Heritage Advisory Committee
January 15, 2026 · 14,206 words of debate
The whole meeting, as text
Transcribed automatically from the City’s recording. Times run from the start of the recording, which begins before the meeting is called to order.
Read the full transcript (14,206 words)
0:03Next slide. So here's the problem opportunity statement developed for this EA study, which
0:11is as follows. The purpose of this class EA study is to identify a solution from a
0:16Quellons Bridge that allows for safe use by pedestrians and non-motorized transportation
0:21and that minimizes environmental, cultural and social impacts while maintaining the
0:26bridge's cultural heritage value in accordance with Bylaw 2004-17357 to the extent possible.
0:35The study also strives to implement the city's official plan by seeking to achieve no negative
0:41impacts to the natural heritage system and to cultural and archaeological resources.
0:49Next slide. Okay, so we have five main categories of criteria that are being used to evaluate
0:56alternative solutions for MacCollons Bridge. These are natural environment, cultural heritage,
1:02social environment, financial and technical. I'm not going to read through all of the criteria
1:08within those five categories, but I did want to highlight that the cultural heritage category
1:13includes impacts to cultural heritage landscapes, impacts to built heritage resources and heritage
1:20value of the bridge and impacts on archaeological resources.
1:25All right, next slide. And this slide is really where I'm going to do most of my talking.
1:34This table provides an overview of the six alternative solutions being considered for
1:38MacCollons Bridge and how they performed in the draft heritage impact assessment. Any
1:45alternatives that would not meet modern safety standards, design standards, durability requirements
1:52were not considered for inclusion. I'm going to walk through these one by one to give you a brief
1:58summary of what each would involve. And I'm really eager to hear this committee's advice and opinion
2:05on each of these six alternatives. The order that the alternatives appear on this slide does not
2:12infer any ranking or prioritization. The numbering is really arbitrary. The lifespan
2:19in column two is the estimated number of years that the solution would be expected to be functional
2:24and in service before any significant repair, rehabilitation or replacement would be required.
2:32Okay, so alternative one, let's start there. It's the do nothing scenario, which we always
2:37include in an EA study as a default option. Under this scenario, the existing bridge would
2:42continue to age in place, would eventually deteriorate to the point of collapse. This alternative
2:48has a lifespan of zero years and is not considered to be a potential preferred alternative.
2:55So we'll move on quickly from that one. Alternative to rehabilitate and strengthen
3:00would preserve the main bridge elements. It would involve reconstructing the bridge elements that
3:04have low concrete cover and upgrading the barriers to meet modern design codes. This could alter the
3:10appearance of some bridge elements, such as the thickness of vertical members or the height of
3:17the railing. This alternative has an estimated lifespan of 30 years and it's regarded as a preferred
3:24alternative in terms of sound heritage conservation practices. Moving on to alternative three,
3:31this encompasses rehabilitating the bridge arches and replacing the deck with a new steel bridge
3:38superstructure within the arches. So the new structure would meet modern design codes,
3:45the arches would no longer support live loads and would serve a primarily decorative function.
3:53Less heritage attributes of the bridge are retained under this alternative compared to alternative
4:00two. However, it does address the poor condition of the existing bridge while avoiding its complete
4:07demolition. Alternative three is regarded as a preferred alternative in terms of sound heritage
4:14conservation practices and in terms of lifespan, the estimate is mixed here because it has 30 years
4:21for the rehabilitated arches and 75 for the new bridge deck. Okay, we then have alternatives four
4:30and five and they both involve removing the existing bridge and replacing with a new structure.
4:36So both have an estimated lifespan of 75 years. Both of these alternatives result, sorry,
4:46both of these would result in the loss of the bridge and are not preferred alternatives
4:51in terms of sound heritage conservation practices. Alternative four would replace with a
4:56prefabricated steel bridge. The new steel structure could integrate some heritage considerations
5:03through sympathetic design and prefabricated steel. Although the architectural reveals that I
5:09identified in the heritage attributes for the hangars would be difficult to reconstruct in steel.
5:17Alternative five in contrast would replace with a new concrete bolstering arch structure.
5:22The design could integrate some heritage considerations through sympathetic bolstering
5:26design and the use of concrete. All right, and then finally, alternative six would involve
5:33removing the bridge and widening the adjacent stone road bridge to provide the river crossing for
5:39people walking and cycling. This alternative six has an estimated lifespan of 50 years because
5:47the existing road bridge is around 20 years old already. Alternative six is not considered to be
5:55a potential preferred alternative in the heritage impact assessment because it results in the loss
6:00of the bridge and does not address the heritage impacts. So that's an overview of all six.
6:08Of these six alternatives, our evaluation work to date identifies alternative number two,
6:14rehabilitate and strengthen as being the preliminary preferred alternative for this EA study.
6:22However, it did rank closely to alternatives three, four, five and six in the preliminary
6:30evaluation. So input from heritage wealth and other interest holders is important
6:36to inform the evaluation process. All right, so to conclude my last slide, these are the next
6:44steps for the EA study from Equalance Bridge. We will be continuing to work on evaluating the
6:50alternative solutions and we'll be presenting them for public feedback at our second public
6:54open house. That's going to be on February the fifth and the details of the open house event
7:00are available on the have your say page for this project. We will also publish the engagement
7:06materials on that page for online review and comment. All of the feedback we gathered from
7:12interest holders will be then used to confirm and refine the recommended alternative from
7:17Equalance Bridge and we will document all of that into the project file report and that will go to
7:22city council for review and decision. And then final step is for the project file report to be
7:28published for the 30 day public review. Okay, and then our last slide, questions and feedback.
7:40Thank you so much for your attention. Would we would be pleased to field your questions and
7:46we welcome feedback from the committee on each of the six alternatives being considered.
7:54I had a question. Sure. I think it's, yeah, we can hear it. Is it Donna? I'm sorry, really quick.
8:00Could we maybe take the change the screen so we could see everyone? Is that possible? Does everyone
8:05have access to the slide deck? The committee members, it's really hard to see everyone otherwise.
8:12If we keep the share screen going, I mean, we can, but it's incredibly difficult to see who's
8:17talking when. Don, keep going though. You're welcome to keep talking. You're good. Thank you.
8:24Okay. No, my only question was it says, it may be subtle or maybe
8:34changes to the appearance. I'm just wondering, you know, how subtle or obvious the changes are
8:41because if they're not particularly obvious, if it's just the widening of some things,
8:48or to strengthen it and the appearance of the design, that's one thing. But if it
8:52significantly alters the appearance of the bridge, that's another. And without kind of diagrams to see,
8:59it's hard to have an opinion. Thanks, Don. Yeah, that's a fair comment. We're not at the stage
9:10where we kind of have, like you say, diagrams or drawings to be able to share with you, to give
9:17you a sense of that. I'm assuming you're kind of mainly referring to that alternative to an
9:22alternative three that are forms of rehabilitation of the structure. Yeah, the different, basically
9:29the difference between two and three, because three would be fine if the bridge basically stayed the
9:35same but had, you know, some changes to strengthen it. But if it looks completely different or it
9:42looks garingly different, that's another thing. Yeah, because essentially, alternative three
9:48retains the arches, but also fully replaces the deck. So it would be an aesthetic change, you know,
9:58to the structure. I might just throw it over to Jeremy. If there's anything, Jeremy, you would
10:05kind of want to add to that in terms of contrasting between alternatives two and three and how that
10:12might, how those options, you know, might alter the existing bridge. Sure, thanks, Kate. Sorry,
10:21thanks, Kate. Hi, Jeremy. Hi. For option two, Don, as mentioned, so the vertical stringers,
10:32which I think were identified as number one there, some of them have low concrete cover to the
10:37existing steel. So the intent would be that those vertical elements might get a little bit bigger.
10:44But any of the dimpling in there could be retained when it's built out. We can, you know,
10:50form that up to match, but would get a little bit bigger. The main visual difference you're going to
10:57see in option two is in the configuration of the railings on the bridge deck. The existing
11:06railings have horizontal rails, which don't meet code for climbability as a pedestrian railing.
11:15So we would need to incorporate some sort of vertical spindle type component to those rails.
11:23The intent would be that it would all be fabricated out of concrete. So it would be similar,
11:28but that would be the main visual difference you're going to see on option two. And we've done a
11:34number of heritage type cast-in-place concrete railing systems that incorporate, you know,
11:42beveled edges, dimples, all that sort of stuff to keep it in a similar appearance to the
11:49to the vertical members within the bowstring. The main thing with option three, we would largely
12:00be preserving the arches, the vertical members. Those railings would be preserved, but a new
12:09bridge that's self-supportive would be slid through the bowstring. I think maybe, you know,
12:18the similar bridge that was done in Guelph recently, the name is escaping me. We slid a new bridge
12:25in between the old bridge. Yes, Jack can probably give us the correct names. I apologize, it's not
12:33at the top of my brain right now. Norwich Street is like the one in the document. Yeah, so it would be
12:40similar approach to the Norwich Street pedestrian bridge there, where a new bridge was slid in
12:45between and the existing bridge was maintained. So that's really the difference between option two and
12:50three. So would that remove the steel reinforced concrete or leave it or simply replace it in the
13:02same way? Or option three. Yeah, we would still need to repair some areas of the existing arches.
13:12But then the deck underneath the bridge deck, which, sorry, the bridge deck and the stringers
13:22underneath, which I don't believe are identified as heritage attributes per se, those would be
13:28modified to remove dead weight from the existing bridge just to take some load off of the arches
13:35and to allow us to slide the new bridge through. Well, that it sounds from what I can hear,
13:40it sounds like it would be fine. Yeah, the appearance of the overall bridge would change
13:47because you've now got a new bridge sliding through and it would have some sort of existing
13:52trust system or beams or something. So the visual appearance would be altered because of that.
14:03Okay, well then I'm back to how much will it be altered? Yeah, the bridge itself is not going to
14:11be altered. But just if you stand there and look at the bridge, you're going to see kind of two
14:16bridges overlapped on top of each other similar to what you've got at Norwich. So yeah, I don't
14:24know what the Norwich bridge looks like. So it's hard to read. I meant, yeah.
14:31Justin? Thank you, Madam Chair. So I think, you know, really complex file, of course,
14:40and there's a lot of information here. So I'll try to tackle some questions I have in a sort of
14:45coherent way. Perhaps maybe as a starting point, I know in terms of our distinctions drawn in the
14:55tables between two and three, they both point out that rehabilitation itself, the construction
15:03activities to rehabilitate, could result in damaging the heritage attributes. But it seems to be
15:10unclear whether and how much that might actually happen. So I guess I'm wondering,
15:16from an engineering standpoint, and it may be something that, you know, we're not prepared to
15:21respond to yet, because it actually will take doing the rehabilitation work to discover how
15:25much damage will be caused to the existing structure. But in terms of drawing a distinction
15:31between two and three, is one more likely, the rehabilitation activities of two or three, more
15:37likely to preserve most of the heritage attributes. I know we're talking about the deck versus the
15:44arch, et cetera, but I mean more in respect of the rehabilitation activities that would be required
15:49in either case, and how much they're going to result in either case in the destruction of
15:55attributes inadvertently. Thank you, Justin. I think I will defer to Jeremy if that's okay, Jeremy,
16:06to sort of help answer that question and kind of distinguish between alternatives two and three
16:13in terms of scale of rehabilitation and kind of risk of impacts to the heritage features.
16:22Sure. Thanks, Kate. The scale of rehabilitation for both option two and three is quite significant.
16:34Concrete bowstring arch bridges are what's known as a single load path structure.
16:42So in a typical bridge where you've got, say, four or five
16:48girders that are underneath the bridge, if damage happened to one of them, the bridges
16:52aren't going to collapse. However, with a concrete bowstring arch, significant damage to one of the
16:58arches could potentially cause the bridge to collapse. So from that perspective, doing repairs to
17:08concrete bowstring arch bridges is very sensitive, requires a lot of 3D modeling,
17:17and requires staging, specific staging so that when we're doing the repairs to the bridge,
17:26we're able to preserve the things that we want to preserve without compromising the overall
17:30stability of the bridge. So that's just a little background into saying that
17:38when repairs are completed, we can work to preserve as much as possible. It's just that
17:46it needs to be done kind of piece by piece as we're working our way across the bridge and in a
17:51specific order so that we're not at risk of compromising the rest of the bridge.
17:59And if that specifically answers your question, Justin, or if you were asking more about
18:05preserving specific elements, is that more what you were?
18:08No, that is where I was going with it, Jeremy. I guess I'm just noticing that it sounds like
18:13either way, two or three, ultimately during rehabilitation, it may be discovered that
18:21certain elements of the bridge are not salvageable or cannot be conserved. And even though we may
18:28prefer two or three or City Council may ultimately choose two or three, the actual work may determine
18:35what is viable in terms of conservation as well. But sorry, please.
18:42No, no. Go ahead. The other thing I'll know, maybe I'll pass it, Madam Chair, to David for now.
18:50I think I'm just sort of collecting my thoughts and I probably would be more helpful to pass it along.
18:56Thanks, Justin. David, you're on deck.
19:01Yes, quick question. Have we done, do we have any sense of the financial
19:06costs for going with option two or option three?
19:13In terms of costs, we're still working on refining cost estimates.
19:21But the initial indications, I'm just looking at my notes I have here,
19:26really that options two to six, they're all in the range between one million and around three
19:33million capital costs. So that's our kind of very broad ballpark that we're in.
19:41The lowest capital costs are expected to be for options four, which was the remove and
19:47replace with steel bridge, and options six, remove and widen the adjacent road bridge.
19:56So four and six are at the lower end of the capital cost scale.
20:02And the highest capital cost is currently expected to be alternative five, which was
20:09removed and replaced with a bolstering concrete arch. And then alternatives two and three,
20:15really, they sit kind of somewhere mid-range in between those. So they kind of, they sit between
20:22four and six as being the lowest and five as the highest. So that's the capital cost. But then we
20:32also will have criteria evaluating more of the lifespan and the maintenance and future
20:42repairs and rehabilitation and so on. Thank you.
20:48Justin? Yeah, thank you. I think, you know, maybe more generally, from the standpoint of heritage
20:58conservation at least, one, four, five and six are kind of, you know, not viable, basically. We're
21:06talking about the removal of the bridge and replacement with something else or just letting
21:10it continue to degrade and not conserving any of its features. So I think from the standpoint of
21:16heritage advice, we're looking at two and three. I wonder as well, in respect of the designated
21:23attributes, perhaps this is a better question for staff, but given that there was a similar project
21:30on Norwich and it sounds like it was an alternative three project that presumably heritage staff were
21:39endorsing of where you replace the deck. If the deck is not a heritage attribute and mainly
21:45what we're concerned with is the preservation of the arches from a heritage standpoint,
21:53three maybe most viable, just kind of thinking out loud here, but I'm just curious from the
21:58heritage attribute standpoints, sort of which one of two and three causes the most to be lost
22:06with respect to heritage attributes? Yeah, I'm happy to answer that.
22:11Heritage planning staff, our preferred option is number two because we believe that would
22:18cause the least adverse impact, not only to the heritage attributes identified in the bylaw,
22:25but to the overall appearance of the heritage structure. So that and Kate noted that staff's
22:33preliminary preferred alternative is number two right now. If I could just maybe with a follow-up,
22:42Madam Chair, I just, so the Norwich project, is it correct to say Jack that it was a number three?
22:50Yeah, a new bridge was built atop the Norwich Street bridge.
23:01It's a different structure, but the result is that the historic Norwich Street bridge is
23:10slightly obscured by the new bridge. Okay, that's helpful. Just as a follow-up to that perhaps,
23:21like I think there are a lot of non-heritage considerations here. They're obviously relevant
23:26to this decision Council will ultimately make, but aren't per se relevant right now in the context
23:31of giving advice, right, like the cost of the project, the lifespan that might be achieved from
23:37one project versus the other, though I will say that does have a heritage dynamic and so
23:42far as, you know, option two, it's noted as a lifespan of 30 years, whereas option three has
23:48presumably a longer lifespan because you replace the deck and so in that respect, you have the
23:55bridge for longer and that matters in respect of its sort of historic importance to the community,
24:01setting aside maybe a bit some of the heritage attributes pieces. So I continue to just think
24:06out loud. I hope that's helpful for the group, but I'm also supportive of option two, but I wonder
24:12and respect this lifespan piece, whether or not in sort of the larger scheme of things, if option
24:19three actually achieves more heritage conservation because we keep the bridge for longer, 75 years
24:24versus 30 years. So that's just my thought. Thanks, Justin. Stephen, I saw your hand go up and then
24:32Piper. Thanks, Sarah. Just a quick observation. The option three does propose a new deck,
24:43replacing the deck. I think we should also give considerate, you know, appropriate consideration
24:49to the idea of what would have to be added to the bridge to make the railing compliant with code.
24:56I think what maybe we can all agree on is that with the Norwich Street Bridge,
25:01it's not so much the replacement of the deck that's visually predominant in the bridge today.
25:10It's actually the side rails that were required to be added to the design that in a way kind of
25:19in my opinion, overpower the historic bridge underneath and beside it. So because the arched
25:27bridge is actually quite large, these are really tall arches. It may be that if additional hand rail
25:35has to be added, it may not be as at the end of the day, may not be as secondary as a heritage
25:44attribute secondary to the new construction. That's all. If I may jump in there, Stephen,
25:52it's Jeremy Colberg again. A new bridge that would be placed within the McFillan's bridge structure
26:06would, due to the length, the span of that existing bridge would likely need to be some sort of
26:11of a truss bridge versus the Norwich one, which is more, the girders are underneath and a new deck
26:18was placed. So there's a little bit of differentiation in there. It won't be just the railing that you
26:24would be seeing. It would be kind of a truss sitting within a truss, likely a prefabricated
26:31steel truss that we would kind of be able to slide under because we've got that the top cross
26:38board. We need to stay under that. So it just, it is a bit of a bigger span bridge. So there are a
26:46few more complications versus what's on the Norwich bridge, but similar concept. Thanks for that,
26:58Jeremy. Piper and then David. I was wondering if it's okay if I share like the Google images link
27:06to what the Norwich Street Bridge looks like so we can sort of contextualize like what that actually
27:12the solution looked like there for number three because we're sort of trying to talk about it as
27:16like a comparable project. And I think what people are saying about what staff is saying about it
27:22really overpowering the bridge is very evident from that. Is that something I can do? I'll turn
27:29to Andrew for confirmation. Yes, to chair up after you. It's Andrew from the Clark's office.
27:36Those images can be shared. It's certainly something we could pull up or the member could
27:41pull up if they have it ready to share. But I'd lead up to the member to let me know when we make
27:48it happen. Piper, if you're comfortable sharing, you're welcome to share screen or links to the
27:53Google images, whatever was your preference. And if not, Andrew can pull it up. I'm sure quite
27:57quickly. I did a quick search too. Actually, I could also probably just share it on my screen if
28:01Yeah, I just put the link in the chat. I think that might be easier.
28:05Chair up. I'm just going to pull up through that link now. That's wonderful. Just a minute to get
28:09there. Just thought through you chair up. If someone would let me know if that looks okay on
28:30screen. Yep, we've got it. Thank you. That's the old one. No, we'd like to. That's the new one.
28:52This is just a static picture. I'll share it up. It's a good shot there. Does that
28:57communicate what you're looking for, member? Yeah, I was just going to say with that,
29:02I felt like especially since what was just mentioned about it having to be more reinforced
29:07than this, I feel like it would completely like include the sight line that we're looking at
29:13with the other bridge. Like even this where you're looking at it from the side and you can only
29:18really see the original structure when you're looking adjacent from the bridge. And if the
29:22experience of walking across a bridge is about the structure of the bridge, then anyone using the
29:27bridge like in an active way wouldn't experience the bridge in the same way.
29:45Were there any other comments on anyone want to talk about the Norwich Bridge that was just
29:48shared? I do agree, Piper. I think that was a very valid point and I had brought it up myself as well
29:53in Google when Jack mentioned the bridge itself. If not, David, I know you were patiently waiting
30:01as well, so I'll turn it to you. Okay, thank you. All of the options are really very informative.
30:08Does this help us though? Like when is the city's role under the responsibility
30:14under the Heritage Act with respect to the bridge in terms of repair or maintenance or otherwise?
30:24What are we contemplating central to what the city's role and obligation is under the legislation?
30:32Are we going the right way? Are we going the right track?
30:37I'm happy to respond to that. So under the property standards bylaw, we have an obligation to
30:46maintain the heritage attributes of the bridge identified in the designation bylaw. And so
30:53options, options two and three that would maintain the heritage attributes would align
30:59with property standards and the Ontario Heritage Act.
31:05It's divided then, it's the property standards act and the Heritage Act that the city has to
31:11grapple with in the book of these options. The Heritage Act allows municipalities to add
31:18maintenance of designated structures to property standards, which we did July 2024, I believe.
31:28Okay, all right. Thanks, that was helpful.
31:33Justin. Yeah, thank you. I just dropped off there for a second everyone. So I think I missed a
31:39little bit of the discussion. But while I asked my question, perhaps just as a starting point,
31:45what was shared, the image that was shared, was that the Norwich Bridge? Just to show,
31:50okay, just show what that looked like. Because I think to that point, by the way,
31:54you know, obviously, that doesn't look like a heritage structure, right? So I think at face
32:01value, I think we, it's from the standpoint of heritage conservation, I think it's,
32:08my preference would be to that city council dot two, as opposed to three. But still, on that point,
32:16if I could just ask separately a sort of non heritage question from Kate's presentation,
32:21that I think is just a little bit confusing for me. I'm not personally familiar very much with
32:26the bridge, besides doing some research on its history and reading the agenda materials. But
32:31this, it's connected by trails that the city doesn't maintain, but that the public have access to.
32:37I'm just, but that is sort of my way of asking, what is the intended purpose of the bridge once
32:42it's conserved? It will continue to be used as a pedestrian bridge by the public, but what's the
32:47city's role in maintaining the connected trails, I guess, none. But like, how does that get reconciled
32:53with the investment to conserve the bridge? Thanks, Justin. It's a, there's a really great question,
33:03because it is kind of an unusual scenario in that respect. So this is in some ways kind of an
33:08often asset for the city, right? Because the, the trails that connect to it are not maintained by
33:18the city. And as it stands, the city, it's not part of our trails master plan or other policy to
33:27you know, pursue taking on those trails or adding them to the city trail network. So
33:34as far as we know, the expectation is for that, you know, the status quo to remain,
33:40to remain going forwards. So really the city's responsibilities would be kind of limited to
33:49the bridge itself and not the connections to it. Yeah, that's really where we're at at the moment.
33:59Yeah, if I could just as a follow up, okay, so the city doesn't own the adjacent lands that connect
34:05to the bridge, it's their own by somebody else, but the public getting access to it through what
34:11means just like, like a non for profit on some or it is, it is the bridge itself and I think
34:20land leading to it is part of the overall public right of way, which is quite wide at this location
34:26because of, you know, it was the original traffic route. And then we had the new road bridge added
34:33and the road realigned. So it is public right of way, but it's not like actively used, maintained
34:41in that respect. And it's the the trails are not like recognized as being designated city trails.
34:49And so there isn't any, there isn't any, you know, maintenance performed by the city to
34:56to make those trails available and are accessible.
34:59Yeah, thank you.
35:01Daniel.
35:01Yeah, sorry, I'm just fiddling with the technology. I do somebody sent me an article from
35:14March 2025. And it and it does appear that there are a lot of groups that do use that. And this is an article from
35:25members of the Guelph Coalition for Active Transportation, Guelph Cycling Club, Guelph Hiking Trail Club,
35:33Guelph Historical Society, Guelph Offroad Bicycling Club, Guelph Outdoor School and the Urban Park
35:41Guelph and Yorkland Screen Hub. So there are quite a few groups that seem to be interested in this
35:47and seem to use it. So it's a well used, well used, you know, bridge. I've walked in that area myself.
36:01Yes, thank you, Don. Definitely, we have, you know, already, we did a first public open house in November
36:07at the beginning of the project. And we, we've certainly already heard lots from the people who
36:13use the bridge and those groups that you mentioned. And so we, you know, expect and hope to hear more from them
36:19at the second public open house too, so that we can keep getting input from all the folks who value the bridge and use that.
36:28Justin? Yeah, thank you. I want to ask another non-heritage question actually. And I just, it's,
36:39it's because I'm sort of trying to reconcile this a little bit. Lots of different groups value the
36:44bridge for different reasons. Maybe it's historical importance or it's heritage significance or because
36:50it's connected some trails. And that's great for the community because they use them. But
36:56what I'm struggling with a bit is, so the city doesn't have plans to integrate those trails into
37:02its network and operate them, at least not at this time, is contemplating subject to council's
37:08decision and investment to rehabilitate or replace the bridge that connects those trails.
37:15So I'm just wondering in terms of the bridge's future purpose, how does, how does that get squared?
37:22Like what if the network needs investment in order to be viable itself? And now we have a bridge
37:31that investment was put into to conserve, but actually won't be used by anyone
37:38because of the trail network piece. So I may be another non-heritage thing, Kate.
37:46Yes, thank you. I mean, yeah, you've captured it really well, that kind of conundrum
37:53of the situation. At the moment, obviously, we undertake this work based on the city's existing
38:00policies in terms of trail network and active transportation. It's something, obviously, that
38:10we will gather feedback on through the study. We could choose to make recommendations about that
38:18as part of the study report. We haven't formulated anything around that at this stage.
38:25And obviously, it'd be something I would think, I would expect that council would be,
38:30like you are, just in like, that they would be thinking through and considering too. And
38:34they're making a decision about this bridge, but thinking also about the connectivity to it and
38:41its future use. So it's an important consideration. I don't really have like a great answer for you
38:47right now, but I appreciate that you're thinking those steps through. You articulated it really
38:56well. Thanks. Jack, did you want to add something to that point before I go to Don?
39:05Yeah, just real quickly. I just wanted to add that because council has decided to designate
39:12this bridge. Staff interpret that to be direction that it should be maintained. So that's the
39:20perspective that heritage planning staff are bringing to this is not necessarily looking into
39:25trail connectivity, but how best to conserve and identify heritage resource in the city.
39:33Which would align, I guess, to it, I guess our goals of this committee, right Jack?
39:37Although big picture is absolutely a big part of this too.
39:42Justin, do you want to add something back to that comment from Jack, or is it different? I
39:45should go to Don. You should go to Don. I'm prepared to make a motion, but I want to hear Don first.
39:52Sure. Thank you. Well, all I was going to say was that it's not really our role to consider all
39:58of those other factors. It's only our role to make recommendation on the heritage aspects. Is that
40:05correct? Yeah. It's within our purview of our committee, yes. Because how much they spend or
40:11who uses it or what it belongs to is really somebody else's, you know, bailiwick.
40:23Yeah, I just wanted to mention before a motion, I had a question about the railings. Like if it was
40:28option two, but there were, there did need to be modifications to bring it up to code.
40:34Then I'm wondering if you have a plan for what that would necessarily look like to be respectful of
40:39like, obviously that it is a concrete bridge, but wanting to make sure that you can distinguish
40:43the changes made from the original bridge, like would it be a different shape, a different material?
40:47What was the idea for that? Or is there? Hi, maybe I'll jump in really quick too before there's a
40:52response to that comment. We also have the opportunity to make comments as part of this. And so I had
40:57noted just based on the discussion that for the recommendation number two part there, one of
41:02the comments be that vertical spindles, if vertical spindles are to be added to the rails,
41:06they should be fabricated in a manner that matches the bridge construction. But if there's other
41:10things that we want as part of those sort of recommendations with comments, we can add that
41:15to the motion as well. And so if one of those is that there should be some distinguishable
41:19aspect of it that can be added into our motion to just wanted to note that before maybe Kate,
41:23I don't know if you wanted to respond to that or if Jeremy did. I was going to throw it over to Jeremy.
41:29I know that we've talked to Jeremy about that kind of thing. Is that okay Jeremy to kind of
41:35describe a little bit of what that might look like? Yeah, thanks, Kate. As we've been talking
41:41here, I've been scouring through Google Maps trying to find the bridges that we've done in the past
41:45that might have something similar so that I could give you an example. But in terms of what we would
41:53be looking at materials wise, I think we would be proposing that the railing would be concrete
42:00similar to the existing railings. The existing ones being horizontal do need to have vertical
42:07elements added. Obviously still preliminary stages here. But I think that the solution we'd be
42:18proposing would be using concrete, would have similar proportions to the existing vertical
42:24components there and would kind of fill in between the horizontal rails that are there. So
42:32trying to preserve the overall aesthetic of it, not putting in a steel railing in front of the
42:39existing concrete would not be the preferred recommendation there. It would be a similar
42:45concrete material, similar appearance. We can put in the architectural features that are identified
42:57within the vertical components. We can kind of mirror those and keep it a similar appearance.
43:06Hi, Amber, did you want to add anything else or respond at all?
43:11No, thank you. I just noticed that someone's in the chat. I'm not sure if people are seeing that.
43:16I'm sorry, Sherry, I'm just going to jump in here. It's Andrew from the clerk's office.
43:20So in situations like this, there's no registered delegates for this meeting. So members of the
43:24public, they're attending, they're watching, but it's sort of like they're maybe calling out
43:28a little bit at a turn. We'd leave it to you, Sherry, to kind of monitor that if it's inappropriate
43:34or appropriate. That's not for me to comment on, but I would note that there are no registered
43:39delegates here. So no one's registered to speak to this item. Okay, we'll continue on then. Thanks
43:44for that note, Andrew. Don, over to you. No, I'm done. Oh, so just the hand was just there from
43:55before, no problem. So I did, I tweaked that one piece a little bit. I'll just read it really quick.
44:02And then Justin, I'll go to you because I think you have a motion. So the way I worded it is if
44:07vertical spindles are to be added to the rails, they should be fabricated in a manner that matches
44:11the bridge construction in material and appearance. I'm happy to change and add and do all those other
44:17things if folks have other comments or if there's other things we want as well, any other comments
44:21we would like to have included in the motion. And Justin, I'll turn it to you now.
44:27Yeah, thank you, Madam Chair. I hope I'm capturing this correctly. My and Andrew, you know,
44:35tweak this as needed to reflect Sarah's comment, but I think I'm gathering from the group. We've
44:41landed on the fact that from the standpoint of heritage conservation, alternative two is preferred
44:47and that the committee recommends City Council adopt alternative two. Sarah made a great
44:53addition to that that I can't quite capture right now in respect to the comment she made. But if
44:59that could be included as part of the motion, I think that would make it more complete. And if
45:05other members perhaps maybe have other things to add. But I think I think we've landed in a place
45:09where we're comfortable recommending alternative two. So why don't I share my screen really quick
45:16so you can see the motion as it's written. Really, really quick. Give me one moment. Sorry,
45:22Chair, I'm Andrew from the clerk's office. I have the motion prepared for you. Perfect.
45:26I'm going to put it on the screen for everyone right now. I know we have a mover here,
45:29and we just need a seconder. I'll give everyone a chance to review the motion on screen that was
45:37moved by Justin. And then if someone is willing to, I see Kate has her hand up. So Kate, did you
45:53want to say something? Sure, I'm not allowed, I'm not sure how to extend, am I allowed to prompt
45:59you. But I am keen as the project manager to document the committee's position on all of the
46:09alternatives presented. So just for you to consider whether you might incorporate that into your
46:16motion. So I'll leave the motion as is right now as moved by Justin, and I'll see if there is a
46:23seconder. Dawn, I see your hand and the little yellow hand are both up. So I'm going to say
46:28Dawn is seconding. And I'm going to keep going with the vote right now. I'll ask if they all are
46:35in favor. And I'm just going to move through really quickly all these teeny tiny little
46:42boxes to make sure I see everyone. I believe I've seen everyone. So I'm going to say that that's
46:51passed. Thank you, folks. And then Stephen, so that's passed, but Stephen, I'll turn to you.
46:57And I see you have your hand up as well. Yes, only to say that the name equivalent has two L's.
47:08Sorry to be picky. No, we like that. Those corrections absolutely. So we'll make sure
47:15that we get two L's into it. All right, well, thanks everyone for that discussion. Piper,
47:22yep, I see your hand is up. Sorry then. So to what Kate was talking about, is it possible for us to
47:29make another motion to protect like option three as a preferred if option two isn't possible?
47:36And then to say that we don't support the other options just so that we're speaking to all of
47:39them? I believe we can if you'd like to move a motion. So maybe give me, Andrew's maybe documenting
47:49something right now. So I don't have to attempt to get this together. Andrew, do you want to write
47:53that out or? Chair up through you. It's Andrew from the Court of Justice. Yes, I will prepare
47:58something insured on screen now that may fit what is being discussed. Just give me a second to share.
48:04Thank you. So they're chair up sorry for the delay.
48:16Not a problem at all. We'll make sure there's two L's in the name for this one. I have done that
48:25chair up through you. Yes, I have. And I would have done as I set up as a preferred second alternative
48:31simply changing the wording there to prefer a second alternative to capture that that preference.
48:36Do we want to add the committee does not support options one, four, five?
48:43So I'm not sure if you heard that chair up through that was Jack. He's noting that we may want to
48:47add that the committee does not prefer the second or the remaining alternatives that these two are
48:53the preferred options. I'm not sure if that is what would like to what the members would like to
48:58capture, but I would look to you. I think that's what Piper was saying. Piper and I see your hand
49:02is up. I don't know where you are on my screen right now, but I think that's what you your
49:06comment was, but you're welcome to correct that. Yeah, no, I would say that we don't support those
49:11options. But also I'm wondering if maybe the wording of that statement could be misconstrued
49:15is that we support alternative three. I feel like that seems a bit too positive for what we've
49:21discussed. So maybe if we could make the wording more clear, I'm not sure how you guys are reading
49:25that about how our absolutely our first preference is that, but if for some reason that isn't an
49:30option, like that's made impossible by some other circumstance, then our opinion would shift to
49:36alternative three. Chair Abbott, through you. I'm just working with Jack over here to try and capture
49:44that. We're just going to. I just wanted to say I agree with Piper. I think it sends
50:02two is preferred, but we don't really care. Three might be all right as well. But I don't think
50:08I think we only prefer to and that's right. We're just finalizing this motion. We'll have
50:15sure not screened just a second. Sharon, thank you for your patience. Committee that is on screen.
50:45I heard it's that capture your motion. Yes. Thank you so much. Perfect. All right. So is there a
50:51seconder for the motion and maybe I'll say if someone was a second, just want to unmute, I can
50:55only see like four people on my screen right now and say you second that would be helpful.
51:00I'm not seeing any hands on screen myself. I'm happy to second. Thank you, Justin. And then
51:12all those in favor, please raise your hands so we can see.
51:19That helps. Okay. Perfect. And then I think I have Kelly on the next screen. Perfect. Excellent.
51:24Thanks, everyone. All right. So that is carried. And we can welcome Liam to come join us again.
51:34Fantastic. Welcome back, Liam. All right, we will move on to item 3.2. And I'll just note
51:47really quickly. We saw quite a bit of the agenda to get through. So if we approach to a clock, the
51:54item 3.4, Jack, the Heritage Advisory designation priorities for 2026 can be deferred to our next
52:00meeting. So just a note that we'll see how timing goes for folks and be as respectful,
52:05sorry, as we can of our two o'clock timing. With that, though, we're going to get into
52:10item 3.2. And I believe Stephen is going to speak to this one.
52:16Thanks, Sarah. I'm going to share my screen just to show the one image that was included within the
52:25report. Just bear with me for a second here. Just let me know when you can see the image on the
52:34screen. It's taking its time. It's up now. Okay, great. And what I propose to do is just read out
52:49several aspects of the report itself. So archaeological research associates,
52:57otherwise known as ARA, they were retained by Infrastructure Ontario to conduct a Heritage
53:04Impact Assessment, which considered the potential impacts from the proposed severance and sale
53:10of a strip of land on the south side of York Road. So ARA's HIA, and I apologize for all the
53:20acronyms, it will be used to support a request to the Minister of Citizenship and Multiculturalism
53:26for consent of the proposed sale of the severed parcel to the city of Guelph. The impact assessment
53:33addresses the possible impacts of the proposed severance and sale, but any future plans regarding
53:40the subject lands are beyond the scope of the HIA. So the rationale for the city's intention to
53:48purchase the subject land is to support the York Road Improvement Project. And this land is required
53:54to ensure that capital project can be completed for servicing capacity improvements to support
54:02growth. So the subject land, as you see on the screen, is that's proposed for severance and sale
54:11is a strip of land that's approximately 10 to 12 meters wide, again, as I said, on the south side
54:17of York Road at the Reformatory, in the Reformatory area, but within the property known as 785 York
54:26Road. And lastly, ARA has recommended that the proposed disposition of the subject lands to the
54:35city of Guelph will not directly or indirectly impact, impair or detract from the heritage
54:42attributes associated with the cultural heritage value or interest of the Ontario Reformatory.
54:49And finally, heritage planning staff support those recommendations made by
54:53our ARA in their report, which essentially is the recommendation that you see
55:01in the staff report. That's all, Chair. Thanks, Stephen. Are there any questions or
55:13comments on this one in between the screen? Just making sure. I don't see anyone raising hands
55:28or unmuting. So I will ask then if there is someone that would like to move the recommended
55:34motion. I can do so. Thank you, Liam. And Piper, I'll take you as a seconder if that's okay.
55:42Perfect. All those in favour? Excellent. I think that's everyone. Perfect. Thanks, everyone.
55:54And we will continue on to item 3.3, which is the Ward Heritage Conservation District Plan
56:00and Guideline Consultation Number One. Guelph-Reca is unavailable today, but her colleague Annie
56:07Villiu is presenting instead. And Annie, is there a fantastic welcome, Annie? Thank you.
56:17We're going to be sharing a slide deck. My colleague Meredith Duert is also going to be
56:24presenting part of some of the slides, as well as Jack is going to give a little intro. So if
56:29Meredith, I think, I'm not sure if Meredith is sharing. Yeah. Okay. Thank you, Annie. So
56:39since Council affirmed the boundary of the ward in June of last year, we've begun development of
56:47the planning guideline for the district. And so we're still early on in that process. So we're
56:54coming to the committee to solicit your feedback on how conservation should work within the district.
57:02So Annie and Meredith are going to make a presentation today. And then we're very keen
57:07to capture your feedback to help us as we move forward on developing the planning guideline.
57:13Over to you, Annie. Okay. Thank you very much. Yes, Rebecca sends her regrets in terms of this
57:22project. I am the engagement lead, so I'm very familiar with this project. So I'm excited to be
57:27here with you. So what we're doing, the city is completing a Heritage Conservation District Plan
57:33to develop policies and guidelines for a district in the western area of the ward.
57:39An HCD, or Heritage Conservation District, is a planning tool that recognizes the significant
57:45heritage character of an area and puts policies in place to guide how change happens over time.
57:51Change can be minor in nature, such as standard maintenance, to more major changes like demolition
57:57or infill buildings or adding to existing buildings. An HCD is enabled under part five
58:05of the Ontario Heritage Act and allows council to designate a defined area. All properties within
58:11that area are then protected under a bylaw and the designation is registered on title.
58:20We are now in the planned phase of the HCD designation process. To reach this point,
58:25we completed a study phase, some of you might remember, which was conducted from March 2024
58:30to June 2025. The study sought to research, analyze and assess a predetermined study area for
58:37eligibility as an HCD. The study process determined that the area does meet criteria for designation
58:44as an HCD and a recommended boundary was determined. Consultation and public engagement were key
58:50components to reaching these findings, which we'll briefly review. Two open houses were held over the
59:01course of the study phase. The public were invited to attend and participate in information
59:06gathering activities as well as a walking tour. The events also provided the opportunity for attendees
59:12to ask questions about the study and the designation process with the city and the consultant team.
59:18In addition, public notices about the study and related public events were mailed to those living
59:22within the study area boundary and surrounding area. Further, the city's website and social media
59:28advertised the study and posted an online survey for participants to provide feedback.
59:36We also held a series of small group meetings, similar to the meeting we're having right now,
59:41with targeted groups that would provide focused feedback on community interests.
59:49Miss Isaka's of the Credit First Nation and Six Nations of the Grand River were consulted,
59:53with a focus on area histories and receiving feedback on the study area boundary,
59:58particularly along the speed in the Aramosa rivers. Through these various engagement events,
1:00:05we received a lot of feedback on how the area is valued and understood by those living,
1:00:10working and visiting the neighborhood. We heard that participants liked the objectives that
1:00:16included conserving the unique nature of the ward and its irregular block configuration.
1:00:21Participants wanted to see a larger area included in the district boundary,
1:00:25and participants thought the naming of the study area, Ward West, as it was called during the study
1:00:31phase, was confusing and did not align with local understanding of naming of the place.
1:00:36Based on this feedback, a recommended study area boundary was developed that extended the
1:00:44initial boundary to include representative and historically important streets like Moors Street
1:00:49and Mal Street, which were frequently mentioned in engagement events. Further, the cultural heritage
1:00:55values and heritage attributes were refined to include specific significant places identified
1:01:00by participants and through area research. The planned phase has named the area under assessment
1:01:05the Ward Heritage Conservation District. On the slide, you'll see the change to the study area
1:01:14that came out of the study phase. The dashed orange line represents the original study area.
1:01:19The solid line shows the study area recommended to move forward to the planned phase,
1:01:23which has been expanded to the north and east to include several key streets that are important
1:01:28to understanding the historical and cultural development of the neighborhood. On June 10th,
1:01:362025, Council endorsed the study recommendations and directed the study to proceed with an HCD plan.
1:01:43Following this directive, the plan phase began on July 1st, 2025. Okay, so now that we covered
1:01:51how we got here, let's discuss what can be achieved with an HCD designation. So in short,
1:01:56the HCD plan will, one, describe the cultural heritage values of this area of the ward,
1:02:01two, define objectives that will describe a vision for change in the district,
1:02:05provide policies and guidelines for different categories of properties,
1:02:09and provide direction for what changes require a heritage permit. An HCD plan is comprised of five
1:02:18components, which all serve to provide guidance and direction on how the district protects its
1:02:23valued attributes and manages change over time. These parts are a statement of significance,
1:02:31objectives, a heritage permit system, policies, and guidelines. So right now we're focused on
1:02:40developing the statement of significance, which describes what is valued about the district,
1:02:44and the objectives, which describes vision for change. Similar to the study phase, we will also
1:02:52be conducting various engagement events and activities. These engagement pieces will inform
1:02:58the five components of the HCD plan. These are divided into three phases shown on the slide.
1:03:04We are currently in phase one of the engagement plan. So in addition to this meeting today,
1:03:12and one with a working group coming up, the project webpage and have your say online surveys
1:03:17now live for the public to participate in. I will now pass it over to Meredith, who will provide a
1:03:22summary of the thematic overview for the HCD. Hi all, thank you for having us today. Just a
1:03:33sound check. Okay, so the purpose of the statement of significance or district significance is to
1:03:40help property owners counsel the Heritage Advisory Committee yourselves, and municipal staff make
1:03:45informed decisions about proposed alterations to the district. So they support the development of
1:03:52policies and guidelines within the HCD plan, ensuring that the direction provided in the plan
1:03:57protects the features and characteristics of the district that are most valued. In order to develop
1:04:02a statement of district significance, we must have an understanding of what themes are important
1:04:07to that district. So I'm jumping around between windows and it doesn't do that. So during the
1:04:17research and analysis performed during the study phase, four themes emerged that we found to define
1:04:23and describe the district. And these are shaping, adapting, making, and celebrating. The shaping
1:04:32theme relates to the district's landscape. Formed by the speed and airamosa rivers and the
1:04:37driveland to the north, the landscape creates a sense of enclosure for the area and provided an
1:04:41important meeting place for indigenous peoples long before settlers arrived. The lowline lands
1:04:46formed a floodplain that limited development in the 1800s, allowing for large industrial
1:04:52operations to be built in the neighborhood when rail infrastructure was later introduced.
1:04:56The irregular blocks and lots of the district respond to the curve of the rivers and the railway.
1:05:09The district has long been associated with entrepreneurship and industry,
1:05:12containing large-scale factories as well as local shops and businesses, often operating out of homes.
1:05:18The simplicity and utilitarian design of the building to the district reflect this history
1:05:23and the families and communities that settled here, many of whom were newcomers and immigrants.
1:05:27They were everyday people that worked, shopped, and lived in these places.
1:05:34The buildings in the district have been modified and adapted over time, changing to meet the
1:05:39evolving needs of the communities that live and work in the neighborhood. Homes have been turned
1:05:43into storefronts, industrial buildings into homes, and other physical and functional adaptations
1:05:49that show a pattern of reinvention that defines the district. Community gathering and celebration
1:05:57are reoccurring themes in the district, with the rhythms and rituals of daily life being played
1:06:02out through local events, installations, and various spaces within the neighborhood.
1:06:10One of the defining characteristics and historical patterns within the ward
1:06:16have been the many small businesses that have operated through street-level storefronts
1:06:20and out-of-people's homes. Carrying forward research conducted during the study phase,
1:06:24small businesses have been identified within the district boundary. These businesses may be in
1:06:29operation today or were historically located within the existing buildings within the district.
1:06:35On the slide, you can see the buildings that we have identified that either currently or at
1:06:39one point contained some of these small businesses. We also learned through the study phase the
1:06:47importance of cultural and community spaces and the value of gathering within the community.
1:06:53In order to devise policy and guidelines that would protect and allow these spaces to thrive,
1:06:59we have identified those places which are active within the community today.
1:07:02So again, on the screen you'll see the various places and spaces we've identified.
1:07:08Now I will hand things back over to Annie. Thanks, Meredith.
1:07:14Okay, so the objectives within an HCD plan are to conserve the district's heritage attributes and
1:07:19manage future change in order to ensure the district's cultural heritage value is maintained
1:07:24long-term. The objectives developed are specific to the district and relate to the built heritage
1:07:30resources, landscapes, streetscapes, and archaeological resources within the boundary.
1:07:35To determine the objectives for an HCD plan, we must consider what are the valued attributes of
1:07:40the district and what are the visions and goals for that area and how it should develop over time.
1:07:49Okay, so using what we know coming out of the study phase, we have drafted a series of goals
1:07:53and visions that we understand are important to the community for the district. These include,
1:07:59one, maintain, celebrate, and conserve the districts you need cultural heritage values
1:08:04in a way that supports ongoing growth, evolution, and dynamism in the ward.
1:08:09Two, promote change in the district in a way that supports its authenticity and evolving quality.
1:08:17And three, encourage and incentivize the ongoing adaptation of existing buildings so that this
1:08:23area can accommodate growth and change while ensuring its historical layers remain recognizable.
1:08:29So the next few slides has a list of goals and visions, so I can read along, but I think it's
1:08:35important to read through them together. Four, implement a conservation approach that embraces
1:08:40visible layering in contrast of existing and new development rather than freezing the area in a
1:08:46single time period. Reinforce the district's unique patchwork quality and its irregular
1:08:52street layout and cheek by jowl lauding pattern. Ensure that additions, alterations, and new
1:08:58development in the district enhance its cultural heritage values while supporting planned density
1:09:03targets and the recommended building heights in the downtown secondary plan. Seven, celebrate the
1:09:11district's worker-oriented history and its industrial legacy, including the water and rail-based industries.
1:09:17Eight, identify opportunities for documenting the area's oral history and further interpreting
1:09:23and commemorating its valued qualities. Nine, identify and support community and cultural spaces
1:09:30that contribute to the social and cultural fabric of the district. Ten, encourage new development
1:09:36that is pedestrian focused. And eleven, reinforce the relationship between district, between the
1:09:42district and the speed and aeromosa rivers, rail lines, and drumlin landscape, all of which
1:09:47contribute to its identity as a distinct place. So now that you've heard all of this, we'd like
1:09:55to have a bit of a workshop. So a key goal in our meeting today is to hear from you on the material
1:10:00we have presented and to get your feedback on both the themes and the goals and visions that we have
1:10:05developed for the HCD plan. As we switch now into the workshop portion of the meeting, we will revisit
1:10:11the themes, then goals and vision to discuss whether where we've got things right and where we could
1:10:17make changes. So we'll be using the mirror board to do this, but first I'll just go through some of
1:10:26these. The first question, so we'll start with the themes as Meredith presented, shaping, making,
1:10:34adapting, and celebrating. So the themes outlined here tell the story of the Ward Heritage Conservation
1:10:39District. This district can be defined by a layering of these themes that repeat and resurface over
1:10:44time, creating a quality to the area that is at one time historical, of another time at extremely
1:10:52contemporary and fluid. Mixing of past and present and the creation of something new all together
1:10:57makes the district a distinct place. So what we'd like to hear from you at first is did we get this
1:11:04right? What does this area of the Ward mean to you? So I will open it up to comments if that's okay.
1:11:16You're all welcome. If anyone has any comments or thoughts, you're welcome just to unmute. Again,
1:11:19it's hard to see folks, so I appreciate keeping this part of the portion of the presentation on the
1:11:24screen. But Piper, you're welcome to jump in. I've never lived in this area, so I'm not going to
1:11:32speak to it beyond this, but I did have one question. You were talking about Indigenous
1:11:37histories and use of the land there. So I wonder about the term celebrating and how we're using
1:11:43that versus commemorating. So I think if we're talking about celebrating, that gets into a question
1:11:50of sort of glorifying colonialism in a way. And I know that's not the intention at all. Of course,
1:11:56people's industry, and there's certainly a lot to celebrate there in small businesses and still
1:12:00today. But I think the politics of that language might get a little lost. That is a very great
1:12:08comment. And as part of this, the planned stage, we will be engaging again with
1:12:16Six Nations and Mississaugas of the Credit First Nations. So we'll be able to get their
1:12:21input directly on these themes. So this is something we can definitely raise and see
1:12:26how, what their thoughts are behind that. So thank you for raising that.
1:12:36Was there any specific feedback from Mississaugas of the Credit and Six Nations?
1:12:40So right now as of, so we, the city and the consultant team, engaged with those nations
1:12:49during the study phase in terms of where we are right now in terms of these specific themes that
1:12:55have been developed as part of the plan. We have not yet gone to speak to them right at this moment.
1:13:11If there's no more additional comments, we can move forward. I will let the chair
1:13:16take my direction on that. I was just going to say, someone who has lived in the ward,
1:13:20I like the eclectic nature of this. I think it really does resonate with the,
1:13:24just the uniqueness of the ward for sure. And it's a very cool place. So
1:13:28that's a personal bias for sure. But I do like this, someone who has that connection.
1:13:34That's something we've heard a lot. Okay. But just to say that's something we heard a lot over
1:13:39and over during the study phase engagement and keep the word weird is what we kept hearing.
1:13:45So it's great. Kelly has put her hand up. So I'll let Kelly jump in there before we move on.
1:13:51Hi. Thanks. I like this, the way that you've really kind of combined the
1:13:58duality of it, that it's, it is really historic, but it was almost in some ways ahead of its time.
1:14:03And I think we look at things like mixed use today. And it's interesting that that was just
1:14:10how it always was in the ward. And now so many different neighborhoods are trying to figure
1:14:14out how can we bring in, you know, other non residential dwellings and stuff like that.
1:14:20So I really appreciate that that was emphasized here. And I think it's very accurate for sure.
1:14:27Great. Thank you. Okay. If there's a last call for this, this question, if not,
1:14:39we can move on to the next one. Okay. All right. So we're going to go back to this question of
1:14:50small businesses. So we'll quickly refresh on two maps that we showed earlier. First, this is the
1:14:56map showing small businesses with examples shown in the images beneath. So I know there's a lot
1:15:02here, but for example, there's 132 Alice Street, which was historically known as
1:15:09Meredith, you're going to have to help me with the
1:15:11The L'Oreal Tays, I think. Thank you.
1:15:14Grocery to you. And these coffee bar 132 Alice was historically known as this no white laundry.
1:15:22And 161 Neve Street was historically known as this Neve Street grocery store. Okay, so that's one
1:15:29map. We're going to show these two maps. And then we're going to flip over to Miro. So Miro board
1:15:33so that we can add some of your comments. And secondly, this is the map of cultural and community
1:15:40spaces again with examples shown beneath such as 176 Alice Street, also known as the Palace on Alice.
1:15:48131 Ontario Street, which is the
1:15:51Hitler Public School apologies if I just pronounce that 60 Ontario Street standing room only and
1:15:57double rainbow cafe. So Meredith is going to switch screens to our mirror board.
1:16:04That will help us capture some of your comments. So we'll just switch screens and then
1:16:12we'll provide some facility, a bit of a discussion.
1:16:20So we're going to in terms, I guess we're going to start with the community hubs.
1:16:25So of the community hubs that are on the map that have been identified.
1:16:31Are there any other important community hubs or cultural spaces that you would also add?
1:16:37If so, we'd ask that you please share the name of the place, the address or approximate location
1:16:42and a brief explanation about what makes that place significant to the ward. And just to mention
1:16:47that the questions we're asking today of you is mirrors what we have are asking as part of the
1:16:53have your say survey. So everybody is welcome to if they haven't already go to the have your say page
1:17:00and fill out that survey as well. But we wanted to also ask of the Heritage Committee if they
1:17:07had any important community hubs or cultural spaces that they would like to add. So I'll open
1:17:13it up to see if anybody has anything to share. And maybe sorry to jump in here, but perhaps it's
1:17:27easier to collectively think about this cultural and community spaces map as well as the small
1:17:32businesses. So true all at the same time of the area we can we can yeah collectively discuss
1:17:39both ideas. Yeah. Good idea, Mary. So what I'm going to prompt you with some questions about the
1:17:47the historical businesses. So if you have again if you have any information about any of the spaces
1:17:52on the map, we're interested to hear about why these spaces in particular have
1:18:01invite community gathering, interested to hear about history of these spaces, how they might
1:18:06have changed over time. So both those types of questions for both the community spaces and the
1:18:13the historic businesses were really interested in knowing if we missed anything. And what else
1:18:18can you share with us? And again, as I said, if you think of something later on that oh I should
1:18:32have mentioned, please go and fill out the have your say survey. That would be a good good way to
1:18:40do this. Yeah, again, I haven't lived here, so I don't have any information to share with you.
1:18:56But I was wondering if maybe again speaking to like the earlier point that we discussed if that
1:19:00would be a good way to bring in, of course, if this is something that with consultation they
1:19:04wanted to bring in indigenous respect is if you recognize like cultural spaces here that are
1:19:09significant to the community. So inquiring about previous land use and maybe recognizing that in
1:19:13the plan somehow. Yeah, that's a great great idea Piper. Thank you for bringing that up. We'll
1:19:20make sure to put that in in terms of conversations going on with ongoing with the nations. Okay,
1:19:44I don't know if we want a few more minutes or if we want to move forward we can also go back
1:19:50if as we go through if anything if anyone has any
1:19:53feedback. I'll leave the chair to let us direct how we want to go forward if this is
1:20:03Yeah, I think you're welcome to with on the only one that I was reflecting on
1:20:07was on North or Street South like the the Sleiman distillery that's there. I feel like it's become
1:20:11a bit of a hub in some ways because they host a lot of community events and fundraising opportunities
1:20:16there and it's in a historic building I believe a heritage building and Sleiman has a huge history
1:20:22in Guelph so it's the only other one I was really reflecting on was how that
1:20:27commercial space has become a hub of a lot of community action. Great, so historical building
1:20:34but recent community hub is what I'm hearing. Great. I think as well and this is just another
1:20:41personal reflection in many of the new developments and like sort of the old factories that have been
1:20:48turned into condominiums as an example or apartment buildings there's been a I mean they all have
1:20:54their own community hubs but something like the metal works the the walkway along the water there
1:20:58I think has also become a little bit of a hub because it is publicly accessible space that was I
1:21:03believe redone by private development so I think there's some of those interesting pieces to that
1:21:07against each that very eclectic nature maybe of the the ward where it isn't a private space it is
1:21:12very much a public area to continue to walk and enjoy. Those are two great additions but you're
1:21:22welcome to move on. Okay maybe one last call to see if anyone has anything to add and again we can
1:21:32come back and you're again I'm gonna keep pushing the the survey so there's always that option.
1:21:40Okay so the next exercise that we'd like to get your feedback on is this list of goals and vision
1:21:54so we've outlined a number of them they're all there on the screen if you can see them
1:22:01and what we'd like to ask is which goals visions resonate most with you
1:22:07and additionally are there any goals or visions that you would like to add
1:22:10that you think we should consider as part of this district plan in terms of how best to
1:22:18identify and how best to to to really capture the protection of what is significant and important
1:22:24in this area so you can either do number one number two you know open up the floor to whatever
1:22:31you'd like to share on both these questions I know there's a lot so we'll give you a few minutes to
1:22:45reabsorb. Don you're welcome. I was just going to ask in addition to the things that you've mentioned
1:22:56there are actually quite a few early heritage buildings in there some important stone ones
1:23:03and that sort of thing I assume they're being included in all of this as well. Yeah all the
1:23:11buildings within the HCD boundary are being included they're all included within the HCD
1:23:18which would include both the oldest up to the newest so yes. Right okay great.
1:23:26And just to jump in there as well there is still the possibility of having an individual property
1:23:30designation within a heritage conservation district so if there are some of those really old
1:23:37early stone buildings that do warrant individual designation that is still a possibility even
1:23:41though it's still within the HCD boundary so there could be specific protections put in place for
1:23:50that particular type if needed. But would they need them if they were in a heritage conservation
1:23:57district wouldn't they be automatically protected? They shouldn't yeah so they would still be covered
1:24:03by all of the policies and guidelines that are are a part of the the HCD but it just can be something
1:24:11that a municipality might pursue. I was going to say I resonate and like the the celebrating the
1:24:25district's worker oriented history especially since you were talking about a lot of the area being a
1:24:31mix of commercial and residential housing and buildings so I think if we're focusing that
1:24:37relationship between the structures it's nice to put a human at the center of it I think it's
1:24:40a it's a good one. I also really like the adaptation I was going to say I really like the adaptation
1:24:57pieces about like keeping the existing buildings adapt them change their use and do it in a way
1:25:02that is sympathetic I think to the the history of the neighborhood and it feels like it comes across
1:25:07in a couple of the the goals and visions so I like that that's that it recognizes change can happen
1:25:12and will and should happen but I like that the focus is still on maintaining the roots of the
1:25:17community and and those buildings for what they were but recognizing that we can adapt.
1:25:24Great yes I think one of the the the key goals here is to really capture make it clear that
1:25:29we know change is going to happen we want change to happen it's expected and this is the the core
1:25:34history of this area is change so how can that happen in a way that still celebrates and identifies
1:25:41and protects those what's significant so yeah okay is there any anyone else that wants to share
1:25:58either one that resonates more or less with you we have a I think one more workshop question to
1:26:06get through before we have our closing slides but there's we still have time so okay if that's
1:26:21okay we can move on to the next question then so this one's fun so imagine someone's walking
1:26:29through the ward heritage conservation district in 2050 so what are some of the characteristics or
1:26:34the feel of the place that you hope that they encounter at that time gotta be creative using
1:26:44your imagination what would be a great thing to have. Hyper and then Kelly I really like that you
1:26:52used the word patchwork in one of the goals I think that's a good one so this was also brought up
1:26:57like not making making sure it doesn't feel frozen in one specific time period that it's
1:27:01honoring the sort of evolution of the neighborhood so of course there are going to be new constructions
1:27:05and old construction and making sure that feels cohesive I think that's a nice feel. Thank you.
1:27:14Kelly yeah similar I think it's just that sort of really eclectic nature of the ward and people
1:27:24either get it or they don't you know that on any given street you'll see houses of all different
1:27:32shapes and styles and even decades and eras you know it's it's about the least homogenous
1:27:40probably neighborhood and Guelph in all in all honesty so I think just making sure that it just
1:27:46looks really eclectic and you just walk down the street you never know what you're going to see
1:27:50that's what I would hope for. Thank you so much. I'll jump into your next I like that you had walking
1:28:00through the ward heritage district because I think like Alice Street as an example is so incredibly
1:28:04narrow and it reflects like the houses very close to the road there's not a lot of front yards and
1:28:10in some of the streets and so I think maintaining that that it's very walkable hopefully it stays
1:28:15that way I mean we don't see the demolition as an example of Alice Street in favor of
1:28:19wider and bigger and better so I think that that small sort of neighborhood quality I think that
1:28:26the ward has and I think it's because many of those streets are so narrow it just develops this
1:28:30need to drive slow first while people are driving and that it is pedestrian friendly I think it's a
1:28:34very pedestrian oriented neighborhood which I hope that that stays in 2050. Liam I jumped in right
1:28:40when your hand was going up apologize. That was kind of a similar sort of point I would say
1:28:47in 2050 I'd like to see the similar layout of the streets and that irregular and
1:28:53irregular lot layout and street layout I think is really characteristic of the neighborhood.
1:28:59That's great thank you so much anybody else for something to share. Well I think this has been
1:29:21really useful again if you think of something that after the fact please go see the have your say
1:29:29survey and you can these are all the same questions that are on there so looking forward to seeing
1:29:35what people will answer so we'll go to the next slide if nobody else has anything that they'd like
1:29:41to share. So in terms of so thank you for having us today and providing your insights and feedback
1:29:49from here our major next steps include our we're going to have a community workshop to discuss
1:29:55policies and guidelines and the feedback we received here that we'll receive as part of the
1:30:00working group and as part of the public engagements for have your say is all going to be used to
1:30:05inform those policies and guidelines so you'll be able to see you know hear back from what
1:30:11it's going to be a bit of a report back of what we heard. That's in early spring 2026 in late
1:30:17spring 2026 will be the statutory public meeting for the plan just before the council
1:30:25of the council sorry their final council meeting will be in summer 2026 and if council decides to
1:30:31proceed with designation a by-law will be prepared for the award heritage conservation
1:30:36conservation district and that's it for us today thank you so much for having us it was a pleasure
1:30:43to present this information for you and thank you for your feedback. I don't know if Jack has any
1:30:50final comments or yeah I'll just note I put a recommended motion in the agenda in case there's
1:30:58anything that the committee explicitly wanted recorded after this item but the project team
1:31:05is going to take everything that was just said and use that to inform next steps so feel no
1:31:12obligation to pass a motion I just put that there as a placeholder in case there is something specific
1:31:17that the committee wanted recorded in the minutes. So with that note from Jack I did take three notes
1:31:24really quickly too which came from paper about indigenous histories and impacts so what I'll
1:31:29do is I'll read it out and again we don't have to have it as a motion but as folks were saying things
1:31:33I did make a few notes and so the only the comments that I captured and these may be a little bit
1:31:38butchered so I apologize for that was that consideration of the meaning behind the term
1:31:42celebrating as part of a theme related to indigenous peoples understanding previous land
1:31:47uses by indigenous peoples and where those community spaces or hubs may have existed
1:31:53and that the plan maintained the eclectic development and land use pattern
1:31:57continuing to recognize industrial working neighborhood freaks of the ward. I don't know
1:32:02if any of those need to be an official motion from anyone so if no one chooses to move that
1:32:08I think it's so nicely and expertly written that we should adopt this emotion I feel like we
1:32:20Sarah would you mind putting that in the chat so that Andrew can capture it and I may have slightly
1:32:26wordsmithed it a little bit because as I was reading I recognized that some of my grammar was in
1:32:30100% so some of that was a live change but Andrew I'll let you correct some of the grammar as it
1:32:36comes up. Excellent chair chair up and I am prepared to receive those I've got some of it but
1:32:44that the body in the chat may be held thank you chair but I will do I will add this to the
1:32:57motion template that we have here and I'll actually share this on screen when it's prepared so that
1:33:02everyone can take a look and and consider the wording just bear with me as I finalize here.
1:33:08Oh good don't worry. And just bring that up on screen now three chair up to the committee
1:33:29should be up on screen shortly. I'll just note for the you can delete that first bullet it's just
1:33:37a repeat of number one that the following comments from the Heritage Advisory Committee that first
1:33:40one doesn't need to be there that was my accident by um oh sorry chair up yes I was okay and then for
1:33:46the third bullet the word land should go before use so it says eclectic development and land use
1:33:51pattern and that was me just ad-libbing live. Piper? Also then this is maybe nitpicky but with
1:34:00the first point being celebrating as part of the theme related to indigenous peoples I think it's
1:34:03celebrating more so related to the theme of colonization because of course we are trying to
1:34:08celebrate indigenous histories but not so well to recognize that there is a colonial effort.
1:34:15So would it be consideration of the meaning behind the colonial term celebrating?
1:34:21And I was thinking more so like celebrating as part of the theme related to colonization.
1:34:27Perfect. Stephen? I wonder if the word celebrating might be within quotation marks just so it's
1:34:40clear it's just that one term. I love the team effort on this one thanks everyone.
1:34:56So if um someone would like to move that motion. Piper thank you and a seconder again I don't have
1:35:04many folks on my screen so if someone wants to Kelly thank you and then all those in favor
1:35:11I believe we are good thanks everyone and and Annie and team thank you for the presentation
1:35:18today and the workshop and if we can reshare that link with everyone in case there is other
1:35:22feedback I think that would be great. Thank you very much. All right I think in our our last
1:35:3111 minutes Jack we may be able to get into our almost final agenda item which is the Heritage
1:35:36Advisory Committee's 2026 designation priorities so I'll turn it to you Jack. I'm going to actually
1:35:43recommend. We deferred. Sure. I think the discussion might take longer and this will also give members
1:35:52an opportunity if uh since December if you've noted any other properties in town that you'd like
1:35:58considered you can send those to me and then I can include them in the item in the February meeting.
1:36:06Sure. Do we need official motion to defer that or are we good just to say that given
1:36:10time constraints we're going to defer it to February? Sheriff through you I would I would
1:36:15recommend a deferral motion to just go to the the February meeting of heritage
1:36:20at the Heritage Advisory Committee. Okay would someone like to move then the motion to defer
1:36:25item 3.4. Thank you Justin a seconder. Thank you Liam and then I'll in favor.
1:36:33All right so we'll move on then to chair announcements I have none so I'll turn it over
1:36:37to staff. Stephen's hand went up immediately so he's got something for us. Yes I do thanks Sarah.
1:36:46I'm just going to what I'd like to announce is that council will be considering the final draft
1:36:51of the Ontario Reformatory Heritage Conservation District Plan at the council planning meeting
1:36:57on Tuesday February the 10th so this is a decision point for council regarding the proposed
1:37:04designation of the the Ontario Reformatory HCD and also the potential approval of the ORA HCD plan.
1:37:13So the final draft of the plan and guidelines is being released to the public by the end of this
1:37:19week and will be available on the Have Your Safe project page for the ORA project the HCD project
1:37:26and also on the city's web page for the ORA HCD. Thanks Stephen and Imogen.
1:37:38Very similarly down excuse me the downtown wealth heritage conservation district
1:37:46bylaw and the adoption of plan will be going to council January 20th for decision.
1:37:52So the finish line is in sight the final version of that plan is still available on the project
1:38:00page the Have Your Safe page but has not been altered substantively since the last version
1:38:08this committee received. Thanks Imogen some good things moving forward hopefully to
1:38:15conclusion that's exciting. Jack last but not least any announcements? Nothing from me for once.
1:38:23No worries. All right so our last major piece then is if someone would like to move adjournment of our
1:38:29meeting. Thank you Piper seconder Kelly and all in favour. Fantastic we'll see you all in just a
1:38:39couple weeks then thank you everyone. Thank you. Bye bye. See you soon. Great job Andrew.