liability

52:56Planning and building policy work is also being undertaken to support new housing units

53:01Which includes zoning by-law amendments community land use studies and special policy area reviews

53:08Implementation of the climate adaptation plan is continuing including annual progress reviews and updates

53:16Investments to maintain current by-laws for development charges

53:19Parkland dedication and community benefit charges remain to support the execution plans for housing enabling infrastructure and amenities

53:32The culture and recreation program makes just over 2 percent of the capital investment

53:36However, this is a forward-looking plan and we must remember that we have invested heavily in recreational facilities in the last few years

53:44With the construction of the south end community center, which is set to open in 2026 in the 10-year capital budget

53:51We are continuing to invest in work on 11 main culture and recreation facilities

53:56This work incorporates energy efficiency improvements through modernization of equipment and technology such as hVAC systems

54:04pool pumps and ice equipment

54:06We maintain our recreational facilities to ensure we can continue to offer a wide range of amenities and programming

54:13geared towards all ages abilities

54:15backgrounds and interests

54:18We maintain state-of-the-art technical theater and event equipment

54:22To ensure continued delivery of the level of service expected by our clients artists and patrons

54:29This investment also allows for modernization of museum

54:32Exhibitions and restoration of artifacts to preserve history for future generations

54:39The 2025 investment also includes the placemaking investment in market square to include permanent audio and visual equipment

54:46supporting civic events that enhance community engagement

54:51The implementation of the culture plan 2030 is paused until until funding is available

54:57This includes projects that action the older adult strategy to create an age friendly city plan

55:03installation of sensory rooms

55:05new park activation stations

55:08incentivization of the development of culture programming in the winter

55:12months

55:13and consideration

55:15To the adoption of the culture friendly bylaws policies and practices

55:26Emergency services includes an investment of 57 million over the 10 years

55:30This includes the investment to replace and expand paramedic vehicles and patient equipment

55:35To continue to provide essential urgent health care to the growing communities of gulf and wellington county

55:42We also continue to invest in the replacement of fire trucks and firefighter self-contained breathing apparatuses

55:48bunker gear and PPE

55:50To maintain safe and effective fire and rescue responses

55:54The parking and transit program of work includes an investment of 336 million over the 10 years with transit making up 97% of this

56:07The investment in parking is primarily to maintain current public parking assets

56:13Along with the state of good repair work. We are making investments in parking technology

56:17to improve and optimize essential systems

56:20On the transit side, we're expanding and enhancing the transit network

56:25Which will add 90 000 additional service hours and 22 additional electric buses

56:31Which are funded in part by isaib. However, certain route expansions and enhancements have been delayed to the last four years of the 10 year future ready action plan

56:42The annual program to replace and upgrade bus stop amenities will also continue

56:47But at a slower pace than previously planned

56:50The investment in transit also provides for lifecycle replacement of essential transit technologies

57:00Parks and open spaces make up 6% of the 10 year capital budget with an investment of 138 million

57:08With this investment, we are maintaining park infrastructure in following requirements and guidelines set up by the technical standards and safety authority

57:16and the canadian standards association

57:18It also includes replacement and renewal of equipment and facilities that support park operations

57:24And continued investment in gulf's urban forest guided by the urban forest mass management plan

57:31Also included is the design and construction of seven new parks

57:35As well as parkland acquisition both at a slower rate than previously planned

57:40To better match the anticipated receipt of growth revenues

57:43The execution of plans such as the parks and recreation master plan

57:48Have been slowed significantly from the original 10 year plan to a 20 year or more plan

57:54With many projects deferred within and outside the 10 year capital budget

57:59Falling outside the 10 year capital budget are new pickleball courts

58:04A new skateboard park and lighting for the existing skateboard park as well as the construction of new sports fields

58:11I'll now welcome deputy ceo jane holmes to present on the next section. Thank you, mr. Lee

58:20The corporate facilities public works and bylaw program accounts for 4% of the 10 year capital plan

58:33This is a 10 year investment of 87.8 million dollars and includes investments to maintain over 70 facilities

58:41Assets and equipment in a state of good repair

58:44This includes the provincial courts building city hall market square and the operations facilities

58:49And the operations facility at 45 municipal street to name a few

58:54Work is prioritized using asset management principles condition assessments and an inventory data

59:01This investment also includes preventive maintenance to mitigate more costly repairs and deferred preventable

59:07replacement as well as maintaining compliance with legislative requirements

59:12deferral of life cycle replacements was necessary due to the financial due to financial capacity

59:16However, this also requires additional investment through operating budget for repairs to maintain those end of life assets until they can be prioritized

59:25This program also includes the replacement of public works vehicles

59:29And assets that are critical to servicing the road sidewalk and active transportation network

59:34network

59:35This includes winter control equipment

59:38As well as vehicles used to provide maintenance activities at park aides parking lots traffic signals downtown public spaces and storm water facilities

59:47Efforts are being made to reduce and right size the city's vehicle fleet along along with the exploration of alternative fuel options

59:58The facility's long-term plan is how we plan to

1:00:01Execute these facility works in the correct sequence using our underlying policy drivers the asset management plan and levels of service

1:00:09master plans and provincially legislative

1:00:11legislative growth plans

1:00:14Data provided through building condition assessments and asset inventories help determine the priorities within this body of work

1:00:21Facility work is integrated into multiple programs of work

1:00:25And the long-term facility overview showcases the key key facility projects planned over the next 10 years

1:00:32facilities for water and wastewater are being expanded to support growth needs

1:00:36Including the new cleith water treatment plant the plant number two expansion and the tertiary treatment

1:00:42facility at the water resource recovery center

1:00:46Other end-of-life

1:00:47Facilities are being replaced and expanded for existing and future needs such as the gulf transit and fleet services facility

1:00:54Renewal works are being done in some cases to extend the life of facilities and delay future expansions

1:01:00All facility work whether it be a full facility renewal

1:01:03expansion replacement or replacement of individual individual building components such as hVAC are being done incorporating modern technology

1:01:11and energy efficiency features to support our race to zero goals

1:01:17Although the majority of work is budgeted in the next four years

1:01:20There's no new construction being approved for 2025 and council will receive an update in q2 of the next year on the gulf transit

1:01:29gulf transit and fleet facility design as well as an overview of the 10-year capital plan including sequencing in advance of the

1:01:372026 budget confirmation

1:01:40The solid waste program of work includes a 77 million dollar investment over 10 years and makes up 3 of the budget

1:01:48Some of these investments include the maintenance and assets and state of good maintenance of assets and state of good repair

1:01:55maintaining diversion of waste from landfill through program related recommendations of the solid waste master plan

1:02:02needs and facility studies for waste disposal alternatives energy from waste circular

1:02:08economy policy levers

1:02:10maintain critical building systems at the materials

1:02:13recovery facility to support site maintenance

1:02:17And repurpose the collections operations center as well as the retrofit of the administration building is included which delays the need for expansion beyond the 10-year plan

1:02:27Deferred outside of the 10-year plan includes several solid waste management plan recommendations recommendations such as the proposed reuse

1:02:34center and the relocation of the hazardous waste depot

1:02:40The transportation the transportation network is the largest program in the 10-year capital budget at 42%

1:02:46This is an investment of almost 1 billion dollars over the 10 years and includes the following

1:02:52Higher higher priority bridge bridge and structure rehabilitation and replacement and preventive preventative maintenance

1:02:59Higher priority full road reconstruction based on an overall corridor asset condition scores which include underground water and sanitary

1:03:08The downtown infrastructure renewal program including the investment for enhanced level an enhanced level of streetscaping as approved by council on september the fourth

1:03:17Housing enable an infrastructure within the downtown infrastructure renewal program as well as for gid and chloramalpy

1:03:25linear asset renewal programs such as sewer

1:03:27Relying the annual asphalt sidewalk renewal program including crack ceiling and new sidewalk gap infill

1:03:34Priority trail and active transportation projects funded in part through isip and other grants signal upgrades replacements and new

1:03:43Road safety initiatives with funding from the transportation reserve

1:03:48The golf trail master plan is now anticipated to be implemented over a 25-year period rather than 10 years

1:03:55A significant number of projects identified in the transportation master plan for implementation in the short term are now planned

1:04:02Are now planned to be implemented over 30 years instead of 10

1:04:08The water management program at work is the second largest program. Sorry. Sorry interrupt. I had several

1:04:14Counselors at the same time go. Which one was that? Can you just go back one slide? Yeah

1:04:20And maybe just say the last two lines there

1:04:24Sorry, I'll okay. I'll read it out the gulf

1:04:27Okay, a significant number of projects as identified in the transportation master plan for implementation

1:04:34In the short term are now planned to be implemented over 30 years instead of 10

1:04:38Okay, all right

1:04:43The water management program at work is the second largest pro second largest program that has a 10-year investment

1:04:53Over just half a billion dollars

1:04:56Investments in critical infrastructure maintenance renewal expansion and security are maintained to ensure ongoing availability of safe drinking water

1:05:04and capacity to process wastewater to meet regulatory requirements and to support growth on the stormwater side

1:05:11What work is being done to address the backlog of aging stormwater infrastructure and protect the city's water supply?

1:05:22Some capital projects some capital projects are being approved in 2025 also have operating impacts that need to be added to the operating

1:05:30Budget in a future year to operate maintain or service the asset that is being created

1:05:35Total future operating impact of capital projects being approved in 2025 is 3.9 million

1:05:42Under corporate facilities public works and bylaw. This includes 175 thousand dollars for a growth tandem sultan sander

1:05:50250 thousand dollars is included under emergency services for the maintenance system software for next generation 911

1:05:57Under the parking and transit services program of work

1:06:00This includes 2.5 million dollars which is specific to transit capital projects which includes the

1:06:07Includes the resourcing fuel maintenance and insurance

1:06:10Net of anticipated fare revenues for six new buses

1:06:14four for root review year five and two for conestoga root requirements

1:06:21Under solid waste services the first set of downtown public space waste containers are anticipated to have a 260 thousand dollar

1:06:28operating cost when fully implemented

1:06:31Additionally a new growth packer comes with a 193 thousand dollar operating impact

1:06:37Under the transportation network additional operation operational costs related to the downtown streetscaping through the windom street north

1:06:45Reconstruction is anticipated to be 300 thousand a full listing of operating impacts from capital for the 2025 to 2028 budget can be found

1:06:54on the website

1:06:57As previously mentioned infrastructure renewal and growth make up almost 86 of capital investments over the 10-year budget and forecast period

1:07:05and the top two priorities

1:07:07In the capital prioritization framework

1:07:10We're keeping assets in a state of good repair to provide expected level of service for the community and building housing enabling infrastructure

1:07:18to allow for growth

1:07:20Mr. Mayor, we had a break planned at this time. Um, so maybe we'll

1:07:26It's okay with you. We'll take a break and then we can invite terry gayman to come up and

1:07:30Um talk about the next section

1:07:33Or would you like to keep going?

1:07:35um, may I just ask

1:07:37How much uh after terry was there?

1:07:4147 more people or

1:07:43Not 47

1:07:46But there's there's a few slides to go still

1:07:49quite a bit to go

1:07:50Okay, just over half. Well, you know what? Um

1:07:53I

1:07:54I've said what how about time frame was it another 15 minutes or was it another hour? Do you think I just I just want to try to

1:08:00judge what you thought it was

1:08:02to the degree of

1:08:03Just because we had like a 15 minute break during the whole uh, well, we can just keep going. We're okay to keep going

1:08:08Okay, is uh, can I just get a temperature in the room? Is that okay? Keep going? Yeah, okay

1:08:13If it's okay with you guys, we'll just keep keep going and

1:08:15yep

1:08:17That's terry was really hoping for that break

1:08:20All right, and thank you gene. Thank you so much

1:08:24All right, we'll keep going. Okay. Good morning. Yeah, mayor guthrie and council. I hope you enjoyed your brief break

1:08:29Uh, so I'm here today to speak to you about uh, maintaining state of good repair

1:08:34And how we have connected the budget to the work the asset management

1:08:39Team is doing on levels of service that is underway now

1:08:42So there are two

1:08:47All right

1:08:49All right, there are two important asset management concepts that are connected to budget state of good repair and level of service

1:08:55Maintaining state of good repair through investments and infrastructure renewal means taking care of the city's assets to ensure continued service delivery

1:09:02For the community this can mean repairing or replacing roads pipes buildings and playgrounds. For example

1:09:08The goal is simple take care of what you own before it fails

1:09:13The corporate asset management plan outlines a strategy to achieve that goal and minimize the city's risk

1:09:19Level of service is an asset management concept that seeks to describe how well assets are performing their intended functions for the community

1:09:27We need to discuss level of service today because asset management regulations require wealth to document both existing levels of service

1:09:33Which we did earlier this year via council approval of the 2024 asset management plan

1:09:38and desired levels of future service

1:09:41Which council will receive next year in the 2025 asset management plan update

1:09:46For the first version of desired levels of service

1:09:48Guelph must set a goal to show the connection between the pace of investment in budget and time to achieve the desired state

1:09:56There can be a broad range in what people want for desired levels of service

1:10:00But ultimately it must be directly aligned to budget investments and not individual wish lists

1:10:05As an organization we have worked to bring back a prioritized funded tenure capital budget and forecast as part of the 2025 budget update

1:10:14Within that context it doesn't make sense to then ask you what your desired levels of service are for the community

1:10:21and put that in an asset management plan

1:10:23Instead next year staff will be asking council to take the approach of establishing the desired levels of service to represent a future state

1:10:30Where there is no infrastructure backlog and asset renewal is funded sustainably

1:10:35And this is in alignment with the information previously presented to council in various asset management reports

1:10:41Staff will report on the estimated time to achieve the targets based on the investments included in the capital budget and forecast

1:10:48As a reminder sustainable funding targets represent the time where funding levels are enough to stop the infrastructure backlog from growing

1:10:55And where with continued investment the backlog decreases to zero

1:11:00To better understand levels of service the images above illustrate a road in excellent fair and very poor condition

1:11:07Roads that provide appropriate levels of service can be counted on by guelph

1:11:10For many things like commuting goods movement transit and emergency services. It helps ensure the city can thrive

1:11:18Next let's discuss the condition distribution for some of the city's key assets and how it relates to level of service in state of good repair

1:11:27This graph shows the condition distribution of the city's core asset types including roads and pipes

1:11:32The distribution represents existing and forecast levels of service based on the proposed investment levels with a range of assets performing well

1:11:40Those are shown in green and some assets being passed due for replacement, which you see towards the bottom of the graph

1:11:50This next chart illustrates what asset condition distribution looks like once sustainable funding is reached and the backlog has been reduced

1:11:57In terms of asset management strategy

1:11:59This is what the desired levels of service in state of good repair look like

1:12:03From a portfolio condition perspective with no assets passed due for replacement

1:12:10Over the next few months staff will prepare sustainable funding analysis for each asset group to identify the time required to reach desired levels of service

1:12:18By each asset type and this information would be presented in the 2025 asset management plan to council

1:12:24Staff have already completed the cumulative analysis for all combined asset types, which I'll present on the next few slides

1:12:32When staff presented the 2024 asset management plan earlier this year

1:12:35Council directed us to report back on changes to the estimated time to reach sustainable funding levels based on revisions contained in this 2025 budget update

1:12:45We are presenting this information separately for tax and non-tax supported services because there's a big difference between the progress in both towards sustainable funding

1:12:54The goal is to reach sustainable funding for assets as soon as possible while balancing all other priorities like housing and affordability

1:13:01Staff prepared updated sustainable funding analysis for all asset types combined presented in this graph

1:13:07Based on the 2025 budget from a tax funding perspective only the city anticipates reaching sustainable funding levels in 2046

1:13:16Where it was previously estimated at 2041 based on the 2024 adopted budget

1:13:23From a non-tax perspective the 2025 budget update did not change the expected sustainable funding date

1:13:29As we continue to be on track to reach sustainable funding targets in 2029 for these funding sources

1:13:35There is a 17 year difference between tax and non-tax sustainable funding forecasts

1:13:39Which means tax funding will act as a constraint on how quickly asset renewal work can progress

1:13:47So now what the next steps ahead of council approval of the desired levels of service targets in 2025

1:13:53include conducting community engagement and analyzing the asset portfolio for each grouping of asset type

1:13:58The 2025 asset management plan will then be presented to council for approval in q2 2025 and time to meet regulatory deadlines

1:14:06After 2025 there will be opportunities for continued refinement as the team seeks to engage you and the community on a regular basis through

1:14:14progress checks and monitoring to understand if any adjustments to the city's strategy

1:14:19Are required to meet the needs of the community ahead of the 2028 asset management plan update

1:14:24If adjustments are needed in the future appropriate financial strategies can be considered through future budget cycles

1:14:29And now i'm going to pass it back to deputies to ao homes to talk about housing enabling infrastructure

1:14:36Great. Thank you. Mr. Gaiman

1:14:44The proposed capital budget takes the state of good repair needs and balances them with other the other priorities

1:14:49I mentioned earlier, which is enabling infrastructure

1:14:52Required to support wealth as it grows the next few slides will demonstrate how staff have worked diligently across the organization

1:14:59To conduct a comprehensive review of the capital plan to ensure critical infrastructure projects that will help unlock housing are incorporated into the budget

1:15:10Shaping wealth is the growth management plan approved along with the official plan the amendment 80 and it defines

1:15:17Planning horizons and strategic growth areas that help staff prioritize timing for growth related capital investments

1:15:24The capital plan has also been refined to incorporate investments in housing enabling infrastructure needed to meet wealth housing pledge

1:15:34Staff rely on council approved master plans that outline the projects needed to enable wealth's growth

1:15:40in alignment with the various planning horizons

1:15:43Adjustments to project timing have been made where appropriate to reflect the changes to growth planning that I just highlighted on the previous slide

1:15:51Staff utilize the capital prioritization framework referenced earlier in this presentation to guide the sequential investments

1:15:58Of growth enabling infrastructure works for capital needs such as roads water towers and pipes as examples

1:16:07Enabling infrastructure is budgeted for prioritize strategic growth areas such as the downtown the gulf innovation district in claremont b

1:16:15We have to prioritize in a sequence because we can't do everything at once

1:16:20Downtown will be a top priority because these projects unlock growth, but also achieve critical state of good repair works

1:16:27The gulf innovation district will see enabling investments

1:16:31Investments made including water main and sanitary required to service growth in that area

1:16:36And there are investments in the capital projects required to service claremont b beginning

1:16:41With works required to service phase one of that secondary plan

1:16:47Investments we are making enabling infrastructure within the 10-year plan are anticipated to provide city-owned infrastructure needed to meet

1:16:55The 18 000 units required by the housing pledge

1:16:58However, the city is only one partner on the path to creating new housing

1:17:03Our development and building community as well as the economic conditions will continue to play a huge role

1:17:08in meeting this goal

1:17:10To help facilitate faster movement on growth enabling infrastructure

1:17:14The city is working on several initiatives that can help get construction done faster

1:17:19Including developing and municipal service and finance financing agreement policy

1:17:24Commonly referred to as front-ending. This is another tool that will be used to allow developers to build infrastructure faster to support housing

1:17:31Which is then repaid by the city as housing development occurs

1:17:35Given all the work on the capital delivery and policy the 2025 budget makes substantial investment in enabling

1:17:41Gwell's growth and with that I will now turn it over to shana wood wire to discuss the financial strategies that will help these investments happen

1:17:57Thank you deputy deputy ceo holmes

1:18:00The city uses a suite of long-term financial strategies to support the advancement of capital projects

1:18:06The next few slides include charts showing the reserve fund activity for each of the financial strategies

1:18:13The blue bars in the charts represent funding going into the reserve funds that support the strategies and the orange bars are the expenditures

1:18:20associated with each of the strategies

1:18:23The solid black lines plot line plots the annual forecasted balance

1:18:28While the dotted black line provides the comparison with the forecasted balance from the multi-year budget

1:18:36On this slide we have the tax-supported infrastructure renewal strategy

1:18:40This strategy funds the planned maintenance and replacement of city-owned assets

1:18:45As you've heard from mr. Gayman. This strategy is directly linked to asset management planning

1:18:51How we plan for and prioritize our infrastructure needs to help ensure the city can continue to provide a reasonable level of service to the community

1:19:00This chart includes the infrastructure renewal reserve fund and the dedicated gas tax and candidate community building fund grants

1:19:07A less aggressive approach to increasing tax-supported funding for this strategy has been taken in the budget update

1:19:13To lessen the effects on the tax levy

1:19:16However, the outlook in the strategy has significantly improved from what was presented last year

1:19:22As a result of the capital prioritization process, which slowed down projects to get to the balance over the next decade

1:19:32This slide shows the same picture, but for the rate-supported services

1:19:36As previously mentioned funding levels have remained the same as what was included in the multi-year budget

1:19:41and the big change here is that

1:19:44That took this from a negative overall balance to positive was the reduction in capital spending

1:19:49While the overall picture for the rate-supported services remains positive throughout the budget and forecast period

1:19:56The water capital reserve fund is in a deficit position beyond 2026 for the duration of the 10-year forecast

1:20:02And the waste water capital reserve fund is in a positive position through the 10-year forecast and beyond

1:20:08More information about this is included in the infrastructure renewal financial strategy document on the budget website

1:20:15This imbalance led staff to make a recommendation to council in the budget companion report to provide direction

1:20:21To investigate the customer impact of adjusting these two utility rates with the objective of eliminating the deficit in water capital

1:20:29And reducing the positive balance in the waste water capital reserve fund

1:20:34Adjustments resulting from this work would be proposed through the 2026 budget update

1:20:43There are three dedicated funding streams for growth capital costs

1:20:46Parkland dedication cash and loo community benefits charges and development charges

1:20:52In the prioritized capital budget and forecast the dc reserve funds as a group are projected to remain positive with the exception of

1:21:002026 and 27

1:21:01Two years when significant growth related water waste water and public works projects are budgeted

1:21:07While there is a healthy positive balance projected in the dc reserve funds by the end of the forecast period

1:21:14DCs are a highly volatile revenue stream and are subject to economic and market conditions

1:21:20Lower than budgeted dc collections may result in the deferral of projects or use of debt capacity later in the 10-year forecast to bridge cash flows

1:21:28Staff will also consider if additional growth projects can be accommodated in the later part of the 10-year forecast

1:21:34Depending on actual collection experience

1:21:40Some capital costs associated with growth are not eligible to be funded through a specific growth revenue funding stream

1:21:47Most notably solid waste non-diversion

1:21:50Additionally, growth studies were removed as dc eligible costs through bill 23 and shifted to a property tax and utility rate burden

1:21:59You may note that there are two different shades of orange on this slide with the darker orange representing

1:22:04Growth related capital costs that are not dc eligible and the light orange representing the cost of development charge exemptions and discounts for

1:22:12tax-supported services

1:22:14While tax-supported funding for this strategy has been maintained at the same level as what was presented in the multi-year budget

1:22:21There have been further legislative changes since last year that have impacted the projected balance in this reserve fund over time

1:22:28An additional changes will be processed in the next few months as well

1:22:32In june 2024 the provincial government passed bill 185 which added growth studies back in as a dc eligible cost

1:22:42Municipalities that had updated their dc study between bill 23 and bill 185 as guelph did

1:22:48Were given six months to approve a bylaw update to add growth studies back into the dc

1:22:54Guelph council will consider this dc update in mid november and budget adjustments resulting from that would be processed after approval

1:23:02This would improve the outlook for this reserve fund

1:23:06The bill 185 impact that has already been updated and is reflected in this chart is the removal of the mandatory phase in discount

1:23:14You can see that this has significantly improved the projection in the earlier years as it was most impactful in the first year of a dc

1:23:21bought new dc bylaw

1:23:23However at the same time that bill 185 was passed the province enacted the affordable housing exemptions that had been introduced through bill

1:23:3023 which negatively impact this reserve fund as well as the utility rate capital reserve funds

1:23:37The actual number of affordable housing units built in any given year will determine how much this costs

1:23:43The assumption included um at this time is that affordable units will be created at the same rate as the average of the last five years

1:23:52Like dc collections the costs associated with all dc exemptions and discounts are dependent on the timing of eligible building activity

1:23:59and will fluctuate

1:24:01actual collections and exemptions will continue to be monitored closely

1:24:05And reported on through the quarterly budget monitoring reports

1:24:12The service enhancement strategy supports investments to advance council strategic plan and approve service delivery master plans to increase service levels for the community

1:24:22As you have heard already the overall tax supported capital funding envelope was reduced for the 2025 budget update

1:24:29To continue to prioritize transfers into infrastructure renewal and growth

1:24:34service enhancement funding was reduced in 2025 and 26

1:24:39Over the 10 years the total funding provided for this strategy has been significantly reduced and the service enhancement reserve fund is projected to have a negative balance until 2034

1:24:50In 2025 staff have made a five hundred and twenty eight thousand dollar reduction

1:24:54To tax support for parking and a corresponding reduction to the annual transfer to the parking capital reserve fund

1:25:01This funding was redirected to the service enhancement strategy to support the execution of more active transportation network and transit enhancements

1:25:10In the 2025 budget update as mentioned earlier

1:25:14The phase in amount for the south end community center and baker library operating costs has not been increased

1:25:20And this was made possible on the capital funding side by the 13.5 million dollar federal grant for the library that was received earlier this year

1:25:30The updated level of funding in the brownfield renewal strategy

1:25:34Provides for continued advancement of the city's contaminated site program

1:25:38Including historical landfill properties at the fountain street parking lot

1:25:42Which lower prior while lower priority contaminated site investigation and management work that is not required for regulatory obligations has been deferred

1:25:51The uncommitted reserve fund balance provides a buffer for managing unexpected costs arising from investigations

1:25:59The value of the liability from contaminated sites as of the end of 2023 was just over 30 million

1:26:05Progress toward reducing this liability is expected to continue within the 10 year forecast

1:26:10And further resources will be required to clean up known city-owned contaminated sites

1:26:19The 100% renewable energy strategy or 100 re

1:26:23Funds projects that reduce emissions and support gulfs raised to zero goal to become a net zero carbon community by 2050

1:26:31Through the capital budget prioritization

1:26:33Some projects from this strategy were deferred beyond the 10 year capital budget

1:26:38Or the pace of investment was slowed

1:26:40The reduction in funding for this strategy overall will mean that there will be less financial capacity to advance future projects that are in the research phase

1:26:49This will impact the city's ability to meet short and long-term 100 re and race to zero goals

1:26:54Staff will continue to build and evaluate the business cases for large-scale projects and actively consider other funding opportunities where possible

1:27:03The projects that continue to be funded through the 100 re strategy are all part of the electrification of gulf transit

1:27:10And can and will contribute to reducing the city's emissions

1:27:13The proposed updates updated strategy means that there will be a project of negative balance in this reserve fund until

1:27:212033

1:27:22Returning to a positive balance in 34

1:27:28Last year we presented a debt strategy that included the planned issuance of 50 million in debt annually beginning in 2025 to support the capital program

1:27:37At that time we cautioned that this level of debt could affect the city's credit rating

1:27:42Now the timing of this potential impact has become clearer and we want to ensure that council is fully fully informed

1:27:49If the issued debt is projected to exceed s and p's target of 30 percent of operating revenue within their forecast period

1:27:57We can expect a lower future credit rating for the city

1:28:01S and p's forecast period includes the current year plus two additional years

1:28:06Therefore we could see this impact as soon as the 2025 credit rating when the 2027 forecast projects debt at the 30 percent threshold

1:28:15This slide illustrates the projected debt as a percentage of operating revenue

1:28:20Comparing it to both the city policy limit of 55 percent and the s and p recommended 30 percent

1:28:27It is important to note that this figure does not include debt capacity reserved for growth

1:28:32Because that debt is not allocated to specific capital projects. It is simply capacity that is set aside in case dc collections lag projections

1:28:41We will closely monitor this through annual budget updates and debt reporting and any new debt proposals will include updated information based on actual experience in the council report

1:28:52Should this debt be required the city would exceed the s and p recommended limit for a longer period and could also approach our policy limits

1:29:02While we all understand the value of a triple a credit rating

1:29:05We must also keep perspective on the fact that the credit rating is a tool that helps the city to borrow funds

1:29:11To move forward capital priorities at the best possible rates and an a a positive credit rating is still an excellent rating

1:29:18A credit rating uses mathematical models to predict risk, but we can't let the tail wag the dog

1:29:24We have capital projects that need to move forward

1:29:27And using finance debt financing for long-lived assets can help move forward much needed infrastructure work and support

1:29:35Intergenerational equity in budgeting by aligning the payment for these expenditures and the tax and rate impacts with the usage of the assets

1:29:47This chart shows another view and that also supports staff's recommended use of debt financing despite the expected impact on the credit rating

1:29:56Legislation mandates that municipalities must not borrow if the debt servicing costs exceed 25 percent of own source revenues

1:30:03A threshold known as the annual repayment limit

1:30:07As you can see even with the planned use of debt as outlined in the debt strategy

1:30:11We project that we will remain well under that legislative limit of debt that we could issue

1:30:17Not exceeding five percent of own source revenue

1:30:19Debt continues to be planned for a mix of previously approved capital projects debt refinancing and proposed capital projects

1:30:28Included in the current capital budget and forecasts that meet the requirements in the debt management policy

1:30:38So it's important to remember that the city has a long-term financial framework that sets policy for the forecast of the capital budget and reserve funds

1:30:47These forecasts are looked at from a 10 and 25 year lens and informed decision-making

1:30:53Over the next 10 years the city will be maximizing the reserve fund capacity while taking on higher debt levels

1:30:59Which will increase our vulnerability and reduce our flexibility to respond to the unexpected

1:31:05The proposed plan includes reliance on inter reserve fund borrowing through the capital budget and forecast period

1:31:12All of this will be closely monitored and any necessary updates whether it be recommended increases to capital funding

1:31:19Further deferral of capital projects or use of debt beyond the debt strategy currently proposed will be recommended through future budget updates

1:31:27Additionally, the federal and provincial governments have been offering a significant number of grant opportunities recently

1:31:34And staff have thoroughly pursued every opportunity

1:31:37Any grant funding received will help reduce vulnerability and improve flexibility and will continue to pursue these opportunities as they become available

1:31:45The timing of dc collections is uncertain

1:31:48Linked to building activity and likewise the timing of exemptions is also uncertain

1:31:53The forecast has been built with collection and exemption assumptions, but market conditions outside of the city's control will dictate the actual outcomes

1:32:01To mitigate this risk. We set aside 230 million 234 million of debt capacity to support growth related infrastructure

1:32:10If collections underperform expectations

1:32:12With reserve and debt capacity maximized throughout the capital budget and forecast period

1:32:18There was no capacity to add or increase tax supported capital projects without an offsetting reduction or to another project or an increase in capital funding

1:32:29Overall the size of the city's capital budget over the next 10 years is on average double the capital budgets of the past several years

1:32:37To support this plan tax supported capital reserve funds will be significantly drawn down and there will be an increase in debt levels

1:32:45Given this reality staff have recommended that council provide direction to undertake a sustainability analysis

1:32:51on the overall level of tax supported capital funding and report back to council with any recommendations prior to the next multi-year budget cycle

1:33:00And with that I will invite cio baker back up to close our program

1:33:04Thank you so much. So today is the beginning of a month long process of reviewing and engaging on guelph's 2025 budget update

1:33:17We know that there will be tough conversations and decision making ahead of council

1:33:22We have time for those conversations to happen and staff are here to support you

1:33:25Starting next week the mayor will be hosting a budget breakfast with the chamber of commerce and then through the month there will be several town halls

1:33:33That will be an important engagement opportunity with the community similar to past budgets. Oh, I apologize. I didn't click the button. Sorry

1:33:44We have time for those conversations to happen and staff are here to support you starting next week. Um, as as you see there, we are host

1:33:53Sorry, I've got myself out of alignment. We're doing the budget breakfast with the chamber like I said

1:33:58And then several town halls next week

1:34:01And then similar to past budgets. We have a special night set aside to hear from public delegations on november the 19th

1:34:09The budget board is open

1:34:12And we've already posted a few a few responses up there. So you we encourage you to use it and ask your budget questions

1:34:20It's a publicly viewable tool. We're all council questions and staff responses

1:34:25Are visible to the community to support transparency in the process

1:34:30Please keep an eye on this board and read it throughout the month

1:34:34Your colleagues may have the same question as you and this is a way for us to be efficient in responding to

1:34:40different questions at the same time

1:34:43All hands are on deck to support your questions. Please don't feel like you cannot call or set up meetings with finance a member of the executive

1:34:52or a general manager

1:34:54If you have questions about a particular service, that's okay to do and then we will try to capture those main questions and answers and post it for

1:35:01Everyone's benefit

1:35:03On november 27th, we will come back together to work through the amendment process

1:35:08We hope by then all your questions would be answered and you can focus on decision making

1:35:13The time to engage with us is now. Let's use our time in the next four weeks to work together to find the best path forward for gulf

1:35:21Finally, I want to sincerely thank all the city staff

1:35:25For their dedication and getting us to this point. The 25 budget update development was like no other

1:35:32Full of complexity and what seemed at some points a lot of change

1:35:36The collaboration and teamwork over many months is something to be incredibly proud of

1:35:42Our job as a city is to serve the public and our budget combined with our strategic plan and your team

1:35:47And our budget combined with our strategic plan and your council direction is the roadmap for how we achieve it

1:35:55So we want to deliver public service that supports high quality of life. We want to build complete communities

1:36:01It's part of what makes gulf a great place to live

1:36:04And like has been said a number of times we can't do everything all at once

1:36:09And also meet the affordability expectations for residents

1:36:13How do we build community and what does it take to make it all happen as we work to answer this question throughout the remainder of the

1:36:19Budget process we will discover and reaffirm what a future gulf looks like

1:36:24And so with that mr. Mayor and members of council

1:36:28That completes the city's the city staff presentation and we'd hand it back to you

1:36:34for

1:36:35questions

1:36:41Thank you. Let me just see if

1:36:44If there's questions on

1:36:47what we've heard

1:36:49So far is there anyone that wants to jump in yet before

1:36:54We move into either a break and or closed session or we can

1:36:58we can

1:36:59Okay, councillor coller and downer

1:37:05Thank you to your worship

1:37:09Overall I appreciate that the work that stuff happened doing

1:37:13And I am very impressed by the budget that has been brought forward based on the mayoral direction

1:37:19I I do question

1:37:21We the direction was given to lower the

1:37:25budget increase to to for below 4%

1:37:28But then what I'm seeing is that in future years it's going to then continue. So are we

1:37:36Do is the plan then that council would need to give direction each year to keep it within this level?

1:37:42Or you know, how would that play out into the future?

1:37:47Through the mayor to councillor Goller. Yes, I believe the

1:37:51intention would be to

1:37:53Get seek direction for future years and in the next multi-year budget cycle. We would look for directions

1:37:59for the four years so that we can

1:38:02um, we can

1:38:03Hopefully reduce the amount of change in the confirmation years

1:38:07That would be the update now the other important part of that is that we have

1:38:12Set that capital funding increase at a lower amount already for the future

1:38:18So the scope of the future changes should be limited to the operating budget in this

1:38:24Multi-year budget cycle. Okay. Okay. Thank you. Thank you for that

1:38:28um, if you don't mind I just wouldn't mind answering that a little bit too just because it involves me

1:38:33so, um

1:38:35I uh

1:38:37I do not want to have to do the strong mayor directive every year for trying to keep things

1:38:43affordable for the community

1:38:46And so I I would actually just as shanna just answered

1:38:50I think council direction

1:38:53Moving forward is the way that I would love us to be able to do that

1:38:58So when that moment comes for an opportunity for us

1:39:00Discuss that whether in the budget cycle or a budget debrief as we do every year

1:39:06opportunity to set the course for the next two

1:39:09budgets

1:39:10I think that would be great that it is a council position

1:39:15That that sets that affordability for the community. And so I just want to

1:39:21State that kind of in conjunction with what shanna said and how the outlook looks

1:39:26That it would be my goal to have

1:39:29Council wrap around something that sends a message of affordability to the community moving forward. Okay

1:39:36Thank you worship. I appreciate that

1:39:38um

1:39:40I wanted to follow up with some of the the service reductions

1:39:44um, and I'm

1:39:45I'm wondering how does this impact or at what point do we figure out how this impacts

1:39:51For example, we approve the one canopy and I believe I I didn't see it directly

1:39:56But I wonder at what point do we get an update on how many

1:40:00You know, how much longer it's going to take to reach that goal based on the service levels

1:40:06And I saw that there were other service reductions to water conservation education

1:40:10You know, how does how do we find out how those reductions would actually impact our ability to

1:40:17To provide water for for the city. So how does how do we get the information on the on the impact of these reductions?

1:40:25Sure through the mayor to councillor goller

1:40:27um, there's there's information included in the capital budget update

1:40:33Document on the website about this

1:40:35But there's been another question that we've received that we will also be posting a response to on the budget board

1:40:41That will have a consolidated table

1:40:44Outlining the impacts on each master plan

1:40:48Perfect that that's very helpful. I will look forward to to finding that information

1:40:54Would that include information about our ability to reach our 100% renewable energy targets?

1:41:03Through the mayor. Yes, it will. Okay. Thank you. Thank you worship

1:41:06Thank you downer than Gibson. Thank you. Thank you, mr. Mayor. So

1:41:10Is that the the same question I asked you the I asked the other day about

1:41:16So we have timelines with each of our master plans

1:41:18Are we're going to get the new pages of what those implementation timelines are because some of them are over 20 years

1:41:2425 years

1:41:26um, I think we need to be transparent with the public about

1:41:30When those projects are coming in especially when it impacts amenities in neighborhoods

1:41:36Which have been given a low priority. It sounds like it sounds I heard amenities

1:41:41Well, that's amenities supporting new growth. Um

1:41:45Communities, but I mean we have a lot of new communities

1:41:48Waiting for amenities

1:41:50um

1:41:51So is that the charts that we're going to get in in that budget board?

1:41:56Uh through the mayor to counselor downer. Yes, that is no part of so because I asked about that the other day

1:42:01Um, the other thing just sort of this is sort of a more bigger picture thing around affordability

1:42:07so we're looking at affordability as

1:42:10as the mayor directive of four percent, which which was fine

1:42:15But I mean there's there's other things around affordability for people in the community that that

1:42:23I wonder has been given consideration

1:42:26um, when we look at things like

1:42:29um

1:42:31Why I could take trans and parks and recs. So transit a good transit system is

1:42:37Uh an affordability issue

1:42:40Uh for many people it's you know, it's an environmental issue as well

1:42:43But it's an affordability issue as well. And and so back

1:42:47I understand we're still doing 10 years

1:42:49But a lot of that's being implemented in the last four now, right?

1:42:53So so have we taken into account and also when you look at parks and rec

1:42:58um amenity amenities are important for

1:43:03Families who are struggling they can't afford to put their children into programs like hockey that is very expensive or baseball

1:43:11a lot of those and to be able to just go to the park and

1:43:15um or do things that are

1:43:17Um

1:43:19More affordable for families

1:43:23Have those types of things been to take it into account in this rather than the four percent

1:43:31I can start and then I can let others jump in but uh through the mayor to counselor downer

1:43:36I would say that I think that they have been taken into account. Um through this

1:43:42transit has continued to be prioritized for example in this update

1:43:47And we've really tried to take a balanced approach to the deferrals

1:43:50And so sometimes that means that capital projects are deferred out for amenities are deferred out later in the plan

1:43:57but as as uh, I showed on that program of work slide

1:44:02The actual proportion for each program of work is very similar to what it was last year

1:44:07So we have tried to preserve

1:44:10To the extent possible that complete community approach and that affordability approach

1:44:16recognizing the things that you have just mentioned

1:44:21so

1:44:26No, that that was

1:44:28What i'm hearing is that you've tried to take that into an account with the transit. It's still within

1:44:34The 10 years, but did we not put the transit over 12 years last year?

1:44:4013

1:44:41So through the mayor to counselor downer so everything within the transit

1:44:46Uh the future ready action plan for transit is still in but there are some that have been shifted out

1:44:51So sort of one to three years

1:44:54So um, we can provide you that level of detail, but everything nothing has been

1:44:58Removed, um, but things were stretched out over uh into future years. Okay

1:45:05the other thing um

1:45:08Is around the the items that have been deferred beyond 20 years or beyond the 10 years

1:45:15Um, so I noticed in the binder that it describes some of them

1:45:19Um up until the 10 years but not sort of be on that

1:45:23So if I think of the pickleball courts because that's who I'm going to hear from a lot of too

1:45:28I mean they've been advocating for and it's one of the fastest growing sports. Um

1:45:34And now that new pickleball court is beyond the 10 years

1:45:37So how long beyond the 10 years like we're are we going to when you bring back the new

1:45:44implementation plans

1:45:47Um, are we gonna am I going to be able to see how beyond far beyond 10 years something is or

1:45:54Or the community is it's to me. It's more about transparency with the community who have been advocating

1:45:59And engaged in many of these master plans

1:46:04So again, I can start on this and but I would say the level of

1:46:09Specificity in terms of what year things will happen in beyond that 10 year plan is not well developed at this time

1:46:16So I think the pickleball

1:46:18um

1:46:19New court has been shifted out to 2037 at this time, but that might

1:46:25Change, um depending on uh future budget multi-year budget cycles when we are focused more on the specific years and that in that

1:46:34Longer term plan

1:46:37Yeah, so I mean that's the kind of transparency

1:46:39I think we need because because I said there is a lot of

1:46:44Sports groups and organizations that have advocated for many of these things

1:46:49trail groups and and you know it

1:46:52And we we sort of created priorities within those plans with our community

1:46:58And so it's not like I understand the need to to move these out because we can't do everything at once

1:47:03but I I also

1:47:05am concerned about people finding out about these things after

1:47:09after the budget um and then you know

1:47:14So the more transparency we have now the the better is my sense so

1:47:20um

1:47:21I will need to contact to pickle people

1:47:23But there's a lot of people too that that need to

1:47:26Understand that and I'm not quite sure how we get that

1:47:30Um out those messages out there about how these plans have been impacted

1:47:39Thank you. Uh Gibson then or work

1:47:41Thank you through you mr. Mayor. I'm I'm going to admit so many of my questions are turning into um

1:47:48comments

1:47:49So I I have to pause I would love to pose questions to staff

1:47:54As if to get the comment I want but I'm going to hold off

1:47:58Because I I do like where this conversation is going and I do like the presentation from staff

1:48:03but a lot of my comments are

1:48:06Affirmation of what's been said so I'll wait till the end of the day

1:48:09Okay

1:48:10Thank you. Uh or work and then uh karan

1:48:14Thanks, mayor guthrie. I got a binder full of sticky notes, but I'll try and hone it down. I'll save that for the budget board

1:48:20I have a question around process. So through you mayor guthrie to staff

1:48:24This doesn't feel good to anybody, right? Like we love the master plans

1:48:28We want the tree canopy you want the tree we want all this stuff and so this is

1:48:31I'm sure it was very difficult for you to look at all the capital projects and then scale them back and bring these recommendations

1:48:37um, so so we don't nobody loves a reduction and the community won't either

1:48:44So I'm wondering going forward when we do master plans

1:48:49Or when we look at level of service work

1:48:51Will they be done in light of what is affordable affordable in the next 10 years?

1:48:57It's a challenge for me personally. I can't speak for my colleagues is this master plan comes and it's our best professional advice

1:49:04And we want this, you know best in class

1:49:08understandably

1:49:10And then we don't want to vote down a master plan that has had all that work put into it

1:49:16But then we see the collision so last year 690 million dollars were pushed out

1:49:21And this year we're seeing some additional reductions in capital. Are we changing?

1:49:26How we are making these capital plans going forward to have a constraint

1:49:31So I have an economics background when we're having the conversations. Do we add in that economic constraint?

1:49:37so that we have

1:49:39clear expectations up front

1:49:44so through you

1:49:46Mr. Mayor to councillor roark

1:49:49Yes, I want to just say I think over the past number of years. I've heard that a lot

1:49:55through

1:49:57Even questions on engagement. Are we going on and engaging and and with kind of an

1:50:03Kind of not with a realistic

1:50:07Kind of budget framing of what we're asking for

1:50:11And so I I am interested in that councillor roark and I I would like to have more of that affordability

1:50:18understanding kind of as a baseline going into our planning cycle and our strategic planning cycle

1:50:24I don't have the answer in terms of what that exactly looks like right now, but I I hear all of those

1:50:33Concerns and and I want yes, and so my answer is yes

1:50:37We're gonna we're gonna embed that affordability and that budget lens into the planning in the future

1:50:45great

1:50:46I'm curious also

1:50:48I understand that the description and the prioritization that took place

1:50:52The end state of where we wanted to see the the key performance indicators was that we could say there's a gap here

1:50:58We're falling behind and so we're going to amp this up

1:51:01How is the budget aligned with those priority key performance indicators and is that work ongoing?

1:51:09through the mayor to councillor roark, uh, absolutely

1:51:12The the ability to demonstrate measurable progress was at the heart of the prioritization framework that you heard me speak to earlier

1:51:19and

1:51:21There are significant change in this budget that we are working through to understand

1:51:25Specifically the impact on delivery of our KPIs so that works underway right now

1:51:29obviously pending budget decisions and the ratification or adoption of

1:51:34Of this budget and we'll bring the specific details of that work to you in in uh,

1:51:39July of 2025 as part of our regular corporate performance reporting cycle

1:51:44Okay, great and through you america three. I just just a couple more

1:51:48um

1:51:50I'm curious to know whether we're also keeping in mind some contingency planning

1:51:55In the event there are changes in isip funding the availability of it in the coming years, which is a possibility

1:52:02Or there's a lot of talk among housing experts who are calling development charges attacks on housing

1:52:09And there seems to be a lot of pressure there that if cities would just reduce their dc's somehow magically housing prices would come down

1:52:16We know that's not true

1:52:18But I see a lot of pressure in you know newspaper articles on social media, etc from experts

1:52:24Who are who are saying that so exactly? Yeah

1:52:28so um

1:52:30I know he's wrong, but you see it in the media and people are buying it so

1:52:35So do we have some contingency planning? Do you have

1:52:39Can you go down that list right? It's now you have an an

1:52:43An ordinal list a priority list of a thousand projects

1:52:47And do we have contingency planning in the event that both of those sources of significant funding could be reduced?

1:52:56Through the mayor, I'll start on this one again. Um, so

1:53:00in turn development charges are obviously a very important

1:53:04revenue stream for our growth related capital costs and if there were significant changes made to those then we would have to revisit our

1:53:12Capacity and ability to execute the capital plan and we do have a prioritized list that we would work from to do that

1:53:20um, and the other thing I would say is there is a report that will be going into morrow that has outlined

1:53:28Sort of our thinking and position on the development charge

1:53:33Conversation that is out there and why we are recommending staying the course at this time on the provincial tool or the tool that the

1:53:41province has provided to municipalities for

1:53:44growth related capital funding

1:53:47it's

1:53:48We don't have another alternative at this time. I think there's a space for a conversation on that

1:53:54But it has to include a conversation on who does pay for that

1:53:59Instead of development charges. If not that funding source

1:54:03Happy to have anyone else

1:54:05add to that

1:54:09Maybe just uh, just to add mr. Mayor uh to councillor roark's question in terms of other contingency plans

1:54:17um, I would say that

1:54:19this

1:54:20Like the budget process is not one that we're just it's a set it and we don't come back to it

1:54:26I think there's a lot of opportunity to continue to monitor and and react and revise

1:54:32Depending on what happens. So we talked a lot in the presentation about the contingency

1:54:37We've left in our debt capacity in the in the instance. We need to kind of do more in that space

1:54:43And then also like we're very aware and and miss sales may want to speak about the ongoing kind of uh

1:54:50grant landscape and

1:54:52And how we're trying to be as reactive as possible understanding that you know, there's federal transit grant that's been

1:54:59discussed and

1:55:00And what that could do to maybe help us even accelerate or do some different things

1:55:05Depending on uh, what that grant may turn out to be just as an example

1:55:10So I would say like we are actively trying to

1:55:13Access funding where we can and that will shift the future and it would also then

1:55:19On the on the alternative if funding is removed

1:55:22Then we'll have to be back in front of you in terms of what that real impact is

1:55:26We don't have contingency planning to be able to address everything

1:55:32Sure and um through the mayor, I will only add that uh, we certainly understand that the grant landscape is unstable right now

1:55:39And we've started talking about other funding programs that don't look like grants that are starting to replace some of the money that

1:55:47Municipalities used to receive through dc's so it's become much more complicated for us

1:55:52On the federal side, I will say icip has been tremendous to understand that municipalities post covet have a different financial reality

1:56:00And we've had a very open dialogue with them as we've had to rescale and rescope some of our programs to meet affordability targets

1:56:07So that's working very well with existing longer term funding programs that we have

1:56:12Um with the provincial side

1:56:15It it is more unstable and a little more uncertain as programs are announced like some of the housing enabling infrastructure programs

1:56:22Uh that that are important to the city to help us realize our capital projects

1:56:26And uh and no stone goes unturned when those programs become available

1:56:31We're certainly applying for them and working closely with finance

1:56:34And the folks in the program areas to make sure that we're putting forward the best application

1:56:38We can on behalf of the city to maximize the dollars available

1:56:41So I would say in the last 12 months

1:56:43Thinking about this as an important source of revenue for the city is very different than how we used to think about grants

1:56:49Um and certainly we are more connected than ever as we try and manage

1:56:54um

1:56:55The changing environment for uh for municipal funding programs

1:57:01So through you my gathry just um two last questions actually on the revenue side because we do love those grants

1:57:06um

1:57:08I think I've asked this question every year

1:57:11and

1:57:12usually

1:57:14I'm curious about what our outlook is on revenue generation

1:57:18Right, so we have a new rec center that's coming on board

1:57:21Are we looking at sponsorships for those rooms?

1:57:25Wellington county is a great job if you go to their facilities every room is sponsored

1:57:30Are we looking at some of those partnerships? I know we have

1:57:33A collaboration with uh, wellington catholic in terms of use of that new field gorgeous new field like

1:57:39Are we looking at clearly creatively?

1:57:42At where there are possible partnerships or sponsorships?

1:57:46um

1:57:47That we haven't tapped before

1:57:51Through the mayor to councillor work. Yes, we just actually uh through dana evans team and working with a number of other departments

1:57:56Just completed our sponsorship policy, which has been approved by the executive team

1:58:00It is more specific to event and program sponsorships, but using that sort of approved policy will now be

1:58:07looking at more specific

1:58:09Sort of those those naming right sponsorships like you're talking about

1:58:13Historically, we have had some success with for example, obviously the river run center and sleam and center

1:58:19But we haven't extended beyond that and so it's definitely something that's on our radar to be looking at

1:58:26That's great news and through you mayor go through my last question is really micro question

1:58:30So we expect that ridership to increase from conestoga college with the addition of that new route

1:58:36uh, and the ridership should increase with the youth programs and uh, and the the free day for seniors

1:58:43So how does all that ridership since the funding is contingent on the ridership do those costs offset each other?

1:58:49So we'll lose the ridership with a subsidized program, but then we should increase the grant right?

1:58:56No, sorry. I will start and then colleen might want to add

1:59:00But we have through the mayor we have budgeted for additional revenue related to that ridership in addition to the expenses

1:59:08Great. Thanks. Oh what shanna said

1:59:13Our karan and gibson

1:59:15Thank you. Uh through you mr. Mayor. I'm picking up where off where uh, counselor

1:59:20Or work talked about community partnerships and sponsorships and

1:59:25One form of partnership that we do have is community benefit agreements where organizations that often rely on volunteers

1:59:33Do work that benefits the city

1:59:36And i'm thinking specifically because we've all been receiving emails about the gulf tool library that helps us meet our circular economy and

1:59:42landfill diversion

1:59:44targets

1:59:46When those programs are compromised and the roi

1:59:49To the city is compromised

1:59:51Will we be taking on some of that work because some of that work is actually related to our strategic plan?

2:00:00So through the mayor i'll start um, but somebody else may want to speak directly to the work of the gulf tool library, but certainly um in

2:00:092025 the funds for the community benefit agreements

2:00:13Was about 2.4 million dollars the full envelope

2:00:17There will be a more specific answer posted on the budget board for you

2:00:21So I would direct you all to the budget board for some more details on on the cbas for for 2025

2:00:27We did have a number of both intake and renewal requests for 2025. We were not able to to fulfill all of the intake

2:00:35But we were able to uh to

2:00:38Fulfill all of the renewals with a 2 percent increase and so that information will be posted on the budget board later this week for you

2:00:45Right I understand that I'm wondering whether there's anything

2:00:49in that portfolio

2:00:52That will have to be taken on

2:00:55through our operational budget through other departments to offset work that may

2:01:01Not be happening in the community through cbas

2:01:05Specifically the circular economy and the landfill diversion work

2:01:09Thank you and through the through the mayor to uh council coran

2:01:12So we'll be taking a look in detail. Um, some of those programs that have been taken on by the gulf tool library

2:01:18Um

2:01:19At at this point, I think we have to look at what we can take on and what we won't take on

2:01:24I think some of that work we are doing in partnership with them

2:01:27That's the kind of work that we can continue

2:01:29But I think realistically we have to expect that some of that work will not be continued

2:01:33We don't we don't have the resources and we can't afford to do it

2:01:36But I'm sorry that doesn't give you a lot of detail

2:01:38But if I can go back if you can give me a chance to take a look at

2:01:42The kind of work that they do and then we can respond back on the budget board for you great and the budget board is a fine place for that

2:01:48um the

2:01:50I know you talked a little bit about the offsetting um of

2:01:55lost dc revenue

2:01:58The the whole conversation about being made whole is that even a realistic expectation anymore?

2:02:04I mean if the answer is no the answer is no and that makes a lot of sense in what we're seeing in the budget

2:02:08But it's still being talked about and it's still a commitment that is

2:02:12You know

2:02:13Verbally out there that we will be made whole for that work that is offsetting dc revenue

2:02:19Is is that realistic at all?

2:02:23Through the marida counselor coran. I think certainly amo and fcm both have significant

2:02:29Number one priority advocacy programs, but they are different. Um amo is looking more

2:02:35um

2:02:36More at replacing some of the dc revenue that's been lost to municipalities specific to ontario's situation

2:02:41Whereas fcm's campaign is more broad and is actually looking at municipal service delivery as a whole across the country

2:02:48and uh and where some provinces provide

2:02:51more services or different services

2:02:53Um than others who may provide those services at the provincial level

2:02:58And so I think both of those programs are important for the city. Um

2:03:02As we continue to in almost every advocacy we meeting

2:03:06That we have talk about this, but it it is fair to say that it's not something that's getting a lot of traction

2:03:13Um with either level of government at this point

2:03:15But it is a priority for every municipality that I speak to uh and every organization that we belong to

2:03:23Thanks, that's what I suspected that it's still being talked about in in in municipalities across the province

2:03:30Uh two more questions. Um, mr. Gaiman slide talked about a 17 year gap a 17 year difference between

2:03:39Tax and non tax supported asset renewal funding. Not sure I fully understood what that means and I just wonder if you could

2:03:48Sure live deeper on that through the mayor. I'll start on that so the um

2:03:54increases to

2:03:56infrastructure renewal funding for tax support

2:03:59Are separate from the increases to the each of the utility rate supported services has their own

2:04:06capital funding

2:04:09Allocation within them and so the projection for when we get to sustainability for those rate supported services

2:04:16Is a lot sooner

2:04:18Then the projection for the tax supported services. So the assumptions for the increases that we've got on the tax side

2:04:24are much lower

2:04:26Than than this assumptions on the rate supported side to stay within that affordability target and that

2:04:32That's sort of baseline assumption

2:04:35For the coming years and now we will be that is part of we want to look at and bring back to you as part of that

2:04:42sustainability analysis as to whether

2:04:45That needs to be adjusted in the future

2:04:49Okay, thanks that makes a bit more sense

2:04:51And my last question is more

2:04:54I'd like to know the scope of work that might be involved with staff when I ask this question, but

2:05:00You know, I've been on council long enough to see a number of projects

2:05:05Added introduced through a master plan

2:05:09deferred

2:05:10Readded put beyond the 10-year capital plan

2:05:14Readded redeferred re added redeferred

2:05:17Um, so for example trail and bridge connections, I mean some of I've seen some projects that were introduced in the early

2:05:242000s that have been added and now have been

2:05:28re-deferred

2:05:29Is there any way?

2:05:31Uh through technology, uh through the the way you your budget

2:05:36technology works

2:05:37Where we can see when a capital project was first added to a budget

2:05:43And at what points in time they were removed re added removed re added

2:05:49And what the original cost was in 2001 2005 2012

2:05:55And what the projected cost is now because I think I think what's really important for me in this budget

2:06:02Deliberation is I need to know what the cost of deferral is as much as I need to know what the 2025

2:06:09tax increases

2:06:11Because the cost of deferral is often more expensive in the long run the payout or pay later kind of philosophy

2:06:17But I just don't understand the scope of work that staff would need to do

2:06:22To give me that information. Is it is is it, you know another 40 hours of staff work to

2:06:29to go project line by project line to show me the

2:06:33um the continuum of where projects have

2:06:37Been introduced and deferred over time

2:06:40um, so uh through through the mayor, I'm gonna I'm gonna take this one. Um, that would be a

2:06:47significant amount of work like significant. I don't even

2:06:51believe we would have the capacity to

2:06:53attempt that

2:06:55um, we don't have the systems that would support that

2:06:59easily at all

2:07:02and over time projects

2:07:05are

2:07:06projects evolve also like what um, what was planned

2:07:1110 years ago

2:07:12With more information, you know, I'm just just even thinking like from an engineering perspective

2:07:17Like there's there's a lot that we find out through design and through planning that that shifts where we're headed and so

2:07:25It's also not even apples to apples. I would say in terms of being able to go backwards and do that work

2:07:30um, and so so yeah, I would say I I that's not something that

2:07:36staff will be able to to deliver

2:07:38Okay, and I I expected that answer because in my mind

2:07:41I started looking through old budget documents to try to find specific projects and so I just wondered if you had the technology to

2:07:47Do that. So thanks for being honest about that

2:07:50If I had a specific project that I wanted to follow the timeline could I could could one project line be?

2:07:57um

2:08:00Be provided if I had a specific project line just to to illustrate that

2:08:05um, continuum

2:08:06Especially a project that's still in our budget. This isn't something that's evolved over time and is no longer relevant

2:08:12These are projects that are actually the same

2:08:16I would give you through the through the mayor. I'd say on a micro level

2:08:20We can attempt that so I would say absolutely like please connect with staff and we will do our best in a in a narrowed

2:08:27view of of one project to see what could be done

2:08:30But we definitely will not have the capacity for the entirety of the budget. Okay. I appreciate it and I won't ask that again

2:08:38um, one last question

2:08:40um, and again the budget board is fine, uh for the answer is

2:08:45I saw a slide uh regarding frontline emergency services that we would need an additional

2:08:51resources

2:08:52Uh to replace or to support

2:08:55um, our frontline teams when the safe injection site is closed

2:09:00Is the province going to be funding that in any way or that is our responsibility again to deliver

2:09:06services that are truly being downloaded to us

2:09:10by a provincial decision

2:09:12So through the mayor to council crown certainly the report that we brought to the joint social services and land ambulance committee one requested

2:09:18Stated that we don't know yet what the impact will be and we can't predict that

2:09:23We as a service, uh, it is our our responsibility and our commitment to respond to

2:09:29Any circumstances in the community that change but we don't yet have any data to say whether or not we think will be a change in

2:09:37Resourcing level. Um, we're coming back to jss lac with the optimal resource deployment

2:09:43for paramedics uh in november

2:09:45Um, but I would say that it is an evolving process and that we're constantly reevaluating

2:09:50But at this point we don't have any data to uh to be able to speak to uh the impact

2:09:56Okay

2:10:01Thank you. Sorry, kate and uh kate and then and then gibson

2:10:09Thank you through you mr. Mayor

2:10:11Um, so I was just wondering how does the transportation and roads sidewalk cut off affect our aod a goal

2:10:19obligations and the upcoming accessible canada act target goals for 2040

2:10:24For completion given that we're moving from like a 10 year timeline to a 30 year timeline

2:10:33through the mayor to to council gaden. I think what

2:10:37What we're trying to do is do as many of these projects as we can

2:10:40At a pace that is is reasonable and affordable balancing against everything else that that is in the budget

2:10:45With respect to your specific question

2:10:46I think we'd have to take take that away and maybe provide you a bit more of a detailed response on the budget board in terms of

2:10:52how we're approaching

2:10:53um meeting that future

2:10:55regulation

2:10:57Thanks, um and through the mayor this may also be a kind of budget board

2:11:01sort of question, but uh, I was just wondering if we had a fulsome list of the

2:11:05accessibility cuts

2:11:07such as sensory rooms older adult strategy and pedestrian crossings things that can be kind of bucketed together as accessibility

2:11:17Through the through the mayor to council kate and yes, we'll get that list for for you

2:11:22Thank you. Um similarly, I was wondering if we had

2:11:26Most of my questions are impact statement risks and issues and things like that. So I was wondering about our vision zero goals

2:11:33and um

2:11:35various departmental budget

2:11:37kind of impacts and I was I heard earlier that you had a

2:11:42Uh request that you're going to be putting up on the budget board and I was wondering is that going to cover

2:11:46Like the line by line cuts in terms of risks and issues or is that specific to one category?

2:11:56So through the mayor to council kate and that list would be uh

2:12:01Based on each service delivery master plan. It would not have a detailed list of each project. Um

2:12:08It would be an update on the overall implementation timeline for the master plan

2:12:13Compared with what was presented. Uh when the master plan was approved

2:12:18Is it possible to get a risks and issues impact list?

2:12:23for cuts like they don't have to be necessarily that granular but

2:12:28um

2:12:30kind of

2:12:32different larger categories of things because that's sort of where

2:12:35I need to make my decisions from

2:12:40Um, so so I'm going to jump in here and I'm just going to say that uh in terms of the the line by line

2:12:46Um changes uh in the email that was sent out uh to council. There was a

2:12:51a document that um

2:12:55Was the summary of of capital project changes over the 10 years. I would say that's that's the line by line

2:13:02Um staff across the organization

2:13:05Experts in each of the areas went through and did that risk assessment in terms of the the prioritization

2:13:12Lens and that the criteria that was presented in the earlier

2:13:18by miss sales in the presentation

2:13:20And and to be able to provide you with a line by line for every project. That is not something that is prepared right now

2:13:28that was done in collaboration with

2:13:31I want to like 25 50 staff that are experts in their in their discipline in terms of

2:13:38Ranking the the projects and so I would say that the best place to start um counselor katin would be on that

2:13:46that line by line capital plan and then if there's specific questions

2:13:51um

2:13:52to to reach out to the departments to the department leaders

2:13:56Uh to to get that comfort that you're looking for

2:14:00I will just say from an executive level position all of our dcaos and all of the department heads had

2:14:08Using that that prioritization criteria. That is what we used in order to

2:14:13Rank and you can see the ranking in the materials

2:14:17And so I I would just you know, that would be where I would say I would offer you to start

2:14:23And I would be interested if you believe that

2:14:26um the

2:14:27prioritization criteria like from a governance level as well if there would be something there that you would like change in the future

2:14:33but um, but this that was the guidance and that was the framework we used going through a

2:14:40significant amount of projects and and programs

2:14:44Uh through through six months of work. So

2:14:48Hopefully that helps

2:14:49Thanks through the mayor. I'm not questioning your prioritization. I'm just looking for transparency on what the outcomes would be for those things so that I can

2:14:58communicate that and understand the impacts of them

2:15:01um, I was also wondering about if we had a

2:15:05list of the affordability measures that are removed from the budget like the a coc member fee programs in the kids in sports

2:15:13Uh such as uh counselor downer brought up

2:15:19Through the mayor all of that can be found in the operating budget update document on the website

2:15:25Okay, thank you

2:15:29Thank you counselor. Uh Gibson, please

2:15:32Thank you very much. Mr. Mayor. I again I have comments, but I'm going to try and pose some of these as questions because I think it's important

2:15:39So this is my 11th budget

2:15:42Really appreciate the work that goes into this every year a line that always appears in our budget

2:15:47Up until this year and I'm going to ask staff if it still exists

2:15:52We increase taxation. We increase the budget and it seems like every year in our budget. There's the same line

2:16:00Staff flag considerable planned and unfunded capital investments that still need to be funded

2:16:05So we we we do this to ourselves a little bit with master planning. We go out. We're an ambitious group

2:16:11We set targets. We set these ambitious goals

2:16:14Infrastructure funding sustainable funding new new roads new rec centers

2:16:18And then the reality kind of hits the road at the budget and it's always asterisked with one line

2:16:23Not all of this is funded

2:16:25And it's always a struggle for me to sort of press yes or no on the budget because everything we've said isn't funded yet

2:16:31So does that line appear?

2:16:33In this budget or am I taking your am I taking your comments about being fully funded and realistic?

2:16:40uh

2:16:41Am I taking those as truth and gospel this year that we are presenting a realistic and fully funded capital budget

2:16:48With without these massive unexplained or unfunded projects in our capital budget

2:16:56So through the mayor to councillor Gibson

2:16:58Uh, the asterisk is not there this year. We are presenting all the capital projects that are in the capital budget are funded

2:17:07within those reserve strategies that we presented

2:17:10That doesn't mean that all of the master plan work that was approved is included in those capital projects

2:17:15Some of that will be deferred and implemented over a longer timeline

2:17:20I appreciate that that's the that's the kind of transparency that I can stand on when we when we present a budget to the folks

2:17:26Saying yeah, all you like in the recent years everyone I think all of us will probably sit there and say yeah your project's in there

2:17:31Your project's in there

2:17:32But we don't want to tell them that it's not necessarily funded. So this is a realistic

2:17:37Outlook for the next 10 years. I appreciate that I'm going to ask a word specific question now, mr

2:17:41Mayor I could put it on the budget board, but I ask it every year. So I figured it was good to for staff to have a chance

2:17:46prioritizing infrastructure projects that unlock housing of that I love that comment. I love that prioritization

2:17:53I've noticed that

2:17:55My favorite infrastructure project in the east end york road has reached victoria road now. We are almost there

2:18:01So I guess my question is

2:18:03that project to

2:18:06Watson road the last stretch of york road that is tied to unlocking housing

2:18:11I believe at the starwood and Watson intersection

2:18:14Can I just ask for a quick commentary from staff on how that's being prioritized in the progress that we're making?

2:18:19So through the mayor to council gibson. Yes, absolutely that work is directly connected to enabling growth

2:18:24It's also infrastructure and new work at the same time. So it ranks quite high in our prioritization

2:18:28The remainder of the work is broken into three stages

2:18:32So that final stretch the first stage is already funded

2:18:35The next two stages are shown in the forecast under project number pn 0 1 1 0

2:18:41That's great news. Thank you

2:18:44Thank you downer than busitil. Uh, just one more that too is a little specific

2:18:49But um interests a lot of people in throughout the city is the elimination of the termite management program

2:18:56Are we at a point in success in that program that?

2:19:00That can be eliminated if somebody could sort of speak to that

2:19:04I mean, that's uh

2:19:06That's been a very successful program. My understanding is and I just want to make sure that we don't

2:19:12Uh stopping it now doesn't create problems later on

2:19:16Through the through the chair to council downer. So it has been a successful program. So

2:19:22we have uh been able to manage the termite problem

2:19:27In gwell to the point now where

2:19:29Um, we probably don't need to provide a program in-house

2:19:34To continue to manage so a little bit of a victim of our own of our own success

2:19:37But we do still provide a support on our website for resources for those who are still experiencing

2:19:44Termites so that they um have resources so they know where to go where they can get some help to manage manage the issue

2:19:50Okay, so you say and we don't need to provide it in-house

2:19:53But if a point comes forward in the next couple of years, we'd be doing outsourcing is that

2:20:01Through the mayor to council downer there are other

2:20:06Other businesses within the city who provide that service so

2:20:10We and looking at where we've come so far and what we're projecting going forward

2:20:15That's not something that as a city we would need to provide it. Okay

2:20:20Thanks, busiatil then alt please

2:20:23Thank you. And through the mayor. I have a clarification just about the um transit pilot projects

2:20:31Just a clarification first and the budget binder page two

2:20:34It says it ends at 4 p.m. And page 19 says 5 p.m. Just uh, which one it is and then I have a follow-up

2:20:42Through the mayor to council puse until the original direction from mayor guthrie

2:20:46In his strong mayor direction about budget asked us to look at it starting at 4 p.m

2:20:49But the staff recommendation back that was ultimately included in the budget is at 5 p.m

2:20:54Because of wanting to avoid overlap with an impact on on schools

2:20:59And 4 p.m. Was still a bit early and so we did make the recommendation and what was included in

2:21:05In the budget was starting at 5 p.m.

2:21:08Thank you. And I think you answered my second question

2:21:10So this was a strong mayor direction because I don't remember this pilot at council

2:21:15Through the mayor or to council puse until yes, it was included in

2:21:20I believe strong mayor direction. I can't remember the number the budget one

2:21:24Where the direction was given to staff this was included as something that we were to report back on

2:21:30Thank you. And my other question about the affordable bus pass

2:21:32I'll put on the budget board and then I did have a question just about

2:21:37capital as well and I think some other counselors caron and

2:21:41Orark talked about partnerships and sponsorships and when I look at things like playground equipment

2:21:46Whether or not the process around affordability partnerships and so on have included other public entities that are also building

2:21:54playgrounds. I know we have reciprocal agreements for

2:21:59Cutting grass and things like that

2:22:00But if you could other than the structure of the south end, you know in the wellington catholic

2:22:06Just take that in mind because I know there are developments that are capital developments that are happening in that side of the public

2:22:14In in the city as well to to try to bring some some of these projects

2:22:19I guess forward that might be delayed

2:22:23Through the mayor certainly we can take that away and and follow up on that

2:22:29Thank you council. I'm so sorry. No, thank you. And I think that's it. Yeah, there's not put on the board. Okay

2:22:34Thank you councillor Allt

2:22:36Thank you very much mayor guthrie

2:22:38Through you two staff

2:22:41In hearing discussion of the correlation between strategic plan and budget. I'm struggling a bit

2:22:47And the reason for that is it strikes me that

2:22:52In the immediate moment we have reversed the equation

2:22:56And that what we are now doing is we are establishing a budget and then trying to fit some formulation

2:23:02Of a strategic plan into that which strikes me as being

2:23:06Um, the wrong way to go, especially if we consider that the job is community building

2:23:11I even see that in some senses we've we've lost the notion of good better best

2:23:16And really what we are doing at this point in time at least is holding the line on costs rather than assessing

2:23:24What is in the best interests of the community? I was wondering if staff could please comment on that

2:23:31Through the mayor and council are all certainly on the sequencing

2:23:34The strategic plan still is an important part of the budget that's presented to you and was part of the prioritization

2:23:40Criteria of work that was brought forward

2:23:42Admittedly though there are parts of the strategic plan that will need to slow and could potentially extend into a future year strategic plan

2:23:49Should that be the direction of council?

2:23:51um

2:23:52It was mentioned earlier some work about master plans and uh and ceo baker certainly talked about the work that we intend to do

2:23:59related to master plans, but I can let you know that our team is also looking at the sequencing

2:24:04Of the strategic plan the multi-year budget and all of those master plans right now to bring forward

2:24:10A longer term much much longer term plan that does sort of put the cart and the horse in the right order going forward

2:24:16So that is some work that's underway obviously with multi-year strategic plan

2:24:21Master plans

2:24:22It's going to take us many years to re-sequence things that we think are out of order

2:24:26But that is work that is underway and future state. We really hope to get to

2:24:31So will we need to be reviewing?

2:24:34What are the priorities in our current strategic plan as a consequence of of this budget and budgets going forward?

2:24:43um, so I'm going to jump in and just say uh to councillor all that no

2:24:46We're not planning on on going back and and revisiting the strategic plan

2:24:51But what we do annually is update our performance reporting and the kpis towards what we're reaching for

2:24:58I did want to also just acknowledge that we always said that the budget is setting the pace for how quickly

2:25:04We'd be able to reach the strategic plan goals and that vision and I think that's what you're seeing here

2:25:10Is that that being demonstrated quite clearly that um that we we are it's a cycle, right?

2:25:18It's the strat plan and informing the budget and kind of that performance reporting cycle that we're

2:25:24We're starting to see as we mature in that space

2:25:27So I actually think it's it's really good that we're starting to see that these interplay and as we grow

2:25:33um

2:25:34And the last thing I just wanted to say is um just in respect to the change that we're seeing

2:25:38I think we have to acknowledge that the last five years we had co vid

2:25:43We had a lot of change. We have new official plan targets

2:25:47We've done so much work in the master planning space. So we have to understand what we need in our services

2:25:53Putting that all into the budget over the last year and now getting to a place here where we can

2:25:57We have an affordable and achievable place to start from we can continue to have conversations

2:26:03But I feel like we reached the end of like a lot of work over many years to get us to today's

2:26:09conversation and so um

2:26:11So I just wanted to say that that in recognition of yes, there has been change

2:26:15But they're you know economically and in our environment. There's been a lot of change that we've we've been responding to

2:26:22Um, and I think that now, you know, we've got a really good place. It's funded and and that will help us have future conversations

2:26:30A bit of a tough question to just follow up on that. Uh, I I appreciate and respect that comment

2:26:35I think we're still in some senses

2:26:38Putting much of the strategic plan on hold, but and this relates to that

2:26:42Has staff factored in any potential for more surprises from the provincial government like the

2:26:49Development charges modifications that we've seen over the last two years and going into next year

2:26:57Sorry, I didn't hear the answer

2:27:00Uh through the mayor, uh, we have not factored in any potential changes to

2:27:07To development charges into the plan at this time

2:27:10But like like uh, cao baker did say earlier

2:27:13What we have done is we've reserved debt capacity to support growth

2:27:19If development charges leg collections to support that program of work

2:27:24Thank you, and that actually raises another question when I when I looked at the the 10 year

2:27:29Reserves that you had mentioned. I think it was 240 million dollars

2:27:33That comes to the equivalent of about 10 percent of our operating budget per year

2:27:38Will that be affected by what you've just stated?

2:27:42Will we be seeing a draw on that that will then increase our our lost

2:27:49The the money taken from those those reserves

2:27:56Through the mayor. I'm sorry counselor out. Could you repeat that question? Yeah, um, you had mentioned earlier get to my notes

2:28:03That um

2:28:06Just can you have a second

2:28:13Or the contingency reserves

2:28:15That there was 240 million dollars less for tax supported budget over 10 years

2:28:20Is there the possibility that we are going to see even more than 240 million over next 10 years as a consequence of

2:28:27The things that we haven't planned for that are that are huge coming from say the provincial government

2:28:34Thank you through the mayor. So that 240 million dollar

2:28:38Reduction in funding is into the tax supported reserves is

2:28:43directly the results of the assumptions that we have built into the capital plan or to the sorry the operating budget

2:28:50budget for increases in capital funding and so that is what that

2:28:55240 million was referring to and so

2:28:59There is a possibility that we would want to reduce it less than that over time

2:29:04And so that's part of that sustainability analysis that we will bring back to council in the future

2:29:10Thank you very much. Thank you. That's uh, that's it for questions. And so thank you

2:29:18I don't

2:29:19Really think I want to do like comments now. I mean, this is more like a workshop. It's a presentation. We've

2:29:25We know we can go to the budget board and such like that. So

2:29:28um, I think what we'll do is we'll uh,

2:29:31We'll kind of cut it off here

2:29:33um

2:29:35In the agenda coming up. We do have

2:29:38Uh, a moment to move in camera

2:29:41Uh, as well

2:29:43Um, but what we'll do now is we'll take um a break that's kind of been planned anyways

2:29:50um

2:29:51And I do though want to just kind of

2:29:54Look around the room to my colleagues and on the screen

2:29:57Uh, we have a lot of like a lot of general managers that are here

2:30:02um

2:30:03And I just don't

2:30:05My personal opinion is that a lot of them might not even need to be here at all for the in-camera discussions that might be able to be

2:30:13um, accomplished with sort of the main executive and general manager team that's been

2:30:18Interacting with us to date

2:30:20So

2:30:21Can I just get a temperature of my colleagues to say that it's probably okay for us to let

2:30:26Let our our friends and staff go and they don't need to wait around for the break

2:30:30Wait around for the entirety of the closed meeting and then come back out and then there's like there's nothing for them

2:30:35Anyways, uh, because we're going to adjourn after the closed meeting anyways. So is it okay if maybe I

2:30:41I thank you. I'm seeing lots of heads not I'll leave it to maybe um the executive team and others to maybe direct

2:30:48Uh, some of the staff that might need to stay or they can be dismissed. Uh, so they're they're not sitting around

2:30:54I think that's helpful for that for them

2:30:57Thank you for being here though. And what I'll do is I'll take a break right now to the clerk. What how long do you think?

2:31:04A half an hour, okay. All right. Um, and so what we'll do is we'll come back here

2:31:11We'll come back here at 12

2:31:1315 just to move the motion to go in camera than at that time. Okay

2:31:17Sorry, just before I do that though. Councillor Gibson. I saw your hand. Thank you through mr. Really quick just a question of process

2:31:24You said we're going to go into closed, but then we're going to adjourn the meeting

2:31:27Are we going to have commentary on the budget?

2:31:30Because this was commentary or this was questions, correct? So are you going to give us a chance to uh speak our mind on the budget?

2:31:37Well, yeah, we're just receiving information as a presentation. Do you have like a high level comment about?

2:31:43That's why I deferred my comments

2:31:46Okay, uh, okay, I'll allow it. I bet I I also don't want to have like 13 of us do it either

2:31:52You know, I mean it's open everyone if you start it gets open to everybody, but um, but so go go ahead and then I will take

2:31:58I can wait if you want to do it later. It's fine. No, no, we're not going to do it later

2:32:02So this is your this is your moment. Go ahead. Okay. Thanks. I'll keep it brief

2:32:05Uh, I I asked a few of my questions and got some of the comments. I wanted back anyway, but um, I just wanted to reiterate

2:32:12That's comment that I've made for years. Um

2:32:16We have spent the last hundred plus years building the infrastructure of our city

2:32:21um

2:32:21and getting it to the point where it is

2:32:24And asking the current generation of homeowner and business owner in the city to pay for the replacement costs

2:32:29Of all of that infrastructure in one generation in one 10 15 year envelope. I've always held it as

2:32:35Is an impossibility. It's just unsustainable. It's unaffordable. I just wanted to acknowledge

2:32:41the work the staff have done

2:32:43I know that at times I've taken my lashes during budget because I pushed back on the infrastructure level and the speed at which we're pushing it

2:32:50But last year we slowed it down from 10 years

2:32:52I believe to 15 years and then this year it looks like we are

2:32:55Stretching that out to 2046 as well. So we're telling our residents

2:33:00That we're going from 2017 to 2046 and we're looking to build that affordability and sustainable funding over that period of time now

2:33:07I'm much more comfortable where we are 10 years almost seven years into the infrastructure

2:33:13Sustainable funding than I was at the beginning. So thank you to staff and I do appreciate that it's been at times a

2:33:20Push and pull on this file, but I do like where the budget has set us now to 2046 on the sustainable path

2:33:27I think that's really important

2:33:29For the obviously the homeowner business owners that are footing the bill in this generation

2:33:35To make that to make that affordability happen

2:33:38Um, thank you for the realistic. I liked some of the commentary that I heard from staff

2:33:43You use the term

2:33:45The 10 year capital forecast is built on conservative

2:33:49Year over year increases. I'm going to insert the word affordable year over year increases in there because that's the politician in me

2:33:55And uh, lastly, it's fully funded and realistic was the comments that I heard from staff say today

2:34:01And I do appreciate that tone. I think the community will appreciate that tone as well because it is realistic. There are there are less

2:34:08um

2:34:09promises being made on what could be and then with the asterisks of

2:34:13By the way, we don't have the money to do it. I think that this is uh, although

2:34:16It's not going to be easy for some people in the public to not see their project in the next 10 years

2:34:21I think it's also an honest moment for us to say but this is realistic

2:34:25And I think that that's something that I look forward to conversing with the public on. I appreciate it. Thank you

2:34:31Thank you

2:34:33Okay, I will take the thank you. I'll take the break then

2:34:36Um, and back here, uh, I'm going to push it to uh, uh 12 20

2:34:40Um

2:34:42Executive team and others can enter mix with staff to let them go if they uh, if they need to then thank and thank you for

2:34:48Those that have been here and when we come back here, all we'll do is we'll go in camera and then when we come back out

2:34:54I'll do the summary and then we'll adjourn. Okay, so, uh, thank you so much for for sticking with us

3:07:05Okay, I'll call the meeting back to order especially for those online. Just to let you know, we're going to kick back up

3:07:10Uh, and so, um, just before we go into closed, um, is there any disclosure of pecuniary interest or any general nature thereof for any of the closed

3:07:23items

3:07:25Hearing and seeing none

3:07:28And so we're looking to move into closed

3:07:32under the title mayors draft 20 25 budget update section two three nine

3:07:372d of the municipal act regarding labor relations or employee negotiations

3:07:44And I just need a mover for that, please uh, alton galler will do that for us

3:07:50Is there any questions on that?

3:07:52No, I'll call the vote is anybody against

3:07:55No, okay, so for those watching online or here in the room, uh, we will go into closed and when we're done

3:08:01We'll come back out and I'll do the summary as usual before we adjourn. Thank you

3:47:27Okay, everyone. I'd like to just call the meeting back to order

3:47:31And uh as uh

3:47:35As we just did just maybe half an hour ago. We went into closed session

3:47:39And and council received information, but no direction

3:47:43Was given at all

3:47:45So we were just receiving information. Thank you

3:47:48Um on that and I do just need actually before her tournament. I forgot we just have to refer

3:47:55All of the information to the 27th. So I need someone to move the motion for

3:48:01I'm sorry

3:48:04Through you mr. Mayor and I'm sorry for the interruption

3:48:06It's not a referral the motions that appear on the agenda today are noted. They will appear that way on the 27th

3:48:11There's no need to refer. Yeah

3:48:13Sorry, I

3:48:15I meant referring as we are sending this all of these to the 27th. Yes

3:48:21Correct. Am I saying the wrong thing through you Mr. Mayor? That's correct, but there's no motion required

3:48:25Those motions as printed here will appear on the 27th. There's no motion required. Oh, okay. So I can just do a german

3:48:31Okay, sounds good. Sounds good. All right. Um

3:48:35Then I would like to ask someone to move a german, please

3:48:38Uh goller and katyn

3:48:41And does anyone against that?

3:48:44Nobody. Okay. Thank you so much everyone. Take care. Bye. Bye